Loading...
7039 - Painting of Buildings and Process Tanks at PCWRP, 4.Drawings/ Plans1 16 17 15 18 14 2 4 4 5 6 7 8 13 9 10 20 21 19 11 12TREATMENT PLANT!I PCWRP Process Units for Painting Buildings sqft Lab 6124 Pre Treatment 2048 Flow Split 5040 Primary Digester 11,314 Heat Exchanger 2964 Maintenance 3008 Sludge 3616 Belt Press 7560 DAF Building 4560 Turblex 3496 UV Structure 1780 UV Building 1728 GT Building 1620 North Return Old 1248 Raw 2 Entry 440 Raw 1 2484 Bar Screen Wall 2132 Operations Building 1378 South Return Building 1656 Green Pipe lg 3760 Green Side Pipe 3560 Total sqft 71516