Loading...
6993 - Electric Distribution Pole Inspection and Treatment Services, 1.Pricing SheetExhibit 1 RFP 6993 - Pricing Sheet for Electric Distribution Pole Inspection & Treatment Services The respondent shall complete the following yellow-highlighted sections, which directly correspond to the specifications. The contractor shall not make changes to this format. Required Pricing: ITEM XXX 1 2 3 4 5 6 7 8 MISCELLANEOUS AND OPTIONAL WORK WITH MAY BE REQUIRED BUT IS NOT GUARANTEED. THE PRICE QUOTED WILL BE USED IN EVALUATING THE COST PROPOSALS (ITEMS 009 – 010): 9 10 Proposer may submit alternative pricing for this contract. Submit per point itemized pricing to perform 100% of the requirements of this RFP. This price is all-inclusive and shall include any and all costs including, but not limited to: GPS devices, equipment, mobilization, travel, labor, re-collection of bad data, fees, and any other foreseen or unforeseen expenses incurred by the CONTRACTOR in the execution of this project. The per point cost shall also include performing any required software integration and office data integrity work. ESTIMATED QUANTITY XXXXX 17000 6000 3000 500 1000 1000 3000 1000 17000 17000 UNIT Each Each Each Each Each Each Each Each Each Each Each Note: Respondent's Name: Respondent's Principle Office City/State: DESCRIPTION Labor, equipment, material, and transportation for the above ground visual inspection of power poles. Labor, equipment, material, and transportation for the sounding and boring of wood power poles. Labor, equipment, material, and transportation for the partial excavation of wood power poles. Labor, equipment, material, and transportation for the full excavation of wood power poles. Labor, equipment, material, and transportation for the partial external ground-line treatment of wood power poles. Labor, equipment, material, and transportation for the full external ground-line treatment of wood power poles. Labor, equipment, material, and transportation for the fumigant treatment of wood power poles. Labor, equipment, material, and transportation for the internal void treatment of wood power poles. TOTAL REQUIRED ITEMS (ITEMS 1-8): Labor, equipment, material and delivery of a digital photo for each pole inspected. Labor, equipment, material and delivery of GPS coordinates for each pole inspected. TOTAL MISCELLANEOUS ITEMS (ITEMS 9-10): GRAND TOTAL: (Line items 1 to 10) Pole Type: Wood Aluminum Concrete Fiberglass Steel Concrete Street Light Other Total EMAIL EXCEL PRICING SHEET TO Ebids@cityofdenton.com BY SUBMISSION DEADLINE. UNIT PRICE $XXX.XX Count: 12027 460 601 1249 405 2531 113 17386 EXTENDED COST $XXXXX.XX 0 0 0 0 0 0 0 0 0 0 0 0 0