Loading...
7051 - Supply of Fiber Optic Cable Installation Services, 1.Pricing SheetExhibit 1 -RFP 7051 - Pricing Sheet for Fiber Optic Cable Installation Services The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. Services Proposal Pricing to include all costs including but not limited to labor, supervision and equipment: ITEM 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 ESTIMATED TOTAL ANNUAL COST *NOTE: PLEASE EMAIL THIS EXHIBIT 1 AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM Estimated Annual Quantity 50000 46700 1 1 1 1 1 1 1 1 1 1 1 1 1 33000 33000 33000 33 33 170 170 170 170 170 25000 4 4 1000 1000 170 170 4 7 16 UOM FT FT Per Splice 36 Fibers Per Splice 72 Fibers Per Splice 144 Fibers EA EA Reel Reel Per Splice 72 Fibers Per Splice 144 Fibers EA EA Reel Reel ft ft ft hr hr hr hr hr hr hr ft ft ft ft ft hr hr hr hr hr Type of Service Requested Installation of ADSS fiber optic cable on utility poles as per instructions located in the Appendix section. All manufactures’ requirements for installation of fiber optic cable shall be met. Installation of ADSS fiber optic cable in existing conduit as per instructions located in the Appendix section. All manufactures’ requirements for installation of fiber optic cable shall be met. Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4 Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4 Fiber Splicing ADSS fiber ( DME supplying Enclosure and all supplies, not equipment ) per manufacturers recommendations -Exhibit 4 ADSS Fiber Cable Prep ADSS Enclosure Prep. ADSS 72 Fiber Reel Test and Verification . Documentation of every fiber ADSS 144 Fiber Reel Test and Verification . Documentation of every fiber Fiber Splicing OPGW ( DME supplying Enclosure and all supplies, not equipment)per manufacturers recommendations. Fiber Splicing OPGW ( DME supplying Enclosure and all supplies, not equipment)per manufacturers recommendations. OPGW Fiber Cable Prep OPGW Enclosure Prep. OPGW 72 Fiber Reel Test and Verification . Documentation of every fiber OPGW 144 Fiber Reel Test and Verification . Documentation of every fiber Installation of Pull Tape in existing conduit Rodding existing conduit Installation of Trace wire in existing conduit as DMEs requirements. 1 man crew to perform small maintinance jobs 1 man crew with Bucket to perform small maintinance jobs 2 man crew to perform small maintinance jobs 2 man crew with bucket to perform small maintinance jobs 3 man crew to perform small maintinance jobs 3 man crew with bucket to perform small maintinance jobs 3 man crew with backhoe to perform small maintinance jobs Removal (retire) of old Fiber (ADSS) Trenching 2 inch typical 48 inches Installation of 2" PVC conuit in open trench Trenching 4 inch typical 48 inches Installation of 4" PVC conuit in open trench Pulling Cat5e or Siamese or Multiple Cables thru conduits or buildings Mounting cameras , housing, terminating Cat5e cable Emergency Services (minimum 4 hours) 1 man crew Emergency Services (minimum 4 hours) 2 man crew Emergency Services (minimum 4 hours) 3 man crew Respondent Company Name: Principal Place of Business (City,ST) City of Denton requested completion schedule 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 2 weeks notification of job 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1 Week Notification of work 1HR Response 2HR Response 3HR Response City of Denton Recommended installation time 2000 ft per day/ straight pull 2000 ft per day/ straight pull 72 per day 1hr 2hr 1 day 72F per day 2hr 3hr 1 day Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion 4000 ft per day 200 ft per day / straight run 200 ft per day / straight run Supervisor Discretion Supervisor Discretion Supervisor Discretion Supervisor Discretion Cost of Service Estimated Annual Total Cost 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0