Loading...
6305 Executed Amendment No 1 Rev. 06/10 4055 INTERNATIONAL PLAZA, SUITE 200 | FORT WORTH, TEXAS 76109-4895 | TELEPHONE: 817-735-7300 | METRO: 817-429-1900 | FAX: 817-735-7491 L:\Resources\OLCR\D\Denton\DTN18104\Amd#1 Client: City of Denton – Water Production Division 901B Texas Street Denton, TX 76209 Attn: Mamun Yusuf, P.E. FNI Project No.: DTN18104 Client Contract Ref.: 6305 Date: March 28, 2018 Project Description: Lake Lewisville WTP Improvements Phase II Description of Services Added/Deleted: 1. Design Separate Buildings for HSPS Electrical Switchgear and Administration Facilities. 2. Extend active site boundary east to accommodate new Administration building. 3. Provide related surveying, geotechnical, and structural design services. Deliverables: Compensation shall be adjusted as follows: Additional estimated effort detailed on the attached table. Original Contract $1,529,180 Amended Amount $21,965 Revised Total Contract $1,551,145 Schedule shall be adjusted as follows: Design phase will be extended approximately six weeks, to a total of 11-1/2 months. The above described services shall proceed upon return of this Contract Change Authorization. Services will be billed as they are done. All other provisions, terms, and conditions of the agreement for services which are not expressly amended shall remain in full force and effect. A contract modification will be submitted. This Contract Change Authorization will serve as contract modification. FREESE AND NICHOLS, INC.: CITY OF DENTON, TEXAS: BY: BY: David R. Jackson, P.E., BCEE Print Name Print Name TITLE: Vice President TITLE: DATE: March 28, 2018 DATE: CONTRACT CHANGE AUTHORIZATION FORM Amendment #1 DocuSign Envelope ID: 53899DFA-F226-4DD8-8ADD-3BDC1860FBE2 Mamun Yusuf 8/8/2018 Senior Engineer Cindy Alonzo 8/8/2018 Senior Buyer Freese and Nichols, Inc.Basic ServicesAdd'l ServicesTotal Project21,965 Project Fee Summary1,529,180 1,551,145 City of DentonLake Lewisville Water Treatment Plant Improvements - Phase II28-Feb-18Detailed Cost BreakdownEmployeeDavid Jackson David Sloan Mark Jalbert Jason Matthews Jeff Hensley Kristin Johnson Michael Robertson William Workman Julia Whitcraft Mike Shiflett Micah Hargrave David Payne Brett BristowProject RolePM APM CADD CADD Lead Elec Proj Elec Lead Struct Struct EIT Struct CAD Sr. Geotech Geotech Part Time Res Rep Site Civil-$ -$ -$ -$ Additional Effort Due to Separation of Buildings-$ -$ -$ -$ Additional Survey Area2 810 1,378$ 85$ 7,529$ 8,992$ Additional Foundation/Retaining Wall Design12 24 20 8 1680 12,293$ 680$ -$ 12,973$ -$ -$ -$ -$ -$ -$ -$ -$ - - 2 8 - - 12 24 20 8 16 - - 90 13,671$ 765$ 7,529$ 21,965$ Phase Task ExpensesTech Charge Miles B&W (sheet) Color (sheet)Lg Format - Bond - B&W (sq. ft.)Other Other Other Other Other Tech Charge Other OtherTotal Exp Effort-$ Additional Effort Due to Separation of Buildings-$ Additional Survey Area1085$ Additional Foundation/Retaining Wall Design 80680$ -$ -$ 90 - - - - - - - - - - - - Phase Task SubconsultantsArcadis SpoonerTotal Sub Effort-$ Additional Effort Due to Separation of Buildings-$ Additional Survey Area7,170 7,529$ Additional Foundation/Retaining Wall Design-$ -$ -$ - 7,170 - - - - - - - - - - - -$ 7,529$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$ 7,529$ Additional ServicesTotal Expense EffortTotal Sub EffortTotal EffortTotal HoursTotal Special Services ItemsTotal Special Services Subconsultants EffortTotal Labor EffortTotal Special Services Subconsultants CostTotal Additional Services HoursAnnual Rate Escalation %Phase Task1 of 1\\freese.com\fniinc2\Resources\OLCR\D\Denton\DTN18104 Lake Lewisville WTP-RWPS Ph II\Amd #1\Fee_Spreadsheet_Denton LL WTP Improvements_Amendment No. 1 Backup3/30/2018DocuSign Envelope ID: 53899DFA-F226-4DD8-8ADD-3BDC1860FBE2 Certificate Of Completion Envelope Id: 53899DFAF2264DD88ADD3BDC1860FBE2 Status: Completed Subject: Please DocuSign: DTN18104 Amd #1 Lake Lewisville WTP-RWPS Ph II.PDF Source Envelope: Document Pages: 2 Signatures: 2 Envelope Originator: Certificate Pages: 2 Initials: 0 Cindy Alonzo AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 901B Texas Street Denton, TX 76209 Cynthia.Alonzo@cityofdenton.com IP Address: 129.120.6.150 Record Tracking Status: Original 8/7/2018 3:41:55 PM Holder: Cindy Alonzo Cynthia.Alonzo@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Mamun Yusuf Mamun.Yusuf@cityofdenton.com Senior Engineer Security Level: Email, Account Authentication (None)Signature Adoption: Pre-selected Style Using IP Address: 129.120.6.150 Sent: 8/7/2018 3:44:12 PM Viewed: 8/8/2018 6:38:07 AM Signed: 8/8/2018 6:39:45 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign Cindy Alonzo cynthia.alonzo@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 129.120.6.150 Sent: 8/8/2018 6:39:46 AM Viewed: 8/8/2018 6:53:42 AM Signed: 8/8/2018 6:53:52 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 8/8/2018 6:39:46 AM Certified Delivered Security Checked 8/8/2018 6:53:42 AM Signing Complete Security Checked 8/8/2018 6:53:52 AM Completed Security Checked 8/8/2018 6:53:52 AM Payment Events Status Timestamps