7200 IFB-- ADDENDUM #2Addendum No. 2 File #/IFB# 7200 DTN12314 – North-South Phase II 36-inch/42-inch Water Transmission Main DTN12314 CITY OF DENTON NORTH-SOUTH PHASE II 35-INCH/42-INCH WATER TRANMISSION MAIN ADDENDUM NO. 2 IFB #7200 NOVEMBER 6th, 2019 BID DATE: Thursday, November 21st, 2019, 11:00 a.m. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the plans and specifications and shall become a part of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. QUESTIONS: 1. Are thickness cores available to determine existing HMAC depths for replacement? a. We specified in Addendum 1 the repair of 4” of B base and 2” of C topping for replacement along the full length of the project. 2. No Bid item exists for furnish and install of ductile iron pipe fittings. Can one be provided? a. A bid item for the 12” fittings using tons as the unit of measure for all the required fittings can be provided. 3. Details show 12"-18" of 2 sack cement stabilized subgrade to be installed under existing pavement required to be removed and replaced as part of the work. No bid item exists for 2 sack cement treated subgrade. Can one be provided? a. We would like to leave this subsidiary to the pipe install. Our city standard includes this as part of the final backfill, which is measured by the liner foot of pipe installed. CONTRACT DOCUMENTS: SPECIFICATIONS: A2-1 Bid Proposal Form A. Replace Bid Proposal Form with Attached A2-2 Special Requirements and Bid Item Descriptions A. Add BID ITEM 34 General: Water line fitting for 16-inch and 12-inch water lines. Payment for this item shall be at the contract price per ton PLAN SET: A2-3 Sheet PL-1 A. Replace Note 275 LF Asphalt Pavement Repair with 690 SY Asphalt Pavement Repair A2-4 Sheet PL-2 A. Replace Note 500 LF Asphalt Pavement Repair with 1225 SY Asphalt Pavement Repair A2-5 Sheet PL-3 A. Replace Note 500 LF Asphalt Pavement Repair with 1225 SY Asphalt Pavement Addendum No. 2 File #/IFB# 7200 DTN12314 – North-South Phase II 36-inch/42-inch Water Transmission Main DTN12314 Repair A2-6 Sheet PL-4 A. Replace Note 321 LF Asphalt Pavement Repair with 770 SY Asphalt Pavement Repair B. Replace Note 105 LF Asphalt Pavement Repair with 190 SY Asphalt Pavement Repair A2-7 Sheet PL-5 A. Replace Note 180 LF Asphalt Pavement Repair with 450 SY Asphalt Pavement Repair B. Replace Note 222 LF Asphalt Pavement Repair with 555 SY Asphalt Pavement Repair A2-8 Sheet PL-6 A. Replace Note 530 LF Asphalt Pavement Repair with 1545 SY Asphalt Pavement Repair A2-9 Sheet PL-6 A. Replace Note Thompson Pipe Group with Rangeline as installer of 1 – 16”x 12” Reducer (Welded x MJ) A2-10 Sheet PL-8 and PL-9 A. REISSUE this sheet to adjust existing ground based on field information from Bonnie Brae roundabout construction and the asphalt repair note has been removed. A2-11 Sheet PL-11 A. REISSUE this sheet to adjust ending point to be at station 10+00, based on field Information from Bonnie Brae roundabout construction; as well as minor profile changes 11/06/2019 Addendum No. 2 File #/IFB# 7200 DTN12314 – North-South Phase II 36-inch/42-inch Water Transmission Main DTN12314 END OF ADDENDUM NO. 2 A1-1A2-1 To:From:CONTRACTOR NAME ADDRESS CITY CONTACT PROJ.:North-South Phase 3 - 42" Water Transmission Main PHONE IFB:7200 EMAIL ENG PMO:180006 SECTION 00 42 43 Item No.Spec. Section No. Description of work UOM BID QTY Unit Price Extended Price 1 COD NCTCOG AM ITEM 203.3 Mobilization LS 1 2 COD NCTCOG AM ITEM 203.3 General Site Preparation LS 1 3 13 47 13 Corrosion Protection LS 1 4 COD NCTCOG AM ITEM 201 SWPPP Plan and Implementation LS 1 5 COD NCTCOG AM ITEM 201 Traffic Control Plan and Implemenation LS 1 6 2 Portable Changeable Message Signs DAY 270 7 COD NCTCOG AM ITEM 501.14 6'' C900 DR-14 PVC Water Line LF 21 8 COD NCTCOG AM ITEM 501.14 12'' C900 DR-14 PVC Water Line LF 618 9 COD NCTCOG AM ITEM 503.3 60”x3/4” Thick Steel Casing By Bore LF 237 10 COD NCTCOG AM ITEM 503.3 60''x3/4'' Thick Steel Casing By Open Cut LF 145 11 COD NCTCOG AM 107.19.3 Excavation Protection (Trench Safety)LF 3,988 12 8" Blowoff Valve Assembly EA 1 13 COD NCTCOG AM ITEM 502.3 Fire Hydrant Assembly EA 3 14 Connect to Existing Fire Hydrant Assembly EA 1 15 33 12 16.23 6'' Gate Valve and Box EA 1 16 33 12 16.23 12'' Gate Valve and Box EA 1 17 33 12 16.26 42'' Butterfly Valve Assembly EA 3 18 COD NCTCOG AM ITEM 502.6.3 2'' Type 1 CAV Assembly EA 1 19 COD NCTCOG AM ITEM 502.6.3 4'' Type 2 CAV Assembly EA 2 20 Connect to Existing 16'' Water Line EA 2 21 Connect to Existing 12'' Water Line EA 2 22 Connect to Existing 42'' Water Line EA 2 23 COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (long) EA 2 24 COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (short) EA 3 25 Remove exisitng 16" and 20" Water Line LF 1,475 26 Asphalt Pavement Repair SY 7,200 27 Sidewalk Replacement SY 13 28 Curb and Gutter Replacement LF 1,601 29 Manway Vault EA 2 30 Temporary Asphalt Repair SY 500 31 Asbestos Removal from Property (Each Property)EA 3 30,000.00$ 90,000.00$ 32 Remove Existing Building(s) from Property (Each Property)EA 3 33 COD NCTCOG AM ITEM 501.14 16'' DIP Special Class 52 LF 20 34 Ductile Iron Fittings TON 4 1A 33 11 13.13 & 09 97 16 42 Inch Water Line (Poly Coated Steel)LF 4,225 1B 33 05 01.05 42 Inch Water Line (Bar-Wrapped)LF 4,225 TOTAL BASE BID PLUS CHOSEN ALTERNATE BID: 5% CONTENGENCY: North-South Phase 3 - 42" Water Transmission Main TOTAL ALT. "A" BID: TOTAL ALT. "B" BID: Alternate B Bid-Bar Wrapped Pipe TOTAL PROJECT BID: CONTRACTOR NAME TOTAL BASE BID: Alternate A Bid- Poly-Coated Steel Pipe City of Denton - Capital Projects 901-B Texas Street Denton, TX 76209 Laura Hermosillo/Purchasing Dept. BIDDERS APPLICATION - UNIT PRICE BID A1-1A2-10 r DRAWN BY: DATE: PROJECT NO.SHEET SHEET OF 100% SUBMITTAL NORTH-SOUTH PHASE III 42-INCH WATER TRANSMISSION MAIN FROM I.H.-35 E TO SCRIPTURE STREET NOTNED PLAN AND PROFILE LINE A - 42" WATER LINE STA 35+00 TO STA 40+00 RGM 11/6/2019 6 33 DTN12314 PL-8 11/06/2019 r r DRAWN BY: DATE: PROJECT NO.SHEET SHEET OF 100% SUBMITTAL NORTH-SOUTH PHASE III 42-INCH WATER TRANSMISSION MAIN FROM I.H.-35 E TO SCRIPTURE STREET NOTNED PLAN AND PROFILE LINE A - 42" WATER LINE STA 40+00 TO END RGM 11/6/2019 7 33 DTN12314 PL-9 11/06/2019 A1-1A2-11 SSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS r r DRAWN BY: DATE: PROJECT NO.SHEET SHEET OF 100% SUBMITTAL NORTH-SOUTH PHASE III 42-INCH WATER TRANSMISSION MAIN FROM I.H.-35 E TO SCRIPTURE STREET NOTNED PLAN AND PROFILE LINE B - 12" WATER LINE STA 5+00 TO END RGM 11/5/2019 16 33 DTN12314 PL-11 11/06/2019