Loading...
7200 IFB-- ADDENDUM #3 - Main DocumentAddendum No. 3 File #/IFB# 7200 DTN12314 – North-South Phase III 42-inch Water Transmission Main DTN12314 CITY OF DENTON NORTH-SOUTH PHASE III 42-INCH WATER TRANMISSION MAIN ADDENDUM NO. 3 IFB #7200 NOVEMBER 11th, 2019 BID DATE: Thursday, November 21st, 2019, 11:00 a.m. The following additions, deletions, modifications, or clarifications shall be made to the appropriate sections of the plans and specifications and shall become a part of the Contract Documents. Bidders shall acknowledge receipt of this Addendum in the space provided on the Bid form. QUESTIONS: NOTE: Any questions from IONWAVE not answered in this addendum will be answered in subsequent addendum. 1. At stations 1+00 and 43+24.93, what type of pipe is existing 42” waterline? a. Pipe at 1+00 is polyurethane coated steel. Pipe at 43+24.93 is bar wrapped pipe. 2. There is only one bedding detail shown in plans while both flexible and semi-rigid pipe are specified. Will a separate bedding detail be provided for semi-rigid pipe? a. For 42” pipe, contractor to follow specification 31 23 33.16 in contract documents. For 12” pipe, contractor to follow City of Denton Standard Details. 3. Plans & specifications call for restrained joints for bar wrap pipe to be welded joints. Are mechanically restrained joints like harness clamps and Snap ring restrained joints acceptable? a. Joints must be welded. Per 33 05 01.05 2.03 E Harnessed joints may be used in lieu of welded joints adjacent to structures, if approved by the Engineer. 4. Plans call for minimum pressure class of 42” pipe to be class 200. Plan sheet DT-8 shows thrust blocks sized for steel & DIP at 200 psi and for Bar Wrap pipe at 150 psi. Specification section 01 45 16.16 specifies a hydrostatic test pressure of 100 psi. Pipe specifications 33 05 01.05 2.03A.2.a and 33 11 13.13 2.03A1.1 both appear to define pressure class as working pressure. Please clarify if working pressure is equal to 200 psi or if it is possible that total transient (Pw + Ps) is equal to 200 pi. a. Pipe shall be Class 200 psi as shown on plans. 5. Would you please clarify if the Butterfly valves are to be 150B,Rubber seated flanged (33 12 16.26 - 2 2.01 A) or Wafer body style between 2 - 250# flanges (2.01 B) ? a. Butterfly valves are to have rubber seats. Butterfly valves are to be 250# flanges. 6. Can a sign-in sheet for the Pre-Bid Construction Meeting on November 7th 2019 be added? a. See attached Pre-Bid Construction Meeting Sign-In Sheet. 7. Can the headings of Addendum 1 and Addendum 2 be updated to “NORTH-SOUTH PHASE III 42- INCH WATER TRANMISSION MAIN” a. See attached Addenda MISCELLANEOUS 1. See attached Pre-Bid Construction Meeting Sign-In Sheet. 2. Addendum 1 and Addendum 2 titles to be updated to “NORTH-SOUTH PHASE III 42-INCH WATER TRANSMISSION” Addendum No. 3 File #/IFB# 7200 DTN12314 – North-South Phase III 42-inch Water Transmission Main DTN12314 CONTRACT DOCUMENTS: SPECIFICATIONS: A3-1 Bid Proposal Form A. Replace Bid Proposal Form with Attached PLAN SET: A3-2 Sheet Cover A. Delete Signature Block Assistant City Engineer Lee Perry P.E. A3-3 Sheet PL-10 A. Replace Note at Station 1+00 Thompson Pipe Group with Rangeline as installed of 1 – 16” x 12” Reducer (Welded x MJ) B. ADD Note: 5. No benching or sloping allowed in roadway A3-4 Sheet DT-2 A. Detail 1 and Detail 2 replace Note “ H.M.A.C to be same thickness as existing pavement (2” Min)” with 2” Surface Course with H.M.A.C Type C and 4” Base Course with H.M.A.C Type B A3-5 Sheet DT-7 A. Rename Sheet Signs and Temporary Driveway Access Details B. ADD Detail 2 Temporary Driveway Access Detail. See attached. END OF ADDENDUM NO. 3 11/11/2019 A3-1 To:From:CONTRACTOR NAME ADDRESS CITY CONTACT PROJ.:North-South Phase 3 - 42" Water Transmission Main PHONE IFB:7200 EMAIL ENG PMO:180006 SECTION 00 42 43 Item No.Spec. Section No. Description of work UOM BID QTY Unit Price Extended Price 1 COD NCTCOG AM ITEM 203.3 Mobilization LS 1 2 COD NCTCOG AM ITEM 203.3 General Site Preparation LS 1 3 13 47 13 Corrosion Protection LS 1 4 COD NCTCOG AM ITEM 201 SWPPP Plan and Implementation LS 1 5 COD NCTCOG AM ITEM 201 Traffic Control Plan and Implemenation LS 1 6 2 Portable Changeable Message Signs DAY 270 7 COD NCTCOG AM ITEM 501.14 6'' C900 DR-14 PVC Water Line LF 21 8 COD NCTCOG AM ITEM 501.14 12'' C900 DR-14 PVC Water Line LF 900 9 COD NCTCOG AM ITEM 503.3 60”x3/4” Thick Steel Casing By Bore LF 237 10 COD NCTCOG AM ITEM 503.3 60''x3/4'' Thick Steel Casing By Open Cut LF 145 11 COD NCTCOG AM 107.19.3 Excavation Protection (Trench Safety)LF 4,929 12 8" Blowoff Valve Assembly EA 1 13 COD NCTCOG AM ITEM 502.3 Fire Hydrant Assembly EA 3 14 Connect to Existing Fire Hydrant Assembly EA 1 15 33 12 16.23 6'' Gate Valve and Box EA 1 16 33 12 16.23 12'' Gate Valve and Box EA 1 17 33 12 16.26 42'' Butterfly Valve Assembly EA 3 18 COD NCTCOG AM ITEM 502.6.3 2'' Type 1 CAV Assembly EA 1 19 COD NCTCOG AM ITEM 502.6.3 4'' Type 2 CAV Assembly EA 2 20 Connect to Existing 16'' Water Line EA 2 21 Connect to Existing 12'' Water Line EA 2 22 Connect to Existing 42'' Water Line EA 2 23 COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (long) EA 2 24 COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (short) EA 3 25 Remove exisitng 16" and 20" Water Line LF 1,475 26 Asphalt Pavement Repair SY 7,200 27 Sidewalk Replacement SY 13 28 Curb and Gutter Replacement LF 1,601 29 Manway Vault EA 2 30 Temporary Asphalt Repair SY 500 31 Asbestos Removal from Property (Each Property)EA 3 30,000.00$ 90,000.00$ 32 Remove Existing Building(s) from Property (Each Property)EA 3 33 COD NCTCOG AM ITEM 501.14 16'' DIP Special Class 52 LF 20 34 Ductile Iron Fittings TON 4 1A 33 11 13.13 & 09 97 16 42 Inch Water Line (Poly Coated Steel)LF 4,225 1B 33 05 01.05 42 Inch Water Line (Bar-Wrapped)LF 4,225 TOTAL BASE BID PLUS CHOSEN ALTERNATE BID: 5% CONTENGENCY: North-South Phase 3 - 42" Water Transmission Main TOTAL BASE BID: Alternate A Bid- Poly-Coated Steel Pipe City of Denton - Capital Projects 901-B Texas Street Denton, TX 76209 Laura Hermosillo/Purchasing Dept. BIDDERS APPLICATION - UNIT PRICE BID TOTAL ALT. "A" BID: TOTAL ALT. "B" BID: Alternate B Bid-Bar Wrapped Pipe TOTAL PROJECT BID: CONTRACTOR NAME A3-5