Loading...
7237 IFB-- 2019 Street Reconstruction - PLANS lhREPORT COVER PAGE Terracon Consultants, Inc. 8901 John W. Carpenter Freeway Dallas, Texas 75247 Registration No. F-3272 P (214) 630 1010 F (214) 630 7070 terracon.com REPORT COVER LETTER TO SIGN REPORT TOPICS ....................................................................................................... I ............................................................................................................. 1 ..................................................... 1 ...................................................................... 2 ....................................................................................... 3 ................................................................................................................ 4 .................................................................................................................. 6 ................................................................................................. 9 REPORT SUMMARY INTRODUCTION INTRODUCTION SITE CONDITIONS AND PROJECT DESCRIPTION GEOTECHNICAL CHARACTERIZATION Subsurface Profile Groundwater Conditions GEOTECHNICAL OVERVIEW EARTHWORK Existing Fill Materials Site Preparation Fill Material Types Fill Compaction Requirements 1 1 PAVEMENTS Pavement Subgrade Preparations Microcracking of Cement Stabilized Subgrade Pavement Design Parameters Pavement Section Thicknesses 1 GENERAL COMMENTS ATTACHMENTS EXPLORATION AND TESTING PROCEDURES Field Exploration 1 Laboratory Testing SITE LOCATION AND EXPLORATION PLANS STUART ROADREDSTONE ROADSTUART ROADBUCKINGHAM DR BRADLEY STREETSTUART ROADMARIETTA STREET BRADLEY STREET STUART ROAD T-1 T-2 T-3 T-4 T-5 •••• •••• EXPLORATION RESULTS SUPPORTING INFORMATION UNIFIED SOIL CLASSIFICATION SYSTEM A B C E F E F C F, G, H F, G, H D E I E I D G, H, I G, H, I K, L, M J K, L, M K, L, M, N K, L, M, O K, L, M K, L, M K, L, M, P K, L, M, Q A B C D E F G H I J K L M N O P Q Level ‘A’ Test Holes Pape Dawson – Street Reconstruction Denton, Texas March 14, 2019 Lamb-Star Engineering, LP 5700 W. Plano Parkway, Suite 1000 Plano, TX 75093 (214) 440-3600 TBPE Registration No. F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:3625 TEST HOLE DATA FORM TH 01 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:E SUE Field Manager:Hendricks Utility Owner DME Field Technicians:BL JK 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:3.5 B Surface Elevation:668.96 C Top of Utility Elevation:665.46 D Utility Material Type:PVC TEST HOLE E Outside Diameter of Utility (Inches):4 F Existing Pavement Thickness (Inches):6 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 01 81045 7143007.39 2387538.07 668.96 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:3625 TEST HOLE DATA FORM TH 02 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:UNK SUE Field Manager:Hendricks Utility Owner UNK Field Technicians:BL JK 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:3.33 B Surface Elevation:659.5 C Top of Utility Elevation:656.17 D Utility Material Type:STL TEST HOLE E Outside Diameter of Utility (Inches):UNK F Existing Pavement Thickness (Inches):6 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 02 81046 7142979.89 2389295.10 659.50 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:3625 TEST HOLE DATA FORM TH 04 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner ATT Field Technicians:BL JP 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/26/2019 Weather:SUNNY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:5.05 B Surface Elevation:693.96 C Top of Utility Elevation:688.91 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):UNK F Existing Pavement Thickness (Inches):- - SHOT POINT NORTHING EASTING SURFACE ELEV 5/8"IR W/ CAP DESCRIPTION NUMBER (Y) (X) (Z) MARKER 04 81054 7130084.99 2380431.37 693.96 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:9991 TEST HOLE DATA FORM TH 06 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner FRONTIER Field Technicians:JP AJ 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:2.92 B Surface Elevation:734.97 C Top of Utility Elevation:732.05 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):1.5 F Existing Pavement Thickness (Inches):5 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 06 81053 7130062.18 2379043.44 734.97 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:9991 TEST HOLE DATA FORM TH 07 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner ATT Field Technicians:JP AJ 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:RAIN Approximate Station: N/A Offset: N/A A Depth to Top of Utility:3.28 B Surface Elevation:736.62 C Top of Utility Elevation:733.34 D Utility Material Type:PVC TEST HOLE E Outside Diameter of Utility (Inches):UNK F Existing Pavement Thickness (Inches):7 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 07 81052 7130114.96 2379011.53 736.62 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:3625 TEST HOLE DATA FORM TH 08 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner VERIZON Field Technicians:BL JK 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:1.76 B Surface Elevation:641.88 C Top of Utility Elevation:640.12 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):1.5 F Existing Pavement Thickness (Inches):12 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 08 81048 7139078.58 2391979.51 641.88 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:9991 TEST HOLE DATA FORM TH 10 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner DENTON FIBER Field Technicians:JK AJ 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:CLOUDY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:3.56 B Surface Elevation:640.2 C Top of Utility Elevation:636.64 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):1.5 F Existing Pavement Thickness (Inches):8 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 10 81047 7139568.64 2389955.09 640.20 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:3625 TEST HOLE DATA FORM TH 11 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner VERIZON Field Technicians:BL JK 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/21/2019 Weather:RAIN Approximate Station: N/A Offset: N/A A Depth to Top of Utility:1.43 B Surface Elevation:640.24 C Top of Utility Elevation:638.81 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):1.5 F Existing Pavement Thickness (Inches):12 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 11 81049 7139119.32 2391998.28 640.24 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:9991 TEST HOLE DATA FORM TH 13 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:FOC SUE Field Manager:Hendricks Utility Owner VERIZON Field Technicians:JP AJ 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:2.04 B Surface Elevation:615.22 C Top of Utility Elevation:613.18 D Utility Material Type:PE TEST HOLE E Outside Diameter of Utility (Inches):1.5 F Existing Pavement Thickness (Inches):8 SHOT POINT NORTHING EASTING SURFACE ELEV PAINT DESCRIPTION NUMBER (Y) (X) (Z) MARKER 13 81050 7140250.34 2394946.87 615.22 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 LSE Project No.:B200505.10 Vacuum Truck No.:9991 TEST HOLE DATA FORM TH 14 PROJECT NAME:2019 - Street Reconstruction TEST HOLE DATA TEST HOLE SECTION (NTS) Utility Type:E SUE Field Manager:Hendricks Utility Owner DME Field Technicians:JP AJ 5700 W. Plano Pkwy, Suite 1000, Plano, TX 75093 Date Completed:02/20/2019 Weather:SUNNY Approximate Station: N/A Offset: N/A A Depth to Top of Utility:3.72 B Surface Elevation:613.27 C Top of Utility Elevation:609.55 D Utility Material Type:PVC TEST HOLE E Outside Diameter of Utility (Inches):2.5 F Existing Pavement Thickness (Inches):- - SHOT POINT NORTHING EASTING SURFACE ELEV 5/8"IR W/ CAP DESCRIPTION NUMBER (Y) (X) (Z) MARKER 14 81051 7140224.26 2395378.68 613.27 Checked By:DWSLSE Project Manager D. Smith Completed By: RFL Lamb-Star Engineering, LP TBPE Firm No.: F-9073 Level ‘A’ Test Holes Pape Dawson-Street Reconstruction Denton, Texas March 20, 2019 Lamb-Star Engineering, LP 5700 W. Plano Parkway, Suite 1000 Plano, TX 75093 (214) 440-3600 TBPE Registration No. F-9073