7237 IFB-- ADDENDUM 4 - Summary2019 Denton Street Reconstruction December 16, 2019 70085-00 70085-00 PAPE-DAWSON ENGINEERS, INC. ADDENDUM NUMBER 4 TO CONTRACT DOCUMENTS & SPECIFICATIONS FOR 2019 DENTON STREET RECONSTRUCTION GENERAL CLARIFICATIONS AND QUESTIONS 1. The stabilization quantities (SY) on Windsor do not equal the paving SYs, but the stabilization and paving quantities are equal on the other streets. Please confirm stabilization quantities on Windsor. If correct can you please explain where the extra paving quantity is supposed to go? a. The stabilization quantities have been revised to match the paving quantities. 2. Can you please provide a structural detail to construct the ramp over the flume on Windsor at Bell, on Sheet 43. The ramp detail on page 81 does not specify how to build that ramp over the flume. In our opinion that ramp should be it's own separate item due to the difference from the other ramps a. A detail has been added for the ramp crossing on Sheet 14. The additional concrete has been added to the flume quantity and the curb ramp quantity has been reduced. 3.02 CHANGES TO THE BID FORM - SECTION 00 4100 A. Remove and replace with enclosed Section 00 4100 B. Reason for change: · Revised Windsor Drive Item 13-14: Increased quantity · Revised Windsor Drive Item 22: Decreased quantity · Revised Windsor Drive Item 27: Increased quantity