Loading...
191106 DDBR Design-Builder RFQ Score Sheet REV 05.00 to TeamThe City of Denton's Development Services Building Renovation Design-Builder RFQ - Attachment One RFQ Evaluation Criteria Updated 06 NOV 2019 Yes No Score (0.0 to 5.0) Total Points A. Qualifications of the Firm 55.0 1. Overview of the Firm & Management Structure 1.0 5.0 5.0 3. Relevant Experience of Construction Contractor: Project Mgr & Superintendent 3.0 5.0 15.0 4. Relevant Experience of Architect or Engineer: Design Lead & Consultants (if any)3.0 5.0 15.0 5. Relevant Experience: Prior Work Together as a Design-Build Team 1.0 5.0 5.0 6. Experience Modifier Rate (EMR < 1.0 is desireable)3.0 5.0 15.0 B. Proven Project Success 30.0 1. Relevance & Success Demonstrated by Municipal Facility & Office Reno Examples 3.0 5.0 15.0 2. Detail, Clarity & Practicality of Project Approach 1.0 5.0 5.0 3. Demonstrated Cost & Schedule Management 2.0 5.0 10.0 D. Firm's Stability 15.0 1. Bonding Capacity 2. Current and Pending Claims 3.0 5.0 15.0 TOTAL SCORE 100.0 Does the Contracting Entity (the "Design Builder) Have Sufficient Bonding Capacity? Pass-Fail Criteria Description Weight Maximum Points Available Note: Candidates must meet both the above criteria to be considered for further evaluation by the City, without exception. Pass/Fail; No Points Available 191106 DDBR Design-Builder RFQ Score Sheet REV 05.00 to Team Page 9 of 10 © 2019 Peak Program Value, LLC All Rights Reserved