Loading...
Exhibit 2 - Bid TabulationItem No.Spec. Section No.Description of Work UOM QTY Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price1COD NCTCOG AM ITEM 203.3 Mobilization LS 1 $70,000.00 $70,000.00 $350,000.00 $350,000.00 $150,000.00 $150,000.00 $50,000.00 $50,000.00 $400,000.00 $400,000.00 $450,000.00 $450,000.00 $100,000.00 $100,000.00 $53,000.00 $53,000.00 2 COD NCTCOG AM ITEM 203.3 General Site Preparation LS 1 $60,000.00 $60,000.00 $140,000.00 $140,000.00 $30,000.00 $30,000.00 $10,000.00 $10,000.00 $210,000.00 $210,000.00 $50,000.00 $50,000.00 $70,000.00 $70,000.00 $108,000.00 $108,000.00 3 13 47 13 Corrosion Protection LS 1 $29,700.00 $29,700.00 $60,000.00 $60,000.00 $65,000.00 $65,000.00 $50,000.00 $50,000.00 $183,000.00 $183,000.00 $15,000.00 $15,000.00 $70,000.00 $70,000.00 $19,000.00 $19,000.004COD NCTCOG AM ITEM 201 SWPPP Plan and Implementation LS 1 $50,000.00 $50,000.00 $25,000.00 $25,000.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 $40,000.00 $40,000.00 $2,500.00 $2,500.00 $25,000.00 $25,000.00 $8,800.00 $8,800.00 5 COD NCTCOG AM ITEM 201 Traffic Control Plan and Implemenation LS 1 $47,500.00 $47,500.00 $50,000.00 $50,000.00 $25,000.00 $25,000.00 $30,000.00 $30,000.00 $32,000.00 $32,000.00 $2,500.00 $2,500.00 $35,000.00 $35,000.00 $74,000.00 $74,000.00 6 2 Portable Changeable Message Signs DAY 270 $151.00 $40,770.00 $100.00 $27,000.00 $35.00 $9,450.00 $100.00 $27,000.00 $127.00 $34,290.00 $150.00 $40,500.00 $50.00 $13,500.00 $228.00 $61,560.00 7 COD NCTCOG AM ITEM 501.14 6'' C900 DR-14 PVC Water Line LF 21 $85.00 $1,785.00 $400.00 $8,400.00 $150.00 $3,150.00 $100.00 $21,000.00 $85.00 $1,785.00 $150.00 $3,150.00 $100.00 $2,100.00 $125.00 $2,625.008COD NCTCOG AM ITEM 501.14 12'' C900 DR-14 PVC Water Line LF 918 $58.00 $53,244.00 $200.00 $183,600.00 $162.00 $148,716.00 $150.00 $137,700.00 $90.00 $82,620.00 $175.00 $160,650.00 $110.00 $100,980.00 $170.00 $156,060.00 9 COD NCTCOG AM ITEM 503.3 60”x3/4” Thick Steel Casing By Bore LF 274 $1,585.61 $434,457.14 $1,900.00 $520,600.00 $1,010.00 $276,740.00 $1,000.00 $274,000.00 $1,640.00 $449,360.00 $1,650.00 $452,100.00 $1,600.00 $438,400.00 $1,400.00 $383,600.00 10 COD NCTCOG AM ITEM 503.3 60''x3/4'' Thick Steel Casing By Open Cut LF 172 $660.61 $113,624.92 $925.00 $159,100.00 $385.00 $66,220.00 $900.00 $154,800.00 $835.00 $143,620.00 $480.00 $82,560.00 $400.00 $68,800.00 $714.00 $122,808.00 11 COD NCTCOG AM 107.19.3 Excavation Protection (Trench Safety)LF 4,910 $6.00 $29,460.00 $1.00 $4,910.00 $0.01 $49.10 $1.00 $4,910.00 $2.00 $9,820.00 $0.01 $49.10 $1.00 $4,910.00 $67.80 $332,898.00 12 8" Blowoff Valve Assembly EA 1 $9,773.00 $9,773.00 $9,000.00 $9,000.00 $7,300.00 $7,300.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 $9,000.00 $9,000.00 $5,000.00 $5,000.00 $16,000.00 $16,000.00 13 COD NCTCOG AM ITEM 502.3 Fire Hydrant Assembly EA 3 $5,543.00 $16,629.00 $7,500.00 $22,500.00 $7,800.00 $23,400.00 $9,000.00 $27,000.00 $6,000.00 $18,000.00 $6,000.00 $18,000.00 $4,000.00 $12,000.00 $15,000.00 $45,000.00 14 Connect to Existing Fire Hydrant Assembly EA 1 $3,591.00 $3,591.00 $2,500.00 $2,500.00 $4,750.00 $4,750.00 $5,000.00 $5,000.00 $3,000.00 $3,000.00 $3,000.00 $3,000.00 $500.00 $500.00 $10,000.00 $10,000.00 15 33 12 16.23 6'' Gate Valve and Box EA 1 $1,267.00 $1,267.00 $1,600.00 $1,600.00 $4,000.00 $4,000.00 $1,000.00 $1,000.00 $2,000.00 $2,000.00 $2,000.00 $2,000.00 $700.00 $700.00 $3,300.00 $3,300.001633 12 16.23 12'' Gate Valve and Box EA 1 $2,828.00 $2,828.00 $3,000.00 $6,000.00 $5,250.00 $5,250.00 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 $2,000.00 $2,000.00 $14,500.00 $14,500.001733 12 16.26 42'' Butterfly Valve Assembly EA 3 $57,296.00 $171,888.00 $55,000.00 $115,000.00 $55,500.00 $166,500.00 $80,000.00 $240,000.00 $83,000.00 $249,000.00 $65,000.00 $195,000.00 $70,000.00 $210,000.00 $103,400.00 $310,200.00 18 COD NCTCOG AM ITEM 502.6.3 2'' Type 1 CAV Assembly EA 1 $6,284.00 $6,284.00 $10,000.00 $10,000.00 $6,500.00 $6,500.00 $15,000.00 $15,000.00 $9,000.00 $9,000.00 $10,000.00 $10,000.00 $4,500.00 $4,500.00 $12,700.00 $12,700.00 19 COD NCTCOG AM ITEM 502.6.3 4'' Type 2 CAV Assembly EA 2 $15,667.00 $31,334.00 $12,000.00 $24,000.00 $12,500.00 $25,000.00 $20,000.00 $40,000.00 $24,000.00 $48,000.00 $12,000.00 $24,000.00 $25,000.00 $50,000.00 $33,700.00 $67,400.0020Connect to Existing 16'' Water Line EA 2 $5,856.00 $11,712.00 $6,500.00 $13,000.00 $6,300.00 $12,600.00 $20,000.00 $40,000.00 $9,000.00 $18,000.00 $2,500.00 $5,000.00 $2,500.00 $5,000.00 $17,000.00 $34,000.0021Connect to Existing 12'' Water Line EA 2 $3,038.50 $6,077.00 $2,500.00 $5,000.00 $5,400.00 $10,800.00 $15,000.00 $30,000.00 $3,000.00 $6,000.00 $2,500.00 $5,000.00 $2,500.00 $5,000.00 $17,000.00 $34,000.00 22 Connect to Existing 42'' Water Line EA 2 $24,200.00 $48,400.00 $10,000.00 $20,000.00 $5,250.00 $10,500.00 $70,000.00 $140,000.00 $20,000.00 $40,000.00 $10,000.00 $20,000.00 $15,000.00 $30,000.00 $41,200.00 $82,400.0023COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (long)EA 2 $3,012.00 $6,024.00 $7,500.00 $15,000.00 $1,500.00 $3,000.00 $2,000.00 $4,000.00 $4,000.00 $8,000.00 $3,000.00 $6,000.00 $2,000.00 $4,000.00 $3,500.00 $7,000.0024COD NCTCOG AM ITEM 502.10.3A Reconnect Water Meter (short)EA 3 $1,897.00 $5,691.00 $7,500.00 $22,500.00 $1,000.00 $3,000.00 $1,000.00 $3,000.00 $3,000.00 $9,000.00 $2,500.00 $7,500.00 $1,500.00 $4,500.00 $3,400.00 $10,200.00 25 Remove exisitng 16" and 20" Water Line LF 1,475 $25.00 $36,875.00 $1.00 $1,475.00 $10.00 $14,750.00 $10.00 $14,750.00 $30.00 $44,250.00 $1.00 $1,475.00 $2.00 $2,950.00 $70.00 $103,250.00 26 Asphalt Pavement Repair SY 7,200 $65.96 $474,912.00 $46.00 $331,200.00 $33.00 $237,600.00 $90.00 $648,000.00 $50.00 $360,000.00 $40.00 $288,000.00 $45.00 $324,000.00 $40.00 $288,000.00 27 Sidewalk Replacement SY 13 $473.85 $6,160.50 $46.00 $2,756.00 $200.00 $2,600.00 $50.00 $650.00 $110.00 $1,430.00 $70.00 $910.00 $200.00 $2,600.00 $37.00 $481.00 28 Curb and Gutter Replacement LF 1,601 $73.63 $117,881.63 $30.00 $48,030.00 $35.00 $56,035.00 $70.00 $112,070.00 $60.00 $96,060.00 $30.00 $48,030.00 $30.00 $48,030.00 $25.00 $40,025.0029Manway Vault EA 2 $22,760.00 $45,520.00 $8,800.00 $17,600.00 $10,500.00 $21,000.00 $9,500.00 $19,000.00 $9,000.00 $18,000.00 $15,000.00 $30,000.00 $25,000.00 $50,000.00 $27,000.00 $54,000.0030Temporary Asphalt Repair SY 500 $70.00 $35,000.00 $23.49 $35.00 $17,500.00 $100.00 $50,000.00 $20.00 $10,000.00 $20.00 $10,000.00 $20.00 $10,000.00 $28.69 $14,345.00 31 Asbestos Removal from Property (Each Property)EA 3 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 $30,000.00 $90,000.00 32 Remove Existing Building(s) from Property (Each Property)EA 3 $25,000.00 $75,000.00 $10,000.00 $30,000.00 $15,000.00 $45,000.00 $20,000.00 $60,000.00 $27,000.00 $81,000.00 $20,000.00 $60,000.00 $15,000.00 $45,000.00 $31,000.00 $93,000.00 33 COD NCTCOG AM ITEM 501.14 16'' DIP Special Class 52 LF 20 $159.00 $3,180.00 $1,000.00 $20,000.00 $200.00 $4,000.00 $1,025.00 $20,500.00 $160.00 $3,200.00 $225.00 $4,500.00 $70.00 $1,400.00 $270.00 $5,400.0034Ductile Iron Fittings TON 4 $8,200.00 $32,800.00 $1.00 $4.00 $1.00 $4.00 $3,000.00 $12,000.00 $3,000.00 $12,000.00 $3,550.00 $14,200.00 $4,600.00 $18,400.00 $1.00 $4.00 35 Material Testing LS 1 $10,000.00 $10,000.00 $50,000.00 $50,000.00 $30,000.00 $30,000.00 $8,000.00 $8,000.00 $68,400.00 $68,400.00 $2,500.00 $2,500.00 $35,000.00 $35,000.00 $37,000.00 $37,000.00 $2,179,367.74 $2,444,625.00 $1,580,414.10 $2,368,380.00 $2,792,835.00 $2,117,124.10 $1,889,270.00 $2,694,556.00 1A 33 11 13.13 & 09 97 16 42 Inch Water Line (Poly Coated Steel)LF 4,225 $385.96 $1,630,681.00 $408.50 $1,725,912.50 No Bid No Bid $500.00 $2,112,500.00 $493.00 $2,082,925.00 $712.00 $3,008,200.00 $788.00 $3,329,300.00 $631.00 $2,665,975.00 $1,630,681.00 $1,725,912.50 $2,112,500.00 $3,008,200.00 $3,329,300.00 1B 33 05 01.05 42 Inch Water Line (Bar-Wrapped)LF 4,225 $0.00 No Bid No Bid $647.00 $2,733,575.00 $460.00 $1,943,500.00 $790.00 $3,337,750.00 $610.00 $2,577,250.00$2,733,575.00 $1,943,500.00 $0.00 $2,577,250.00$5,218,570.00 $260,928.50 $5,271,806.00 $263,590.30 $4,480,880.00 $224,044.00 $4,736,335.00 $236,816.75 $5,125,324.10 $256,266.21 ENG PMO: 180006 TOTAL BASE BID: $3,810,048.74$190,502.44 $4,111,687.50 $208,526.80 $4,704,924.00 $4,973,151.75 $5,381,590.31 $5,479,498.50 $5,535,396.30 TOTAL ALT. "A" BID: $4,000,551.18 $4,379,069.30 $4,450,667.85 $4,313,989.10 $136,678.75 SECTION 00 42 43 Prague, OK SECTION 00 42 43 Carthage, TX SECTION 00 42 43 McKee Utility Contractors, Inc Excel Trenching (Excel Aircraft)Thalle Construction Co., Inc. IFB 7200 - Bid Tabulation for North-South Phase 3 - 42" Water Transmission Main Jacksonville, AR Alvarado, TX Mansfield, TX Midlothian, TX Dallas, TX Hillsborough, NCATKINS BROS. EQUIP. CO., INC.Flow-Line Construction, Inc. SECTION 00 42 43SECTION 00 42 43 SECTION 00 42 43 SECTION 00 42 43 SECTION 00 42 43 TOTAL BASE BID PLUS CHOSEN ALTERNATE BID:TOTAL ALT. "B" BID: 5% CONTENGENCY: Exhibit 2 TOTAL: S&J Construction Co., Inc.S.J. Louis Construction of Texas, Ltd.Mountain Cascade of Texas