Loading...
7103-33 3113 BSD-Site Sanitary Sewerage Gravity Piping-Addendum 317190 / American Legion Senior Center 33 3113 - 1 SITE SANITARY SEWERAGE GRAVITY PIPING SECTION 33 3113 SITE SANITARY SEWERAGE GRAVITY PIPING PART 1 GENERAL 1.01 SECTION INCLUDES A.Private Sanitary sewerage drainage piping, fittings, and accessories. B.Connection of building sanitary drainage system to public sanitary Sewers. C.This section does not include public sanitary sewers, which shall be constructed in accordance with the North Central Texas Council of Governments Standard Specifications for Public Works Construction. Public Works Constructio 1.02 RELATED REQUIREMENTS A.Section 31 2323 - Fill: Bedding and backfilling. 1.03 PRICE AND PAYMENT PROCEDURES A.See Section 01 2200 - Unit Prices, for additional unit price requirements. 1.04 REFERENCE STANDARDS A.ASTM D1785 - Standard Specification for Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120; 2015. B.ASTM D2321 - Standard Practice for Underground Installation of Thermoplastic Pipe for Sewers and Other Gravity-Flow Applications; 2014. C.ASTM D2729 - Standard Specification for Poly(Vinyl Chloride) (PVC) Sewer Pipe and Fittings; 2011. 1.05 SUBMITTALS A.See Section 01 3000 - Administrative Requirements, for submittal procedures. B.Product Data: Provide data indicating pipe, pipe accessories. PART 2 PRODUCTS 2.01 SEWER PIPE MATERIALS A.Provide products that comply with applicable code(s). B.Fittings: Same material as pipe molded or formed to suit pipe size and end design, in required tee, bends, elbows, cleanouts, reducers, traps and other configurations required. 2.02 CLEANOUT MANHOLE A.Lid and Frame: Cast iron construction, hinged lid. PART 3 EXECUTION 3.01 TRENCHING A.Backfill around sides and to top of pipe with cover fill, tamp in place and compact, then complete backfilling. 3.02 INSTALLATION - PIPE A.Verify that trench cut is ready to receive work and excavations, dimensions, and elevations are as indicated on layout drawings. B.Lay pipe to slope gradients noted on layout drawings; with maximum variation from true slope of 1/8 inch in 10 feet. C.Connect to building sanitary sewer outlet and municipal sewer system, through installed sleeves. 3.03 INSTALLATION - CLEANOUTS A.Form bottom of excavation clean and smooth to correct elevation. 17190 / American Legion Senior Center 33 3113 - 2 SITE SANITARY SEWERAGE GRAVITY PIPING B.Form and place cast-in-place concrete base pad, with provision for sanitary sewer pipe end sections. C.Establish elevations and pipe inverts for inlets and outlets as indicated. D.Mount lid and frame level in grout, secured to top cone section to elevation indicated. END OF SECTION 33 3113