Loading...
Exhibit 1 - Agenda Information Sheet - CO 8City of Denton _____________________________________________________________________________________ AGENDA INFORMATION SHEET DEPARTMENT: Procurement & Compliance CFO: Antonio Puente, Jr. DATE: June 23, 2020 SUBJECT Consider adoption of an ordinance of the City of Denton, a Texas home-rule municipal corporation, authorizing the approval of Change Order No. 8 to the contract between the City of Denton and Zachry Construction Corporation, for the Mayhill Roadway Improvements Project; providing for the expenditure of funds therefor; and providing an effective date (IFB 6389 – Change Order No. 8 in the not-to-exceed amount of $1,832,541.66 for a total contract award aggregated to $37,436,131.77). INFORMATION/BACKGROUND Change Order 8 includes costs associated with delay impacts for utility relocations, staff-approved Change Orders addressing following items: Items including: 1) Sanitary Sewer temporary bypass line to SS-03 for constructability; 2) Inlet relocation at Valero Driveway; 3) Added concrete to address low spot near STA 297+50; 4) Soil Retention Blanket; 5) Handicap ramp removal at Morse Street; 6) Additional Signal items at 380; 7) 18” Gate Valves – Landfill; 8) Temporary Driveway over wall 6; 9) Relocation of Barb-Wire fence; 10) MBGF at Cooper Creek Bridge; 11) Milling of 16” Asphalt at Treatment Plant Road, 12) Trucking and seeding unclassified excavation; and final reconciliation of all project overruns and underruns. PRIOR ACTION/REVIEW (Council, Boards, Commissions) On June 27, 2017, City Council approved a contract with Zachry Construction Corporation, in the not-to- exceed amount of $35,877,414.52 (Ordinance 2017-189). To date, there have been seven (7) change orders for a total decrease of $273,824.41 for a modified total contract not-to-exceed amount of $35,603,590.12. Change Order Summary includes: 1. Change Order No. 1 ($13,291.25 increase). Included 1,065 lf. of barb wire and gate to contain cattle. 2. Change Order No. 2 ($18,695.04 increase). Compensated contractor for potholes to locate the existing utilities that have yet to be relocated. 3. Change Order No. 3 ($35,104.04 increase). Compensated the Contractor to remove and relay a storm sewer pipe, install and remove low profile barriers on the south end of the project to help protect a sidewalk near the roadway that school children use, 4,278 cy of excavation requiring a backhoe and truck instead of a scraper due to utility poles on the south end of the project that was not relocated at the time, allowed the contractor to keep working. $35,104.04 increase. 4. Change Order No. 4 (-$667,847.97 decrease). Removed various bid items from the original bid due to a change in the limits of the project and compensated the contractor for various items. City Hall 215 E. McKinney Street Denton, Texas www.cityofdenton.com 5. Change Order No. 5 ($76,184.70 increase.). Included full depth repair of existing Mayhill, at the request of the City, in the area where the newly constructed pavement crosses the existing pavement from the eastern side of the road to the western side of the road. This work was necessary to keep a smooth transition for the motorists. 6. Change Order No. 6 ($137,836.23 increase). Compensated the contractor for various additional items that were not in the original bid plans, and to perform an interim recap of the contract prior to the traffic switch and start of Phase 2 construction. These items included: Additional retaining wall needed on Spencer near the intersection of Mayhill for soil stabilization; low profile barriers at the south end of the project were required to be relocated in relation to 2 DISD bus stops to maintain a buffer from the sidewalk; addition of a concrete mow strip to stabilize the metal beam guard fence at the retaining wall on Spencer Rd; change type of pedestrian bridge rail that is to be used on throughout the project; addition of low profile barrier at the southern traffic switch location for motorist safety; Repair and installation of new barbed wire fence along Spencer Road; pedestrian pole assembly installation and relocation and temporary signal cabinet and relocation at University and Spencer; storm drain modifications for existing drainage related to new development at Madison Lane. 7. Change Order No. 7 ($112,912.30 increase). Compensated the contractor for additional work that is not in the original bid plans. The City is asking the Contractor, Zachry Construction Inc., to add inlets to Mills rd. due to grade issue, add inlets to US380 that were not in the original plans, purchase and install mailboxes on standard installation at the end of the project, and add a temporary sanitary sewer line that was in direct conflict with proposed reinforced concrete pipe. RECOMMENDATION Award Change Order No. 8 with Zachry Construction Corporation, for the Mayhill Roadway Improvements Project, in the not-to-exceed amount of $1,832,541.66, for a total contract award aggregated to $37,436,131.77. PRINCIPAL PLACE OF BUSINESS Zachry Construction Corporation San Antonio, TX ESTIMATED SCHEDULE OF PROJECT Mayhill Roadway Construction Project has been substantially complete, contractor is finalizing Punchlist Items and is expected to be done June 30, 2020. FISCAL INFORMATION These items will be funded from Engineering Account 350283402.1360.40100. Purchase Order #182084 will be revised to add $1,832,541.66. The total budgeted amount for this item is $37,436,131.77. The sum of all eight (8) change orders represents a 5.1% increase over original contract amount. EXHIBITS Exhibit 1: Agenda Information Sheet Exhibit 2: Original Ordinance, Contract, and Change Orders Exhibit 3: Ordinance and Change Order 8 Exhibit 4: Presentation Respectfully submitted: Lori Hewell, 940-349-7100 Purchasing Manager For additional information, contact: Tracy L. Beck at 940-349-8925. Legal point of contact: Mack Reinwand at 940-349-8333.