Exhibit 2 - Power Engineers Task List#Station Project Description Scope of Work Estimated Cost 1 Denton North Addition of a new power transformer in an existing station Provide testing required for commissioning one new switchgear building, one new power transformer, and all 138kV relay and control for new the transformer in the main control building $69,000 2 Masch Branch New substation Perform complete station commissioning and end-to-end testing for two 138kV transmission lines (does not include power factor or transformer testing) $112,000 3 Arco Replace existing standard range CT's with extended range CT's for EPS metering for Transformers 1 and 2 Test six new free-standing CT's, verify wiring (two sets of 3 CT's each) $10,800 4 Denton West Replace carrier communications hardware that is no longer supported by the manufacturer for two 345kV lines and complete end-to-end testing with Oncor (TMPA project; reimbursable) Replace two TC-10B and four TCF-10B units with UPLC's on two line panels; completely test local facilities; complete end-to-end testing with Oncor for the two 345kV transmission lines $28,000 5 Denton West Complete end-to-end testing of the RD Wells and Jim Christal 138kV transmission lines for new panels and new breakers installed in Denton West (TMPA project; reimbursable) Complete remote end testing for the RD Wells and Jim Christal 138kV transmission lines $15,500 6 Fort Worth Commission the revised relay panel for F-440 after the panel has been upgraded by replacing a 311L relay with a 411L (makes F-440 relaying consistent with DME standard protection scheme; supports Denton West panel replacements) Complete F-440 411L relay upgrade with relay testing, wiring confirmation, functional checks, and end-to-end testing on the Denton West 138kV transmission line $10,600 $245,900 #Station Project Description Scope of Work Estimated Cost 7 Fort Worth Perform periodic relay testing that is required by NERC Standard PRC-005 Complete required periodic testing of protective relays and schemes $27,500 8 McKinney Perform periodic relay testing that is required by NERC Standard PRC-005 Complete required periodic testing of protective relays and schemes $50,300 9 Cooper Creek Perform periodic relay testing that is required by NERC Standard PRC-005 Complete required periodic testing of protective relays and schemes $53,000 10 Teasley Perform periodic relay testing that is required by NERC Standard PRC-005 Complete required periodic testing of protective relays and schemes $27,500 O&M and Engineering Support: 11 Arco Reprogram the protective relay system to add transfer trip to Circuit #1 on the Arco to Collin 138kV transmission line and complete end-to-end testing as requested by Oncor Complete required end-to-end testing with Oncor (required to verify functionality and to comply with NERC standards for coordination between neighboring utilities) $8,600 12 Multiple stations Provide assistance and relay testing for adjusting transformer differential relay settings in seven substations to eliminate power flow limitations on multiple transmission lines Assist with changing CT taps and relay settings for transformer differential relaying in Woodrow, Kings Row, McKinney, North Lakes, Pockrus, Industrial, and Cooper Creek substations; verify relay performance; test relays only if required $55,000 13 Multiple stations Provide testing, technical, and field support for urgent, emergency, operational, or other needs that normally cannot be predicted Provide relay testing and/or other technical assistance, consultation, or field support for items such as: reviews and adjustments after system events or protective system misoperations; discovery of protective system problems; relay setting changes; support of adjacent utility requests; protective system component or SCADA RTU replacements or setting changes; reviews after equipment failures; implementation of changes required for system studies, protection philosophy changes, new NERC or ERCOT requirements, or discovery of protective system problems; regulatory audits related to protective systems; compliance related requirements; etc. (Example: Most recent transmission system coordination study identified changes needed in at least 227 relays, some of which will require testing) $137,000 $358,900 $604,800Grand Total CIP Project Commissioning: Exhibit 2 Power Engineers Task List Subtotal for Project Commissioning Operations, Maintenance, and Engineering Support: Periodic NERC Protective Relay System Compliance Testing Planned for the Balance of 2019 and for 2020: Subtotal for O&M and Engineering Support Contingency for Urgent, Emergency, Operational, or other Unforeseen Needs: DRAFT-For Discussion Purposes Only