Exhibit 2 - Pricing Evaluation-Exhibit 2 RFP 7633 - Pricing Evaluation for Underground Electric Installation Line #Description Mfgr QTY UOM Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended 1 2 3 Trench with Trencher 6in wide by 30in deep D1 2000 Ft $1.29 $2,580.00 $4.00 $8,000.00 $4.74 $9,480.00 $4.13 $8,260.00 $6.75 $13,500.00 4 Trench with Trencher 6in wide by 48in deep D2 5000 Ft $1.34 $6,700.00 $7.00 $35,000.00 $5.32 $26,600.00 $4.96 $24,800.00 $6.75 $33,750.00 5 Trench with Trencher 6in wide by 60in deep D3 5000 Ft $1.65 $8,250.00 $10.00 $50,000.00 $7.10 $35,500.00 $6.20 $31,000.00 $8.50 $42,500.00 6 Trench with Backhoe 18in wide 48in deep D4 25000 Ft $2.06 $51,500.00 $12.00 $300,000.00 $6.08 $152,000.00 $5.92 $148,000.00 $6.75 $168,750.00 7 Trench with Backhoe 18in wide 60in deep D5 25000 Ft $2.32 $58,000.00 $15.00 $375,000.00 $7.10 $177,500.00 $7.11 $177,750.00 $8.50 $212,500.00 8 Trench with Backhoe 18in wide 72in deep D6 15000 Ft $2.57 $38,550.00 No Bid $130,350.00 $8.19 $122,850.00 $8.69 $130,350.00 $8.50 $127,500.00 9 Trench with Backhoe 18in wide 84in deep D7 1000 Ft $3.60 $3,600.00 No Bid $10,140.00 $10.14 $10,140.00 $9.08 $9,080.00 $8.50 $8,500.00 10 Trench with Backhoe 18in wide 96in deep D8 1000 Ft $4.22 $4,220.00 No Bid $12,520.00 $12.52 $12,520.00 $10.27 $10,270.00 $8.50 $8,500.00 11 Trench with Backhoe 24in wide 48in deep D9 1000 Ft $4.22 $4,220.00 $16.00 $16,000.00 $8.11 $8,110.00 $6.32 $6,320.00 $8.50 $8,500.00 12 Trench with Backhoe 24in wide 60in deep D10 10000 Ft $4.73 $47,300.00 $18.00 $180,000.00 $9.46 $94,600.00 $7.11 $71,100.00 $8.50 $85,000.00 13 Trench with Backhoe 24in wide 72in deep D11 10000 Ft $5.30 $53,000.00 $20.00 $200,000.00 $10.91 $109,100.00 $7.90 $79,000.00 $8.50 $85,000.00 14 Trench with Backhoe 24in wide 84in deep D12 5000 Ft $6.38 $31,900.00 No Bid $67,550.00 $13.51 $67,550.00 $9.48 $47,400.00 $8.50 $42,500.00 15 Trench with Backhoe 24in wide 96in deep D13 1000 Ft $8.44 $8,440.00 No Bid $16,680.00 $16.68 $16,680.00 $9.87 $9,870.00 $8.50 $8,500.00 16 Trench with Backhoe 36in wide 48in deep D14 1000 Ft $5.30 $5,300.00 $24.00 $24,000.00 $12.16 $12,160.00 $11.06 $11,060.00 $8.50 $8,500.00 17 Trench with Backhoe 36in wide 60in deep D15 1000 Ft $6.33 $6,330.00 $26.00 $26,000.00 $14.19 $14,190.00 $9.87 $9,870.00 $8.50 $8,500.00 18 Trench with Backhoe 36in wide 72in deep D16 1000 Ft $7.41 $7,410.00 $28.00 $28,000.00 $16.36 $16,360.00 $10.27 $10,270.00 $8.50 $8,500.00 19 Trench with Backhoe 36in wide 84in deep D17 1000 Ft $8.44 $8,440.00 No Bid $20,270.00 $20.27 $20,270.00 $10.66 $10,660.00 $8.50 $8,500.00 20 Trench with Backhoe 36in wide 96in deep D18 1000 Ft $10.55 $10,550.00 No Bid $25,030.00 $25.03 $25,030.00 $11.06 $11,060.00 $8.50 $8,500.00 21 Special trencher for trenching in rock, 6in width D19 2000 Ft $6.33 $12,660.00 No Bid $109,820.00 $54.91 $109,820.00 $13.59 $27,180.00 $11.50 $23,000.00 22 Rock Adder, Backhoe 18in Width, Cutting & Jack Hammer D20 1000 Ft $10.29 $10,290.00 No Bid $68,630.00 $68.63 $68,630.00 $7.30 $7,300.00 $11.50 $11,500.00 23 Rock Adder, Backhoe 24in Width, Cutting & Jack Hammer D21 1000 Ft $10.08 $10,080.00 No Bid $78,430.00 $78.43 $78,430.00 $10.12 $10,120.00 $14.25 $14,250.00 24 Rock Adder, Backhoe 36in Width, Cutting & Jack Hammer D22 500 Ft $12.61 $6,305.00 No Bid $45,755.00 $91.51 $45,755.00 $17.15 $8,575.00 $14.25 $7,125.00 25 Rock Adder, Backhoe 18in Width, Large Rock Quantity D23 1000 Ft $6.74 $6,740.00 No Bid $15,700.00 $15.70 $15,700.00 $15.21 $15,210.00 $12.75 $12,750.00 26 Rock Adder, Backhoe 24in Width, Large Rock Quantity D24 1000 Ft $10.29 $10,290.00 No Bid $18,310.00 $18.31 $18,310.00 $16.22 $16,220.00 $12.75 $12,750.00 27 Rock Adder, Backhoe 36in Width, Large Rock Quantity D25 1000 Ft $12.61 $12,610.00 No Bid $21,960.00 $21.96 $21,960.00 $16.31 $16,310.00 $12.75 $12,750.00 28 Hand Digging 12in x 30in deep or less D26 1000 Ft $10.14 $10,140.00 No Bid $19,750.00 $17.74 $17,740.00 $19.75 $19,750.00 $11.50 $11,500.00 29 Hand Digging 12in x 31in - 48in deep D27 500 Ft $12.66 $6,330.00 No Bid $14,180.00 $28.36 $14,180.00 $25.67 $12,835.00 $16.50 $8,250.00 30 Concrete Backfill of Trench Excavated by Backhoe D28 2500 Cy $150.00 $375,000.00 No Bid $654,800.00 $177.23 $443,075.00 $261.92 $654,800.00 $150.00 $375,000.00 31 Mechanical Tamping of Trench Excavated by Backhoe D29 2500 Ft $1.59 $3,975.00 No Bid $8,875.00 $3.55 $8,875.00 $2.78 $6,950.00 $1.00 $2,500.00 32 2in - 4in Thick Asphalt Saw Cut D30 1000 LF $6.84 $6,840.00 No Bid $6,840.00 $5.79 $5,790.00 $2.57 $2,570.00 $1.25 $1,250.00 33 1in - 6in Concrete Saw Cut D31 500 LF $8.44 $4,220.00 No Bid $4,630.00 $9.26 $4,630.00 $3.14 $1,570.00 $1.75 $875.00 34 8in+ Thick Concrete Saw Cut D32 500 LF $12.66 $6,330.00 No Bid $6,330.00 $11.56 $5,780.00 $3.58 $1,790.00 $2.80 $1,400.00 35 4in+ Asphalt and/or Concrete Saw Cut D33 1000 LF $9.52 $9,520.00 No Bid $11,560.00 $11.56 $11,560.00 $3.14 $3,140.00 $2.00 $2,000.00 36 37 Conduit 1in PVC CT1 1000 Ft $0.51 $510.00 $3.00 $3,000.00 $0.34 $340.00 $1.30 $1,300.00 $0.60 $600.00 38 Conduit 2in PVC CT2 5000 Ft $0.62 $3,100.00 $5.30 $26,500.00 $0.39 $1,950.00 $1.74 $8,700.00 $0.70 $3,500.00 39 Conduit 2 & 1/2 in PVC CT3 5000 Ft $0.62 $3,100.00 $8.80 $44,000.00 $0.43 $2,150.00 $1.94 $9,700.00 $0.70 $3,500.00 40 Conduit 3in PVC CT4 100 Ft $0.67 $67.00 $10.40 $1,040.00 $0.48 $48.00 $2.05 $205.00 $0.80 $80.00 41 Conduit 4in PVC CT5 2500 Ft $1.23 $3,075.00 $14.60 $36,500.00 $0.54 $1,350.00 $2.10 $5,250.00 $1.00 $2,500.00 42 Conduit 1in PVC 90 degree sweep CT6 25 Ea $4.53 $113.25 $3.60 $90.00 $26.59 $664.75 $3.95 $98.75 $4.25 $106.25 43 Conduit 2in PVC 90 degree sweep CT7 50 Ea $5.25 $262.50 $9.44 $472.00 $28.36 $1,418.00 $9.08 $454.00 $5.50 $275.00 44 Conduit 2 & 1/2 in PVC 90 degree sweep CT8 50 Ea $5.45 $272.50 $17.60 $880.00 $32.72 $1,636.00 $9.87 $493.50 $5.50 $275.00 45 Conduit 3in PVC 90 degree sweep CT9 1 Ea $5.66 $5.66 $29.00 $29.00 $38.67 $38.67 $10.71 $10.71 $5.50 $5.50 46 Conduit 4in PVC 90 degree sweep CT10 50 Ea $8.44 $422.00 $48.00 $2,400.00 $47.27 $2,363.50 $13.82 $691.00 $5.50 $275.00 47 Conduit 2in PVC 45 degree sweep CT11 10 Ea $5.25 $52.50 $9.00 $90.00 $21.27 $212.70 $9.48 $94.80 $5.50 $55.00 48 Conduit 2 & 1/2 in PVC 45 degree sweep CT12 10 Ea $5.45 $54.50 $18.70 $187.00 $23.64 $236.40 $10.27 $102.70 $5.50 $55.00 49 Conduit 3in PVC 45 degree sweep CT13 1 Ea $5.66 $5.66 $26.00 $26.00 $26.59 $26.59 $10.66 $10.66 $5.50 $5.50 50 Conduit 4in PVC 45 degree sweep CT14 10 Ea $8.44 $84.40 $46.00 $460.00 $30.39 $303.90 $11.06 $110.60 $5.50 $55.00 51 Conduit 4in PVC 22 & 1/2 degree sweep CT15 10 Ea $8.44 $84.40 $47.00 $470.00 $30.39 $303.90 $15.01 $150.10 $6.50 $65.00 52 53 Conduit 1in PVC CB1 1000 Ft $0.67 $670.00 $3.70 $3,700.00 $0.34 $340.00 $1.30 $1,300.00 $0.60 $600.00 54 Additional 1in PVC Conduit in Trench CB2 100 Ft $0.67 $67.00 $3.70 $370.00 $0.34 $34.00 $1.30 $130.00 $0.60 $60.00 55 Conduit 2in PVC CB3 25000 Ft $0.77 $19,250.00 $5.00 $125,000.00 $0.39 $9,750.00 $1.74 $43,500.00 $0.70 $17,500.00 56 Additional 2in PVC Conduit in Trench CB4 2000 Ft $0.77 $1,540.00 $5.00 $10,000.00 $0.39 $780.00 $1.74 $3,480.00 $0.70 $1,400.00 57 Conduit 2 & 1/2 in PVC CB5 20000 Ft $0.82 $16,400.00 $10.00 $200,000.00 $0.43 $8,600.00 $1.94 $38,800.00 $0.70 $14,000.00 58 Additional 2 & 1/2in PVC Conduit in Trench CB6 1000 Ft $0.82 $820.00 $10.00 $10,000.00 $0.43 $430.00 $1.94 $1,940.00 $0.70 $700.00 59 Conduit 3in PVC CB7 100 Ft $0.67 $67.00 $11.50 $1,150.00 $0.48 $48.00 $2.05 $205.00 $0.80 $80.00 60 Additional 3in PVC Conduit in Trench CB8 100 Ft $0.67 $67.00 $11.50 $1,150.00 $0.48 $48.00 $2.05 $205.00 $0.80 $80.00 EPS Logix, Inc.FX5 Utility Construction, LLC Infratech Corporation Primoris Distribution Services Renegade Well Services Grapevine, TX Justin, TX Grand Prairie, TX Arlington, TX Product Proposal Pricing (PRICING SHALL INCLUDE ALL COSTS TO DELIVER GOODS AS SPECIFIED F.O.B DESTINATION): Excavation and Backfill Conduit Installation in 6in Wide Trench Argyle, TX Respondent's Business Name: Principal Place of Business (City and State): Multiple Conduit Installations in 18in to 36in Trench Exhibit 2 RFP 7633 - Pricing Evaluation for Underground Electric Installation EPS Logix, Inc.FX5 Utility Construction, LLC Infratech Corporation Primoris Distribution Services Renegade Well Services Grapevine, TX Justin, TX Grand Prairie, TX Arlington, TXArgyle, TX Respondent's Business Name: Principal Place of Business (City and State): 61 Conduit 4in PVC CB9 20000 Ft $1.59 $31,800.00 $14.60 $292,000.00 $0.54 $10,800.00 $2.17 $43,400.00 $0.80 $16,000.00 62 Additional 4in PVC Conduit in Trench CB10 20000 Ft $1.59 $31,800.00 $14.60 $292,000.00 $0.54 $10,800.00 $2.17 $43,400.00 $1.00 $20,000.00 63 Conduit 6in PVC CB11 20000 Ft $2.16 $43,200.00 $28.00 $560,000.00 $0.62 $12,400.00 $2.61 $52,200.00 $2.50 $50,000.00 64 Additional 6in PVC Conduit in Trench CB12 12000 Ft $2.16 $25,920.00 $28.00 $336,000.00 $0.62 $7,440.00 $2.61 $31,320.00 $2.50 $30,000.00 65 Bank of two 6in, two 4in, two 2in, and two 1in installed in conduit spacers CB13 5000 Ft $6.33 $31,650.00 $45.00 $225,000.00 $3.67 $18,350.00 $35.08 $175,400.00 $9.60 $48,000.00 66 Bank of three 6in, three 4in, three 2in, and two 1in installed in conduit spacers CB14 1000 Ft $8.03 $8,030.00 $45.00 $45,000.00 $4.59 $4,590.00 $54.57 $54,570.00 $14.40 $14,400.00 67 Conduit 1in PVC 90 degree sweep CB15 500 Ea $5.81 $2,905.00 $3.80 $1,900.00 $35.46 $17,730.00 $4.34 $2,170.00 $3.25 $1,625.00 68 Conduit 2in PVC 90 degree sweep CB16 1000 Ea $6.59 $6,590.00 $9.80 $9,800.00 $38.67 $38,670.00 $5.92 $5,920.00 $5.50 $5,500.00 69 Conduit 2 & 1/2 in PVC 90 degree sweep CB17 1000 Ea $7.41 $7,410.00 $18.00 $18,000.00 $40.91 $40,910.00 $6.12 $6,120.00 $5.50 $5,500.00 70 Conduit 3in PVC 90 degree sweep CB18 5 Ea $6.17 $30.85 $28.40 $142.00 $42.54 $212.70 $6.32 $31.60 $5.50 $27.50 71 Conduit 4in PVC 90 degree sweep CB19 1000 Ea $10.55 $10,550.00 $48.20 $48,200.00 $60.78 $60,780.00 $6.99 $6,990.00 $5.50 $5,500.00 72 Conduit 6in PVC 90 degree sweep CB20 1000 Ea $12.66 $12,660.00 $175.00 $175,000.00 $85.07 $85,070.00 $7.11 $7,110.00 $6.50 $6,500.00 73 74 Conduit 2in PVC 45 degree sweep CB21 50 Ea $6.59 $329.50 $9.00 $450.00 $32.72 $1,636.00 $5.92 $296.00 $5.50 $275.00 75 Conduit 2 & 1/2 in PVC 45 degree sweep CB22 50 Ea $7.41 $370.50 $19.00 $950.00 $35.46 $1,773.00 $6.12 $306.00 $5.50 $275.00 76 Conduit 3in PVC 45 degree sweep CB23 1 Ea $6.17 $6.17 $26.00 $26.00 $38.67 $38.67 $6.71 $6.71 $5.50 $5.50 77 Conduit 4in PVC 45 degree sweep CB24 200 Ea $10.55 $2,110.00 $46.00 $9,200.00 $53.18 $10,636.00 $6.99 $1,398.00 $5.50 $1,100.00 78 Conduit 6in PVC 45 degree sweep CB25 200 Ea $12.66 $2,532.00 $96.00 $19,200.00 $70.90 $14,180.00 $7.41 $1,482.00 $6.50 $1,300.00 79 Conduit 4in PVC 22 & 1/2 degree sweep CB26 100 Ea $8.44 $844.00 $47.00 $4,700.00 $53.18 $5,318.00 $6.99 $699.00 $5.50 $550.00 80 Conduit 6in PVC 22 & 1/2 degree sweep CB27 100 Ea $10.08 $1,008.00 $188.00 $18,800.00 $70.90 $7,090.00 $7.50 $750.00 $6.50 $650.00 81 82 Cable, Cu UF SOL, 12/2 awg Secondary CI1 2500 Ft $0.62 $1,550.00 No Bid $2,800.00 $0.72 $1,800.00 $1.12 $2,800.00 $0.60 $1,500.00 83 Cable, Al #6 Duplex CI2 5000 Ft $0.72 $3,600.00 No Bid $6,250.00 $0.86 $4,300.00 $1.25 $6,250.00 $0.62 $3,100.00 84 Cable, Al 4/0 4/0 2/0 Secondary CI3 70000 Ft $1.34 $93,800.00 No Bid $165,900.00 $0.98 $68,600.00 $2.37 $165,900.00 $1.06 $74,200.00 85 Cable, 350, 350, 4/0 Secondary CI4 10000 Ft $1.59 $15,900.00 No Bid $25,000.00 $1.19 $11,900.00 $2.50 $25,000.00 $1.24 $12,400.00 86 Cable, # 2 Al 15 kV Single Phase Pull CI5 100000 Ft $1.00 $100,000.00 No Bid $187,000.00 $1.52 $152,000.00 $1.87 $187,000.00 $0.88 $88,000.00 87 Cable, # 1/0 Al 15 kV Single Phase Pull CI6 500 Ft $0.77 $385.00 No Bid $980.00 $1.59 $795.00 $1.96 $980.00 $0.98 $490.00 88 Cable, #4/0 Al 15 kV Single Phase Pull CI7 500 Ft $1.34 $670.00 No Bid $1,040.00 $1.64 $820.00 $2.08 $1,040.00 $1.21 $605.00 89 Cable, #2 Al 15 kV Three Phase Pull CI8 25000 Ft $2.16 $54,000.00 No Bid $80,250.00 $3.04 $76,000.00 $3.21 $80,250.00 $2.54 $63,500.00 90 Cable, #1/0 Al 15 kV Three Phase Pull CI9 1000 Ft $1.65 $1,650.00 No Bid $3,280.00 $3.28 $3,280.00 $3.27 $3,270.00 $2.94 $2,940.00 91 Cable, # 4/0 Al 15 kV Three Phase Pull CI10 10000 Ft $3.19 $31,900.00 No Bid $45,800.00 $3.55 $35,500.00 $4.58 $45,800.00 $3.63 $36,300.00 92 Cable, 250 MCM Cu 15 kV Three Phase Pull (Includes 4/0 bare neutral)CI11 1000 Ft $2.11 $2,110.00 No Bid $8,220.00 $5.00 $5,000.00 $8.22 $8,220.00 $4.85 $4,850.00 93 Cable, 500 MCM Cu 15 kV Three Phase Pull (Includes 4/0 bare neutral)CI12 15000 Ft $3.19 $47,850.00 No Bid $173,250.00 $5.50 $82,500.00 $9.16 $137,400.00 $11.55 $173,250.00 94 Cable, 750 MCM Cu 15 kV Three Phase Pull (Includes 4/0 bare neutral)CI13 150000 Ft $7.41 $1,111,500.00 No Bid $2,182,500.00 $6.11 $916,500.00 $10.41 $1,561,500.00 $14.55 $2,182,500.00 95 Cable, 8 Triplex Cu CI14 2000 Ft $0.46 $920.00 No Bid $2,740.00 $1.19 $2,380.00 $1.37 $2,740.00 $1.06 $2,120.00 96 Install Fault Indicator Single Phase CI15 700 Ea $11.32 $7,924.00 No Bid $24,500.00 $33.39 $23,373.00 $23.70 $16,590.00 $35.00 $24,500.00 97 Install Fault Indicator Three Phase CI16 400 Set $17.49 $6,996.00 No Bid $42,000.00 $53.43 $21,372.00 $78.99 $31,596.00 $105.00 $42,000.00 98 Multiple Duct Bank Tagging of Conductors in Multiple Duct Banks (individual conduits and cables shall be included in base bid)CI17 40 Ea $4.22 $168.80 No Bid $668.00 $16.70 $668.00 $8.69 $347.60 No Bid $668.00 99 100 Elbow, Loadbreak #2 AL 220 mil 15 kV T1 1000 Ea $73.78 $73,780.00 No Bid $95,390.00 $95.39 $95,390.00 $75.00 $75,000.00 $70.00 $70,000.00 101 Elbow, Loadbreak #1/0 AL 220 mil 15 kV T2 20 Ea $58.96 $1,179.20 No Bid $1,907.80 $95.39 $1,907.80 $82.50 $1,650.00 $70.00 $1,400.00 102 Elbow, Loadbreak #4/0 AL 220 mil 15 kV T3 500 Ea $95.18 $47,590.00 No Bid $55,640.00 $111.28 $55,640.00 $86.25 $43,125.00 $70.00 $35,000.00 103 Elbow, T Nonloadbreak 250 MCM or 4/0 15 kV T4 30 Ea $84.17 $2,525.10 No Bid $4,800.00 $133.55 $4,006.50 $99.40 $2,982.00 $160.00 $4,800.00 104 Elbow, T Nonloadbreak 500 MCM 15 kV T5 60 Ea $105.27 $6,316.20 No Bid $13,200.00 $148.38 $8,902.80 $107.99 $6,479.40 $220.00 $13,200.00 105 Elbow, T Nonloadbreak 750 MCM 15 kV T6 300 Ea $157.95 $47,385.00 No Bid $66,000.00 $166.92 $50,076.00 $112.49 $33,747.00 $220.00 $66,000.00 106 Termination Rack / Utility Pole single phase # 2 T7 150 Ea $478.49 $71,773.50 No Bid $71,773.50 $457.50 $68,625.00 $16.12 $2,418.00 $33.17 $4,975.50 107 Termination Rack / Utility Pole vee phase # 2 T8 4 Ea $463.05 $1,852.20 No Bid $2,744.92 $686.23 $2,744.92 $18.13 $72.52 $66.34 $265.36 108 Termination Rack / Utility Pole 3 phase # 2 T9 50 Ea $792.33 $39,616.50 No Bid $54,898.00 $1,097.96 $54,898.00 $26.19 $1,309.50 $66.34 $3,317.00 109 Termination Rack / Utility Pole single phase #1/0 T10 10 Ea $378.67 $3,786.70 No Bid $4,575.00 $457.50 $4,575.00 $27.50 $275.00 $33.17 $331.70 110 Termination Rack on a Utility Pole vee phase # 1/0 T11 5 Ea $420.86 $2,104.30 No Bid $4,574.90 $914.98 $4,574.90 $28.34 $141.70 $66.34 $331.70 111 Termination Rack on a Utility Pole 3 phase # 1/0 T12 5 Ea $631.60 $3,158.00 No Bid $5,489.80 $1,097.96 $5,489.80 $28.34 $141.70 $66.34 $331.70 112 Termination Rack / Utility Pole single phase #4/0 T13 1 Ea $378.67 $378.67 No Bid $499.08 $499.08 $499.08 $30.45 $30.45 $50.80 $50.80 113 Termination Rack on a Utility Pole vee phase # 4/0 T14 1 Ea $420.86 $420.86 No Bid $1,097.96 $1,097.96 $1,097.96 $31.41 $31.41 $101.60 $101.60 114 Termination Rack on a Utility Pole 3 phase # 4/0 T15 25 Ea $792.33 $19,808.25 No Bid $30,499.00 $1,219.96 $30,499.00 $31.03 $775.75 $101.60 $2,540.00 115 Termination Rack on a Utility Pole 3 phase 250MCM T16 5 Ea $1,093.83 $5,469.15 No Bid $5,489.80 $1,097.96 $5,489.80 $31.83 $159.15 $90.50 $452.50 116 Termination Rack on a Utility Pole 3 phase 500 MCM T17 30 Ea $1,178.21 $35,346.30 No Bid $41,173.80 $1,372.46 $41,173.80 $36.27 $1,088.10 $180.30 $5,409.00 117 Termination Rack on a Utility Pole 3 phase 750MCM T18 100 Ea $1,594.95 $159,495.00 No Bid $182,994.00 $1,829.94 $182,994.00 $37.47 $3,747.00 $180.30 $18,030.00 118 600 - 200 AMP Plug Adapter T19 210 Ea $11.32 $2,377.20 No Bid $168,000.00 $22.27 $4,676.70 $13.54 $2,843.40 $800.00 $168,000.00 119 Insulated Plugs/Deadend Plugs T20 50 Ea $11.32 $566.00 No Bid $6,250.00 $16.70 $835.00 $10.88 $544.00 $125.00 $6,250.00 120 Splice, #2 AL 220 mil 15 kV T21 50 Ea $154.35 $7,717.50 No Bid $7,717.50 $222.56 $11,128.00 $149.99 $7,499.50 $142.00 $7,100.00 Multiple Conduit Installations in 18in to 36in Trench (Continued) Primary and Secondary Conductor Installation Terminations Exhibit 2 RFP 7633 - Pricing Evaluation for Underground Electric Installation EPS Logix, Inc.FX5 Utility Construction, LLC Infratech Corporation Primoris Distribution Services Renegade Well Services Grapevine, TX Justin, TX Grand Prairie, TX Arlington, TXArgyle, TX Respondent's Business Name: Principal Place of Business (City and State): 121 Splice, #1/0 AL 220 mil 15 kV T22 5 Ea $121.42 $607.10 No Bid $1,112.80 $222.56 $1,112.80 $168.74 $843.70 $140.00 $700.00 122 Splice, #4/0 AL 220 mil 15 kV T23 25 Ea $154.35 $3,858.75 No Bid $6,070.00 $242.80 $6,070.00 $176.24 $4,406.00 $140.00 $3,500.00 123 Splice, 250 MCM or 4/0 15 kV T24 25 Ea $125.54 $3,138.50 No Bid $6,677.00 $267.08 $6,677.00 $179.99 $4,499.75 $180.00 $4,500.00 124 Splice, 500 MCM 15 kV T25 30 Ea $138.92 $4,167.60 No Bid $8,902.50 $296.75 $8,902.50 $187.49 $5,624.70 $180.00 $5,400.00 125 Splice, 750 MCM 15 kV T26 150 Ea $185.22 $27,783.00 No Bid $50,076.00 $333.84 $50,076.00 $191.24 $28,686.00 $205.00 $30,750.00 126 Indoor Termination 250MCM T27 30 Ea $168.24 $5,047.20 No Bid $5,400.00 $148.38 $4,451.40 $164.99 $4,949.70 $180.00 $5,400.00 127 Indoor Termination 500MCM T28 60 Ea $168.24 $10,094.40 No Bid $13,353.60 $222.56 $13,353.60 $171.23 $10,273.80 $180.00 $10,800.00 128 Indoor Termination 750MCM T29 200 Ea $210.95 $42,190.00 No Bid $66,768.00 $333.84 $66,768.00 $182.95 $36,590.00 $205.00 $41,000.00 129 130 Arrester Elbow, 10 kV A1 300 Ea $14.41 $4,323.00 No Bid $22,440.00 $22.27 $6,681.00 $15.00 $4,500.00 $74.80 $22,440.00 131 Arrester, Bushing 10 kV A2 90 Ea $14.41 $1,296.90 No Bid $6,732.00 $22.27 $2,004.30 $8.25 $742.50 $74.80 $6,732.00 132 Arrester, Parking Stand 10 kV A3 30 Ea $14.41 $432.30 No Bid $2,244.00 $16.70 $501.00 $20.62 $618.60 $74.80 $2,244.00 133 134 2 Way Manhole 12ft X 12ft X 9ft with 5ft of Cover V1 4 Ea $4,160.00 $16,640.00 No Bid $100,000.00 $11,375.19 $45,500.76 $8,538.54 $34,154.16 $25,000.00 $100,000.00 135 4 Way Manhole 12ft X 12ft X 9ft with 5ft of Cover V2 4 Ea $4,160.00 $16,640.00 No Bid $100,000.00 $13,650.23 $54,600.92 $9,392.39 $37,569.56 $25,000.00 $100,000.00 136 3 Way Manhole 12ft X 10ft X 9ft with 5ft of Cover V3 5 Ea $4,160.00 $20,800.00 No Bid $117,500.00 $11,375.19 $56,875.95 $9,392.39 $46,961.95 $23,500.00 $117,500.00 137 Additional foot of cover for 4 Way or 3 Way to 10ft V4 10 Ft $735.74 $7,357.40 No Bid $11,375.20 $1,137.52 $11,375.20 $11,375.20 $25.00 $250.00 138 Polymer Concrete Vault 4ftW X 5ftD x 8ftL Surface Mount V5 120 Ea $958.00 $114,960.00 No Bid $461,080.80 $1,097.96 $131,755.20 $3,842.34 $461,080.80 $3,500.00 $420,000.00 139 Polymer Concrete Vault 4ftW X 5ftD x 6ftL Surface Mount V6 5 Ea $874.65 $4,373.25 No Bid $19,211.70 $914.98 $4,574.90 $3,842.34 $19,211.70 $3,500.00 $17,500.00 140 Polymer Concrete Vault 3ftW X 5ftD x 5ftL Surface Mount V7 30 Ea $589.62 $17,688.60 No Bid $115,270.20 $784.26 $23,527.80 $3,842.34 $115,270.20 $3,500.00 $105,000.00 141 Polymer Concrete Vault 4ftW X 4ftD x 4ftL Surface Mount V8 5 Ea $442.06 $2,210.30 No Bid $17,500.00 $686.23 $3,431.15 $2,561.56 $12,807.80 $3,500.00 $17,500.00 142 Polymer Concrete Box 13inW X 18inD x 24inL Surface Mount V9 12 Ea $210.43 $2,525.16 No Bid $18,000.00 $133.55 $1,602.60 $394.96 $4,739.52 $1,500.00 $18,000.00 143 Polymer Concrete Box 12inW X 12inD x 12inL Surface Mount V10 100 Ea $133.77 $13,377.00 No Bid $150,000.00 $95.39 $9,539.00 $355.46 $35,546.00 $1,500.00 $150,000.00 144 Fiberglass Sleeve, Pri. Connection Cabinet 1 Phase V11 15 Ea $159.50 $2,392.50 No Bid $18,000.00 $265.84 $3,987.60 $47.40 $711.00 $1,200.00 $18,000.00 145 Fiberglass Sleeve, Pri. Connection Cabinet 3 Phase V12 25 Ea $267.54 $6,688.50 No Bid $32,500.00 $354.46 $8,861.50 $71.09 $1,777.25 $1,300.00 $32,500.00 146 Excavation to Access side of a Manhole V13 10 Ea $736.76 $7,367.60 No Bid $7,367.60 $267.08 $2,670.80 $78.99 $789.90 $350.00 $3,500.00 147 Excavation to Access side of a Vault V14 10 Ea $368.38 $3,683.80 No Bid $3,683.80 $267.08 $2,670.80 $78.99 $789.90 $350.00 $3,500.00 148 6in Conduit Entry into Manhole V15 6 Ea $147.15 $882.90 No Bid $1,602.48 $267.08 $1,602.48 $47.40 $284.40 $150.00 $900.00 149 4in Conduit Entry into Manhole V16 6 Ea $126.57 $759.42 No Bid $450.00 $267.08 $1,602.48 $43.45 $260.70 $75.00 $450.00 150 2 1/2in Conduit Entry into Manhole V17 6 Ea $104.96 $629.76 No Bid $1,335.36 $222.56 $1,335.36 $43.45 $260.70 $75.00 $450.00 151 2in Conduit Entry into Manhole V18 6 Ea $104.96 $629.76 No Bid $1,335.36 $222.56 $1,335.36 $39.50 $237.00 $75.00 $450.00 152 6in Conduit Entry into Vault V19 6 Ea $126.57 $759.42 No Bid $1,602.48 $267.08 $1,602.48 $52.30 $313.80 $150.00 $900.00 153 4in Conduit Entry into Vault V20 6 Ea $84.38 $506.28 No Bid $1,602.48 $267.08 $1,602.48 $43.45 $260.70 $150.00 $900.00 154 2 1/2in Conduit Entry into Vault V21 6 Ea $62.77 $376.62 No Bid $1,335.36 $222.56 $1,335.36 $59.24 $355.44 $75.00 $450.00 155 2in Conduit Entry into Vault V22 6 Ea $62.77 $376.62 No Bid $1,335.36 $222.56 $1,335.36 $59.24 $355.44 $75.00 $450.00 156 Installation of 4ft x 6ft Concrete Pull Box V23 150 Ea $2,000.00 $300,000.00 No Bid $300,000.00 $1,372.46 $205,869.00 $640.39 $96,058.50 $250.00 $37,500.00 157 Installation of 3ft x 5ft Concrete Pull Box V24 75 Ea $1,750.00 $131,250.00 No Bid $131,250.00 $1,097.96 $82,347.00 $394.96 $29,622.00 $250.00 $18,750.00 158 Installation of Fiber Communications Box V25 50 Ea $432.18 $21,609.00 No Bid $21,609.00 $95.39 $4,769.50 $197.48 $9,874.00 $100.00 $5,000.00 159 160 Transformer Pad 48in X 54in Fibercrete P1 350 Ea $185.22 $64,827.00 No Bid $77,896.00 $222.56 $77,896.00 $197.48 $69,118.00 $156.97 $54,939.50 161 Switch Gear Pad 7ft x 7ft x 3ft P2 50 Ea $746.03 $37,301.50 No Bid $47,395.00 $531.67 $26,583.50 $947.90 $47,395.00 $363.53 $18,176.50 162 Transformer Pad 83in X 83in Old Castle P3 10 Ea $637.98 $6,379.80 No Bid $16,511.00 $267.08 $2,670.80 $631.93 $6,319.30 $1,651.10 $16,511.00 163 164 Secondary Connection Pedestal E1 600 Ea $97.76 $58,656.00 No Bid $87,678.00 $133.55 $80,130.00 $146.13 $87,678.00 $118.19 $70,914.00 165 Single Phase Transformer on Pad E2 350 Ea $400.00 $140,000.00 No Bid $328,734.00 $303.82 $106,337.00 $939.24 $328,734.00 $254.81 $89,183.50 166 Three Phase Transformer on Pad up to 500KVA E3A 30 Ea $1,300.00 $39,000.00 No Bid $102,462.30 $607.63 $18,228.90 $3,415.41 $102,462.30 $341.44 $10,243.20 167 Three Phase Transformer on Pad above 500KVA up to 1500KVA E3B 20 Ea $3,189.90 $63,798.00 No Bid $85,385.40 $1,417.79 $28,355.80 $4,269.27 $85,385.40 $341.44 $6,828.80 168 Three Phase Transformer on Pad above 1500KVA E3C 10 Ea $5,350.80 $53,508.00 No Bid $53,508.00 $4,253.34 $42,533.40 $4,682.19 $46,821.90 $430.50 $4,305.00 169 Switch Gear on Pad - (PME Gear)E4 75 Ea $535.08 $40,131.00 No Bid $63,800.25 $850.67 $63,800.25 $513.45 $38,508.75 $565.59 $42,419.25 170 Primary 1 Phase Sectionalizing Pedestal on Sleeve E5 15 Ea $164.64 $2,469.60 No Bid $5,740.50 $265.84 $3,987.60 $138.24 $2,073.60 $382.70 $5,740.50 171 Primary 3 Phase Sectionalizing Pedestal on Sleeve E6 20 Ea $267.54 $5,350.80 No Bid $9,483.20 $354.46 $7,089.20 $150.08 $3,001.60 $474.16 $9,483.20 172 Fused Cabinet E7 5 Ea $421.89 $2,109.45 No Bid $2,109.45 $212.67 $1,063.35 $394.96 $1,974.80 $303.95 $1,519.75 173 Fused Cabinet Sleeve E8 5 Ea $535.08 $2,675.40 No Bid $1,817.65 $354.46 $1,772.30 $78.99 $394.95 $363.53 $1,817.65 174 175 20 Ft Concrete Pole and Street Light, 976 pounds SL1 400 Ea $411.60 $164,640.00 No Bid $1,400,000.00 $425.34 $170,136.00 $901.81 $360,724.00 $3,500.00 $1,400,000.00 176 35 Ft Concrete Pole and Street Light 1,750 pounds SL2 250 Ea $463.05 $115,762.50 No Bid $875,000.00 $708.90 $177,225.00 $991.99 $247,997.50 $3,500.00 $875,000.00 177 45 Ft Fiberglass Pole and Street Light SL3 25 Ea $427.04 $10,676.00 No Bid $13,291.75 $531.67 $13,291.75 $1,262.53 $31,563.25 $445.80 $11,145.00 178 Streetlight Poles with either bases or anchor cages on streetlights SL4 50 Ea $463.05 $23,152.50 No Bid $68,734.50 $1,372.46 $68,623.00 $1,374.69 $68,734.50 $350.00 $17,500.00 179 Antique Streetlight Poles with anchor cages/poured foundations SL5 100 Ea $950.00 $95,000.00 No Bid $95,000.00 $850.67 $85,067.00 $1,803.61 $180,361.00 $900.00 $90,000.00 180 181 Install 2.5in conduit with underground secondary conductors and warning tape.S1 50000 Ft $8.00 $400,000.00 No Bid $474,000.00 $7.09 $354,500.00 $9.48 $474,000.00 $3.22 $161,000.00 Arresters Manholes and Vaults Foundations Equipment Other Service Installation Exhibit 2 RFP 7633 - Pricing Evaluation for Underground Electric Installation EPS Logix, Inc.FX5 Utility Construction, LLC Infratech Corporation Primoris Distribution Services Renegade Well Services Grapevine, TX Justin, TX Grand Prairie, TX Arlington, TXArgyle, TX Respondent's Business Name: Principal Place of Business (City and State): 182 Secondary Riser S2 50 Ea $391.02 $19,551.00 No Bid $27,876.00 $531.67 $26,583.50 $42.29 $2,114.50 $557.52 $27,876.00 183 Trip charge for additional trips after initial trip S3 30 Trip $123.48 $3,704.40 No Bid $50,751.60 $343.12 $10,293.60 $1,691.72 $50,751.60 $125.00 $3,750.00 184 Bore for service installations (Residential)S4 3000 Ft $21.61 $64,830.00 No Bid $319,020.00 $106.34 $319,020.00 $68.43 $205,290.00 $75.00 $225,000.00 185 186 Three man crew to perform small projects M1 250 HR $195.00 $48,750.00 $240.00 $60,000.00 $265.84 $66,460.00 $261.76 $65,440.00 $217.95 $54,487.50 187 Two man crew and backhoe to perform small projects M2 300 HR $180.00 $54,000.00 $300.00 $90,000.00 $166.92 $50,076.00 $196.24 $58,872.00 $220.12 $66,036.00 188 Three man crew and backhoe to perform medium projects M3 500 HR $260.00 $130,000.00 $400.00 $200,000.00 $265.84 $132,920.00 $274.42 $137,210.00 $267.95 $133,975.00 189 Four man crew and backhoe to perform large projects M4 500 HR $300.00 $150,000.00 $500.00 $250,000.00 $343.12 $171,560.00 $382.48 $191,240.00 $307.95 $153,975.00 190 Dump truck used on projects where all excavated material is hauled off M5 300 HR $67.91 $20,373.00 $34,644.00 $99.06 $29,718.00 $115.48 $34,644.00 $95.00 $28,500.00 191 Large Track Hoe per day M6 25 Ea $936.39 $23,409.75 $900.00 $22,500.00 $994.75 $24,868.75 $1,101.47 $27,536.75 $1,000.00 $25,000.00 192 Large Track Hoe per week M7 10 Ea $2,804.03 $28,040.30 $5,500.00 $55,000.00 $2,489.75 $24,897.50 $5,142.47 $51,424.70 $5,000.00 $50,000.00 193 Delivery & Pickup of Large Track Hoe M8 35 Ea $262.40 $9,184.00 No Bid $667.68 $23,368.80 $740.69 $25,924.15 $125.00 $4,375.00 194 Aluminum Trench Box per day M8 25 Ea $366.32 $9,158.00 No Bid $186.30 $4,657.50 $0.00 $0.00 $390.00 $9,750.00 195 Aluminum Trench Box per week M10 10 Ea $1,098.97 $10,989.70 No Bid $466.90 $4,669.00 $0.00 $0.00 $1,200.00 $12,000.00 196 Delivery & Pickup of Aluminum Trench Box M11 35 Ea $370.44 $12,965.40 No Bid $445.12 $15,579.20 $0.00 $0.00 $125.00 $4,375.00 197 Steel Trench Box 8ftHx16ftL per day M12 20 Ea $263.42 $5,268.40 No Bid $181.70 $3,634.00 $0.00 $0.00 $390.00 $7,800.00 198 Steel Trench Box 8ftHx16ftL per week M13 10 Ea $790.27 $7,902.70 No Bid $455.40 $4,554.00 $0.00 $0.00 $1,200.00 $12,000.00 199 Delivery & Pickup of Steel 8ftHx16ftL Trench Box M14 30 Ea $368.38 $11,051.40 $667.68 $20,030.40 $0.00 $0.00 $125.00 $3,750.00 Item # 1 2 3 4 Evaluation $7,318,873.78 $8,666,408.03 $9,770,482.46Total:$5,863,064.06 $15,653,946.74 Hourly Infratech Corporation Primoris Distribution Services Renegade Well Services 5 5 0 4 FX5 Utility Construction, LLC EPS Logix, Inc. 100 5 5 13 4 15 4 40 15 5 15 5 50 5 5 12 1 15 0 0 0 1 86 5 34 77 3 0 19 20 Probable Performance - 20% Safety - 10% Experience and Qualifications; Key Personnel - 20% Price, Total Cost of Ownership - 50% Provide OSHA 300 logs - 5% Provide Safety Program/Records Requested - 5% Proof of ability to complete projects within the requested timeline. (Ex: Letter(s) from a client) - 15% 0 4 4 30 45 0 Past Positive Performance - 5% Experience Working with an Electric Utility Number of Crews readily available to DME Total Score: Description