Loading...
Exhibit 2-EvaluationIFB 6608 Tabulation Sheet for Supply of Soil, Sand, Lime and Aggregate Respondent's Business Name: Principal Place of Business ITEM # EST. ANNUAL QTY UOM PRODUCT DESCRIPTION (FOB DELIVERED TO CITY LOCATIONS) DELIVERED UNIT PRICE EXTENDED PRICE ESTIMATED DELIVERY DAYS (ARO)* DELIVERED UNIT PRICE EXTENDED PRICE ESTIMATED DELIVERY DAYS (ARO)* 1 500 Cu. Yd Top Soil Screened 16.04$ 8,020.00$ 2 2 1,500 Cu. Yd Field Sand - Backfill 13.37$ 20,055.00$ 2 3 16,000 Cu. Yd Screened Sand 13.37$ 213,920.00$ 2 4 1,000 Tons Pit Sand (Concrete)23.50$ 23,500.00$ 2 5 800 Tons Manufactured Sand for Concrete Mixture 14.50$ 11,600.00$ 2 6 800 Tons Concrete Aggregate Class A, 1" - #4 Rock 16.80$ 13,440.00$ 2 7 300 Tons Concrete Aggregate 3/8" Down Rock 16.25$ 4,875.00$ 2 8 1,000 Tons 1-3/4" + Down Flexible Base -$ -$ 9 1,000 Tons 1-1/2" + Down Flexible Base 14.25$ 14,250.00$ 2 10 4,000 Tons 5/8" + Down Flexible Base 14.25$ 57,000.00$ 2 11 1,000 Tons Crushed Stone #6-20 (for ice and snow control of city streets)13.75$ 13,750.00$ 2 12 300 Tons Limestone Screening 13.75$ 4,125.00$ 2 13 200 Tons 1 1/2" Rock, Limestone (Washed & Screened) 17.00$ 3,400.00$ 2 14 100 Tons 4" - 7 1/2" Gabion Limestone 19.85$ 1,985.00$ 2 15 500 Tons 3/4" Rock, Limestone Utility Stone (Not Washed)17.00$ 8,500.00$ 2 16 400 Tons 8-12" Rip Rap Limestone 25.25$ 10,100.00$ 2 17 400 Tons 12-18" Rip Rap Limestone 25.90$ 10,360.00$ 2 18 100 Tons 24" Rip Rap Limestone 26.40$ 2,640.00$ 2 19 100 Tons 30" Rip Rap Limestone 29.65$ 2,965.00$ 2 20 100 Tons 36" Rip Rap Limestone 29.65$ 2,965.00$ 2 21 100 Tons Pea Gravel (Unwashed) 14.95$ 1,495.00$ 2 22 1,300 Tons Pea Gravel (Washed)14.95$ 19,435.00$ 2 23 15,000 Cu. Yd.Select Fill 12.81$ 192,150.00$ 2 24 1,000 Tons Type A, Grade 1 Flexible Base 14.25$ 14,250.00$ 2 654,780.00$ 42A 200 Tons Bulk Type A Hydrated Lime 157.82$ 31,564.00$ 2 42B Tons Minimum Truck Delivery = _________ 42C Tons Maximum Truck Delivery = _________ 43A 800 Tons Bulk Type B Slurry Lime 166.93$ 126,256.00$ 2 43B Tons Minimum Truck Delivery = _________ 43C Tons Maximum Truck Delivery = _________ 44 What is the Plant location? SECTION C-BULK LIME TOTAL 157,820.00$ 4 Yrs contract amount w/ Contingency 1,500,000.00$ 500,000.00$ SECTION C-BULK LIME CJA Enterprises LLP Lhoist North America Collinsville, TX Ft Worth, TX SECTION A- BULK UTILITY PRODUCTS SECTION A- BULK UTILITY PRODUCTS TOTAL