Loading...
Intent to AwardProfessional Coil Cleaning, Inc. Euless, TX Line #Unit 1 2 $16,104.55 Location Units ·       1 @ 25 ton — 1st floor ·       4 @ < 20 ton — 1st floor ·       4 @ < 20 tons — 2nd floor ·       1 @ 25 ton — 1st floor ·       4 @ < 20 ton — 1st floor ·       4 @ < 20 tons — 2nd floor ·       8 @ < 20 tons, straight coils — ground ·       2 @ < 20 tons, straight coils and covers — 2nd floor— (top of gym) · 1 @45 ton with Underneath Coils 2nd Floor · 1 @170 ton with V-Coils Ground and Covers · 1@ 180 ton with V-Coils Ground · 14 @ < 20 tons with Straight Coil - 2nd Floor · 3 @ < 20 tons, split systems -2ndfloor · 9 @ < 20 tons with Straight Coils 2nd Floor Covers · 2 Lieberts units @ 4 fans each - 2nd Floor · 2 @ 60 ton with Straight Coils 1st floor (Spray Though Covers) · 2 @ < 20 tons, split systems, 1st floor · 6 @ < 20 tons with V-Coils 2nd and 3rd Floor · 2 @ < 20 tons with Straight Coils 2nd and 3rd Floor · Remove and return covers (if applicable) Fleet Services 4 · 4 @ < 20 tons, straight coils and covers ·       9 @ < 20 tons, straight coils with covers — location: Single story rooftop ·       2 Lieberts @ 3 tons with 1 fan each — location: Ground & rooftop Senior Center 11 · 11 @ < 20 tons, straight coils and covers 1st Floor · 20 @ < 20 tons, straight coils · Location: Single story rooftop · 19 @ < 20 tons, straight coils · 1 @ 20 tons, straight coils · Location: Ground · 2 @ 20 tons, 1st story rooftop (extra hose length required to get from one side to the other) · 3 @ < 20 tons, 1st story rooftop · 5 @< 20 tons, ground Section A - Service Work Hourly Rate: Exhibit 2 We do not price on an hourly rate bases - our prices are on a per job bases Regular Hours: Monday through Friday, 7:00 a.m. - 5:00 p.m. Normally scheduled day hours. Paid for by the hour. Hourly rate shall include all items of cost, overhead, and profit. Work time on the job only. Description RFP 7798 - Pricing Evaluation foc Coil Cleaning Services 4 11 Police Training Facilities 20 20DME Facilities CVA 10 Denia Recreation Center 9 North Lake Recreation Center 9 MLK Recreation Center 10 City Hall East 35 Service Center 8 South Branch Library Fire Station 1 (Central) Professional Coil Cleaning, Inc. Euless, TX Line #Unit Exhibit 2 Description RFP 7798 - Pricing Evaluation foc Coil Cleaning Services · 15 @ < 20 tons, straight coils · Location: Single story rooftop · Remove and return covers (if applicable) · 14 @ < 20 tons, straight coils · Location: Ground · 7 @ < 20 tons, straight coils · 3 Minispilts · Location: Ground ·       8 @ < 20 tons, straight coils – Ground ·       1 @ < 20 tons, straight coil – ground elevated Solid Waste – 1001 Mayhill 1 ·       1 @ < 20 tons, straight coil – single-story rooftop · 3 @ < 20 tons, straight coils · 1 Minisplit · Location: Ground elevated · 2 @ 30 tons, straight coils · Location Ground · 1 @ 20 tons, straight coils · 2 @ < 20 tons, straight coils · Location: Ground · 4 @ < 20 tons, straight coils · Location: 3rd story rooftop · 5 @ < 20 tons, straight coils - 3rd story rooftop · 4 Minispilts - ground Lesa Building 1 1 · 1 @ < 20 tons, straight coil - ground · 2 @ < 20 tons, straight coils, tall single-story rooftop · 4 @ < 20 tons, straight coils, ground · 8 @ < 20 tons, straight coils, ground · 1 Minisplit, ground Fire Station 3 1 · 1 @ < 20 tons, straight coil, ground · 8 @ < 20 tons, straight coils, ground · 1 Minisplit, ground Fire Station 5 3 · 3 @ < 20 tons, straight coils, ground Fire Station 6 3 · 3 @ < 20 tons, straight coils, ground Traffic 1 1 · 1 @ < 20 tons, straight coil, ground Tennis/Golf 3 · 3 @ < 20 tons, straight coils, ground 258 $100,000.00Total Contract Amount (5 years): Total Units: 15North Branch Library 14Linda McNatt Animal Shelter Fire Station 4 9 Fire Station 2 9 10Facilities Management 9Solid Waste 4Solid Waste – 651 Mayhill 9Airport 1 Civic Center 6 Denton Energy Center 2 3Emily Fowler Library North Lake Annex 4