Loading...
2nd Amend PSA Pecan Creek Wtr Rec Plant Proj-5718-Award/Ordinance/Pricing Docusign City Council Transmittal Coversheet File Name Purchasing Contact City Council Target Date Granicus # Ordinance # DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 FILE Rebecca Hunter 5718 2nd Amendment to Hazen & Sawyer PSA for Pecan Creek Water Rec. Plant Project 4/5/2016 THE STATE OF TEXAS § § COUNTY OF DENTON § SECOND AMENDMENT TO CONTRACT BY AND BETWEEN THE CITY OF DENTON, TEXAS AND HAZEN AND SAWYER, P.C. [CONTRACT #5718] THIS SECOND AMENDMENT TO CONTRACT (hereafter the “Second Amendment”) to that certain Contract by and between the City of Denton, Texas and Hazen and Sawyer, P.C. (hereafter the “Agreement”) in the original Professional Services Agreement, which were heretofore executed on 06th of January, 2015, and was approved by the Denton City Council and subsequently executed by the Denton City Manager or his duly authorized designee; and said Agreements were heretofore entered into by and between the City of Denton, Texas, a Texas Municipal Corporation with its offices at 215 East McKinney Street, Denton, Texas 76201 (hereafter the “CITY”); and the firm of Hazen and Sawyer, P.C. (hereafter “Hazen and Sawyer”) with its offices at 8350 North Central Expressway, Suite 775, Dallas, Texas 75206; and The original Agreements provided for Hazen and Sawyers’ services related to the Pecan Creek Water Reclamation Facility Process Modeling and Operations Tool Development Project as is contained in Contract #5718 (Exhibit A, on file in the Purchasing Office). The initial agreement for the Basic Services – (Exhibit A), was approved on January 6, 2015, in the not-to-exceed amount of $136,017. The City and Hazen and Sawyer further specified and agreed within Contract #5718, that additional services may be necessary to complete the project, and identified those services within Article 5(B) (c) – Additional Services. A First Amendment was approved on December 3, 2015 for additional Professional Services, totaling $21,508, bringing the not to exceed grand total to $157,525. (Exhibit B) NOW THEREFORE, the CITY and Hazen and Sawyer (hereafter collectively referred to as the “Parties”), in consideration of their mutual promises and covenants, as well as for other good and valuable considerations, do hereby AGREE to the following Second Amendment, which amends the following terms and conditions of the said Agreements, to wit: 1. The provisions of the said Agreements are hereby amended to add the additional Agreements as follows, to wit: Hazen and Sawyer shall provide to the CITY the Additional Professional Services in addition to the initial project, as defined in the “Scope of Work for the Water Reclamation Plant Iron Addition Optimization and Water Treatment Plant Solids Assessment & Raw Sewage Pump Station No. 2 Hydraulic Improvements ”. The individual tasks and deliverables are fully defined within the Scope of Work DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 (Exhibit C). The additional professional services to complete the Project, are provided in “Exhibit C” of this Second Amended Agreement, and shall become a part of the contractual requirements of Contract #5718. The total cost of these additional professional services, which shall not exceed $124,650. The total project costs shall not exceed $282,175. 2. The Parties hereto agree, that except as specifically provided for by this Second Amendment, that all of the terms, covenants, conditions, agreements, rights, responsibilities, and obligations of the Parties, set forth in both the Agreements and now the Second Amendment shall be, and will remain in full force and effect. IN WITNESS WHEREOF, the City of Denton, Texas and Hazen and Sawyer, P.C.., have each executed this Second Amendment, by and through their respective duly authorized representatives and officers on this date: ________________________. CITY OF DENTON, TEXAS BY: __________________________________ GEORGE C. CAMPBELL, CITY MANAGER ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: __________________________________ APPROVED AS TO LEGAL FORM: ANITA BURGESS, CITY ATTORNEY BY: __________________________________ CONSULTANT BY:_______________________________ AUTHORIZED SIGNATURE, TITLE DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 Vice President April 5, 2016 DocuSign Envelope ID: 25B8C0AA-37F1-4123-8224-5461558C9E7D EXHIBIT B DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 DocuSign Envelope ID: 25B8C0AA-37F1-4123-8224-5461558C9E7D EXHIBIT B DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 Hazen and Sawyer 8350 N. Central Expressway, Suite 775 • Dallas, TX 75206 Re: City of Denton Pecan Creek Water Reclamation Plant Iron Addition Optimization and Water Treatment Plant Solids Assessment Dear Mr. Arora: As requested, Hazen and Sawyer (Hazen) is submitting a proposal to assist in optimizing the Pecan Creek Water Reclamation Plant (PCWRP) iron feed system, update the process model iron to phosphorus molar ratio for more accurate prediction of iron usage and quantity the impacts of water treatment plant (WTP) solids. The task will be hourly not to exceed and can include the following types of services: Jar Testing for Various Feed Points Prior to Full Scale Startup Hazen will assist in developing a procedure for jar testing various iron feed doses at each of the feed points to determine the theoretical molar ratio for a target phosphorus removal. The results can be compared to the actual iron usage to determine the relative efficiency of iron due to the physical mixing and settling parameters. The City will perform all sampling, jar tests and provide data to Hazen in Excel format. Meetings:One, 1-hour conference call will be included to review the results. Deliverables:One electronic copy in .PDF format of the jar testing procedure with sampling requirements and data entry template in Excel format. One electronic copy in .PDF format of the results. Iron Addition Startup and Optimization Plan Hazen will assist in developing a startup plan and systematic approach to feeding iron with key process parameters to monitor. Hazen will develop a sampling plan to determine the utilization of iron at the various feed points including upstream of the primary clarifiers, upstream of secondary clarifiers, upstream of the filters and upstream of the belt filter press. The City will perform all process testing and provide data to Hazen in Excel format. Meetings:Hazen will review the plant process data monthly for three months and perform a one hour operations conference call, once per month, to discuss the results and potential adjustments to optimize. February 18, 2016 P.S. Arora, PE Assistance Director Wastewater Utilities City of Denton 901A Texas Street Denton, TX 75209 EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 Page 2 of 3 Deliverables:One electronic copy in .PDF format of the startup and sampling plan with associated monitoring parameters. One electronic copy in .PDF format of the monthly meeting materials. One electronic copy in .PDF format of meeting minutes for the three monthly meetings to document the results and discussion. PCWRP Process Model Update Hazen will estimate the field molar ratio of iron to phosphorus for the PCWRP and update the process model to better predict the iron usage. Hazen will provide guidance on sampling requirements if the necessary data is not available or accounted for in the tasks above. The City will perform all sampling, process testing and provide data to Hazen in Excel format. The City will update the iron to phosphorus molar ratio in the model files delivered as part of the process model development project. Hazen will also update the PCWRP process model to BioWin version 5.0 and populate the energy assumptions to reflect Denton specific values such as cost of electricity. Meetings:One, 1-hour meeting to review results in the model compared to actual plant data at the PCWRP training room and provide an overview of BioWin version 5.0 functionality. Deliverables:One electronic copy in .PDF format of the meeting materials. PCWRP BioWin model files (same files as the PCWRP process modeling project) updated to version 5.0 with Denton specific energy information included. Iron Feed Estimation Tool Hazen will provide an Excel based tool for operations staff to input concentrations at various points in the plant and determine a target iron feed rate. The tool would use the sampling data to more accurately predict the feed rates. Meetings:Two, 1-hour meetings: one to determine tool layout and functionality, the second to review the completed tool and provide training on how to use it. Deliverables:One iron addition optimization tool in Excel format including guidelines for use in the Excel file. Water Treatment Plant (WTP) Solids Impacts on PCWRP Hazen will leverage the process model to quantify impacts of WTP solids on the PCWRP. The evaluation will include estimated increases in solids loading and reductions in treatment capacity due to decreased volatile solids retention times and potential growth limitations. In order to maintain the PCWRP’s rated treatment capacity a maximum solids loading rate will be determined and leveraged to estimate a maximum discharge limit from the WTP. Meetings:One, 1-hour meeting to present results from the evaluation. Deliverables:One electronic copy in .PDF format of a technical memorandum summarizing the results from the evaluation. EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 Page 3 of 3 Regards, Brandt Miller, PE Principal Engineer Enclosure: Fee Breakdown cc: Chamindra Dassanayake, PhD, PE and Joe Rohrbacher, PE EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton PCWRP Iron Addition Optimization Assistance Engineering Service Fee Breakdown / Details 2/18/2016 TASK Project Director CD Project Engineer Brandt Miller Assistant Engineer Technical Advisor J. Rohrbacher Billable Rate =$ 285 $ 130 $ 110 $ 210 Labor ODC Sub Subtotal Jar Test Procedure and Sampling Plan Development 2 4 2 8 1,120$-$-$1,120$ Data review, analysis and meeting 2 8 2 12 2,030$-$-$2,030$ Startup and Sampling Plan Development 6 6 4 16 2,280$-$-$2,280$ Data review, analysis and meetings 2 20 24 8 54 7,490$-$-$7,490$ Data review, model simulations and meeting 2 32 6 40 5,990$200$-$6,190$200.00$ Tool development and meetings 2 8 8 2 20 2,910$200$-$3,110$200.00$ Tool development and meetings 2 30 10 8 50 7,250$200$-$7,450$200.00$ Hours Subtotal 10 106 52 32 200 600$ Fee Subtotal 29,070$600$-$29,670$ Jar Testing Guidance and Data Analysis Iron Addition Startup Plan and Data Analysis PCWRP Model Update Water Treatment Plant Solids Impacts on PCWRP Iron Feed Estimation Tool Development Total Hours Fee ODC Breakdown Travel/ Lodge/ Mileage /Consumables EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 1 of 6 February 18, 2016 P.S. Arora, P.E. Assistant Director of Wastewater Utilities City of Denton 901-A Texas Street Denton, TX 76209 Re: Scope of Work – Design of the Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Dear Mr. Arora: As requested, Hazen and Sawyer (Hazen) is submitting a proposal to design hydraulic improvements at the Pecan Creek Water Reclamation Plant (PCWRP) Raw Sewage Pump Station No. 2 (RSPS2) to address hydraulic challenges the City of Denton (City) has experienced. Hazen will include the following features in the design: Wet well structural improvements including isolation wall extension, baffle wall and new passage hole through the isolation wall upstream of the baffle New dry pit submersible pumps similar to the Flygt N-Style Impeller preliminarily evaluated as part of the RSPS2 Hydraulic Investigation Dry pit piping improvements including relocation of the pumps and concrete bases, demolition of the existing pump bases, suction pipe extension, replacement of existing knife gate valves, discharge pipe reconfiguration with check valve in the horizontal position, one new check valve and one new plug valve Electrical and instrumentation wiring and conduit will not be changed from the existing Replacement of the existing I-Beam above the pumps for pump retrieval. Installation of a new manual dolly and winch on the I-Beam Replacement of an existing yard valve between RSPS2 and the grit removal facility. Task 100: Preliminary Engineering Services Task 101: Hydraulic Validation and Preliminary Engineering Technical Memorandum ENGINEER will build upon the RSPS2 Hydraulic Investigation and validate the design of the baffle wall to a preliminary design level using computational fluid dynamics (CFD) and HazenPro hydraulic calculation tool. A vertical baffle wall will be considered as part of the evaluation. The baffle wall invert elevation will be confirmed in order to maintain adequate water surface elevation upstream of the pumps for operation of the Raw Sewage Pump Station No. 1 without causing backups in the collection system. EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 2 of 6 ENGINEER will evaluate pump station capacity and potential alternate pump selections to achieve 46- mgd firm capacity with both RSPS1 and 2 with appropriate standby capacity to meet State and Federal requirements. Scope Item Assumptions: CFD and HazenPro hydraulic tools will be used to refine the baffle wall configuration. The baffle wall configuration developed in the Hydraulic Investigation will be enhanced The baffle wall invert elevation will be validated under various operating scenarios including low flow, average and 2-hour peak to determine the resulting upstream water surface elevation The City will simulate normal operating parameters and high flow conditions using the existing InfoWorks model based on the baffle wall elevation and upstream water surface elevation to determine impacts to the upstream collection system The size of the new opening in the wet well isolation wall will be optimized for appropriate velocities through the opening The City will provide pump curves for all pumps at RSPS1 for pump selection evaluation Disciplines involved in the preliminary engineering and design include structural, process mechanical, electrical and instrumentation Meetings: One, 1-hour meetings with the City Engineer to coordinate the collection system model runs One, 1-hour meeting with the City to review results from the hydraulic evaluation One, 1-hour meeting to review the draft technical memorandum and receive the City’s review comments Deliverables: Presentation with the results from the CFD, hydraulic analysis and pump selection One electronic (.PDF format) copy and five hard copies of the draft technical memorandum One electronic (.PDF format) copy and five hard copies of the final technical memorandum Task 200: Detailed Design and Bid Services Subtask 201: 90-Percent Design ENGINEER will perform the necessary design calculations, agency coordination, development of plans, specification development, manufacturer coordination and cost estimation in accordance with applicable Federal, State and local regulations in addition to the City’s design standards. The level of detail will conform to industry standards for a 90% level design detailed below. EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 3 of 6 Subtask activities will include: Preparing the 90% design drawings which will contain the following in general: o Cover sheet with drawing index o Civil Yard valve replacement sheet, which will consist of the existing as-built and an appropriate call out for the valve replacement only. o Structural General Notes RSPS2 Demolition Plan RSPS2 Plan and Sections RSPS2 Wet Well Section and Details Typical Details o Mechanical RSPS2 Demolition Plan RSPS2 Plan and Section RSPS2 Sections and Details Typical Details o Electrical is not included as part of the scope; the existing wiring will not be changed The City will provide record drawings in AutoCAD format Prepare 90% technical specifications for all disciplines including bypass pumping specification and confined space requirements. The specification will include the technical portion and any start-up or training requirements only Two bypass pumping options will be evaluated: pumping to RSPS No. 1 and pumping to the grit removal / diversion structure. Dewatering requirements to replace the yard valve will be included in the bypass pump supplier’s scope of work. Front end specification are not required as part of this project and are not included in the scope The Engineer will evaluate and select up to three pumps to fit the application and requirements. The pump evaluation and selection will be the first priority including the pump specification for purchase due to the lead time in procurement. The pumps will be factory tested prior to delivery; witness testing is not required Cost estimate and down time required to coat the interior of the pump station will be evaluated including potential quick dry products compared to the Raven coating system Concrete mixes will be evaluated and selected to provide quick cure due to limitation of down time for improvements Conduct an internal milestone quality control review Perform a 90% internal constructability review Perform a 90% internal interdisciplinary coordination workshop 90% review comments from the City will be provided in writing Meetings: Two, 1-hour meetings to be used at the discretion of the City EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 4 of 6 Deliverables: One electronic (.PDF format) copy and five hard copies of the 90% plans and specifications One electronic (.PDF format) copy of the meeting minutes for the City’s records Subtask 202: Bid Set and Coordination ENGINEER will perform necessary design calculations, agency coordination, specification development and manufacturer coordination in accordance with applicable Federal, State and local regulations in addition to the City’s design standards. The level of detail will conform to industry standards for a bid ready level design detailed below. Subtask activities will include: Incorporating the City’s 90% review comments Preparing the bid set drawings and specifications including a bill of materials The City will provide electronic and hard copy bid documents to all interested bidders The City will receive all questions and inquiries from contractors in writing and provide them to the ENGINEER for response ENGINEER will keep record on questions and inquiries to be addressed from the pre-bid meeting ENGINEER will prepare all addenda and provide electronic copies for the City to issue to bidders ENGINEER will prepare the conformed documents after bid phase is completed. ENGINEER will not provide hard copy bid set drawings or specification to bidders ENGINEER will provide hard copy conformed set of half size and full size drawings and specifications to the City unbound for easy reproduction by the City ENGINEER will submit necessary drawings and forms to the State for review Meetings: None Deliverables: One electronic copy (.PDF format) of each addendum required to address bidder inquiries and questions One electronic copy (.PDF format) of meeting minutes from the pre-bid meeting for the City’s records Conformed Drawings - one electronic copy (.PDF format), one full size hard copy, one half size hard copy and one hard copy of specifications unbound for reproduction Task 200 Exemptions: In an effort to clearly define efforts that are not included in this scope or fee, Hazen has identified the following exemptions: EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 5 of 6 Changes to the existing instrumentation and control of the pump stations other than re-wiring Front end documents are not required as part of this project Changes to the design directives defined by the City of Denton Additional time that would be encountered due to stoppages/delays in the design process of over 6 months Flow monitoring in the existing sewer system Arc Flash Analysis (to be provided by contractor at construction completion based on electrical system installed, specification provided to contractor for direction) SCADA/PLC programming Electrical and instrumentation improvements Subtask 300: Construction Assistance ENGINEER will assist the City with construction administration including responding to request for information, review and approval of submittals, review of any cost change proposals, walk through inspection and record drawing development. Subtask activities will include: Review and response to RFIs – assuming 12 RFIs not requiring any site visits Review and approval of submittals - assuming 14 submittals with no more than two total review cycles per submittal Review and approval of manufacturer operation and maintenance manuals (O&M) - assuming one O&M Review of cost change proposals Six, 6-hour site visits for structural field observations All concrete testing will be performed by the City; the Engineer will specify the number of samples and types of tests required One, 4-hour site visit for pump start up and testing One, 4-hour walk through upon substantial completion Incorporate contractor markups into the record drawings set All responses will be electronic through email Meetings: Six, one-hour construction phase meetings in addition to the field observation or inspection visits listed above. Deliverables: Electronic copies (.PDF format) of each response to RFIs and submittal reviews Record Drawings - one electronic copy (.PDF format), one full size hard copy, one half size hard copy and one hard copy of specifications; all unbound for reproduction EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton Pecan Creek Water Reclamation Plant Raw Sewage Pump Station No. 2 Hydraulic Improvements Page 6 of 6 Task 300 Exemptions: In an effort to clearly define efforts that are not included in this scope or fee, Hazen has identified the following exemptions: Resident engineer services Maintaining submittal logs including RFIs, submittals and cost change proposals Special inspections or material testing SCADA/PLC programming or integration Very truly yours, Brandt Miller, PE Project Manager Enclosure: Level of effort and sheet list cc: Chamindra Dassanayake, PhD, PE, Southwest Regional Manager EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 City of Denton PCWRP Raw Sewage Pump Station No. 2 Engineering Service Fee Breakdown / Details 2/18/2016 PD PM TASK Project Director CD Project Engineer Brandt Miller Technical Advisor Senior Engineer Assistant Engineer CADD Technical Advisor CFD Specialist Assistant Engineer CADD Billable Rate =$ 285 $ 157 $ 208 $ 208 $ 112 $ 96 $ 211 $ 208 $ 102 $ 90 Labor ODC Sub Subtotal Hydraulic calculations and CFD validation 2 20 2 4 40 40 108 17,382$200$-$17,582$200.00$ -$-$-$-$ Drawing and Specification Development 32 20 32 40 60 56 240 27,763$368$-$28,131$168.00$200.00$ Internal Quality and Coordination Review 2 4 2 2 4 14 2,886$100$-$2,986$100.00$ -$-$-$-$ Drawing and Specification Development 2 8 2 12 16 12 16 12 80 10,394$368$-$10,762$168.00$200.00$ Bidding and response to inquiries 2 8 4 1 15 2,867$100$-$2,967$100.00$ -$-$-$-$ Shop drawing and RFI review and response 2 20 20 40 8 48 16 154 19,462$500$-$19,962$500.00$ Field Inspection and Start-up 2 52 12 66 11,219$1,370$-$12,589$1,370.00$ -$-$-$-$ Hours Subtotal 12 140 6 72 90 60 9 40 164 84 677 1,706$1,300$ Fee Subtotal 91,974$3,006$-$94,980$ 100: Preliminary Engineering Services 101: Hydraulic Validation and Prelim. Eng. TM 200: Detailed Design and Bid Services 201: 90-Percent Design 202. Bid Set and Coordination 300: Construction Assistance Total Hours Fee ODC Breakdown Travel/ Lodge/ Mileage Repro/ Shipping/ Consumables Structural Process Mechanical EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 THIS PAGE INTENTIONALLY LEFT BLANK EXHIBIT C FILE 5718 - Amendment #2 DocuSign Envelope ID: A731FC1F-5BFE-4389-975E-5E3D664DB4F8 Certificate Of Completion Envelope Id: A731FC1F5BFE4389975E5E3D664DB4F8 Status: Completed Subject: Please DocuSign: 5718 Amendment #2 Pecan Creek Water Reclamation Facility for the City of Denton Source Envelope: Document Pages: 18 Signatures: 4 Envelope Originator: Certificate Pages: 6 Initials: 0 Rebecca Hunter AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) rebecca.hunter@cityofdenton.com IP Address: 129.120.6.150 Record Tracking Status: Original 3/8/2016 12:05:13 PM Holder: Rebecca Hunter rebecca.hunter@cityofdenton.com Location: DocuSign Signer Events Signature Timestamp Rebecca Hunter rebecca.hunter@cityofdenton.com Senior Buyer City of Denton Security Level: Email, Account Authentication (Optional) Completed Using IP Address: 129.120.6.150 Sent: 3/8/2016 12:07:47 PM Viewed: 3/8/2016 12:07:58 PM Signed: 3/8/2016 12:09:26 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Chamindra Dassanayake (CD), PhD, PE cdassanayake@hazenandsawyer.com Security Level: Email, Account Authentication (Optional) Using IP Address: 70.121.38.165 Signed using mobile Sent: 3/8/2016 12:09:30 PM Viewed: 3/8/2016 2:39:53 PM Signed: 3/8/2016 2:42:04 PM Electronic Record and Signature Disclosure: Accepted: 3/8/2016 2:39:53 PM ID: e71ee927-bae4-4d1c-99ab-3db4324bb2b0 John Knight john.knight@cityofdenton.com Deputy City Attorney City of Denton Security Level: Email, Account Authentication (Optional) Using IP Address: 129.120.6.150 Sent: 3/8/2016 2:42:09 PM Viewed: 3/8/2016 3:02:06 PM Signed: 3/8/2016 3:02:26 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Julia Winkley julia.winkley@cityofdenton.com Contracts Administration Supervisor City of Denton Security Level: Email, Account Authentication (Optional) Completed Using IP Address: 129.120.6.150 Sent: 3/8/2016 3:02:30 PM Viewed: 3/9/2016 1:07:08 PM Signed: 4/5/2016 2:28:19 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Signer Events Signature Timestamp George C. Campbell george.campbell@cityofdenton.com City Manager City of Denton Security Level: Email, Account Authentication (Optional) Using IP Address: 129.120.6.150 Sent: 4/5/2016 2:28:25 PM Viewed: 4/18/2016 9:18:56 AM Signed: 4/18/2016 9:19:12 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Jennifer Walters jennifer.walters@cityofdenton.com City Secretary City of Denton Security Level: Email, Account Authentication (Optional) Using IP Address: 129.120.6.150 Sent: 4/18/2016 9:19:16 AM Viewed: 4/22/2016 11:58:54 AM Signed: 4/22/2016 12:00:45 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Julia Winkley julia.winkley@cityofdenton.com Contracts Administration Supervisor City of Denton Security Level: Email, Account Authentication (Optional) Sent: 3/8/2016 2:42:07 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Sherri Thurman sherri.thurman@cityofdenton.com Security Level: Email, Account Authentication (Optional) Sent: 3/8/2016 2:42:08 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Robin Fox Robin.fox@cityofdenton.com Security Level: Email, Account Authentication (Optional) Sent: 4/5/2016 2:28:24 PM Electronic Record and Signature Disclosure: Accepted: 10/9/2015 11:39:51 AM ID: 04463961-03db-4c4d-9228-d660d6146ed6 Jane Richardson jane.richardson@cityofdenton.com Security Level: Email, Account Authentication (Optional) Sent: 4/5/2016 2:28:26 PM Viewed: 4/7/2016 6:47:52 AM Carbon Copy Events Status Timestamp Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Jennifer Bridges jennifer.bridges@cityofdenton.com Procurement Assistant City of Denton Security Level: Email, Account Authentication (Optional) Sent: 4/22/2016 12:00:49 PM Viewed: 4/27/2016 7:30:14 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: P.S. Arora P.S.Arora@cityofdenton.com Security Level: Email, Account Authentication (Optional) Sent: 4/22/2016 12:00:51 PM Viewed: 4/23/2016 2:49:09 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Jane Richardson jane.richardson@cityofdenton.com Security Level: Email, Account Authentication (Optional) Sent: 4/22/2016 12:00:54 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign ID: Notary Events Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 4/22/2016 12:00:54 PM Certified Delivered Security Checked 4/22/2016 12:00:54 PM Signing Complete Security Checked 4/22/2016 12:00:54 PM Completed Security Checked 4/22/2016 12:00:54 PM Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Denton (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronically through your DocuSign, Inc. (DocuSign) Express user account. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to these terms and conditions, please confirm your agreement by clicking the 'I agree' button at the bottom of this document. Getting paper copies At any time, you may request from us a paper copy of any record provided or made available electronically to you by us. For such copies, as long as you are an authorized user of the DocuSign system you will have the ability to download and print any documents we send to you through your DocuSign user account for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. To indicate to us that you are changing your mind, you must withdraw your consent using the DocuSign 'Withdraw Consent' form on the signing page of your DocuSign account. This will indicate to us that you have withdrawn your consent to receive required notices and disclosures electronically from us and you will no longer be able to use your DocuSign Express user account to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through your DocuSign user account all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. Electronic Record and Signature Disclosure created on: 4/20/2015 2:25:38 PM Parties agreed to: Chamindra Dassanayake (CD), PhD, PE, Robin Fox How to contact City of Denton: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: kevin.gunn@cityofdenton.com To advise City of Denton of your new e-mail address To let us know of a change in your e-mail address where we should send notices and disclosures electronically to you, you must send an email message to us at kevin.gunn@cityofdenton.com and in the body of such request you must state: your previous e-mail address, your new e-mail address. We do not require any other information from you to change your email address.. In addition, you must notify DocuSign, Inc to arrange for your new email address to be reflected in your DocuSign account by following the process for changing e-mail in DocuSign. To request paper copies from City of Denton To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an e-mail to kevin.gunn@cityofdenton.com and in the body of such request you must state your e-mail address, full name, US Postal address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Denton To inform us that you no longer want to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your DocuSign account, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an e-mail to kevin.gunn@cityofdenton.com and in the body of such request you must state your e-mail, full name, IS Postal Address, telephone number, and account number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software Operating Systems: Windows2000? or WindowsXP? Browsers (for SENDERS): Internet Explorer 6.0? or above Browsers (for SIGNERS): Internet Explorer 6.0?, Mozilla FireFox 1.0, NetScape 7.2 (or above) Email: Access to a valid email account Screen Resolution: 800 x 600 minimum Enabled Security Settings: •Allow per session cookies •Users accessing the internet behind a Proxy Server must enable HTTP 1.1 settings via proxy connection ** These minimum requirements are subject to change. If these requirements change, we will provide you with an email message at the email address we have on file for you at that time providing you with the revised hardware and software requirements, at which time you will have the right to withdraw your consent. Acknowledging your access and consent to receive materials electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please verify that you were able to read this electronic disclosure and that you also were able to print on paper or electronically save this page for your future reference and access or that you were able to e-mail this disclosure and consent to an address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format on the terms and conditions described above, please let us know by clicking the 'I agree' button below. By checking the 'I Agree' box, I confirm that: • I can access and read this Electronic CONSENT TO ELECTRONIC RECEIPT OF ELECTRONIC RECORD AND SIGNATURE DISCLOSURES document; and • I can print on paper the disclosure or save or send the disclosure to a place where I can print it, for future reference and access; and • Until or unless I notify City of Denton as described above, I consent to receive from exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to me by City of Denton during the course of my relationship with you.