Loading...
Intent to AwardTotal Price $12,705.00 Line #Description Mfgr Mfgno QTY UOM Estimated Unit Extended 1 ACTION 1 EA 2 BASIC INSPECTION REPORT 1 PER WELL $525.00 $525.00 3 LOW PRIORITY INSPECTION REPORT 1 PER WELL $560.00 $560.00 4 MODERATE PRIORITY INSPECTION REPORT 1 PER WELL $560.00 $560.00 5 POST PRODUCTION INSPECTION REPORT 1 PER WELL $755.00 $755.00 6 ANNUAL SUMMARY REPORT 1 REPORT $6,500.00 $6,500.00 7 OTHER DIRECT CHARGES 1 EA 8 SUMA CANISTER (EPA METHOD TO-14)1 PER SAMPLE $200.00 $200.00 9 SUMA CANISTER (EPA METHOD TO-15)1 PER SAMPLE $225.00 $225.00 10 VOC Collection (EPA Method TO-17) includes pump, tubing and sample media1 PER SAMPLE $115.00 $115.00 11 Noise Survey (continuous 72-hour period)1 PER EVENT $2,350.00 $2,350.00 12 Add Fenceline Observations A thru E to Inspection 1 PER PADSITE $145.00 $145.00 13 Add Fenceline Observations A thru G to Inspection 1 PER PADSITE $205.00 $205.00 14 JOB TITLE 1 EA 15 PROGRAM MANAGER 1 PER HOUR $155.00 $155.00 16 PROJECT MANAGER 1 PER HOUR $135.00 $135.00 17 FIELD TECHNICIAN 1 PER HOUR $105.00 $105.00 18 DRAFTING/GIS ANALYST 1 PER HOUR $105.00 $105.00 19 ADMINISTRATIVE 1 PER HOUR $65.00 $65.00 Modern Geosciences (Modern Geosciences, LLC) 8101 Addendum 1 - Page 1