Loading...
Elec Substation Galvanized Tubular Steel Structure-5841-Amendment MATERIALS MANAGEMENT DIVISION  901B TEXAS STREET  DENTON, TEXAS 76201 940.349.7100  FAX 940.293.1837 “Dedicated to Quality and Service” www.cityofdenton.com May 16, 2016 Mr. Nathan Chan Techline, Inc. 5401 Martin Street Fort Worth, TX 76119 Ref: RFP 5841 – Supply of Substation Tubular Steel (1st Amendment) Mr. James: The City of Denton (COD) has reviewed and accepts the addition of the following new line items to contract 5841 with your firm: Line Description Part # Unit Cost Delivery 23 H-frame take-off tubular steel structure 6.0 Kip, 55’ shaft w/20 connecting bolts TO2 $13,360.00 8 Weeks 24 40' H-frame take-off structure beam - 6.0 Kip, 37’-6” Beam w/10 connecting bolts 40TOB2 $2,945.00 8 Weeks 25 Anchor bolt assemblies for 6.0 Kip TO2, Qty 8 each, 2-1/4” x 7’ w/template A615 gr 75 Anchor Cage $2,155/set 8 Weeks All terms and conditions of the contract shall apply. We look forward to future business with Techline. Regards, Karen E. Smith, A.P.P Assistant Purchasing Manager