Loading...
Exhibit 2 - Pricing EvaluationPowell Electrical Systems, Inc.Crown Technical Systems Houston, TX Fontana, CA Line #Description QTY UOM Unit Unit 1 2 Line 1. Basic Building 4 EA $1,437,136.00 $1,636,134.03 3 4 Line 2. Price to increase length of building in 1' increments 4 EA $8,746.00 $6,914.00 5 Line 3. Deduction to decrease length of building in 1' increments 1 EA -$8,746.00 -$6,914.00 6 Line 4. Price to increase length of marshalling room in 1' increments 1 EA $8,746.00 $6,914.00 7 Line 5. Switchgear building with switchgear, marshalling room, doors, and other equipment on the opposite side of building (mirror of the standard floor plan)1 EA $1.00 $1.00 8 9 Line 6. Substitute 25kV insulators for the bus (if feasible)1 EA $1.00 $1.00 10 Line 7. Substitute porcelain bus insulators 1 EA $2,112.00 $1.00 11 Line 8. Additional 1200A feeder section (would also require lengthening the building by 4 feet; include only switchgear pricing on this line)1 EA $87,292.00 $125,259.00 12 Line 9. Remote circuit breaker racking capability (attached description)4 EA $2,650.00 $3,223.00 13 Line 10. Thermal monitoring for typical locations as described in the specification 4 EA $47,598.00 $34,866.00 14 Line 11. Additional battery charger (Refer to section J in spec)2 EA $14,734.00 $9,085.00 15 Line 12. Additional set of station batteries (Refer to Section J in spec)4 EA $49,021.00 $49,346.00 Item #Powell Electrical Systems Inc.Crown Technical Systems 1 4.00 3.00 2 28.00 28.00 3 18.67 13.33 4 40.00 38.00 90.67 82.33 Evaluation Exhibit 2 Section A - Basic Building Section B - Building Options Section C - Switchgear Options RFP 8156 - Pricing Evaluation for Medium Voltage Switchgear Buildings Respondent's Business Name: Principal Place of Business (City and State): Delivery/Project Schedule - 5% Standard Criteria Total Score: Compliance with Specifications - 35% Probable Performance - 20% Price, Total Cost of Ownership - 40%