Loading...
6138 - Data Cabling Services: Design and Installation, Addendum 1 Purchasing Department 901-B Texas St. Denton, TX 76209 (940) 349-7100 www.dentonpurchasing.com ADDENDUM #1 RFP # 6138 DATA CABLING SERVICES: Design and Installation FOR THE CITY OF DENTON Issue Date: November 11, 2016 Response due Date and Time (Central Time): Tuesday, November 15, 2016, 11:00 a.m. RFP #6138 ADDENDUM #1 Addendum #1 to be returned with RFP Proposal The following are the discussion key points shared during the Pre-Submittal Conference: The most common type of copper installation is Category 6; however, 6A may become more common in the future. This contract only involves the fiber installation inside a building. Denton Municipal Electric is responsible for the fiber installation in between buildings. There will be television installs on occasion. The wireless and security camera installation are becoming more frequent at the City of Denton. Shielding will be required for cameras. The specified project work involves new facility acquisition or new construction. While standardization at the City is important, the City is open to review and consider alternative and equivalent brands. The brands listed in the specifications are the preferred brands. Mounting equipment can be asked to be a part of the labor cost. City staff will review and consider submitted requests to utilize subcontractors. While it is not preferred due to past negative experiences, City staff will evaluate and consider all proposals. Generally, the day-to-day expectations are in between two to five drops. As projects are approved, expectations can increase and drops can increase to 10 drops per day. The City’s expectation for response time is very important, even if it is for 1 to 2 drops, within 24 to 48 hours. When possible, City staff will try to group together small jobs into one call to the contractor. NO OTHER CHANGES AT THIS TIME. Please acknowledge addendum on Attachment F of the main RFP document when submitting a proposal.