Loading...
Exhibit 2 - Pricing EvaluationStuart C. Irby KBS Electrical Distributors, Inc.Anixter Inc.Texas Electric Cooperatives Fort Worth, TX Bryan, TX Denton, TX Georgetown, TX Line #Description QTY UOM Unit Pricing Unit Pricing Unit Pricing Unit Pricing 1 SWITCHGEAR,PME9,600A ; Manual PME-9 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit 1 EA $22,630.00 $23,830.10 $23,920.00 $24,470.00 2 SWITCHGEAR,PME10,600A ; Manual PME-10 configuration, Padmounted Switchgear, 14.4kV nominal, 3-Phase unit.1 EA $23,686.00 $24,327.64 $24,420.00 $24,980.00 3 SWITCHGEAR,PME11,600A ; Manual PME-11 configuration, Padmounted Switchgear, 14.4kV nominal, 3-Phase unit.1 EA $24,399.00 $25,693.07 $25,790.00 $26,385.00 4 SWITCHGEAR,PME12,600A ; Manual PME-12 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit.1 EA $25,572.00 $26,264.90 $26,364.00 $26,970.00 5 SWITCHGEAR,PME9,600A,ATO ; Supervisory PME-9 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with S&C 6802 control as specified in the technical specifications.1 EA $96,359.00 $101,466.49 $101,853.00 $104,195.00 6 SWITCHGEAR,PME10,600A,2ATO ; Supervisory PME-10 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with S&C 6802 control as specified in the technical specifications. (2 motor operated switches)1 EA $95,031.00 $100,068.43 $100,449.00 $102,760.00 7 SWITCHGEAR,PME10,600A,3ATO ; Supervisory PME-10 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with two (2) S&C 6802 controls as specified in the technical specifications. (3 motor operated switches)1 EA $130,162.00 $137,060.82 $137,583.00 $140,745.00 8 SWITCHGEAR,PME10,600A,4ATO ; Supervisory PME-10 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with two (2) S&C 6802 controls as specified in the technical specifications. (4 motor operated switches)1 EA $142,802.00 $150,370.55 $150,943.00 $154,415.00 9 SWITCHGEAR,PME11,600A,2ATO ; Supervisory PME-11 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with S&C 6802 control as specified in the technical specifications. (2 motor operated switches)1 EA $94,935.00 $99,967.12 $100,348.00 $102,655.00 10 SWITCHGEAR,PME11,600A,3ATO ; Supervisory PME-11 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit with two (2) S&C 6802 controls as specified in the technical specifications. (3 motor operated switches)1 EA $130,045.00 $136,938.12 $137,459.00 $140,620.00 11 SWITCHGEAR,PME9,200A ; Manual PME-9 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit, 200A 1 EA $23,762.00 $25,022.18 $25,117.00 $25,695.00 12 SWITCHGEAR,PME10,200A ; Manual PME-10 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit, 200A 1 EA $25,372.00 $26,717.41 $26,819.00 $27,435.00 13 SWITCHGEAR,PME11,200A ; Manual PME-11 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit, 200A 1 EA $25,509.00 $26,199.61 $26,299.00 $26,905.00 14 SWITCHGEAR,PME12,200A ; Manual PME-12 configuration, Padmounted Switchgear, 14.4 kV nominal, 3-Phase unit, 200A 1 EA $25,627.00 $26,985.32 $27,088.00 $27,710.00 15 SWITCH CONTROL, AUTO 6801-A1F01H9JB1K1P0R164R98W2 1 EA $20,695.00 $21,792.67 $21,875.00 $22,380.00 16 SWITCH CONTROL, AUTO 6802-A2F01H15JB7K2P0R164R98W2 1 EA $25,543.00 $26,897.52 $27,000.00 $27,620.00 Exhibit 2 RFP 8374 - Pricing Evaluation for Distribution Automation and Controls Respondent's Business Name: Principal Place of Business (City and State): Stuart C. Irby KBS Electrical Distributors, Inc.Anixter Inc.Texas Electric Cooperatives Fort Worth, TX Bryan, TX Denton, TX Georgetown, TX Line #Description QTY UOM Unit Pricing Unit Pricing Unit Pricing Unit Pricing Exhibit 2 RFP 8374 - Pricing Evaluation for Distribution Automation and Controls Respondent's Business Name: Principal Place of Business (City and State): 17 INTELLICAP 2000 AUTO CAP CONTROL, 240160-JB1M3N1P0R88S2 1 EA $5,131.00 $5,403.14 $5,423.00 $5,550.00 18 SCADA-MATE SD SWITCHING SYSTEM, 25KV UPRIGHT EXTRA MOUNTING-POLE CLEARANCE SWITCH #358213R1-A1DE3G45-SXXX (FOR MOUNTING ON STEEL POLES)1 EA $23,521.00 $24,767.78 $24,892.00 $25,435.00 19 SCADA-MATE SD SWITCHING SYSTEM, 15KV UPRIGHT EXTRA MOUNTING-POLE CLEARANCE SWITCH #358212R1-A1DE3G45P1 1 EA $21,331.00 $22,462.44 $22,548.00 $23,065.00 20 TripSaver II recloser, 15kV, 100 amps, 6.3kA with polymer cutout 1 EA $4,362.00 $4,701.65 $4,497.00 $4,600.00 21 TripSaver II recloser, 15kV, 200 amps, 6.3kA with polymer cutout 1 EA $4,778.00 $5,150.55 $4,926.00 $5,040.00 22 FLEXIBLE COMMUNICATION GATEWAY FOR TRIPSAVER II, WITH BACKUP BATTERY, READY FOR EXTERNAL ETHERNET DEVICE (R323)1 EA $4,336.00 $4,674.48 $4,457.00 $4,575.00 23 AC Power Cable, 30' length, for TripSaver II Gateway 1 EA $279.00 $342.66 $288.00 $295.00 24 CS-L-X-M03-M03 CURRENT SENSOR CABLE, 3 FT, S&C control to junction bocx 1 EA $290.00 $356.10 $299.00 $305.00 25 15.5 KV 60 HZ DISCONNECT STYLE UPRIGHT-CROSSARM INTELLIRUPTER WITH R164-RUGGEDCOM SINGLE-MODE ST CONNECTORS FIBER-OPTIC MODEM RS900-24-P-T2-T2-00-XX 1 EA $48,163.00 $50,716.37 $50,909.00 $52,080.00 26 INTELLIRUPTER MODULE HANDLING HANDLE 1 EA $157.00 $192.16 $161.00 $165.00 27 18-FOOT SINGLE MODE LIQUID-TIGHT CABLE ASSEMBLY WITH ST CONNECTORS 1 EA $1,983.00 $2,138.19 $2,045.00 $2,090.00 28 TripSaver II recloser, 25kV, 100 amps, 6.3kA with polymer cutout 1 EA $5,157.00 $5,699.87 $5,451.00 $5,575.00 29 TripSaver II recloser, 25kV, 200 amps, 6.3kA with polymer cutout 1 EA $5,596.00 $6,184.21 $5,915.00 $6,050.00 30 27 KV 60 HZ DISCONNECT STYLE UPRIGHT-CROSSARM INTELLIRUPTER WITH R164-RUGGEDCOM SINGLE-MODE ST CONNECTORS FIBER-OPTIC MODEM RS900-24-P-T2-T2-00-XX 1 EA $54,481.00 $57,368.98 $57,587.00 $58,910.00 31 25kV Padmount IR 1 EA $81,607.00 $85,932.46 $86,259.00 $88,240.00 32 55' control cable for Scada-Mate 1 EA $1,841.00 $1,984.62 $1,898.00 $1,940.00 33 35' control cable for Scada-Mate 1 EA $1,830.00 $1,972.80 $1,887.00 $1,930.00 34 Battery charger for R/S PME gear with 6802 control 1 EA $3,019.00 $3,254.54 $3,112.00 $3,185.00 35 Battery for IntelliRupter 1 EA $312.00 $382.98 $322.00 $330.00 36 Battery for 6801/6802 control 1 EA $395.00 $483.75 $406.00 $415.00 37 Line post sensor 15kV (for cap control)1 EA $1,282.00 $1,382.14 $1,322.00 $1,350.00 38 Line post sensor 25kV (for cap control)1 EA $1,446.00 $1,559.34 $1,491.00 $1,525.00 39 Vista SD manual, Model 422, 25kV, 600 amp 1 EA $111,915.00 $117,847.02 $118,296.00 $121,015.00 40 Vista SD manual, Model 422, 25kV, 200 amp 1 EA $112,334.00 $118,288.27 $118,739.00 $121,470.00 41 Vista SD manual, Model 431, 25kV, 600 amp 1 EA $109,553.00 $115,359.32 $115,799.00 $118,460.00 42 Vista SD manual, Model 431, 25kV, 200 amp 1 EA $110,294.00 $116,139.40 $116,582.00 $119,260.00 43 Vista SD Remote Sup, Model 422, 25kV, 600 amp 1 EA $178,625.00 $188,092.36 $188,809.00 $193,150.00 Stuart C. Irby KBS Electrical Distributors, Inc.Anixter Inc.Texas Electric Cooperatives Fort Worth, TX Bryan, TX Denton, TX Georgetown, TX Line #Description QTY UOM Unit Pricing Unit Pricing Unit Pricing Unit Pricing Exhibit 2 RFP 8374 - Pricing Evaluation for Distribution Automation and Controls Respondent's Business Name: Principal Place of Business (City and State): 44 Vista SD Remote Sup, Model 431, 25kV, 600 amp 1 EA $207,189.00 $218,169.84 $219,001.00 $224,035.00 45 Vista SD Remote Sup, Model 624, 25kV, 600 amp 1 EA $242,875.00 $255,747.57 $256,722.00 $262,625.00 46 Vista SD Remote Sup, Model 633, 25kV, 600 amp 1 EA $271,400.00 $285,784.53 $286,873.00 $293,465.00 47 Metal Enclosed Switchgear - 15kV - 4-bay lineup per CDA-817422 1 EA $157,773.00 $166,135.34 $166,768.00 $170,600.00 48 Metal Enclosed Switchgear - 25kV - 4 bay lineup per CDA-2590034 1 EA $167,170.00 $176,029.84 $176,701.00 $180,760.00 49 SMU-20 fuse unit, 15kV, 100E 1 EA $167.00 $212.50 $173.00 $185.00 50 SMU-20 fuse unit, 15kV, 10E 1 EA $167.00 $212.50 $173.00 $185.00 51 SMU-20 fuse unit, 15kV, 125E 1 EA $167.00 $212.50 $173.00 $185.00 52 SMU-20 fuse unit, 15kV, 150E 1 EA $167.00 $212.50 $173.00 $185.00 53 SMU-20 fuse unit, 15kV, 15E 1 EA $167.00 $212.50 $173.00 $185.00 54 SMU-20 fuse unit, 15kV, 20E 1 EA $167.00 $212.50 $173.00 $185.00 55 SMU-20 fuse unit, 15kV, 25E 1 EA $167.00 $212.50 $173.00 $185.00 56 SMU-20 fuse unit, 15kV, 30E 1 EA $167.00 $212.50 $173.00 $185.00 57 SMU-20 fuse unit, 15kV, 40E 1 EA $167.00 $212.50 $173.00 $185.00 58 SMU-20 fuse unit, 15kV, 50E 1 EA $167.00 $212.50 $173.00 $185.00 59 SMU-20 fuse unit, 15kV, 65E 1 EA $167.00 $212.50 $173.00 $185.00 60 SMU-20 fuse unit, 15kV, 80E 1 EA $167.00 $212.50 $173.00 $185.00 61 SML-20 end fittings (use in PMH gear)1 EA $482.00 $591.25 $497.00 $185.00 62 SME-20 end fitting (use on PME gear)1 EA $476.00 $585.00 $492.00 $510.00 63 SMU-20 fuse unit, 25kV, 100E 1 EA $175.00 $222.50 $181.50 $505.00 64 SMU-20 fuse unit, 25kV, 10E 1 EA $175.00 $222.50 $181.50 $190.00 65 SMU-20 fuse unit, 25kV, 125E 1 EA $175.00 $222.50 $181.50 $190.00 66 SMU-20 fuse unit, 25kV, 150E 1 EA $175.00 $222.50 $181.50 $190.00 67 SMU-20 fuse unit, 25kV, 15E 1 EA $175.00 $222.50 $181.50 $190.00 68 SMU-20 fuse unit, 25kV, 20E 1 EA $175.00 $222.50 $181.50 $190.00 69 SMU-20 fuse unit, 25kV, 25E 1 EA $175.00 $222.50 $181.50 $190.00 70 SMU-20 fuse unit, 25kV, 30E 1 EA $175.00 $222.50 $181.50 $190.00 71 SMU-20 fuse unit, 25kV, 40E 1 EA $175.00 $222.50 $181.50 $190.00 72 SMU-20 fuse unit, 25kV, 50E 1 EA $175.00 $222.50 $181.50 $190.00 73 SMU-20 fuse unit, 25kV, 65E 1 EA $175.00 $222.50 $181.50 $190.00 74 SMU-20 fuse unit, 25kV, 80E 1 EA $175.00 $222.50 $181.50 $190.00 $2,877,616.00 $3,030,702.90 $3,038,955.00 $3,108,940.00Total: Stuart C. Irby KBS Electrical Distributors, Inc.Anixter Inc.Texas Electric Cooperatives Fort Worth, TX Bryan, TX Denton, TX Georgetown, TX Line #Description QTY UOM Unit Pricing Unit Pricing Unit Pricing Unit Pricing Exhibit 2 RFP 8374 - Pricing Evaluation for Distribution Automation and Controls Respondent's Business Name: Principal Place of Business (City and State): Item #Stuart C. Irby KBS Electrical Distributors, Inc.Anixter Inc. Texas Electric Cooperatives 1 30.00 30.00 30.00 30.00 2 15.00 14.00 14.00 11.00 3 15.00 10.00 10.00 10.00 4 30.00 28.47 28.40 27.76 90.00 82.47 82.40 78.76Total Score: Delivery/Project Schedule - 30% Compliance with Specifications - 20% Probable Performance - 20% Price, Total Cost of Ownership - 30% Scoring Criteria Evaluation