Loading...
Electronic Meter Reading System-4485-Scope of Work STATEMENT OF WORK (“SOW”) NO. 2010-02 File 4485 This Statement of Work (SOW) defines a Statement of Services, Schedule and Price for work to be completed by Trilliant Networks, Inc. (“Trilliant”) for Denton Municipal Electric (“Customer” or “DME”). Unless specified otherwise within this SOW all work completed under this Statement of Work will be in accordance with the terms of the Agreement for Advanced Metering Infrastructure (“AMI”) Project dated 063010. AUTHORIZATION This Statement of Work is authorized and made an attachment to the above-identified Agreement. Authorized by: Accepted by: Customer Trilliant SignatureonFile Tit Da Trilliant Confidential STATEMENT OF WORK (“SOW”) This document provides the Statement of Work (“SOW”) for Denton Municipal Electric Phase 2 and 3 of the Customer Smart Grid communications infrastructure deployment project. The document includes responsibilities for both Trilliant and Customer. Any exceptions outside of this statement of work require change order documentation and a mutual agreement by all parties. Project Objective This Statement of Work document is focused on Phase 2 and 3 of the project that is expected to be completed during the Denton Fiscal year of 2011-2012. The objectives of Phase 2 and 3, which will run from the date of contract signing to September 30, 2012, will be to: 1.Complete installation of SecureMesh Network, per network design delivered in Phase 1. 2.Installation of electric meters as delivered through SOWs in DME service territory. 3.Transition of HES, currently hosted by Trilliant, to DME Facilities. 4.Implement integration with Itron IEE MDMS. Scope of Work Overview Specifically, Trilliant will provide the following services during Phase 2 and 3: 1.Procurement of required WAN/NAN equipment per Network Design delivered during Phase 1. 2.Provide Hosting Services for UnitySuite head end system and Phase 1 deployed meters at Trilliant headquarters in Redwood City, California 3.Maintain Hosted solution during Phase 2 until transferred to DME on or before September 30, 2011. 4.UnitySuite NEMS at Denton a.NEMS is run by Trilliant while hosting HES 5.Transition of HES system from Trilliant Hosting Facilities to DME Facilities a.Transition scheduled to begin during phase 2 and be completed on or before September 30, 2011. 6.Support integration of the hosted Trilliant UnitySuite with Itron IEE MDMs 7.Operate the Trilliant solution on a daily basis to ensure the data is available for 98% of meters by 9 AM Pacific Time the following day. 8.Implement security on the SecureMesh communications network Project Deliverables To meet the above objectives Trilliant shall provide the following deliverables: 1. Hardware Trilliant will provide procurement and integration services for Phase 2 and 3 including the following activities: Manage the network equipment ordering. Ensure that meter and module configurations are consistent and accurate. Serve as the single point-of-contact for manufacturing, delivery and failure issues. Trilliant shall provide the following SecureMesh Communication Network infrastructure, metering and other end-point products: Network Equipment: WAN Devices SecureMesh Gateways o SecureMesh Extender Bridges o NAN Devices SecureMesh Repeaters o SecureMesh Meters o 2. Program Management and Deployment Support Services Trilliant shall provide services to support the delivery and deployment of the solution at Customer. Following is a description of the included services as outlined in the Price section following. Project Management: The project director shall be responsible for Trilliant’s portion of the project acting as the lead for overall project management services including: Ensure collaboration as needed for a successful delivery of Phase 2 and 3 Submit Trilliant deliverables based on the most-current, approved Denton project plan with authorization to provide approvals and escalation as required Request information necessary to order and configure network and meter products for Denton Attend status calls with Denton including network and meter performance debriefs Create with client success criteria for Phase 2 and 3 Provide weekly status reports including Tracking of time and expenses o Status of deliverables per the most-current, approved project plan o Coordinate and escalate with Trilliant executives and resources as appropriate Assist in tracking and managing issues Support change control Develop and maintain the detailed project plan, which will be reviewed at weekly status meetings to ensure the schedule is achieve Training Services – based on a mutually agreed upon number of individuals to be trained: Trilliant will provide during Phase 2 the following training-related items: Courses User training for UnitySuite Metering software o Use of ProCare field tool o Field installation of Hardware including meters and collectors o Documentation Electronic copies of presentations, user guides and other documentation covered in the o training course. Acceptance Testing Services : Operate the Trilliant solution on a daily basis to ensure data is available for 98% of meters by 9 AM Pacific Time the following day. 3. Services Assurance and other Support Services Head End System Implementation Trilliant shall provide and be responsible for the tasks and services described below #Key Deliverables/Activities Description 1. Analyze Requirements identification and analysis 2. Design Consultation on sizing and configuration of the overall system components, inputs, outputs and data flow 3. Construct Installation and configuration of the Trilliant UnitySuite system to support integration with the MDMS and others as identified 4. Test Creation and execution of functional test plans and support for integration and system test plans and testing 5. Train Creation and execution of training plans throughout project 6. Implement Go Live Planning, Transition and Production Support 1.Analyze Phase The completion of this deliverable will occur when the Phase 2 project is closed. Deliverable Assumptions 1.All project resources will use methodologies, tools and templates as mutually agreed upon by DME and Trilliant Project Managers. All deliverables completed by Trilliant will conform to standards defined and agreed upon by DME and Trilliant. 2.Trilliant will provide the DME team members with a standard set of Trilliant documentation such as technical architecture, functional and technical specifications, training materials etc. for DME’s use in preparing for and executing the Project. DME will provide a single issue tracking / resolution tool for the entire project team. 3. 4.Trilliant has identified requirements workshops for UnitySuite product components and configuration, and data conversion requirements. Trilliant expects that the appropriate DME Subject Matter Experts will be able to participate in these workshops. Poor attendance or inability to quickly resolve discussion items within the workshops (e.g., within 24 hours) will increase the time to complete the requirements gathering activities. Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility 1. Kick-off Meeting - First on-site meeting of the Project Schedule the Host meeting at their meeting and provide location and invite Team. The sessions will include: agenda participants. System demonstration if required System Training Definition of roles and responsibilities Discussion of the documentation that will be used in the course of the project. Review Project schedule System architecture discussions Set “next steps” and action items Establish regular Project review meetings schedule Solution Analysis Description, Strategy and Completion Criteria The approach to this deliverable will start with a joint review of the defined business requirements, Trilliant system architecture requirements and DME IT requirements. From this review, the Trilliant and DME teams can finalize the detailed requirements to be included in this phase. Requirements documents will be created by Trilliant, with input expected from both DME and the MDMS vendor. Once the requirements have been reviewed and accepted by DME, Trilliant will be able to develop an overall plan for the integration component of the project, encompassing: Functional Design Integration implementation and testing, including connectivity Training Deployment At the completion of this plan, the integrations required to pass data to and from the UnitySuite system are defined in support of the Meter to Bill capability, per the project plan. Deliverable Assumptions 1.Integration will utilize existing UnitySuite interface functions to integrate with the Itron MDMS system 2.File vs. service based integration for each type of information passed will be determined during execution of SOW. Generally it is expected that larger files (e.g. daily meter reads and profile data) to be passed using file-based processes, while direct call-response activities (e.g. ad hoc read requests and disconnect commands) to be supported using web services. As detailed requirements are established, the type of interface will be finalized. Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility 1Lead all activities Will participate in all Solution Requirements Facilitate workshops. Workshops. Activities include: Coordinate internal Workshops to include (not necessarily Scheduling the resources. presented in this order): session Coordinate bringing Session 1 : Core Functional Processes Preparing agenda in other vendors, as Requirements Facilitating the needed, for sessions. a.Data collection / retrieval workshops Provide facilities for b.Error handling Capturing decisions, sessions. c.Data Migration action items and issues Session 2 : Interfaces & Integration a.Imports b.Exports c.Interfaces & APIs Session 3: Reporting & Administration a.Reporting b.System Administration c.Security Session 4: Technical Requirements a.Hardware, O/S, storage b.Network c.Database d.Environments 2.Design Phase Description, Strategy and Completion Criteria Trilliant and DME will sign off on the requirements documents before proceeding with configuration and build of associated components. At the completion of this deliverable, DME and Trilliant will have agreed to and documented the configuration and system architecture. Deliverable Assumptions 1.DME will ensure that subject matter experts are available for all system components that will integrate with the UnitySuite system or use UnitySuite data. 2.Trilliant will work with DME to schedule design sessions and produce the system architecture and configuration documents. 3.System configuration documentation (technical architecture and business designs) will include flow charts, process outputs and report descriptions, as needed. 4.DME has some documented existing (As-Is) business processes, known requirements, current system architecture and file structure / data model and data flow. Trilliant has an assumed time requirement for review but not creation of associated documentation. 5.DME will provide resources to support development effort including access to Itron IEE experts during the design phase and testing of file formats as the IEE interface process is developed. 6.DME is responsible for any data extractions, data updates or customization to internal systems. Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility 1. Confirm hardware requirements and Primary Support with DME IT configuration guidelines for UnitySuite requirements solution applications. 2. Determine number of environments and Shared Shared requirements for each (production, test, etc….) to include installation planning and configuration management 3. Complete System Architecture design Trilliant will write DME will review document and sign upon document and sign document. agreement.upon agreement. 4. Procure Hardware Primary Complete UnitySuite 5. Primary responsibility Participate in design implementation design documents. for creation and sessions and review / sign-off on completed Document(s) define: documentation. document. Solution Design ( requirements for Integration points(e.g. MDMS), system operations, security requirements) Technical configuration and setup. Confirm requirements for data to be used for testing and develop plan to support. Transition Plan from Itron Hosting to an environment hosted by DME 6. Design IEE interface Primary Support 3.Construct Phase Description, Strategy and Completion Criteria This phase includes the installation and configuration of UnitySuite as defined by the System Architecture design and UnitySuite implementation design documents. This phase also includes functional testing of UnitySuite to confirm stand-alone operation as defined in the UnitySuite functional test plan. At the completion of this deliverable, UnitySuite HES is installed, tested and ready for operation and integration testing. DME and Trilliant will sign off on the configuration, installation and functional testing of UnitySuite. Deliverable Assumptions 1.It is expected that a test system will be available during the implementation of this project. It is advisable to maintain a test system at all times. If a test system is not maintained and DME requires Trilliant to perform trouble-shooting, upgrades, customizations, or other work on the system(s), then additional estimates, time and costs may be required. 2.DME will be responsible for developing and implementing any disaster recovery (DR) plan, including procuring, installing and testing necessary hardware and UnitySuite and securing any required services and resources. 3.DME will provide Trilliant a local administrator account on all UnitySuite servers for remote Trilliant access. This will include VPN (or equivalent) access to the system as agreed between DME and Trilliant. 4.Devices secured by the Trilliant hosted system will need to be re-secured on DME’s hosted system. 5.All prerequisite hardware and operating system, database and any 3rd party software for the HES and Trilliant testing tools, are the responsibility of DME and will be installed and configured by DME. 6.Desktop requirements for all DME systems users will be the responsibility of DME’s IT group to purchase, install and configure prior to the start of the Construct Phase. Deliverable Tasks #Task and Description Trilliant DME Responsibility Responsibility 1Installation and configuration of Primary Support UnitySuite in DME environments 2Functional Testing of UnitySuite Primary Support 4.Test Phase Description, Strategy and Completion Criteria To ensure component, system and solution operation, testing will occur throughout the phases of the project. Note that the efforts required for some testing is included in other deliverables and noted below. At the completion of this deliverable, all testing provided within the scope of this project has been performed. Deliverable Assumptions 1.DME will provide environments for testing. 2.Each testing deliverable will have a test plan with test scenarios agreed to by DME and Trilliant. 3.To ensure that the DME system is fully operational and ready to support DME business objectives, the testing approach will include the following activities/deliverables: Test Plan – identifies the approach, roles and responsibilities, test cases and success criteria. Test Cases – designed to validate functionality, scalability, security and usability. Pre-Testing – provide a pre-testing session to ensure all participants understand the solution and testing procedures. Testing – the actual execution of the tests. Obtain Test Case Sign-Off – ensures test was completed and expected results achieved. Obtain Solution Test Sign-Off – marks the end of the testing and DME is ready to deploy in a production environment. 4.During testing, the following types of tests are typically conducted: Functional testing includes routine tests performed anytime a product is installed or upgraded. It ensures the application operates as expected. It also tests the hierarchy and configuration to ensure accuracy of setup and expected operations. Integration testing is performed to ensure the DME data interfaces are functioning and system components can pass data and commands as designed. End-to-End “Solution” testing is performed to ensure that all standard functionality, business scenarios, and custom functionality works as identified in the solution design. Systems Acceptance – Sign off of acceptance of system based on solution testing. 5.DME will allow authorized Trilliant staff to have access to other systems as required to facilitate integration implementation, testing and troubleshooting. 6.Once the HES has been put in production, any changes will require a backout plan before implementation on the production system. Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility Conduct Pre-Testing Training 1.Primary DME will attend all sessions Test Cases, Scripts & Data 2.Develop Support Primary 3.Confirm System Acceptance Criteria Shared Shared 4.Conduct Integration Testing Support Primary Solution Tests 5.Conduct End to End (toSupport Primary sign off on each Test Case upon completion). System Acceptance Document 6.Trilliant will prepare acceptance DME will sign upon document based on End to End agreement. Solution testing results 5.Train Phase Training Services Description, Strategy and Completion Criteria Training will be performed throughout the project to ensure that users have appropriate knowledge to install and operate the UnitySuite system. Note that some training efforts are included in other deliverables and noted below. At the completion of this deliverable, all training included in this scope of work will be performed. Deliverable Assumptions 1.DME will make appropriate staff (limited to 10 per session), facilities, PC’s available for training. They will also install appropriate UnitySuite (e.g. – Key Manager) in advance of training. It is assumed that the DME standard desktop will support UnitySuite needs for training requirements. (see Exhibit I) 2.Trilliant will provide standard documentation in support of training activities. Customized documentation or training materials are not included. 3.DME will provide environments for training Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility 1.Primary Review and Approve Develop Training Plan 2.Primary Develop Course Material 3.Primary DME to coordinate and Provide UnitySuite training for items make available appropriate resources being installed 6.Implement Phase Production Go Live, Transfer and Project Close Services Description, Strategy and Completion Criteria Prior to Go Live, Trilliant will prepare and review the Transition Plan document and process with DME and review the solution with Trilliant Support. This critical activity ensures that Trilliant Support Services is engaged early enough to learn the solution so they may begin to implement a plan for supporting DME upon Go Live. A Go/No-go decision meeting will be held to ensure that all required activities have been completed. Operational readiness will be reviewed to ensure that DME is ready to go live. DME AMI Project Management Office and other necessary approvals will also be required. After Go Live, Trilliant will work with the team to update all project documentation into a Final Report. This ensures all documentation is accounted for so DME may assume ownership. Trilliant will provide a post Phase 2 Review survey and report. It provides an opportunity to collect lessons learned in order to document key accomplishments and point out areas for improvement. Finally, to complete Phase 2 of the project, a review meeting is scheduled and sign-off is obtained. This documents that the solution objectives have been met. Deliverable Assumptions 1.Once transition of the project to Trilliant Support occurs, standard product support begins. 2.Post go-live, day to day operations will be handled by DME. Deliverable Tasks #Task and Description Trilliant Responsibility DME Responsibility Transition to Support Plan 1.Primary DME will review Schedule and conduct a meeting with Trilliant Support to discuss designed solution and support plans Conduct Operational Readiness 2.Support Primary Review Go/No-Go Decision for transition to 3.Support Primary production Prepare Project Final Report 4.Primary DME will review & sign-off (directory of all deliverables) Post Go-Live Activities 5.Primary DME will review & complete Hand out Post Project Review Survey Prepare and schedule meeting on Project Review Report System Use Determine need for 6.Shared Shared Assessment and Optimization Session and schedule Phase 2 Completion Sign-off 7.Trilliant will prepare the DME will review document and document and submit sign upon agreement. Prepare document and obtain sign for review/sign-off. off Project Assumptions The following are assumptions for this project: 1.Denton is responsible for procuring all IT hardware and UnitySuite platform (e.g. OS and DBMS UnitySuite) infrastructure 2.Denton will provide appropriate contact points and support for program management, systems integration, IT, and data center. 3.Denton will provide access to facilities (desks, internet access, meeting rooms, etc.) at the data center location(s) for working sessions during this project. DENTON will define access procedures. 4.Denton will provide Trilliant remote access (e.g., VPN) for the duration of the project to Denton environments for named engineering and technical staff. 5.Unless specifically identified in this document, no custom UnitySuite development has been included in the scope of this Statement of Work. 6.Trilliant is not providing any hosting services or servers as part of this scope. Denton is responsible for procuring, setup and configuration of servers and all associated hardware, UnitySuite and network connections for all environments to support this project including, but not limited to, development and production servers, in accordance with Trilliant recommendations and specifications. 7.Denton will be responsible for troubleshooting all network related issues. Head End System Operations During Phase 2, Trilliant will operate and monitor the UnitySuite Metering head-end system consistent with the policies and procedures in place through Phase 1 and to include: Monitoring of system performance Investigation of system anomalies Scheduled reports are received by time specified by client Data Extract files are being sent successfully Trouble tickets are handled within specified time lines of the support contract Trouble tickets are logged and reported on (daily, weekly, monthly as specified by client) Configure Denton’s network equipment in the hosted system. Provide initial configuration of operations reports for users and facilitate questions on standard data exports. Note: As stated previously, operation of the UnitySuite Metering head-end system will be transferred to DME on or before September 30, 2011. 4. UnitySuite Application Software and Hosting Services as defined by separate Hosting Agreement Hosting Services Trilliant will continue to provide the following hosting services as part of Phase 2: Support for deployed Phase 1 meters only. Support for meters deployed as part of Phase 2 and beyond will not be supported as part of current Hosting Service. Provide return material authorization (RMA) as required for inoperable or damaged equipment during the project. Provide an online trouble ticket site and support procedures to submit and track any new or outstanding issues. Follow Trilliant’s standard service levels to support ticket resolution (as noted in the Trilliant- Denton contract.) Provide Telecommunications network requirements including connectivity and equipment at the Trilliant data center facility to enable VPN connectivity to the Denton facility. Provide End-to-End Connectivity Validation Report including continual validation of end-to-end connectivity for all meters connected to the network. Roles and Responsibilities The following table outlines Trilliant resources proposed for Phase 2 and 3 of the Denton project. Final determination of resources will be determined following contract signature based on availability of Trilliant resources. TitleResponsibility Project Director Overall project management, scheduling, customer point of contact Sr. Architect / Subject Matter Expert Specialized support for implementation design Network Architect Network Design Network Planner Network design support and deployment planning System Integration Lead System deployment planning lead System Integration Analyst System deployment delivery Training Technical Consultant Training development and delivery Services Assurance Analyst System operations monitoring and reports 5. Customer Responsibilities Customer will provide the following: Data/Resources Denton will provide the following to Trilliant during Phase 2 and 3: Resources including field and office personnel to meet the Denton Detailed Project Plan including resources required to support integration of UnitySuite Metering head-end system with the Itron MDM. Hardware including a router to support the VPN as well as all facilities required to backhaul data from Trilliant Gateways to the Head End. Physical facilities required to host information technology equipment including servers to enable operation of UnitySuite Metering head-end system to be transferred from Trilliant to DME Project Management Denton will provide the following project management resources: Designated project manager with authorization to provide approvals on Trilliant work and assist Trilliant in facilitating and escalating as required across Denton to ensure successful delivery of project. Weekly status meetings with project participants, and monthly executive reviews. Training site to conduct training. Prompt review and management of approval process within Denton for SOW requests that may be submitted to support mutually identified areas of additional work for Trilliant. Development and maintenance of the project plan, with input from Trilliant. Create trouble tickets for all field devices during the project Request RMA using the Foot Prints application Impacted Procedure/Process Assessment DME will: Develop the network and meter equipment installation/removal procedures with support from Trilliant. Final standards and procedures will be approved jointly between Denton and Trilliant. Develop asset management processes associated with the NIC/infrastructure equipment tracking. Update call center processes to address customer questions. Documentation DME will, as required, document: Updates of the mapping system with installed network equipment Installation standards for field devices General Assumptions 1.DME is responsible for procuring all IT hardware and UnitySuite platform (e.g. OS and DBMS UnitySuite) infrastructure 2.DME will provide appropriate contact points and support for program management, systems integration, IT, and data center. 3.DME will provide access to facilities (desks, internet access, meeting rooms, etc.) at the data center location(s) for working sessions during this project. DME will define access procedures. 4.DME will provide Trilliant remote access (e.g., VPN) for the duration of the project to DME environments for named engineering and technical staff. 5.Unless specifically identified in this document, no custom UnitySuite development has been included in the scope of this Statement of Work. 6.For its internal systems, DME is responsible for procuring, setup and configuration of servers and all associated hardware, UnitySuite and network connections for all environments to support this project including, but not limited to, development and production servers, in accordance with Trilliant recommendations and specifications. 6. Acceptance Criteria All areas will continue to meet the contract SLA. This consists of 98% of the meters reading on time daily. 7. Schedule A detailed schedule shall be delivered within 30 days of execution of this Statement of Work and receipt of purchase order. It is expected that all of Phase 2 SOW deliverables shall be completed no later than September 30, 2011. 8. Price and Payment Terms a.Services Resources (T&E Daily Rates) Title2010 Rate DiscountDiscounted Rate Project Director $ 2,000.00 15% $ 1,700.00 Sr. Architect / Subject Matter Expert $ 2,000.00 15% $ 1,700.00 Network Architect $ 2,000.00 15% $ 1,700.00 Network Planner $ 1,350.00 15% $ 1,147.50 System Integration Lead $ 1,500.00 15% $ 1,275.00 System Integration Analyst $ 1,350.00 15% $ 1,147.50 Training Technical Consultant $ 1,350.00 15% $ 1,147.50 Services Assurance Analyst $ 1,200.00 15% $ 1,020.00 b.Pricing Summary Phase 2* Network Infrastructure and Meters Quantity Unit Price Extended Price SecureMesh WAN Gateway 0 $15,200.00 $0.00 SecureMesh Extender Bridge 13 $6,444.00 $83,772.00 SecureMesh Power Service Unit 13 $650.00 $8450.00 Mounting Kit for Gateway and Extender 13 $435.00 $5655.00 SecureMesh Repeater 6 $497.00 $2,982.00 SecureMesh Meters 7449 Per chart c, Phase 2 $662,791.57 Meter Mix and Quantities SecureMesh USB Radio 0 $150.00 $0.00 UnitySuite NEMS 1 $40,000 $40,000 Services 1 $549,270.00 $549,270.00 Hosting Service to support Phase 1 1 $0.00 Deployment* Total Price Phase 2 – Capital Budget $1,352,920.57 UnitySuite NEMS Software Maintenance 1 $8,000 $8,000 and Support – Operating Budget* c.Phase 2 Meter Mix and Quantities* Item FmClass VRes/ With WithMeter WithMeter UnitExtended Com Disc Demand Type Batt QtyPricePrice Switch 1 2S 200 240 Res YES NO AX SD NO 1992 $140.12 $279119.04 $9202.00 2 12S 200 120 Res YES NO AX-SD NO 40 $198.97 3 16S 200 120-277 Res NO NO AX Wide NO 12 $230.05 $2760.60 Range 4 2S 200 240 Res/ NO NO AL NO 5240 $ 65.12 $341228.80 Com $10444.36 5 2S 200 240 Res/ NO YES AX YES 74 $141.14 Com $1091.02 6 4S 20 240 Res/ NO YES AX YES 7 $155.86 Com $6671.45 7 9S 20 120-277 Com NO YES AX Wide YES 29 $230.05 Range 8 16S 200 120-277 Com NO YES AX Wide YES 37 $230.05 $8511.85 Range 9 16S 320 120-277 Com NO YES AX Wide NO 3 $288.66 $690.15 Range 10 2S 320 240 Res/ NO YES AX YES 5 $154.36 $771.80 Com 11 12S 200 120-277 Com NO YES AX Wide YES 5$230.05 $1150.25 Range 5 12 9S 20 120-277 Com NO YES AX Wide YES $230.05 $1150.25 Range $662,791.57 Totals d.Phase 2 Services Breakdown* Trilliant ResourcesWork DaysUnit PriceExtended Price Project Management Project Director30 $1,700$51,000 Sr. Architect/SME2.4 $1,700$4,080 System Implementation System Implementation Lead96 $1,275$122,400 System Implementation Analyst300 $1,148$344,250 Training Training Technical Consultant24$1,148$27,540 Total Services Phase 2 Price$549,270 e.Pricing Summary Phase 3* Network Infrastructure and Meters Quantity Unit Price Extended Price SecureMesh WAN Gateway 0 $15,200.00 $0.00 SecureMesh Extender Bridge 47 $353,863.00 $7,529.00* SecureMesh Repeater 6 $497.00 $2,982.00 SecureMesh Meters TBD Per chart f, Phase $662,791.57 3 Meter Mix and Quantities SecureMesh USB Radio 0 $150.00 $0.00 SecureMesh T-Stat 0 $225 $0.00 Securemesh Aztech IHD 0 $155 $0.00 Services $190,434 $190,434.00 Total Price Phase 3 - Capital Budget $1,210,070.57 UnitySuite Software Maintenance and 1 $45,100 $45,100.00 Support no DSM (Oct 2011 – Sept 2012) – Operating Budget* f.Phase 3 Meter Mix and Quantities* ItemFmClassVRes/WithWithMeter WithMeter UnitExtended ComDiscDemandTypeBattQtyPricePrice Switch $## 12S200 240ResYESNOAX SDNO$140.12 ## 212S200120ResYESNOAX-SDNO$198.97$## ## 316S200120-277ResNONoAX Wide NO$230.05 $## ## Range $## 42S200 240Res/NONOALNO$ 65.12 ## Com $## 52S200 240Res/NOYESAXYES$141.14 ## Com $## 64S20 240Res/NOYESAXYES$155.86 ## Com 79S20120-277ComNOYESAX Wide YES$230.05$## ## Range $## 816S200120-277ComNOYESAX Wide YES$230.05 ## Range 916S320120-277ComNOYESAX Wide NO$288.66$## ## Range 102S320240Res/NOYESAXYES$154.36$## ## Com $## 1112S200120-277ComNOYESAX Wide YES$230.05 ## Range Totals$## g. Phase 3 Services Breakdown* Trilliant ResourcesWork DaysUnit PriceExtended Price Project Management Project Director21.6 $1,700$36,720 System Implementation System Implementation Analyst60 $1,148$68,850 Training Training Technical Consultant24$1,148$27,540 Total Services Phase 3 Price$133,110 * Notes: Trilliant will provide Hosting Services for HES to support Phase 1 meter deployments at no charge to DME until 1. transition of HES to DME facility on or before September 30, 2011. Phase 2 meter deployments and beyond will be supported by HES at DME facility. The expense for UnitySuite Software Maintenance and Support listed in the Phase 2 and 3 Pricing Summary is 2. included in the total amount allocated for Phase 2 and Phase 3 but is identified as part of DME’s operating budget. The services total is based on estimated resource requirements and will be billed monthly based on actual time. 3. Pricing does not include Project expenses which shall be reimbursed by DME as defined in section 6.1.3 of the Agreement for Advanced Metering Infrastructure (“AMI”) Project dated 063010. Meter mix and quantities have not been finalized for Phase 3 4. The quantities shown are estimates and may be increased or decreased based upon actual needs, with no increase in 5. price. The City of Denton may release purchase orders for quantities as needed. 6. Pricing is firm for shipments through calendar year end 2011. Shipments beyond this date shall be subject to 7. escalation equal the change in the Producer Price Index Series Id: PCU334515334515 with a maximum escalation not to exceed to 3%. The Unit Price of the SecureMesh Extender Bridge indicated in the Phase 3 Pricing Summary includes the PSU and 8. Mounting Kit.