6304 - Denton Energy Center Waterline Phase 1, Addendum 2 (2) Addendum No. 2 – Page 1 of 2 ADDENDUM NUMBER 2 TO PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR CITY OF DENTON, TEXAS REQUEST FOR PROPOSAL RFP 6304 CONSTRUCTION OF DENTON ENERGY CENTER (DEC) WATER LINE IMPROVEMENTS PHASE 1 Issued January 5, 2017 TO: PROSPECTIVE PROPOSERS AND PLAN HOLDERS The Plans and Specifications for RFP 6304 CONSTRUCTION OF DENTON ENERGY CENTER (DEC) WATER LINE IMPROVEMENTS PHASE 1 shall be modified as follows: ITEM 1 EXHIBIT 1 - RFP 6304 PRICING SHEET FOR WATER LINE IMPROVEMENTS – PHASE 1 DME DENTON ENERGY CENTER 1) Replace with the attached revised Exhibit 1. A rock excavation item has been included. ITEM 2 EXHIBIT 3 – TECHNICAL SPECIFICATION, V. SPECIAL CONTRACT REQUIREMENTS AND PRICE ITEM DEFINITIONS, B. PRICE ITEMS, 1) Add the following: Item 203.X Rock Excavation General: This item shall provide for all the labor and equipment necessary to excavate all solid rock to the lines, neat lines and grades shown on the plans and standard details for trench excavation. Rock excavation shall not include gravel, cemented gravel, cobble, hardpan, and soft laminated shale. Solid rock shall be defined as rock formations, other than those excluded above, that require hard ripping, jackhammering, or other extra work beyond the capability of heavy duty trench excavating equipment such as a Caterpillar 235 or 345B Excavator. Blasting and the use of any explosives shall not be allowed. Material unsuitable for backfill and any excess material shall become the property of the contractor and disposed of appropriately, no separate pay will be given. Excavated rock shall be considered unsuitable for transporting to the spoils site or spreading out on the adjacent field along the alignment of the project. Addendum No. 2 – Page 2 of 2 Payment: Payment shall be at the unit price per cubic yard of material excavated based upon the neat line depth of excavated rock, trench width of excavated rock, and along the center line of pipe line. The trench width used for measurement shall be the actual trench width of the excavated rock or the width of the pipe outside diameter plus 24”, whichever is less. This item shall include all labor, equipment, materials, tools and incidentals required to perform the work. 2) Add the following to the payment paragraph for Item 501.7 12” R.J.D.I Water Carrier Pipe, Item 501.14 12” C900 DR 14 PVC Water, Item 501.7 16” C151 DIP CL 52, and Item 503.3 24” Steel Casing By Open Trench: The unit price shall not include rock excavation, all other required trench excavation shall be included. Rock excavation is covered in Item 203.X Rock Excavation. All other items and provisions of the contract documents not modified herein shall remain the same. THIS ADDENDUM IS MADE PART OF THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS AND SHALL BE ACKNOWLEDGED ON THE PROPOSAL. By: Robin Harris, P.E. (TX No. 110694) TEAGUE NALL & PERKINS, INC. Attachments: END ADDENDUM NUMBER 2