Loading...
6258 ADDENDUM 2 Materials Management Department 901-B Texas Street Denton, Texas 76209 ADDENDUM #2 RFP 6258 SUPPLY OF MATERIALS FOR THE REPLACEMENT OF BARRIER FLOATS/ MARKIN BUOYS FOR LAKE LEWISVILLE RAW WATER PUMP STATION INTAKE STRUCTURE NIGP CLASS and ITEM 720 17 720 25 Issue Date: January 11, 2017 Response due Date and Time (Central Time): Tuesday, January 31, 2017, 11:00 A.M. C.S.T ADDENDUM #2 RFP#6258 SUPPLY OF MATERIALS FOR THE REPLACEMENT OF BARRIER FLOATS/ MARKING BUOYS FOR LAKE LEWISVILLE RAW WATER PUMP STATION INTAKE STRUCTURE 1 RFP#6258- ADDENDUM #2 1. 18” DIAMETER Pile Float Collar- What is the application of this collar, the technical specifications of this product (stability, buoyancy, etc). The Float Collars are for the two corners in the water (Exhibit #6258-4), so they can go up and down with the water surface level. We may install pile at the center of the float collar. 2. What is the time frame for this project? The time frame upon notification of the approval of this purchase by City of Denton, will preferably be within an 8 week time frame. 3. RFP is specifying the products be Stainless Steel. However, per product specifications from various vendors, these are “Hot Deep Galvanized”. Is that a problem? We are asking for stainless steel material for all components including the Float Collar. 4. 18” x 30” Buoys w/ 1” Stainless Steel Pipe through the middle: What is the minimum thickness for “Heavy Wall” for your protection? The minimum thickness for Heavy Wall is 5 mm. NO OTHER CHANGES AT THIS TIME All Documents can be obtained by accessing the City of Denton’s Materials Management website at: https:// www.cityofdenton.com/business/soliciations-contracting This form must be signed and returned with your proposal. Name: ____________________________________ Signature: _________________________________ Company: __________________________________ Title: _____________________ Date: ____________ Addendum #2 to be returned with Proposal 6258-4 BUOY BOUNDARY MAP RFP# 6258