Loading...
6275-C - Construction of Wayfinding Signage, 3.Statement of Work/ SpecificationsWayfinding Signage Project City of Denton, TX PERFORMANCE SPECIFICATIONS SECTION 3 February 2, 2017 Denton, TX 120 North Church Street Suite 208 West Chester, PA 19380 T 484.266.0648 www.merjedesign.com Lee Engineering, LLC 3030 LBJ Freeway, Suite 1660 Dallas, TX 75234 (972) 248-3006 office (817) 528-7193 mobile www.leeengineering.com February 2, 2017 The City of Denton 01100 - 1 Wayfinding and Signage Project SECTION 01100 - SUMMARY 1. GENERAL 1. WORK COVERED BY DOCUMENTS A. Project Identification: Project consists of Vehicular, Pedestrian post and panel directional signs, parking signs, and identification signs located within The City of Denton, Texas. General sign components consist of footings, custom fabricated poles, surface painted sign panels, High Intensity grade reflective vinyl copy/arrows/background and graphic artwork. All exposed surfaces shall receive a graffiti protectant clear coating. Installations shall require Manual and Machine digging/drilling into concrete or brick paver sidewalks as well as soil. Where unforeseen conditions present themselves the fabricator will be responsible for engineering spread footers, meeting the same requirements as outlined in the design intent drawings at no additional cost to the owner. On-going coordination and sequencing will be required with current streetscape programs based on construction and installation schedules. In order to minimize impacts to existing utilities, the contractor is responsible for contacting the One Call system prior to installation and shall identify this process with in a critical path project schedule chart. Representatives from the city and design team will be available to review locations where a conflict presents it self. Custom mounting methods may be required for locations that interfere with underground utilities. Reference Section 1.3 (below) for project schedule. The final design and certification of these signs shall be the responsibility of the fabricator, approval of the design is required by MERJE and The City of Denton. B. Project Information 1. Project Location: Denton, TX 2. Owner: The City of Denton 3. Administrator: The City of Denton 4. Designer: MERJE, West Chester PA & LEE Engineering C. Designer Identification: The Contract Documents, dated July 1, 2016 were prepared by MERJE/Lee Engineering. D. The Work consists of: 1. Fabrication and Installation of Wayfinding System. 2. WORK SEQUENCE A. The Work sequence will be negotiated with the selected contractor at the time of contract award. 3. USE OF PREMISES A. General: The space available to the Contractor for the performance of the work, either exclusively or in conjunction with others performing other construction as part of the project, is shown on the sign location plans. B. Access to sign locations may be limited; obtain The City of Denton approval of proposed routes of access. C. Make other arrangements for storage. 4. WORK UNDER OTHER CONTRACTS February 2, 2017 The City of Denton 01100 - 2 Wayfinding and Signage Project A. Separate Contract: Owner has a separate contract for performance of certain construction operations at Project site. Those operations are scheduled to be substantially complete before work under this Contract begins. This contract includes the following: streetscape and road repairs B. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. 2. PRODUCTS (Not Used) 3. EXECUTION 1. PRECONSTRUCTION MEETING A. A preconstruction meeting will be held at a time and place designated by the Owner and Administrator for the purpose of clarification of the project and for the purpose of identifying responsibilities of the Owner, Administrator and the Contractors personnel and explanation of administrative procedures. B. The Contractor shall also use this meeting for the following: 1. Agenda: Construction Schedule, Safety, Security, Cleaning up, Subcontractor procedures relating to; Submittals, Change Orders, Applications for payment and record documents. 2. Attendees: Representatives from the following shall be present; The City of Denton and the consultant team. 2. SECURITY PROCEDURES A. Provide secure storage for materials B. Secure completed work as required to prevent loss or damage 3. COORDINATION A. If necessary, inform each party involved, in writing, of procedures required for coordination; include requirements for giving notice, submitting reports and attending meetings. B. Prepare coordination drawings where limited space available may cause conflicts in the locations of installed products, and when required to coordinate installation of products. 1. Where space is limited, show plan and cross section dimensions of space available, including structural obstructions. 2. Coordinate shop drawings prepared by separate entities. 3. Show installation sequence when necessary for proper installation. END OF SECTION 01100 February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 1 Wayfinding and Signage Project SECTION 01320 - CONSTRUCTION PROGRESS DOCUMENTATION 1. GENERAL 1. SUMMARY A. This Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following: 1. Construction Schedule. 2. Submittals Schedule. 3. Daily construction reports. 4. Material location reports. 5. Field condition reports. 6. Special reports. 7. Construction photographs. 2. DEFINITIONS A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources. 1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times. 2. Predecessor activity is an activity that must be completed before a given activity can be started. B. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project. C. Critical Path: The longest continuous chain of activities through the network schedule that establishes the minimum overall Project duration and contains no float. D. Event: The starting or ending point of an activity. E. Float: The measure of leeway in starting and completing an activity. 1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a jointly owned, expiring Project resource available to both parties as needed to meet schedule milestones and Contract completion date. 2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the following activity. 3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date. F. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail. G. Milestone: A key or critical point in time for reference or measurement. H. Diagram: A graphic diagram of a schedule, showing activities and activity relationships. 3. SUBMITTALS February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 2 Wayfinding and Signage Project A. Submittals Schedule: Submit 5 copies of schedule. Arrange the following information in a tabular format: 1. Scheduled date for first submittal. 2. Submittal category (action or informational). 3. Name of subcontractor. 4. Description of the Work covered. 5. Scheduled date for Administrators final release or approval. B. Preliminary Construction Schedule: Submit 5 printed copies; one a single sheet of reproducible media, and one a print. C. Contractor's Construction Schedule: Submit 5 printed copies of initial schedule, one a reproducible print and one a blue- or black-line print, large enough to show entire schedule for entire construction period. D. Construction Photographs: Submit two prints of each photographic view within seven days of taking photographs. 1. Format: 3” x 5” smooth-surface matte prints on single-weight commercial-grade stock, enclosed back to back in clear plastic sleeves that are] punched for standard 3-ring binder. 2. Identification: On back of each print, provide an applied label or rubber-stamped impression with the following information: a. Name of Project. b. Sign Location #. c. Date photograph was taken d. Name of Contractor. 3. Negatives: Submit a complete set of photographic negatives in protective envelopes as a Project Record Document. Identify date photographs were taken. E. Daily Construction Reports: Submit five copies at weekly intervals. F. Material Location Reports: Submit five copies at weekly intervals. G. Field Condition Reports: Submit five copies at time of discovery of differing conditions. H. Special Reports: Submit five copies at time of unusual event. 4. QUALITY ASSURANCE A. Prescheduling Conference: Conduct conference at Project site to comply with requirements in Division 1 Section 01010 Summary – Preconstruction Meeting. Review methods and procedures related to the Preliminary Construction Schedule and Contractor's Construction Schedule, including, but not limited to, the following: 1. Discuss constraints, including phasing and milestones 2. Review schedule for work of Owner's separate contracts. 3. Review time required for review of submittals and resubmittals and approvals 4. Review requirements for utility checks. 5. Review time required for completion and startup procedures. 6. Review and finalize list of construction activities to be included in schedule. 7. Review submittal requirements and procedures. 5. COORDINATION A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate contractors. February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 3 Wayfinding and Signage Project B. Coordinate Contractor's Construction Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports. 1. Secure time commitments for performing critical elements of the Work from parties involved. 2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence. 2. PRODUCTS 1. SUBMITTALS SCHEDULE A. Preparation: Submit a schedule of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, resubmittal, ordering, manufacturing, fabrication, and delivery when establishing dates. 1. Coordinate Submittals Schedule with list of subcontracts, the Schedule of Values, and Contractor's Construction Schedule. 2. Initial Submittal: Submit concurrently with preliminary bar-chart schedule. Include submittals required during the first 20 days of construction. List those required to maintain orderly progress of the Work and those required early because of long lead-time for manufacture or fabrication. 3. Final Submittal: Submit concurrently with the first complete submittal of Contractor's Construction Schedule. 2. CONTRACTOR'S CONSTRUCTION SCHEDULE A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of Final Completion. 1. Contract completion date shall not be changed by submission of a schedule that shows an early completion date, unless specifically authorized by Change Order. B. Activities: 1. Procurement Activities: Include procurement process activities for long lead items and major items, requiring a cycle of more than 30 days, as separate activities in schedule. Procurement cycle activities include, but are not limited to, submittals, approvals, purchasing, fabrication, and delivery. 2. Submittal Review Time: Include review and resubmittal times indicated in Division 1 Section "Submittal Procedures" in schedule. Coordinate submittal review times in Contractor's Construction Schedule with Submittals Schedule. 3. Substantial Completion: Indicate completion in advance of date established for Substantial Completion, and allow time for Designer's and Owner’s Representative administrative procedures necessary for certification of Substantial Completion. C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected. 1. Phasing: Arrange list of activities on schedule by phase. 2. Work under More Than One Contract: Include a separate activity for each contract. 3. Work by Owner: Include a separate activity for each portion of the Work performed by Owner. 4. Products Ordered in Advance: Include a separate activity for each product. Include delivery date indicated in Division 1 Section "Summary." Delivery dates indicated stipulate the earliest possible delivery date. 5. Work Restrictions: Show the effect of the following items on the schedule: a. Coordination with existing construction. February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 4 Wayfinding and Signage Project b. Uninterruptible services. c. Use of premises restrictions. d. Seasonal variations. e. Environmental control. 6. Work Stages: Indicate important stages of construction for each major portion of the Work, including, but not limited to, the following: a. Subcontract awards. b. Submittals. c. Mockups. d. Fabrication. e. Deliveries. f. Installation. g. Curing. D. Milestones: Include milestones indicated in the Contract Documents in schedule. E. Cost Correlation: At the head of schedule, provide a cost correlation line, indicating planned and actual costs. On the line, show dollar volume of the Work performed as of dates used for preparation of payment requests. F. Contract Modifications: For each proposed contract modification and concurrent with its submission, prepare a time-impact analysis using fragnets to demonstrate the effect of the proposed change on the overall project schedule. G. Bar-Chart Schedule: Submit preliminary horizontal bar-chart-type construction schedule within seven days of date established for the Notice to Proceed H. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line. Outline significant construction activities for first 30 days of construction. Include skeleton diagram for the remainder of the Work and a cash requirement prediction based on indicated activities. 3. REPORTS A. Daily Construction Reports: Prepare a daily construction report recording the following information concerning events at Project site: 1. List of subcontractors at Project site. 2. List of separate contractors at Project site. 3. Approximate count of personnel at Project site. 4. High and low temperatures and general weather conditions. 5. Accidents. 6. Meetings and significant decisions. 7. Unusual events (refer to special reports). 8. Stoppages, delays, shortages, and losses. 9. Meter readings and similar recordings. 10. Emergency procedures. 11. Orders and requests of authorities having jurisdiction. 12. Change Orders received and implemented. 13. Construction Change Directives received. 14. Services connected and disconnected. 15. Substantial Completions authorized. B. Material Location Reports: At weekly intervals, prepare a comprehensive list of materials delivered to and stored at Project site. List shall be cumulative, showing materials previously reported plus items recently delivered. Include with list a statement of progress on and delivery dates for materials or items of equipment fabricated or stored away from Project site. February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 5 Wayfinding and Signage Project C. Field Condition Reports: Immediately on discovery of a difference between field conditions and the Contract Documents, prepare a detailed report. Submit with a request for information on CSI Form 13.2A. Include a detailed description of the differing conditions, together with recommendations for changing the Contract Documents. 4. SPECIAL REPORTS A. General: Submit special reports directly to Owner within one day of an occurrence. Distribute copies of report to parties affected by the occurrence. B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project site, whether or not related directly to the Work, prepare and submit a special report. List chain of events, persons participating, response by Contractor's personnel, evaluation of results or effects, and similar pertinent information. Advise Owner in advance when these events are known or predictable. 3. EXECUTION 1. CONTRACTOR'S CONSTRUCTION SCHEDULE A. Contractor's Construction Schedule Updating: At bi-weekly intervals, update schedule to reflect actual construction progress and activities. Issue schedule 3 days before each regularly scheduled progress meeting. 1. Revise schedule immediately after each meeting or other activity where revisions have been recognized or made. Issue updated schedule concurrently with the report of each such meeting. 2. Include a report with updated schedule that indicates every change, including, but not limited to, changes in logic, durations, actual starts and finishes, and activity durations. 3. As the Work progresses, indicate Actual Completion percentage for each activity. B. Distribution: Distribute copies of approved schedule to Administrator, Designer, Owner’s Representative and other parties identified by Contractor with a need-to-know schedule responsibility. 2. CONSTRUCTION PHOTOGRAPHS A. Photographer: Contractors photographer. B. Photographic Prints: 3” x 5” C. Date Stamp: Unless otherwise indicated, date and time stamp each photograph as it is being taken so stamp is integral to photograph. D. Preconstruction Photographs: Before starting construction, take 2 color photographs of Project site and surrounding properties from different vantage points. Show existing conditions adjacent to property. E. Construction Progress: On a weekly basis take minimum 2 color photographs of each sign location and minimum of 9 color photographs in-shop production of sign materials. Photographer shall select vantage points to best show status of construction and progress since last photographs were taken. 1. Field Office Prints: Retain one set of prints of periodic photographs in field office at Project site, available at all times for reference. Identify photographs the same as for those submitted to Designer. F. Final Completion Construction Photographs: Take 2 color photographs after date of Substantial Completion of each sign location for submission as Project Record Documents. February 2, 2017 CONSTRUCTION PROGESS DOCUMENTATION The City of Denton 01320 - 6 Wayfinding and Signage Project END OF SECTION 01320 February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 1 Wayfinding and Signage Project SECTION 01330 - SUBMITTAL PROCEDURES 1. GENERAL 1. SUMMARY A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals. B. Related Sections include the following: 1. Division 1 Section "Construction Progress Documentation" for submitting schedules and reports, including Contractor's Construction Schedule and the Submittals Schedule and construction photographs. 2. DEFINITIONS A. Action Submittals: Written and graphic information that requires Administrators, Designer's and Owner’s Representative’s responsive action. B. Informational Submittals: Written information that does not require Designer and Owner’s Representative’s approval. Submittals may be rejected for not complying with requirements. 3. SUBMITTAL PROCEDURES A. General: Electronic copies of CAD Drawings of the Contract Drawings will be provided by Designer for Contractor's use in preparing submittals. B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities. 1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that requires sequential activity. 2. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination. a. Designer and Owner’s Representative reserve the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received. C. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for list of submittals and time requirements for scheduled performance of related construction activities. D. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Designer's receipt of submittal. 1. Initial Review: Allow 10 days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. Construction Manager will advise Contractor when a submittal being processed must be delayed for coordination. 2. If intermediate submittal is necessary, process it in same manner as initial submittal. 3. Allow [10] days for processing each resubmittal. February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 2 Wayfinding and Signage Project 4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing. E. Identification: Place a permanent label or title block on each submittal for identification. 1. Indicate name of firm or entity that prepared each submittal on label or title block. 2. Provide a space approximately 4 by 5 inches on label or beside title block to record Contractor's review and approval markings and action taken by Designer and Construction Manager. 3. Include the following information on label for processing and recording action taken: a. Project name. b. Date. c. Name and address of Designer and Owner’s Representative. d. Name and address of Contractor. e. Name and address of subcontractor. f. Name and address of supplier. g. Name of manufacturer. h. Unique identifier, including revision number. i. Drawing number and detail references, as appropriate. j. Other necessary identification. F. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. G. Additional Copies: Unless additional copies are required for final submittal, and unless Designer or Construction Manager observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. 1. Transmittal: Package each submittal individually and appropriately for transmittal and handling. Transmit each submittal using a transmittal form. H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, and authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms. I. Use for Construction: Use only final submittals with mark indicating action taken by Designer and Owner’s Representative in connection with construction. 2. PRODUCTS 2. ACTION SUBMITTALS A. General: Prepare and submit Action Submittals required by individual Specification Sections. 1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment. 1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data. 2. Mark each copy of each submittal to show which products and options are applicable. 3. Include the following information, as applicable: a. Manufacturer's written recommendations. b. Manufacturer's product specifications. c. Manufacturer's installation instructions. d. Manufacturer's catalog cuts. February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 3 Wayfinding and Signage Project C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. 1. Preparation: Include the following information, as applicable: a. Dimensions. b. Identification of products. c. Fabrication and installation drawings. d. Roughing-in and setting diagrams. e. Shopwork manufacturing instructions. f. Templates and patterns. g. Schedules. h. Design calculations. i. Notation of coordination requirements. j. Notation of dimensions established by field measurement. 2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 11 x 17 inches but no larger than 30 by 40 inches . 3. Number of Copies: Submit copies of each submittal, as follows: a. Initial Submittal: Submit one correctable, translucent, reproducible print and one blue- or black-line print. Designer, through Owner’s Representative, will return the reproducible print. b. Final Submittal: Submit three blue- or black-line prints, unless prints are required for operation and maintenance manuals. Submit five prints where prints are required for operation and maintenance manuals. Designer and Owner’s Representative will retain two prints; remainder will be returned. D. Samples: Prepare physical units of materials or products, including the following: 1. Comply with requirements in Division 1 Section "Quality Requirements" for mockups. 2. Samples for Approval: Submit color samples consisting of units or sections of units showing the full range of colors, textures, and patterns available. 3. Preparation: Mount, display, or package Samples in manner specified to facilitate review of qualities indicated. Prepare Samples to match Designer's sample where so indicated. Attach label on unexposed side that includes the following: a. Generic description of Sample. b. Product name or name of manufacturer. c. Sample source. 4. Additional Information: On an attached separate sheet, prepared on Contractor's letterhead, provide the following: a. Size limitations. b. Compliance with recognized standards. c. Availability. d. Delivery time. 5. Submit Samples for review of kind, color, pattern, and texture for a final check of these characteristics with other elements and for a comparison of these characteristics between final submittal and actual component as delivered and installed. a. If variation in color, pattern, texture, or other characteristic is inherent in the product represented by a Sample, submit at least three sets of paired units that show approximate limits of the variations. b. Refer to individual Specification Sections for requirements for Samples that illustrate workmanship, fabrication techniques, details of assembly, connections, operation, and similar construction characteristics. February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 4 Wayfinding and Signage Project 6. Number of Samples for Initial Selection: Submit one full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line. Designer through Owner’s Representative, will return submittal with options selected. 7. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set. a. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor. 8. Samples for Verification 1. Aluminum Post: For each form, finish, and color, on 6-inch- long sections of extrusions. All custom extrusion die shall be approved prior to fabrication. 2. Aluminum Sheet: Squares of sheet at least 4 inches by 4 inches. 3. Paint Swatches: For each painted color, provide a 3” by 6” inch aluminum sheet. Clearly indicate on the back the color specification, date and submittal number. 4. Reflective Vinyl Sheet: 8 by 10 inches for each color required. 5. Examples of all graphic image process, including materials, methods, colors and finishes, patterns, imagery, letters, numbers and other graphic devices. 6. Sample of the following i. Finial (VDIR.3) ii. Brick Material (PARK.2 iii. Sign Panel (PDIR.2) 7. Full Size Prototype Sign: A full size prototype VDIR.3 and PDIR.2 sign type, shall be constructed and installed in place. The prototype will be fabricated of all materials, process, colors and finishes as outlined in the design intent drawings. The sign will ultimately be used as a component of the system. The City of Denton will provide exact location and messages upon completion of shop drawings. E. Product Schedule or List: Prepare a written summary indicating types of products required for the Work and their intended location. Include the following information in tabular form: F. Contractor's Construction Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation" for Owner’s Representative action. G. Submittals Schedule: Comply with requirements in Division 1 Section "Construction Progress Documentation." H. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form: 1. Name, address, and telephone number of entity performing subcontract or supplying products. 2. Number and title of related Specification Section(s) covered by subcontract. 3. Drawing number and detail references, as appropriate, covered by subcontract. 2. INFORMATIONAL SUBMITTALS A. General: Prepare and submit Informational Submittals required by other Specification Sections. February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 5 Wayfinding and Signage Project 1. Number of Copies: two copies of each submittal, unless otherwise indicated. 2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity. 3. Test and Inspection Reports: Comply with requirements in Division 1 Section "Quality Requirements." B. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, names and addresses of designers and owners, and other information specified. C. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements. D. Welding Certificates: Prepare written certification that welding procedures and personnel comply with requirements. Submit record of Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) on AWS forms. Include names of firms and personnel certified. E. Installer Certificates: Prepare written statements on manufacturer's letterhead certifying that Installer complies with requirements and, where required, is authorized for this specific Project. F. Manufacturer Certificates: Prepare written statements on manufacturer's letterhead certifying that manufacturer complies with requirements. Include evidence of manufacturing experience where required. G. Material Certificates: Prepare written statements on manufacturer's letterhead certifying that material complies with requirements. H. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements. I. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. J. Design Data: Prepare written and graphic information, including, but not limited to, performance and design criteria, list of applicable codes and regulations, and calculations. Include list of assumptions and other performance and design criteria and a summary of loads. Include load diagrams if applicable. Provide name and version of software, if any, used for calculations. Include page numbers. K. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer. Include the following, as applicable: 1. Preparation of substrates. 2. Required substrate tolerances. 3. Sequence of installation or erection. 4. Required installation tolerances. 5. Required adjustments. 6. Recommendations for cleaning and protection. L. Manufacturer's Field Reports: Prepare written information documenting factory-authorized service representative's tests and inspections. Include the following, as applicable: 1. Name, address, and telephone number of factory-authorized service representative making report. 2. Statement on condition of substrates and their acceptability for installation of product. 3. Statement that products at Project site comply with requirements. 4. Summary of installation procedures being followed, whether they comply with requirements and, if not, what corrective action was taken. 5. Results of operational and other tests and a statement of whether observed performance complies with requirements. 6. Statement whether conditions, products, and installation will affect warranty. February 2, 2017 SUBMITTAL PROCEDURES The City of Denton 01330 - 6 Wayfinding and Signage Project 7. Other required items indicated in individual Specification Sections. M. Insurance Certificates and Bonds: Prepare written information indicating current status of insurance or bonding coverage. Include name of entity covered by insurance or bond, limits of coverage, amounts of deductibles, if any, and term of the coverage. 3. EXECUTION 2. CONTRACTOR'S REVIEW A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Designer and Construction Manager. B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents. 3. DESIGNER'S AND CONSTRUCTION MANAGER'S ACTION A. General: Designer and Owner’s Representative will not review submittals that do not bear Contractor's approval stamp and will return them without action. B. Action Submittals: Designer and Owner’s Representative will review each submittal, make marks to indicate corrections or modifications required, and return it. Designer and Construction Manager will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows: C. Informational Submittals: Designer and Owner’s Representative will review each submittal and will not return it, or will reject and return it if it does not comply with requirements. Designer and Construction Manager will forward each submittal to appropriate party. D. Submittals not required by the Contract Documents will not be reviewed and may be discarded. END OF SECTION 01330 February 2, 2017 PROJECT RECORD DOCUMENTS The City of Denton 01781 - 1 Wayfinding and Signage Project SECTION 01781 - PROJECT RECORD DOCUMENTS 1. GENERAL 1. SUMMARY A. This Section includes administrative and procedural requirements for Project Record Documents, including the following: 1. Record Drawings. 2. Record Specifications. 3. Record Product Data. 2. SUBMITTALS A. Record Drawings: Comply with the following: 1. Number of Copies: Submit 1 set of marked-up Record Prints. 2. Number of Copies: Submit copies of Record Drawings as follows: a. Initial Submittal: Submit one set of plots from corrected Record CAD Drawings and one set of marked-up Record Prints. Designer will initial and date each plot and mark whether general scope of changes, additional information recorded, and quality of drafting are acceptable. Designer will return plots and prints for organizing into sets, printing, binding, and final submittal. b. Final Submittal: Submit one set of marked-up Record Prints, B. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract modifications. C. Record Product Data: Submit one copy of each Product Data submittal. 1. Where Record Product Data is required as part of operation and maintenance manuals, submit marked-up Product Data as an insert in the manual instead of submittal as Record Product Data. 2. PRODUCTS 2. RECORD DRAWINGS A. Record Prints: Maintain one set of blue- or black-line white prints of the Contract Drawings and Shop Drawings. 1. Preparation: Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints. a. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. b. Accurately record information in an understandable drawing technique. c. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations. 2. Content: Types of items requiring marking include, but are not limited to, the following: February 2, 2017 PROJECT RECORD DOCUMENTS The City of Denton 01781 - 2 Wayfinding and Signage Project a. Dimensional changes to Drawings. b. Revisions to details shown on Drawings. c. Depths of foundations. d. Locations and depths of underground utilities. e. Changes made by Change Order or Construction Change Directive. f. Changes made following Designer's written orders. g. Details not on the original Contract Drawings. h. Field records for variable and concealed conditions. i. Record information on the Work that is shown only schematically. 3. Mark the Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. If Shop Drawings are marked, show cross- reference on the Contract Drawings. 4. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location. 5. Mark important additional information that was either shown schematically or omitted from original Drawings. 6. Note Construction Change Directive numbers, alternate numbers, Change Order numbers, and similar identification, where applicable. B. Record CAD Drawings: Immediately before inspection for Certificate of Substantial Completion, review marked-up Record Prints with Designer and Owner’s Representative. When authorized, prepare a full set of corrected CAD Drawings of the Contract Drawings, as follows: 1. Format: Same CAD program, version, and operating system as the original Contract Drawings. 2. Incorporate changes and additional information previously marked on Record Prints. Delete, redraw, and add details and notations where applicable. 3. Refer instances of uncertainty to Designer through Owner’s Representative for resolution. C. Newly Prepared Record Drawings: Prepare new Drawings instead of preparing Record Drawings where Designer determines that neither the original Contract Drawings nor Shop Drawings are suitable to show actual installation. 1. New Drawings may be required when a Change Order is issued as a result of accepting an alternate, substitution, or other modification. 2. Consult with Designer and Owner’s Representative for proper scale and scope of detailing and notations required to record the actual physical installation and its relation to other construction. Integrate newly prepared Record Drawings into Record Drawing sets; comply with procedures for formatting, organizing, copying, binding, and submitting. D. Format: Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. 1. Record Prints: Organize Record Prints and newly prepared Record Drawings into manageable sets. Bind each set with durable paper cover sheets. Include identification on cover sheets. 2. Record CAD Drawings: Organize CAD information into separate electronic files that correspond to each sheet of the Contract Drawings. Name each file with the sheet identification. Include identification in each CAD file. 3. Identification: As follows: a. Project name. b. Date. c. Designation "PROJECT RECORD DRAWINGS." d. Name of Designer and Construction Manager. e. Name of Contractor. 2. RECORD SPECIFICATIONS A. Preparation: Mark Specifications to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications. February 2, 2017 PROJECT RECORD DOCUMENTS The City of Denton 01781 - 3 Wayfinding and Signage Project 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected. 3. Record the name of the manufacturer, supplier, Installer, and other information necessary to provide a record of selections made. 4. For each principal product, indicate whether Record Product Data has been submitted in operation and maintenance manuals instead of submitted as Record Product Data. 5. Note related Change Orders, Record Drawings, and Product Data where applicable. 3. RECORD PRODUCT DATA A. Preparation: Mark Product Data to indicate the actual product installation where installation varies substantially from that indicated in Product Data submittal. 1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later. 2. Include significant changes in the product delivered to Project site and changes in manufacturer's written instructions for installation. 3. Note related Change Orders, Record Drawings, and Product Data where applicable. 4. MISCELLANEOUS RECORD SUBMITTALS A. Assemble miscellaneous records required by other Specification Sections for miscellaneous record keeping and submittal in connection with actual performance of the Work. Bind or file miscellaneous records and identify each, ready for continued use and reference. 3. EXECUTION 1. RECORDING AND MAINTENANCE A. Recording: Maintain one copy of each submittal during the construction period for Project Record Document purposes. Post changes and modifications to Project Record Documents as they occur; do not wait until the end of Project. B. Maintenance of Record Documents and Samples: Store Record Documents and Samples in the field office apart from the Contract Documents used for construction. Do not use Project Record Documents for construction purposes. Maintain Record Documents in good order and in a clean, dry, legible condition, protected from deterioration and loss. Provide access to Project Record Documents for Designer's and Owner’s Representative reference during normal working hours. END OF SECTION 01781 February 2, 2017 The City of Denton 01730 - 1 Wayfinding and Signage SECTION 01730 REMOVALS, CUTTING, AND PATCHING PART 1 GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE A. Rubbish Removal: Section 01500. 1.02 PROJECT CONDITIONS A. Existing Conditions: Do not disturb existing structures, construction, materials or equipment unless required by the Contract. 1. Do not cut, drill or remove structural members such as joists, beams or columns supporting construction that is to remain unless expressly required by the Contract Documents. B. Existing Paint: Assume existing painted surfaces to contain lead based paints. Take precautions as required to prevent spread of lead containing particles and dust. C. Items to Remain the Property of the State: The following items shall remain the property of the State and shall be stored at the site where directed: 1. To be determined by Owner and provided to contractor at pre-construction meeting. PART 2 PRODUCTS 2.01 MATERIALS A. Match the appearance and performance of existing corresponding materials as closely as practicable, unless otherwise indicated. PART 3 EXECUTION 3.01 EXAMINATION A. Prior to cutting, drilling or removal, investigate both sides of the surface involved. Determine the exact location of structural members. B. If unforeseen obstructions are encountered, take precautions necessary to prevent damage and obtain instructions from the Owner’s Representative before proceeding with the Work. 3.02 PREPARATION February 2, 2017 The City of Denton 01730 - 2 Wayfinding and Signage A. Prepare existing surfaces properly to receive and, where required, bond with the Work. 3.03 REMOVALS, CUTTING, AND ALTERING A. In addition to the items indicated to be removed on the Drawings, remove existing construction superseded by the Work except items such as pipes, conduits, recessed boxes, and ducts which are built into existing construction that is to remain. Cut off and conceal such items at face of remaining construction. Provide cover plates on recessed boxes. B. Remove and alter existing construction as required to install and connect the Work to adjacent construction in an approved manner. C. Cut and alter existing materials as required to perform the Work. Limit cutting to the smallest amount necessary. Core drill round holes and saw cut other openings where possible. D. Perform cutting, drilling, and removals in a manner which will prevent damage to construction which is to remain. E. Perform removal of items to remain the property of the State with such care as necessary to prevent damage to these items. 3.04 PATCHING A. Patch existing construction and finishes defaced, damaged, or left incomplete due to alterations and removals. Patching, except as otherwise indicated, shall be limited to the areas which have been cut or altered. Finish patched surfaces to match existing adjacent surfaces as closely as practicable. B. Perform patching around items penetrating existing construction in a manner that will maintain the water and fire resistive capability of the existing construction. C. Paint patched areas and cover plates to match existing adjacent surfaces as closely as practicable using same type of paint. Painting, except as otherwise indicated, shall be limited to the areas which have been patched. D. Where surfaces exposed by removals are to remain as exposed surfaces, paint such areas to match existing adjacent surfaces as closely as practicable using same type of paint. 3.05 REINSTALLATION A. Where reinstallation of removed items is indicated, reinstall them to a condition equal to or better than their condition before removal. END OF SECTION February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 1 Wayfinding & Signage Project SECTION 03300 - CAST-IN-PLACE CONCRETE 1. GENERAL 1. SUMMARY A. This Section specifies cast-in place concrete, including formwork, reinforcement, concrete materials, mix design, placement procedures, and finishes. Contractor may NOT use/reuse any existing footings. 2. DEFINITIONS A. Cementitious Materials: Portland cement alone or in combination with one or more of blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume. 3. SUBMITTALS A. Product Data: For each type of manufactured material and product indicated. B. Design Mixes: For each concrete mix. Include alternate mix designs when characteristics of materials, project conditions, weather, test results, or other circumstances warrant adjustments. 1. Indicate amounts of mix water to be withheld for later addition at Project site. C. Steel Reinforcement Shop Drawings: Details of fabrication, bending, and placement, prepared according to ACI 315, “Details and Detailing of Concrete Reinforcement.” Include material, grade, bar schedules, stirrup spacing, bent bar diagrams, arrangement, and supports of concrete reinforcement. Include special reinforcement required for openings through concrete structures. D. Formwork Shop Drawings: Prepared by or under the supervision of a qualified professional engineer detailing fabrication, assembly, and support of formwork. Design and engineering of formwork are Contractor’s responsibility. E. Material Test Reports: From a qualified testing agency indicating and interpreting test results for compliance of the following with requirements indicated, based on comprehensive testing of current materials: F. Material Certificates: Signed by manufacturers certifying that each of the following items complies with requirements: 1. Cementitious materials and aggregates. 2. Form materials and form-release agents. 3. Steel reinforcement and reinforcement accessories. 4. Admixtures. 5. Curing materials. 6. Bonding agents. 7. Adhesives. G. Minutes of preinstallation conference. February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 2 Wayfinding & Signage Project 4. QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has completed concrete Work similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. B. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for formwork and shoring and reshoring installations that are similar to those indicated for this Project in material, design, and extent. C. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment. 1. Manufacturer must be certified according to the National Ready Mixed Concrete Association’s Certification of Ready Mixed Concrete Production Facilities. D. Testing Agency Qualifications: An independent testing agency, acceptable to authorities having jurisdiction, qualified according to ASTM C 1077 and ASTM E 329 to conduct the testing indicated, as documented according to ASTM E 548. 1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program. E. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer’s plant, each aggregate from one source, and each admixture from the same manufacturer. F. ACI Publications: Comply with the following, unless more stringent provisions are indicated: 1. ACI 301, “Specification for Structural Concrete.” 2. ACI 117, “Specifications for Tolerances for Concrete Construction and Materials.” G. Preinstallation Conference: Conduct conference at Project site to comply with requirements in Division 1 Section “Project Meetings.” 1. Before submitting design mixes, review concrete mix design and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast- in-place concrete to attend, including the following: a. Contractor’s superintendent. b. Independent testing agency responsible for concrete design mixes. c. Ready-mix concrete producer. d. Concrete subcontractor. 5. DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle steel reinforcement to prevent bending and damage. 2. PRODUCTS February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 3 Wayfinding & Signage Project 1. FORM-FACING MATERIALS A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints. 1. Plywood, metal, or other approved panel materials. 2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows: a. High-density overlay, Class 1, or better. b. Medium-density overlay, Class 1, or better, mill-release agent treated and edge sealed. c. Structural 1, B-B, or better, mill oiled and edge sealed. d. B-B (Concrete Form), Class 1, or better, mill oiled and edge sealed. 2. STEEL REINFORCEMENT A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 , as required by structural engineer. 3. REINFORCEMENT ACCESSORIES A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire fabric in place. Manufacture bar supports according to CRSI’s “Manual of Standard Practice” from steel wire, plastic, or precast concrete or fiber-reinforced concrete of greater compressive strength than concrete, and as follows: 1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected or CRSI Class 2 stainless-steel bar supports. 4. CONCRETE MATERIALS A. Portland Cement: ASTM C 150, Type I. 1. Fly Ash: ASTM C 618, Class F. B. Normal-Weight Aggregate: ASTM C 33, uniformly graded, and as follows: 1. Nominal Maximum Aggregate Size: 3/4 inch . 2. Combined Aggregate Gradation: Well graded from coarsest to finest with not more than 18 percent and not less than 8 percent retained on an individual sieve, except that less than 8 percent may be retained on coarsest sieve and on No. 50 sieve, and less than 8 percent may be retained on sieves finer than No. 50. C. Water: Potable and complying with ASTM C 94. 5. ADMIXTURES A. General: Admixtures certified by manufacturer to contain not more than 0.1 percent water-soluble chloride ions by mass of cementitious material and to be compatible with other admixtures and cementitious materials. Do not use admixtures containing calcium chloride. February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 4 Wayfinding & Signage Project B. Air-Entraining Admixture: ASTM C 260. C. Water-Reducing Admixture: ASTM C 494, Type A. D. Corrosion-Inhibiting Admixture: Commercially formulated, anodic inhibitor or mixed cathodic and anodic inhibitor; capable of forming a protective barrier and minimizing chloride reactions with steel reinforcement in concrete. 6. CURING MATERIALS A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete. B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. dry. C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet. D. Water: Potable. 7. RELATED MATERIALS A. Bonding Agent: ASTM C 1059, Type II, non-redispersible, acrylic emulsion or styrene butadiene. B. Epoxy-Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class and grade to suit requirements, and as follows: 1. Type II, non-load bearing, for bonding freshly mixed concrete to hardened concrete. 8. CONCRETE MIXES A. Prepare design mixes for each type and strength of concrete determined by either laboratory trial mix or field test data bases, as follows: 1. Proportion normal-weight concrete according to ACI 211.1 and ACI 301. B. Use a qualified independent testing agency for preparing and reporting proposed mix designs for the laboratory trial mix basis. C. Footings and Foundation Walls: Proportion normal-weight concrete mix as follows: 1. Compressive Strength (28 Days): 5400 psi . 2. Maximum Slump: 4 inches . 3. Maximum Slump: 5 inches . 9. FABRICATING REINFORCEMENT A. Fabricate steel reinforcement according to CRSI’s “Manual of Standard Practice.” February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 5 Wayfinding & Signage Project 10. CONCRETE MIXING A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94, and furnish batch ticket information. 1. When air temperature is between 85 and 90 deg F , reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F , reduce mixing and delivery time to 60 minutes. 3. EXECUTION 1. FORMWORK A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until concrete structure can support such loads. B. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117. C. Limit concrete surface irregularities, designated by ACI 347R as abrupt or gradual, as follows: 1. Class A, 1/8 inch . D. Construct forms tight enough to prevent loss of concrete mortar. E. Fabricate forms for easy removal without hammering or prying against concrete surfaces. Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical. Kerf wood inserts for forming keyways, reglets, recesses, and the like, for easy removal. 1. Do not use rust-stained steel form-facing material. F. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds. G. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations. H. Do not chamfer corners or edges of concrete. I. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items. J. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete. K. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment. February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 6 Wayfinding & Signage Project L. Coat contact surfaces of forms with form-release agent, according to manufacturer’s written instructions, before placing reinforcement. 2. EMBEDDED ITEMS A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use Setting Drawings, templates, diagrams, instructions, and directions furnished with items to be embedded. 1. Install anchor bolts, accurately located, to elevations required. 3. REMOVING AND REUSING FORMS A. General: Formwork, for sides of beams, walls, columns, and similar parts of the Work, that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete provided concrete is hard enough to not be damaged by form-removal operations and provided curing and protection operations are maintained. B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent. C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints. Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by Architect. 4. STEEL REINFORCEMENT A. General: Comply with CRSI’s “Manual of Standard Practice” for placing reinforcement. B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials. C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars. D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces. 5. JOINTS A. General: Construct joints true to line with faces perpendicular to surface plane of concrete. B. Construction Joints: Install so strength and appearance of concrete are not impaired, at locations indicated or as approved by Architect. 6. CONCRETE PLACEMENT A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed. February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 7 Wayfinding & Signage Project B. Do not add water to concrete during delivery, at Project site, or during placement, unless approved by Architect. C. Before placing concrete, water may be added at Project site, subject to limitations of ACI 301. D. Deposit concrete continuously or in layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as specified. Deposit concrete to avoid segregation. E. Deposit concrete in forms in horizontal layers no deeper than 24 inches and in a manner to avoid inclined construction joints. Place each layer while preceding layer is still plastic, to avoid cold joints. F. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures. 1. When air temperature has fallen to or is expected to fall below 40 deg F, uniformly heat water and aggregates before mixing to obtain a concrete mixture temperature of not less than 50 deg F and not more than 80 deg F at point of placement. 2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials. 3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators, unless otherwise specified and approved in mix designs. G. Hot-Weather Placement: Place concrete according to recommendations in ACI 305R and as follows, when hot-weather conditions exist: 1. Cool ingredients before mixing to maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor’s option. 2. Cover steel reinforcement with water-soaked burlap so steel temperature will not exceed ambient air temperature immediately before embedding in concrete. 3. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade moisture uniform without standing water, soft spots, or dry areas. 7. MISCELLANEOUS CONCRETE ITEMS A. Filling In: Fill in holes and openings left in concrete structures, unless otherwise indicated, after work of other trades is in place. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous concrete filling indicated or required to complete Work. 8. CONCRETE PROTECTION AND CURING A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and with recommendations in ACI 305R for hot- weather protection during curing. B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer’s written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing. February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 8 Wayfinding & Signage Project C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing by one or a combination of the following methods: D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces, by one or a combination of the following methods: 9. CONCRETE SURFACE REPAIRS A. Defective Concrete: Repair and patch defective areas when approved by Architect. Remove and replace concrete that cannot be repaired and patched to Architect’s approval. B. Patching Mortar: Mix dry-pack patching mortar, consisting of one part portland cement to two and one- half parts fine aggregate passing a No. 16 sieve, using only enough water for handling and placing. C. Repairing Formed Surfaces: Surface defects include color and texture irregularities, cracks, spalls, air bubbles, honeycombs, rock pockets, fins and other projections on the surface, and stains and other discolorations that cannot be removed by cleaning. D. Repairing Unformed Surfaces: Test unformed surfaces, such as floors and slabs, for finish and verify surface tolerances specified for each surface. Correct low and high areas. Test surfaces sloped to drain for trueness of slope and smoothness; use a sloped template. E. Perform structural repairs of concrete, subject to Architect’s approval, using epoxy adhesive and patching mortar. F. Repair materials and installation not specified above may be used, subject to Architect’s approval. G. When locating a footer within a single pavement block (max. 5’-0” x 5’-0”), adjacent to at least 2 expansion joints, the entire block of pavement shall be removed and replaced with the same materials and finish of adjacent sidewalk areas. 10. FIELD QUALITY CONTROL A. Testing Agency: Engage a qualified independent testing and inspecting agency to sample materials, perform tests, and submit test reports during concrete placement according to requirements specified in this Article. B. Testing Services: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements: C. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete. D. Strength of each concrete mix will be satisfactory if every average of any three consecutive compressive- strength tests equals or exceeds specified compressive strength and no compressive-strength test value falls below specified compressive strength by more than 500 psi . February 2, 2017 CAST IN PLACE CONCRETE The City of Denton 03300 - 9 Wayfinding & Signage Project END OF SECTION 03300 February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 1 Wayfinding and Signage Project SECTION 10436 - POST AND PANEL SIGNS 1. GENERAL 1. SUMMARY A. This Section includes the following: 1. Non illuminated, single-sheet-type post and panel signs. All Signs, Post and Panel should be retro- reflective as stated in the Document Drawings. Signs shall be fabricated according to TXDOT’s MUTCD Retroreflective and non-reflective sheeting specifications. 2. PERFORMANCE REQUIREMENTS A. Structural Performance: Provide post and panel signs capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated, determined according to ASCE 7, "Minimum Design Loads for Buildings and Other Structures": 1. Wind Loads: Determine loads based on a uniform pressure from an ultimate wind speed of 105 mph acting in any direction. B. Thermal Movements: Provide post and panel signs that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime- sky heat loss. 1. Temperature Change (Range): 120 deg F, ambient; 180 deg F, material surfaces. 3. SUBMITTALS A. Product Data: For each type of product indicated. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes. Include manufacturer's written instructions for maintaining and cleaning sign surfaces. B. Shop Drawings: Show fabrication and installation details for post and panels signs. 1. Include plans, elevations, and at least 3/4-inch scale sections of typical members and other components and construction details. Show anchors, reinforcement, accessories, layout, and installation details. 2. Include message list, with details of wording and lettering layout, at least half size. Include full- size details of graphics. 3. Provide Graphic layouts for each sign location and its associated message. Minimum scale: 1” = 1’ – 0” Must be reviewed and approved by the Client and Designer prior to fabrication. 4. Fabricator shall provide a Structural Engineer Seal (Texas Appropriate Certification) for all shop drawings indicating fasteners, construction, installation, footers or other structural components C. Samples for Verification: For 3 sets of each type of product indicated, of size below: 1. Aluminum Post: For each form, finish, and color, on 6-inch- long sections of extrusions. All custom extrusion die shall be approved prior to fabrication. 2. Aluminum Sheet: Squares of sheet at least 4 inches by 4 inches. February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 2 Wayfinding and Signage Project 3. Paint Swatches: For each painted color, provide a 3” by 6” inch aluminum sheet. Clearly indicate on the back the color specification, date and submittal number. 4. Reflective Vinyl Sheet: 8 by 10 inches for each color required. 5. Examples of all graphic image process, including materials, methods, colors and finishes, patterns, imagery, letters, numbers and other graphic devices. 6. Sample of the following i. Finial (VDIR.3) ii. Brick Material (PARK.2 iii. Sign Panel (PDIR.2) 7. Full Size Prototype Sign: A full size prototype VDIR.3 and PDIR.2 sign type, shall be constructed and installed in place. The prototype will be fabricated of all materials, process, colors and finishes as outlined in the design intent drawings. The sign will ultimately be used as a component of the system. The City of Denton will provide exact location and messages upon completion of shop drawings. D. Cost for mobilization, product data, shop drawings, mock-ups, samples and other submittals shall be included within the Lump Sum Bid Proposal. 4. QUALITY ASSURANCE A. Installer Qualifications: An authorized representative of sign manufacturer for installation and maintenance of units required for this Project. 1. Installer shall be capable of providing replacement message panels within 10 working days of receipt of order. B. Source Limitations: Obtain each type of post and panel sign through one source from a single manufacturer. C. Product Options: Drawings indicate size, profiles, and dimensional requirements of post and panel signs and are based on the specific type and model indicated. 1. Do not modify intended aesthetic effects, as judged solely by Designer, except with Designer’s approval. If modifications are proposed, submit comprehensive explanatory data to Designer for review. 2. Suggested Modifications shall not increase cost or schedule of project. 5. DELIVERY AND HANDLING A. Deliver post and panel signs in protective covering and crating to protect sign components and surfaces against damage. 6. COORDINATION February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 3 Wayfinding and Signage Project A. Coordinate installation of anchorages for post and panel signs. Furnish setting drawings, templates, and directions for installing anchorages and other items that are to be embedded in concrete. Deliver such items to Project site in time for installation. B. Coordinate delivery time so signs can be installed within 24 hours of receipt at Project site. 7. WARRANTY A. Warranty Period: 10 years from date of Substantial Completion. The post, panel, footers, sign faces, materials and fasteners shall be free of defects, including. but not limited to the following; scaling, peeling, fading, warping, vinyl shrinking, and corrosion. 2. PRODUCTS 1. MATERIALS A. Aluminum: a. Aluminum Plate: Aluminum plate for all signs shall conform to ASTM-B209, alloy and temper recom- mended by aluminum producer and finisher for type of use and finish indicated, to the dimensions and thickness indicated on drawings. b. Aluminum shall be finished as indicated on Drawings. Finish shall be uniformly applied without waviness, ‘oil-canning,’ or other imperfections. Exposed aluminum shall exhibit no markings, scratches, or blemish- es. c. Clear anodic finish: Manufacturer’s standard Class 1 clear anodic coating, 0.018 mm or thicker, over a sat- in (directionally textured) mechanical finish, complying with AAMA 611 and AAMA 2605. B. Structural Steel: a. Hot-Rolled Structural-Steel Shapes: ASTM A 36/A 36M or ASTM A 529/A 529M. b. Steel Tubing or Pipe: ASTM A 500, Grade B. c. Steel Members Fabricated from Plate or Bar Stock: ASTM A 529/A 529M or ASTM A 572/A 572M, 42,000-psi (290-MPa) minimum yield strength. d. Bolts for Steel Framing: ASTM A 307 or ASTM A 325 (ASTM A 325M) as necessary for design loads and connection details. e. For steel exposed to view on completion, provide materials selected for surface flatness, smoothness, and freedom from surface blemishes. Do not use materials whose surfaces exhibit pitting, seam marks, roller marks, rolled trade names, or roughness. C. Acrylic: a. Clear Acrylic: For sign component construction. Color: Clear. Material to be consistent, rigid and stable, conforming to ASTM D4802-10 for index of refraction; specific gravity; luminous transmittance; haze; water-absorption; shrinkage; thermal stability; deflection temperature under flexural load; tensile strength and elongation at break; impact strength; spectral transmittance of Type UVF and UVT sheet; abrasion re- sistance; coating adhesion; and chemical resistance. February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 4 Wayfinding and Signage Project b. Clear Matte Acrylic: For sign component construction. Color: Clear Matte. Material to be consistent, rigid and stable, conforming to ASTM D4802-10 for index of refraction; specific gravity; luminous transmit- tance; haze; water-absorption; shrinkage; thermal stability; deflection temperature under flexural load; ten- sile strength and elongation at break; impact strength; spectral transmittance of Type UVF and UVT sheet; abrasion resistance; coating adhesion; and chemical resistance. c. Clear Non-Glare Acrylic: For sign component construction. Color: Clear Non-Glare. Material to be con- sistent, rigid and stable, conforming to ASTM D4802-10 for index of refraction; specific gravity; luminous transmittance; haze; water-absorption; shrinkage; thermal stability; deflection temperature under flexural load; tensile strength and elongation at break; impact strength; spectral transmittance of Type UVF and UVT sheet; abrasion resistance; coating adhesion; and chemical resistance. D. Polycarbonate: a. Polycarbonate shall be UV resistant with minimum 5 year written warranty against breakage, yellowing and loss of light transmission. E. Adhesives and Tapes: Foam Tape: a. Provide 3M double coated foam tape 4016, 4032 or equal. Adhesive shall be A-20 Acrylic. Carrier shall be urethane foam Laminating Adhesive: b. A Provide Flexcon V9590 D/FPFW clear or equal. VHB Foam Tapes: c. Provide 3M Scotch VHB 4930 d. Adhesive shall be Acrylic VHB e. Carrier shall be closed cell foam Silicone Adhesive: f. TTs-00230C, ASTM C920 Clear, (Acetoxy Cure) Epoxy: g. 3M DP-110 or equal F. Vinyl Film Non-Reflective Graphics: a. Use 3.0 mil thick 3M Scotchcal Film 220 Series or approved equal. b. Color of vinyl material is to be integral and not surface applied unless specifically noted. Translucent Graphics: c. Use 3M Scotchcal translucent film or approved equal. Reflective Graphics: a) Custom color background and characters printed with 3M inks directly. b) Series 3930 sheeting incorporates a pressure sensitive adhesive and should be applied to the sign substrate at temperature of 65˚F/18˚C or higher by any of the following methods: 1) Mechanical squeeze roll applicator – refer to 3M Information Folder (IF) 1.4 for more details. 2) Hand squeeze roll applicator – refer to 3M IF 1.6 for more details. c) Splices: Series 3930 sheeting must be butt spliced when more than one piece of sheeting is used on one piece of substrate. The sheeting pieces should not touch each other. This is to prevent buckling as the sheet expands in extreme temperature and humidity exposure. February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 5 Wayfinding and Signage Project d) For traffic sign use, substrates found to be most reliable and durable are properly prepared aluminum sheets and extrusions. Plastic substrates are NOT acceptable. e) High intensity prismatic sheeting may be processed into traffic signs by any of the imaging methods describe below: 1) Screen Processing: Series 3930 sheeting may be screen processed into traffic signs before or after mounting on a sign substrate, using 3M Process Colors Series 880I or Series 880N. Refer to 3M IF 1.8 for more details. 2) Thermal Transfer Printing: Series 3930 sheeting may be imaged with 3M Thermal Transfer Ribbon Series TTR2300 in conjunction with the Matan SprinG3 or Matan Spot4 thermal transfer printers. Additionally, series 3930 sheeting may be imaged by the Durst RHO 161 TS printer, by Sherine Industries: (604) 513-1887. All applications utilizing the above printers must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. 3) 3M ElectroCut Film Series 1170 may be used to provide transparent colored background copy for traffic control signs on high intensity prismatic sheeting. Both materials then must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. Refer to Product Bulleting 1170 for fabrication procedures. 4) Vinyl Graphic Films: Scotchcal Vinyl Series 7720 and Series 7725 may be used to provide copy for traffic control signs on high intensity prismatic sheeting. Both materials then must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. Refer to Scotchcal product literature for more information. f) All of the above methods utilizing series 3930 reflective sheeting must be warranted for a period of eight (8) years and shall not excessively fade, discolor, crack, craze, peel, blister or lose reflectivity such that the signs become visually unsuitable for their intended purpose. G. Metals a) Aluminum Components: Finish for all aluminum components shall be #220 Inline Brush with eased corners and brushed edges b) Sign components shall be pre-drilled in proper locations prior to any pretreatment process. c) Pretreatment: All surfaces shall be cleaned, primed, and pre-treated as required prior to finishing. d) Clear Coat: Apply protective clear coat to all painted, printed, and vinyl surfaces. Contractor shall verify all product warranties. e) Finished work shall be crisp, accurate, visibly free from flow lines, streaks, bleeding, blisters or other imperfections. H. Acrylic a) All background colors shall be spray painted with Matthews Acrylic Polyurethane. Finish with prime coating under a minimum color coat of 1.5 mil dry film thickness. b) Translucent or transparent acrylic specified for the purpose of transmitting light should be free from internal flaws or variations in color. I. Custom High Pressure Laminate Graphic Panels a) Description: Custom High Pressure Laminate (CHPL) material composed of required layers of phenolic resin impregnated brown kraft filler paper to produce specified thicknesses, surfaced by a layers of melamine overlay, graphics imaged on saturation grade paper with UV resistant pigment based process color inks, and with an optically clear UV overlay that will resist no less that 99% of all sunlight and UV rays, as well as provides a graffiti resistant surface that allows for removal with standard cleaners. b) Process: For purposes of this specification, layers of material described A.1 are to be assembled, February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 6 Wayfinding and Signage Project and heat / pressure consolidated at approximately 1200 PSI at temperatures exceeding 275° Fahr- enheit at manufacturer’s prescribed time frames. All manufacturing processes of printing, press- ing, machining, finishing and crating to be accomplished within a single stand alone manufactur- ing facility to ensure consistent quality control and providing standard product delivery times of three weeks. c) Artwork: The graphic material and images are to be supplied by and under the supervision of the Designer or Owner. To include mechanicals, text, photographs, transparencies, film and other graphic source materials incorporated into digital graphic production artwork files in manufactur- er’s required file formats. All graphics must be assembled by computer designers familiar with and experienced in the process of digital printing and submitting production artwork files that meet the artwork requirements of the manufacturer. d) Acceptable Manufacturer: iZone Imaging, 2526 Charter Oak Dr., Suite 100, Temple, TX 76502. Tel: 888.464.9663, Email: info@izoneimaging.com, Web: http://www.izoneimaging.com - or Approved Equal Vendor J. Dye-Sublimated Printed Graphic Panels a) Process: Product substrates selected shall be able to withstand the 350 degree F (177 degree C) temperature of the powder coating oven. This includes and is not limited to aluminum, steel, glass, MDF, ceramic and high temperature plastics. b) Characteristics: Coating shall be super durable polyurethane powder coated finish that is resistant to abrasion, humidity and corrosion. It shall be anti-graffiti, scratch resistant and non-combustible. The coating process shall be applicable for both interior and exterior applications. Coating shall withstand high traffic and extreme weather. c) Capability: Embed process capability shall allow parts from the size of a button to 24 feet (7315 mm) in length. Includes dimensional objects, flat and embossed sheets, extruded profiles, and folded panels. d) Warranty: Manufacturer’s Warranty: Provide manufacturer’s standard warranty for up to 10 years depending on location, substrate, environment and amount of direct sunlight. e) Acceptable Manufacturer: Direct Embed Coating Systems; 6 Morris St., Paterson, NJ 07501. Tel: 954.825.0410, Email: info@directembedcoating.com, Web: http://www.directembedcoating.com. - or Approved Equal Vendor K. Aluminum Extrusions: a) ASTM B 221, alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of alloy 6061-T6. 2. ACCESSORIES A. Fasteners: Use concealed, fasteners fabricated from metals that are noncorrosive to sign material and mounting surface. Where fasteners are exposed, use tamper resistant fasteners. B. Anchors and Inserts: Use stainless-steel or hot-dip galvanized anchors and inserts. Use torque-controlled expansion-bolt devices for drilled-in-place anchors. Furnish inserts, as required, to be set into concrete. C. Concrete for Postholes: Comply with requirements "Cast-in-Place Concrete" for normal-weight, air- entrained, poured in place ready-mix CLASS B concrete with a minimum 28-day compressive strength of 5400 psi, unless otherwise indicated. February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 7 Wayfinding and Signage Project 3. FABRICATION, GENERAL A. General: Provide post and panel signs of configurations indicated. 1. Welded Connections: Comply with AWS standards for recommended practices in shop welding. Provide welds behind finished surfaces without distortion or discoloration of exposed side. Clean exposed welded surfaces of welding flux and dress exposed and contact surfaces. Chemical welding is not an acceptable substitute. 2. Mill joints to tight, hairline fit. Form joints exposed to weather to exclude water penetration. 3. Preassemble signs in the shop to greatest extent possible. Disassemble signs only as necessary for shipping and handling limitations. Clearly mark units for reassembly and installation, in location not exposed to view after final assembly. 4. Conceal fasteners if possible; otherwise, locate fasteners where they will be inconspicuous. 5. Single ground mounted signs shall meet criteria as specified relative to aluminum materials and structural supports for signs. 4. POSTS A. General: Fabricate posts to lengths required for mounting method indicated. Field verify conditions , document and adjust post length according to ground conditions that may slope or be uneven. Double post signs shall be delivered and trimmed to exact size in the field. 1. Baseplate Method: Provide posts with baseplates, flanges, or other fittings, welded to bottom of posts. Drill holes in baseplate for anchor-bolt connection. a. Provide anchor bolts of size required for connecting posts to concrete foundations B. Aluminum Posts: Manufacturer's standard 0.25-inch- thick, extruded-aluminum tubing. Provide stop blocks in slots to hold panels in position. Include post caps, fillers, spacers, access panels, and related accessories required for complete installation. 1. Custom (Decorative Base) 2. TXDOT Design Standard as noted by TX designation on sign type nomenclature 5. SIGN PANELS A. General: Provide smooth sign panel surfaces constructed to remain flat under installed conditions within a tolerance of plus or minus 1/16 inch measured diagonally from corner to corner. 1. Coordinate dimensions and attachment methods to produce message panels with closely fitting joints. Align edges and surfaces with one another in the relationship indicated. 2. Increase metal thickness or reinforce with concealed stiffeners or backing materials as needed to produce surfaces without distortion, buckles, warp, or other surface deformations. 3. Continuously weld joints and seams, unless other methods are indicated; grind, fill, and dress welds to produce smooth, flush, exposed surfaces with welds invisible after final finishing. 4. All roadside break-away panels and posts shall conform to TXDOT Design standards. B. Unframed Single-Sheet Panels: Provide unframed single-sheet sign panels with edges mechanically and smoothly finished. 1. Panel Material: .125 - .25-inch- thick aluminum sheet a. Panel Finish: Surface painted, utilizing Matthews polyurethane paints or equal b. Panel Coating: Dupont Imron 5000, Anti-Graffiti Protectant or equal February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 8 Wayfinding and Signage Project c. Component matching paints and coatings are required. 2. Edge Condition: Routed and/or Square cut or as indicated on the drawings. 3. Corner Condition: As indicated on Drawings C. Message Panel Materials: 1. Aluminum Sheet: In thicknesses indicated. a. Panel Finish: Surface painted b. Panel Coating: Anti Graffiti Protectant Vinyl Film, as manufactured by 3M Corporation c. Color: As indicated. 2. Edge Condition: Square cut. 3. Corner Condition: Square. 4. Color: As indicated. GRAPHICS A. Surface-Applied Copy and Background: Provide High Intensity grade reflective vinyl film with pressure- sensitive adhesive backing. Apply copy to exposed face of sign panel. B. Use 3M High Intensity Prismatic Reflective Sheeting Series 3930, with 3M ElectroCut Film 1170 overlaminate. a) Custom color background and characters printed with 3M inks directly. b) Series 3930 sheeting incorporates a pressure sensitive adhesive and should be applied to the sign substrate at temperature of 65˚F/18˚C or higher by any of the following methods: 1) Mechanical squeeze roll applicator – refer to 3M Information Folder (IF) 1.4 for more details. 2) Hand squeeze roll applicator – refer to 3M IF 1.6 for more details. c) Splices: Series 3930 sheeting must be butt spliced when more than one piece of sheeting is used on one piece of substrate. The sheeting pieces should not touch each other. This is to prevent buckling as the sheet expands in extreme temperature and humidity exposure. d) For traffic sign use, substrates found to be most reliable and durable are properly prepared aluminum sheets and extrusions. Plastic substrates are NOT acceptable. e) High intensity prismatic sheeting may be processed into traffic signs by any of the imaging methods describe below: 1) Screen Processing: Series 3930 sheeting may be screen processed into traffic signs before or after mounting on a sign substrate, using 3M Process Colors Series 880I or Series 880N. Refer to 3M IF 1.8 for more details. 2) Thermal Transfer Printing: Series 3930 sheeting may be imaged with 3M Thermal Transfer Ribbon Series TTR2300 in conjunction with the Matan SprinG3 or Matan Spot4 thermal transfer printers. Additionally, series 3930 sheeting may be imaged by the Durst RHO 161 TS printer, by Sherine Industries: (604) 513-1887. All applications utilizing the above printers must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. 3) 3M ElectroCut Film Series 1170 may be used to provide transparent colored background copy for traffic control signs on high intensity prismatic sheeting. Both materials then must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. Refer to Product Bulleting 1170 for fabrication procedures. 4) Vinyl Graphic Films: Scotchcal Vinyl Series 7720 and Series 7725 may be used to provide copy for traffic control signs on high intensity prismatic sheeting. Both materials then must be covered with 3M ElectroCut Film 1170 Clear UV/Anti-Graffiti overlaminate. Refer to Scotchcal February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 9 Wayfinding and Signage Project product literature for more information. f) All of the above methods utilizing series 3930 reflective sheeting must be warranted for a period of eight (8) years and shall not excessively fade, discolor, crack, craze, peel, blister or lose reflectivity such that the signs become visually unsuitable for their intended purpose. 6. ALUMINUM FINISHES A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes. C. Baked-Enamel Finish: AA-C12C42R1x (Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: acid-chromate-fluoride-phosphate conversion coating; Organic Coating: as specified below). Apply baked enamel complying with paint manufacturer's written instructions for cleaning, conversion coating, and painting. 1. Organic Coating: Thermosetting, modified-acrylic enamel primer/topcoat system complying with AAMA 2603 except with a minimum dry film thickness of 1.5 mils , medium gloss. 2. Color: As indicated on drawings. 3. EXECUTION 1. INSTALLATION A. Excavation: In firm, undisturbed or compacted soil, drill or (using a post-hole digger) hand-excavate holes for posts to diameters and spacing indicated. B. Excavation: In firm, undisturbed or compacted soil, drill or (using a post-hole digger) hand-excavate holes for each post to minimum diameter recommended by sign manufacturer, but at least four times the largest post cross-section. 1. Excavate hole depths approximately 39 inches below finished grade. C. Set anchor bolts, mounting sleeves and other embedded items required for installation. Use templates furnished by suppliers of items to be attached. D. Install signs level, plumb, and at height indicated in the contract documents, with surfaces free from distortion or other defects in appearance. All signs installed shall conform to BC MOTI’s standards for offsets and standard heights. E. Prior to any digging the contractor must contact for marked-out of Traffic Signal conduits at all intersections where new signs shall be installed. F. Fabricator/Installer is responsible for contacting the local Utility Call-In system prior to any digging. It is the responsibility of the fabricator/installer to coordinate all calls, utility checks and footer production so that it will not delay the installation of the sign program. G. Installer shall coordinate sequencing, excavation, delivery, installation and clean-up with all related construction projects including streetscaping, roadwork or utility projects. H. Installer shall coordinate all excavation, delivery, installation and clean-up with adjacent businesses and property owners as required. February 2, 2017 POST AND PANEL SIGNS The City of Denton 10436 - 10 Wayfinding and Signage Project I. Fabricator shall replace all surfaces with like materials. All new surfaces adjacent to and within 10’ feet of post, including the entire excavated area shall be returned to the same condition and quality, including, materials, finish and grading that was present prior to excavation. J. When locating a footer within a single pavement block (max. 5’-0” x 5’-0”), adjacent to at least 2 expansion joints, the entire block of pavement shall be removed and replaced with the same materials and finish of adjacent sidewalk areas. K. Lateral Offsets: The following minimum lateral offsets shall be used for placement of signs: 1. Urban Areas: 2’ – 0” min. from face of curb to edge of sign panel L. The City of Denton representatives will be present at all field surveys and site markings prior to installation. As part of a team including The City of Denton, representatives of the design team and other agency representatives, the installer representative responsibilities will include; 1. Measuring and marking out (spray paint) final sign location number and placement 2. Recording measurements of sign placement from nearest intersection 3. Recording any field conditions that may alter or revise design intent 4. Record special field conditions, including custom pavers, colored concrete or other surface treatments that will require treatments. 5. Record all message, sign type and location revisions, additions or subtractions that effect the production or installation of the sign program. This information shall be forwarded to The City of Denton and consultant team for review and approval. 2. CLEANING A. At completion of installation, clean soiled surfaces of sign units according to manufacturer's written instructions. This shall be included within the lump sum cost of the project 3. TRAFFIC CONTROL A. Develop general Maintenance and Protection of Traffic plans for vehicular and pedestrian traffic in accordance with the current MUTCD, TXDOT requirements. Details for traffic control device must conform to the standard TXDOT details. B. The contractor shall apply for all permits required by The City of Denton for the purposes of traffic control. The cost for all permits and coordination shall be included within the Lump Sum Bid Proposal; this includes but is not limited to equipment, manpower, police presence or any other devices required for traffic control. 4. REMOVAL A. The contractor shall remove all existing wayfinding, directional and trailblazer signs. This work shall be completed prior to the installation of the new sign component. 5. ATTIC STOCK A. Contractor shall supply attic stock components of posts, sign panels, brackets and other components as requested and as outlined on the Bid Form. B. If requested by the owner, contractor may provide storage space for attic stock. The cost of this will be a negotiated fee between the city and the contractor on, per square footage basis. END OF SECTION 10436 February 2, 2017 PYLON SIGNS The City of Denton 10437 - 1 Wayfinding and Signage Project SECTION 10437 – Pylon Signs 1. GENERAL 1. RELATED WORK SPECIFIED ELSEWHERE A. Cast-In-Place Concrete: Section 03050. 2. SUMMARY A. This Section includes pylon signs. B. Related Sections include the following: 1. Division 3 Section "Cast-in-Place Concrete" for concrete foundations and bases for pylon signs. 2. Division 10 Section "Post and Panel Signs" for post-mounted signs. 3. PERFORMANCE REQUIREMENTS A. Structural Performance: Provide pylon signs capable of withstanding the effects of gravity loads and the following loads and stresses within limits and under conditions indicated, determined according to ASCE 7, "Minimum Design Loads for Buildings and Other Structures": 1. Wind Loads: Determine loads based on a uniform pressure from an ultimate wind speed of 105 mph acting in any direction. B. Thermal Movements: Provide pylon signs that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss. 1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. 4. SUBMITTALS A. Product Data Sheets: For each type of product indicated provided Manufacturers published product data sheets. Include construction details, material descriptions, dimensions of individual components and profiles, and finishes. Include manufacturer's written instructions for maintaining and cleaning sign surfaces. B. Shop Drawings: Show fabrication and installation details for pylon signs. February 2, 2017 PYLON SIGNS The City of Denton 10437 - 2 Wayfinding and Signage Project 1. Include plans, elevations, and at least 3/4-inch (1:20) scale sections of typical members and other components. Show anchors, reinforcement, accessories, layout, and installation details. a. Show locations of electrical service connections. 2. Include message list, with details of wording and lettering layout, at least half size. Include full-size details of graphics. a. Include full-size templates for cutout characters and graphic symbols. b. Include full-size spacing template for individually mounted dimensional characters and graphic symbols for field-applied characters on pylons. 3. Wiring Diagrams: For power, signal, and control wiring of externally illuminated signs. C. Samples for Initial Selection: Manufacturer's color charts consisting of actual units or sections of units showing the full range of colors available and project colors as specified for the following: 1. Aluminum. 2. Die-cut vinyl characters and graphic symbols in typefaces specified. D. Samples for Verification: For each type of product indicated, of size below: 1. Aluminum: For each form, finish, and color, on 6-inch- (150-mm-) long sections of extrusions and squares of sheet at least 4 by 4 inches (100 by 100 mm). 4. Dimensional Characters: Full-size representative samples of each dimensional character type required, showing style, color, and material finish and method of attachment to sign background. E. Quality Control Submittals: 1. Sign Fabricator Qualification Data: Certified statement from the fabricator indicat- ing the capacity and number of years products similar to those specified for the Work have been produced. 2. Sign Installer Qualification Data: Certified statement from the fabricator listing the names of employees of the installation firm that are trained and approved to install the specified products. 5. QUALITY ASSURANCE A. Installer Qualifications: An authorized representative of sign manufacturer for installation and maintenance of units required for the Work. B. Source Limitations: Obtain pylon signs through one source from a single manufacturer. C. Product Options: Drawings indicate size, profiles, and dimensional requirements of pylon signs and are based on the specific types and models indicated. February 2, 2017 PYLON SIGNS The City of Denton 10437 - 3 Wayfinding and Signage Project 1. Do not modify intended aesthetic effects, as judged solely by Architect, except with Director’s approval. If modifications are proposed, submit comprehensive explanatory data to the Director’s Representative for review. D. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use. 6. DELIVERY AND HANDLING A. Deliver pylon signs in protective covering and crating to protect sign components and surfaces against damage. 7. COORDINATION A. Coordinate delivery time so signs can be installed within 24 hours of receipt at Project site. 2. PRODUCTS 1. MATERIALS A. Aluminum Sheet and Plate: ASTM B 209 (ASTM B 209M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of alloy 6061-T6. B. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and with at least the strength and durability properties of alloy 6061-T6. C. Structural Steel: 1. Hot-Rolled Structural-Steel Shapes: ASTM A 36/A 36M or ASTM A 529/A 529M. 2. Steel Tubing or Pipe: ASTM A 500, Grade B. 3. Steel Members Fabricated from Plate or Bar Stock: ASTM A 529/A 529M or ASTM A 572/A 572M, 42,000-psi (290-MPa) minimum yield strength. 4. Bolts for Steel Framing: ASTM A 307 or ASTM A 325 (ASTM A 325M) as necessary for design loads and connection details. 5. For steel exposed to view on completion, provide materials selected for surface flatness, smoothness, and freedom from surface blemishes. Do not use materials whose surfaces exhibit pitting, seam marks, roller marks, rolled trade names, or roughness. February 2, 2017 PYLON SIGNS The City of Denton 10437 - 4 Wayfinding and Signage Project D. Vinyl Film: Opaque, nonreflective vinyl film, 0.0035-inch (0.09-mm) minimum thickness, with pressure-sensitive adhesive backing, suitable for exterior applications. E. Colored Coatings for Plastic Sheet: Nonfading coatings, including inks and paints for copy and background colors. Use coatings that are recommended by manufacturers for optimum adherence to type of plastic used. 2. ACCESSORIES A. Fasteners: Use concealed fasteners fabricated from metals that are noncorrosive to sign material and mounting surface. B. Anchors and Inserts: Use stainless steel or hot-dip galvanized anchors and inserts. Use torque-controlled expansion-bolt devices for drilled-in-place anchors. Furnish inserts, as required, to be set into concrete. C. Concrete for Foundations: Comply with requirements in Division 3 Section "Cast-in- Place Concrete" for normal-weight, air-entrained, ready-mix concrete with a minimum 28-day compressive strength of 4000 psi (17 MPa), unless otherwise indicated. 3. FABRICATION, GENERAL A. General: Provide manufacturer's standard pylon sign assembly consisting of message panels supported on foundation-mounted, structural framing system. 1. Welded Connections: Comply with AWS standards for recommended practices in shop welding. Provide welds behind finished surfaces without distortion or discoloration of exposed side. Clean exposed welded surfaces of welding flux and dress exposed and contact surfaces. 2. Mill joints to a tight, hairline fit. Form joints exposed to weather to exclude water penetration. 3. Preassemble signs in the shop to greatest extent possible. Disassemble signs only as necessary for shipping and handling limitations. Clearly mark units for reassembly and installation, in location not exposed to view after final assembly. 4. Conceal fasteners if possible; otherwise, locate fasteners where they will be inconspicuous. 4. STRUCTURE A. Base: Provide pylon signs with integral base consisting of channels, angles, plates, or other fittings. Drill holes in members for anchor-bolt connection. 1. Provide anchor bolts of size required for connecting base to concrete foundations. B. Internal Frames: Manufacturer's standard internal steel framing system, designed to withstand wind pressure indicated. Provide welded construction using mitered joints. Cut, drill, and tap units to receive hardware, bolts, and similar items. February 2, 2017 PYLON SIGNS The City of Denton 10437 - 5 Wayfinding and Signage Project 1. Hot-dip galvanize steel framing system after fabrication to comply with ASTM A 123/A 123M. C. External Frames: Manufacturer's standard external aluminum framing system designed to withstand design wind pressure indicated and for direct attachment of sign message panels. Provide welded construction using mitered joints. Cut, drill, and tap units to receive hardware, bolts, and similar items. 1. Frame Finish: Match finish of panels. 2. Corner Condition: Square corners. 5. SIGN PANELS A. General: 1. Coordinate dimensions and attachment methods to produce message panels with closely fitting joints. Align edges and surfaces with one another in the relationship indicated. 2. Continuously weld joints and seams, unless other methods are indicated; grind, fill, and dress welds to produce smooth, flush, exposed surfaces with welds invisible after final finishing. B. Flat Panels: Produce smooth sign panel surfaces, constructed to remain flat under installed conditions within a tolerance of plus or minus 1/16 inch (1.5 mm) measured diagonally from corner to corner. 1. Panel Material: 0.125-inch- (3.2-mm-) thick aluminum sheet 2. Panel Finish: High-performance organic coating. 3. Panel Finish: Manufacturer's standard semi gloss finish with UV inhibitors. 4. Provide clips welded to back of panels for installation without visible fasteners. C. Illuminated Units: Make provisions for servicing and for concealed connection to electric service. Coordinate electrical characteristics with those of the power supply provided. 6. GRAPHICS A. Surface-Applied, Die-Cut Vinyl Copy: Provide die-cut characters from nonreflective vinyl film with pressure-sensitive adhesive backing. Apply copy to exposed face of sign panel. B. Surface-Applied Cutout Characters: Cut copy characters from solid material of thickness indicated. Produce precisely cut characters with square-cut, smooth edges. Apply to exposed face of sign panel with concealed fasteners. 1. Material: 1/4-inch- (6-mm-) thick aluminum plate 7. ALUMINUM FINISHES February 2, 2017 PYLON SIGNS The City of Denton 10437 - 6 Wayfinding and Signage Project A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes. C. Class I, Clear Anodic Finish: AA-M12C22A41 (Mechanical Finish: nonspecular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class I, clear coating 0.018 mm or thicker) complying with AAMA 611. D. Class I, Color Anodic Finish: AA-M12C22A42/A44 (Mechanical Finish: nonspecular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class I, integrally colored or electrolytically deposited color coating 0.018 mm or thicker) complying with AAMA 611. 1. Color: Match Architect's sample E. Baked-Enamel Finish: AA-C12C42R1x (Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: acid-chromate-fluoride-phosphate conversion coating; Organic Coating: as specified below). Apply baked enamel complying with paint manufacturer's written instructions for cleaning, conversion coating, and painting. 1. Organic Coating: Thermosetting, modified-acrylic enamel primer/topcoat system complying with AAMA 2603 except with a minimum dry film thickness of 1.5 mils (0.04 mm), medium gloss. F. High-Performance Organic Coating Finish (Fluoropolymer Two-Coat System): AA- C12C40R1x (Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: conversion coating; Organic Coating: Manufacturer's standard two-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturer's written instructions and AAMA [2604] [2605]. G. High-Performance Organic Coating Finish (Fluoropolymer Three-Coat System): AA- C12C40R1x (Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: conversion coating; Organic Coating: Manufacturer's standard three-coat, thermocured system consisting of specially formulated inhibitive primer, fluoropolymer color coat, and clear fluoropolymer topcoat, with both color coat and clear topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with coating and resin manufacturer's written instructions and AAMA 2605. 1. Color and Gloss: As selected by Architect from manufacturer's full range. 3. EXECUTION February 2, 2017 PYLON SIGNS The City of Denton 10437 - 7 Wayfinding and Signage Project 1. INSTALLATION A. Excavation: In firm, undisturbed or compacted soil, excavate sign foundation to dimensions indicated. B. Set anchor bolts and other embedded items required for installation of signs. Use templates furnished by suppliers of items to be attached. February 2, 2017 PYLON SIGNS The City of Denton 10437 - 8 Wayfinding and Signage Project 4. Install signs level, plumb, and at height indicated, with surfaces free from distortion or other defects in appearance. 1. CLEANING A. At completion of installation, clean soiled surfaces of sign units according to manufacturer's written instructions. END OF SECTION February 2, 2017 Decorative Metal Coatings The City of Denton Dye Sublimated Printed Graphic Panels Wayfinding and Signage Project DECORATIVE METAL COATINGS - DYE SUBLIMATED PRINTED GRAPHIC PANELS GENERAL 1.1. SECTION INCLUDES A. Permanent imaging thermally-embedded in flat surfaces and dimensional objects for the following applications: 1. Signage and streetscape components. 1.2. RELATED SECTIONS A. Section 09900 – Paints and Coatings. 1.3. SYSTEM DESCRIPTION A. Process: The process embeds a high resolution image deep into and throughout a super durable powder coated layer. The image is embedded inside the powder and flows seamlessly over edges and corners. It is not a film or a laminate. There are no visible corners and no delamination. The process shall be capable of coating and decorating both flat surfaces and dimensional objects. 1. Product substrates selected shall be able to withstand the 350 degree F (177 degree C) temperature of the powder coating oven. This includes and is not limited to aluminum, steel, glass, MDF, ceramic and high temperature plastics. B. Characteristics: Coating shall be super durable polyurethane powder coated finish that is resistant to abrasion, humidity and corrosion. It shall be anti-graffiti, scratch resistant and non-combustible. The coating process shall be applicable for both interior and exterior applications. Coating shall withstand high traffic and extreme weather. 1. Available characteristics include anti-skid, antimicrobial, post-formable and super texture. C. Capability: Embed process capability shall allow parts from the size of a button to 24 feet (7315 mm) in length. Includes dimensional objects, flat and embossed sheets, extruded profiles, and folded panels. 1.4. SUBMITTALS A. Submit under provisions of Section 01300. B. Product Data: Manufacturer's data sheets on each product to be used. C. Shop Drawings: For all fabrications, including details of construction and attachment to adjacent surfaces. D. Verification Samples: For each finish product specified, two samples, minimum size 6 inches (150 mm) square representing actual product, color, and patterns. E. Sustainability Submittals: 1. Certificates for percentage of recyclable base materials, recyclable transfer film and organic February 2, 2017 Decorative Metal Coatings The City of Denton Dye Sublimated Printed Graphic Panels Wayfinding and Signage Project water-based inks. 2. Coating Process documentation of polyurethane powders emitting zero or near zero volatile organic compounds (no VOC’s). 1.5. QUALITY ASSURANCE A. Manufacturer Qualifications: Minimum 3 years experience manufacturing similar products. Manufacturer shall have capability to provide a “delegated design” responsibility including prototypes, value engineering and budget analysis. B. Quality Assurance Process: The following services shall be provided by the manufacturer to deliver the specified product for installation. 1. Project Management: Management of the design facilitation, review, prototype and implementation process. 2. Value Engineering: Reviewing possible cost saving approaches for single or multiple production pieces. 3. Prototype Development: Creating a full design element or portion of the element that reflects the final production piece. 4. Production/Fabrication: Creation of the final production piece. 5. Coating and Embedding: The powder coating and embedded decoration of the final production piece. 6. Installation and Service: Installation of the final production piece as well the maintenance of the final piece after installation. C. Mock-Up: Provide a mock-up for evaluation of surface preparation techniques and application workmanship. 1. Finish areas designated by Designer. 2. Do not proceed with remaining work until workmanship is approved by Designer. 3. Rework mock-up area as required to produce acceptable work. 1.6. PRE-INSTALLATION MEETINGS A. Convene minimum two weeks prior to starting work of this section. 1.7. DELIVERY, STORAGE, AND HANDLING A. Deliver and store products in manufacturer's unopened packaging until ready for installation. B. Handling: Handle materials to avoid damage. 1.8. PROJECT CONDITIONS February 2, 2017 Decorative Metal Coatings The City of Denton Dye Sublimated Printed Graphic Panels Wayfinding and Signage Project A. Maintain environmental conditions (temperature, humidity, and ventilation) within limits recommended by manufacturer for optimum results. Do not install products under environmental conditions outside manufacturer's recommended limits. 1.9. SEQUENCING A. Ensure that products of this section are supplied to affected trades in time to prevent interruption of construction progress. 1.10. WARRANTY A. Manufacturer’s Warranty: Provide manufacturer’s standard warranty for up to 10 years depending on location, substrate, environment and amount of direct sunlight. 2. PRODUCTS 1.1. MANUFACTURERS A. Acceptable Manufacturer: Direct Embed Coating Systems; 6 Morris St., Paterson, NJ 07501. ASD. Tel: (954) 825-0410. Email: info@directembedcoating.com. Web: http://www.directembedcoating.com. B. Requests for substitutions will be considered in accordance with provisions of Section 01600. 1.2. COATING SYSTEM A. Powder Coating with Embedded Image using DECS Equipment: As manufactured by Direct Embed Coating Systems. Coating shall be resistant to abrasion, humidity and corrosion; anti-graffiti, scratch resistant, non-combustible, super-durable (UV resistant), and TGIC free (non-toxic). Suitable for both interior and exterior applications. Coating shall withstand high traffic and extreme weather.. 1. Substrate Material: As indicated on the Drawings. 2. Image Source: As indicated on the Drawings. 3. Color: As indicated on the Drawings. 4. Finish: Matte. 1.3. APPLICATIONS/SCOPE A. Sign and Streetscapes: As detailed on the Drawings for the following applications. 1. Identity. 2. Wayfinding. 3. Banners. 4. Landmarks. 5. Overhead. February 2, 2017 Decorative Metal Coatings The City of Denton Dye Sublimated Printed Graphic Panels Wayfinding and Signage Project 3. EXECUTION 1.1. EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. If substrate preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. 1.2. PREPARATION A. Clean surfaces thoroughly prior to installation. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. 1.3. INSTALLATION A. Install in accordance with manufacturer's instructions and in proper relationship to adjacent surfaces. 1.4. PROTECTION A. Protect installed products until completion of project. B. Touch-up, repair or replace damaged products before Substantial Completion. END OF SECTION