Loading...
6375C - Construction of Pecan Creek Interceptor IV, 1.Pricing SheetExhibit 1 IFB 6375 - Pricing Sheet for Construction of Pecan Creek Interceptor IV The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. I II III IV V VI Wastewater Proposal Pricing: Item 1 2 3 4 5 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 23 25 26 27 28 29 31 Water Proposal Pricing: Item 50 51 53 56 58 59 61 63 64 65 66 68 Alternate A Wastewater Proposal Pricing: Item 5 7 9 12 14 16 22 24 26 30 Alternate A Water Proposal Pricing: Item 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 *NOTE: PLEASE EMAIL THIS EXHIBIT 1 AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM Respondent's Name: Principal Place of Business (City and State) Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual? Respondent can meet time requirement of Qualification #4 under Bidder Qualifications (Y/N)? Total calendar days after Notice to Proceed is issued by City for substatial completion (Maximum of 330): Total calendar days after Notice to Proceed is issued by City for project start: Description Surety Bonds Project Signs General Site Preparation Barricades, Warning Signs and Detours Excavation Protection Temporary Erosion Control 4' I.D. Concrete Manhole (0-6 ft deep) 5' I.D. Concrete Manhole (0-6 ft deep) 5' I.D. Concrete Drop Manhole (0-6 ft deep) 6' I.D. Concrete Drop Manhole (0-6 ft deep) Additional Concrete Manhole Depth (>6 ft deep) Core into Existing Manhole 4" Sanitary Sewer Service 6" Sanitary Sewer Service 8" Sanitary Sewer with Pavement Repair 8" Sanitary Sewer Unpaved 24" Sanitary Sewer Unpaved 27" Sanitary Sewer Unpaved 30" Sanitary Sewer Unpaved 30" Sanitary Sewer with Pavement Repair 30" Sanitary Sewer in Casing 42" Steel Casing / Tunnel Liner Plate by Tunnel Cut and Plug Existing Sanitary Sewer Line Abandon Existing Manhole Remove Existing Manhole Bypass Pumping Water Main Lowering Wastewater Total Description Excavation Protection 6" PVC C900 Water with Pavement Repair 12" PVC C900 Water with Pavement Repair 6" Gate Valve 12" Gate Valve Fire Hydrant Assembly 12" Tapping Sleeve Connection 6" Cut-in Connection Cut and Plug Existing Water Line Remove Valve Stack Remove Fire Hydrant Assembly 6" Line Stop Water Total Description Excavation Protection 4' I.D. Concrete Manhole (0-6 ft deep) 4' I.D. Concrete Drop Manhole (0-6 ft deep) Additional Concrete Manhole Depth (>6 ft deep) 4" Sanitary Sewer Service 8" Sanitary Sewer with Pavement Repair 8" Sanitary Sewer in Casing 12" Steel Casing by Bore Cut and Plug Existing Sanitary Sewer Line Aerial Crossing Removal Alternate A Wastewater Total Description Excavation Protection 6" PVC C900 Water with Pavement Repair 8" PVC C900 Water with Pavement Repair 12" PVC C900 Water with Pavement Repair 12" PVC C900 Water in Casing 24" Steel Casing by Bore 6" Gate Valve 8" Gate Valve 12" Gate Valve Fire Hydrant Assembly 1" Water Service Connection 12" Tapping Sleeve Connection 2" Cut-in Connection 6" Cut-in Connection Cut and Plug Existing Water Line Remove Valve Stack Remove Fire Hydrant Assembly 2" Line Stop 6" Line Stop Alternate A Water Total Base Bid Total (Wastewater + Water) Base Bid Total Pricing in typed words Base Bid Plus Alternate A Total Base Bid Plus Alternate A Total Pricing in typed words Quantity 1 2 1 1 2278 1 1 1 3 2 38 1 17 9 273 20 28 913 466 578 40 40 8 11 3 1 1 Quantity 348 38 310 2 2 1 1 2 2 2 1 2 Quantity 506 2 1 3 1 506 35 35 1 1 Quantity 650 75 40 535 35 35 1 2 2 1 1 1 1 1 4 4 1 1 1 Unit LS EA LS LS LF LS EA EA EA EA VF EA EA EA LF LF LF LF LF LF LF LF EA EA EA LS EA Unit LF LF LF EA EA EA EA EA EA EA EA EA Unit LF EA EA VF EA LF LF LF EA EA Unit LF LF LF LF LF LF EA EA EA EA EA EA EA EA EA EA EA EA EA Unit Price Unit Price Unit Price Unit Price Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0