Loading...
6391 - Construction of 9/11 Memorial Bell Tower, 3.Statement of Work/ Specifications The scope of work shall be finalized upon the selection of the Firm. The respondent’s submission shall have accurately described your understanding of the objectives and scope of the requested products and services and provided an outline of your process to implement the requirements of the Scope of Work and Services. It is anticipated that the scope of work will include, at a minimum, the following: Sheet Contents Date  G0.01 Cover Sheet 13 February 2017  A2.01 Demo, Floor, and Site Plans 13 February 2017  A3.01 Elevations 13 February 2017  A4.01 Sections and Detail 13 February 2017  S1.01 Structural Plan and Details 13 February 2017  E1.00 Cover Sheet – Electrical 13 February 2017  E1.01 Site Plan Electrical 13 February 2017      Project Manual  13 February 2017