6395 - Landfill Cell 3 Liner Construction and Site Improvements, Addendum 1 (3) \\Data1\Projects\2016\0172.16\03_PRCMNT\02_ADDM\ADDENDUM 1\PSC_Denton LF Cell 3_Addendum No 1.docm ADDENDUM NO: 1 TO: All Prospective Respondents/Plan Holders FROM: Frank E. Pugsley, PE PROJECT NAME: Landfill Cell 3 Liner Construction And Site Improvements PROJECT NO.: 0172.16 – RFP 6395 DATE: March 23, 2017 Attention of all Prospective Respondents/Plan Holders is directed to the following modifications to the referenced Project Manual/Specifications and Drawings. This Addendum forms a part of, and shall be attached to the Project Manual/Specifications, and modifies the original Request for Proposals dated March 9, 2017 as noted below: I. CHANGES TO EXHIBIT 1 – PRICING SHEET A. Item 18 has been revised to require a quantity of 400 LF. Refer to item III.B below. B. Item A5 has been revised. Pavement Type D and A were inadvertently transposed. Refer to Item III. A below. A revised Pricing Sheet is included with this Addendum. II. CHANGES TO TECHNICAL SPECIFICATIONS: A. Specification Section 11300 – Booster Pumps 1. Inset Section 1.3 – Acceptable Manufacturers to read as follows: 1.3 ACCEPTABLE MANUFACTURERS A. Grundfos 1. Product Name: HYDRO MPC E 3CRE15-03 3X460V, Product No.: 95055166 B. Pre-approved equivalent B. Add Specification Section 13100 – Membrane Lined Tank III. CHANGES TO DRAWINGS: A. Sheet C-006 1. Detail C3 – Typical Asphalt Section. The HMAC section shall be revised to note a 4-inch Type A base course and 2-inch Type D surface course. B. Sheet C-012 1. Revise Note 1 to read: Install pipe fencing (approximately 400 LF total). Pre-Proposal Agenda Page 2 Date IV. ADDITIONAL INFORMATION A. Geotechnical Information 1. A geotechnical investigation was conducted for the ground storage tank site. A copy of this report is attached for review. 2. A geotechnical investigation was not conducted in the vicinity of the screening wall. However, provided with this Addendum for review, are several boring logs in the vicinity of the screening wall. END OF ADDENDUM NO. 1 Respectfully submitted, PARKHILL, SMITH & COOPER, INC. By: March 23, 2017 Receipt of this addendum shall be acknowledged by the Bidder, below and on the bid Proposal. This entire addendum, or a copy thereof, shall be attached to the bid Proposal submitted. ACKNOWLEDGED: By: 01017216 MEMBRANE LINED TANK 13100 - 1 03/17 SECTION 13100 – MEMBRANE LINED TANK PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Membrane lined round steel tank and appurtenances. 2. All labor, materials, equipment, and incidentals required and install tank and appurtenances in locations as shown on Drawings. B. Scope: 1. Furnish and install one membrane lined steel water storage tank, with secondary membrane containment, floating cover, through-wall connections, foundation and all other required appurtenances. 2. Tank materials shall be compatible with the storage of municipal solid waste landfill leachate and stormwater. 3. Tank capacity shall be 230,000- to 250,000 gallons. 4. Tank diameter shall be 36-ft to 41’6”-ft. C. Related Sections: 1. Division 01 Specification Sections apply to Work of this Section. 1.2 QUALIFICATIONS A. All tank components shall be supplied by a single manufacturer, fully experienced, reputable, and qualified in manufacture of items to furnish. Design, construct, and install equipment in accordance with best practices and methods and comply with these Specifications and manufacturer instructions. B. Equipment to consist of parts designed to act as a unit by a manufacturer experienced in design, construction, and operation of equipment for required purpose. 1.3 SUBMITTALS A. Shop drawings shall be submitted to Engineer for approval in accordance with Division 01 and include dimensioning, methods, and locations of supports and fittings, and technical specifications for all equipment to be furnished. PART 2 - PRODUCTS 2.1 ACCEPTABLE MANUFACTURERS A. ModuTank, Inc. 41-04 35th Avenue Long Island City, NY 11101 01017216 MEMBRANE LINED TANK 13100 - 2 03/17 2.2 MATERIALS A. Tank shell shall be designed to AWWA standards for hydrostatic pressure and for wind loading in accordance with local codes and ordinances. Seismic design tank shells shall be in accordance with local conditions. B. Tank capacity shall be 230,000- to 250,000 gallons C. Tank diameter shall be 36-ft to 41’6”-ft D. Concrete ring foundation E. Wall Panels shall be: 1. 48" x 120" or 60" x 120" 2. Tolerance -0", + 1/8" 3. Less than 1/4" differential on diagonals 4. G-90 galvanized ASTM A-924 5. 16, 14, 12, or 10 gauge F. Wall Panels for large diameter tanks shall be: 1. Cor Ten alloy ASTM A588 2. ASTM A606 Type 4 3. 48” x 120” or 60” x 120”, 16, 14, 12 or 10 ga. 4. 3/16” to 3/8” thick G. Girths shall be: 1. ASTM A 36 structural angles 2. 3" x 3" x 1/4" 3. Rolled to required radius 4. Hot dip galvanized after fabrication H. Anchor Brackets shall be: 1. 6” x 3-1/2” x 3/8” x 4” wide angle 2. Hot dip galvanized I. Spacers shall be: 1. 1/4" x 2” x 2” long hot roll strip 2. Hot dip galvanized after fabrication J. Footing Plates shall be: 1. Corrosion-resistant Cor-ten 2. ASTM A588 3. 3/16" thickness K. Fasteners shall be: 1. All structural bolts and hardware, grade 5 or better, zinc plated L. Fitted liners shall be shop fabricated in one piece for drop-in installation or in sections for field seaming. Floating covers shall be made of the same materials as liners and include flotation logs, ballast pipe and vent. All liner seams shall be tested by standard industry methods for seaming integrity. M. Liner material shall be: 1. 45 mil reinforced Polypropylene N. Rope Grid for floating cover shall be: 1. 1/4” OD polypropylene rope 2. 3/8” forged eye bolts, galvanized O. Underlayment / Interlayment 01017216 MEMBRANE LINED TANK 13100 - 3 03/17 1. 8 oz. per yard nonwoven needle punched geotextile. P. Leak detection system shall be provided and shall consist of: 1. Primary and Secondary liners, comprised of the same type of material 2. Interlayer of geotextile between Primary and Secondary liners 3. Special modified PVC flanges attached to secondary liner at bottom 4. Geotextile encased galvanized steel cover plate Q. Inlet and outlet connections: 1. Through-the-wall 304 SS steel pipe with SS flange, SCH 40 PVC internal elbow a. Two (2) 6-inch diameter inlet b. Two (2) 6-inch diameter outlet c. Two (2) 2-inch diameter level indicator (top and bottom) 2. External expansion joint at each connection R. Galvanized steel ladder and safety cage, OSHA compliant. S. Level indicator 1. 304 Stainless steel magnetic wide flag level indicator, Mag-Gage. 2. 304 Stainless steel gate valves at inlet, vent, and drain 3. Electrical heat tracing for freeze protection 4. Measurement length to be coordinated with actual tank dimensions 5. Manufactured by Process Level Technology, LTD or equal. 2.3 WARRANTIES A. All tank system components manufactured and/or supplied by the tank manufacturer shall be warranted for two years from date of substantial completion. PART 3 - EXECUTION 3.1 INSTALLATION A. Tank system installation shall be strictly in accordance with manufacturer's technical data and printed instructions. END OF SECTION ~: /' ,..---' ',-. _;r·~-x-.... ·~-----··, ' '· _, ; ",, 'I ' I -=...x .-:.-_.lt ~~·=· ' \ ' 'I / I I I , I I l• I i ); \/ . ' /' .~:t. \ .I :: // -~ // .· .'/ ,' ,,, ·. // // /' PRoPE Fl tv UN( ' '· ·.,.-'-------~ . ':~ </ ~ , / ' .... ·.· ~ ·.··,· ,, ',· --- '. ·-,'~ ', ' \, .-.,/' / ~ / /-,:/ ,·"~:j:;;a~ '/ .",//. , / : / ' : , .-'.//:;' / : . , : 0:;'\ -.,. J,' " ', ... ; ' . "' '~ ·'":·,, 0 400 St~E IN FEET LEGEND ----P£-TLIIAIT 8 LEACHATL. CQU.ICTIOii S1Jiof' • - - - -LEACHATE COlLECTION P1PHC [)IVERS10II aEFl\1 ~L WEATI-f:Fl ACct:SS ROW -------· PHASE L.t.IIT -----PROPOSED SlURRY WAll -------- 0 -4r + EJOSTIHC 8(NTONTE SllflRY WJU BORING CONPLETED BY RON£ ENClNEERS loi()NITORINC wELL BoruNG COUPLETED BY EUCON IP DENOTES .JVJACENT PIEZOUETER JNST ALLED BY EUCONl l:J. PIEZCUE TER 0 CAS PROBE -570- A 551.16 -y 713196 ~~-564~- -)1--x-x- -o-t>-t>· CONTOUR OF HIGHEST UEASURED WATER-LEVEL ELEVATION IN UPPER S»>I NOTE• THESE CONTOURS ~ NOT POTENTIOUETRIC LEVELS .>1'10 DO NOT REPRESENT rLOW PO TEN Tilt.. HIGHEST UEASUREO WATER-LEVEL ELEVATION IN PI[ZOUETER WITH DATE EXCA'iATJON CONTOUR B.&RB£0 WIRE r ENCE P£R\IoiE TER FENCE ~2.. .of-~J ~~'-'" tt\b NOTE• TOPOGRAPHIC UAPPHG PREP .o.R£0 BY PtiOT OCR.wto'E TRIC UE THOOS IH ACCOROANCE WITH NAT )()HAL IIAPP1HG ACC\lii.ACY STH«lAAOS BY O.olLAS' K~ 5tJRIIEYS.INC- FROW I£RI.ol PtiOTOCRAPH OAT£0 APRil. 7. ~-. liR CITY OF DENTON LANDFILL \Dote -~ DEWATERING PLAN June, 199~ HIGHEST MEASURED Fiigure 1 WATER LEVEL ELEVATIONS .1.. IIPPI='R SAND I HOR Engineering, Inc. ~ '2.--o-f' ~ '3> B-120MW 4U & 4L MW 5U & 5L