Loading...
6416 - Construction of Hickory Sub Underground Transmission Line Duct Bank, 2.General Provisions/ Terms and Conditions / Materials Management Department 901-B Texas Street Denton, Texas 76209 940-349-7100 purchasing@cityofdenton.com RFP – 6416 Exhibit 2 General Provisions –Terms and Conditions CONSTRUCTION OF HICKORY SUB UNDERGROUND TRANSMISSION LINE DUCT BANK The following document provides details of the City’s General Provisions, Terms and Conditions, insurance requirements and sample contract for the procurement of Civil Engineered Construction Projects. This exhibit governs the solicitation and supporting exhibits as identified in the Main Document Table of Contents. Table of Contents A. GENERAL PROVISIONS 4 1. AVAILABILITY OF TECHNICAL DRAWINGS AND SPECIFICATIONS 4 2. EXAMINATION OF PLANS, SPECIFICATIONS AND SITE OF THE WORK 4 3. SILENCE OF SPECIFICATIONS 5 4. RESPONDENTS COST TO DEVELOP SUBMITTAL 5 5. MINIMUM RESPONSE 5 6. VALIDITY PERIOD 5 7. REJECTION OF SUBMITTAL 5 8. PROPRIETARY INFORMATION 5 9. NON-ENDORSEMENT 6 10. ASSIGNMENT 6 11. UNAUTHORIZED COMMUNICATIONS 6 12. DISQUALIFICATIONS 7 13. INTELLECTUAL PROPERTY INDEMNIFICATION 7 14. RIGHTS TO DATA, DOCUMENTS, AND COMPUTER SOFTWARE (GOVERNMENTAL ENTITY OWNERSHIP) 7 15. PATENT RIGHTS 7 16. PREFERENCES 8 17. AWARD 9 18. POST AWARD ADDITIONAL REQUIREMENTS 9 19. CONTRACTS 10 20. BONDS 10 21. RETAINAGE 11 22. INSURANCE 11 23. WARRANTIES 11 24. SUBSTITUTIONS 11 25. PRODUCT CHANGES DURING CONTRACT TERM 11 26. ADDING NEW PRODUCTS OR SERVICES TO THE CONTRACT AFTER AWARD 12 27. ASBESTOS FREE MATERIALS 12 28. PREVAILING WAGE RATES 12 29. SAFETY AND ENVIRONMENTAL HAZARDS 12 30. CONTRACTOR STANDARDS OF PERFORMANCE 13 31. ANTICIPATED PROBLEMS AND PROPOSED SOLUTIONS 13 32. ADDITIONAL GENERAL REQUIREMENTS 13 33. REMEDIES 14 a. COMPLETION OF CONTRACTOR’S DEFAULT 14 b. CUMULATIVE REMEDIES 14 34. PAYMENT AND PERFORMANCE REQUIREMENTS 14 a. PAYMENT AND INVOICES: 14 b. PAYMENT TO PERFORMANCE MILESTONES 15 c. TAX EXEMPTION 15 d. RELEASE OF LIENS AND CERTIFICATE OF CONTRACTOR 15 e. PAYMENTS TO MATERIAL-MEN AND SUBCONTRACTORS 16 B. SPECIAL NOTICES AND REQUIREMENTS 17 1. CONTRACT ADMINISTRATION SUBMITTALS AND REQUIREMENTS 17 2. MEETINGS 19 3. SURVEYS, MEASUREMENTS AND LAYOUTS 21 4. MISCELLANEOUS REQUIREMENTS 21 C. STANDARD PURCHASE TERMS AND CONDITIONS FOR CIVIL ENGINEERED CONSTRUCTION SERVICES 22 Vegetative material removed as a result of work operations shall be transported off-site and deposited at a legal site in accordance with all applicable federal, state, and local laws and regulations. Removed vegetation will not be allowed to remain in piles or mounds on the easement or surrounding property. 52 APPENDIX A- INSURANCE REQUIREMENTS AND WORKERS’ COMPENSATION REQUIREMENTS 81 APPENDIX B – SAMPLE CONTRACT 89 A. GENERAL PROVISIONS 4 1. AVAILABILITY OF TECHNICAL DRAWINGS AND SPECIFICATIONS 4 2. EXAMINATION OF PLANS, SPECIFICATIONS AND SITE OF THE WORK 4 3. SILENCE OF SPECIFICATIONS 5 4. RESPONDENTS COST TO DEVELOP SUBMITTAL 5 5. MINIMUM RESPONSE 5 6. VALIDITY PERIOD 5 7. REJECTION OF SUBMITTAL 5 8. PROPRIETARY INFORMATION 5 9. NON-ENDORSEMENT 6 10. ASSIGNMENT 6 11. UNAUTHORIZED COMMUNICATIONS 6 12. DISQUALIFICATIONS 7 13. INTELLECTUAL PROPERTY INDEMNIFICATION 7 14. RIGHTS TO DATA, DOCUMENTS, AND COMPUTER SOFTWARE (GOVERNMENTAL ENTITY OWNERSHIP) 7 15. PATENT RIGHTS 7 16. PREFERENCES 8 17. AWARD 9 18. POST AWARD ADDITIONAL REQUIREMENTS 9 19. CONTRACTS 10 20. BONDS 10 21. RETAINAGE 11 22. INSURANCE 11 23. WARRANTIES 11 24. SUBSTITUTIONS 11 25. PRODUCT CHANGES DURING CONTRACT TERM 11 26. ADDING NEW PRODUCTS OR SERVICES TO THE CONTRACT AFTER AWARD 12 27. ASBESTOS FREE MATERIALS 12 28. PREVAILING WAGE RATES 12 29. SAFETY AND ENVIRONMENTAL HAZARDS 12 30. CONTRACTOR STANDARDS OF PERFORMANCE 13 31. ANTICIPATED PROBLEMS AND PROPOSED SOLUTIONS 13 32. ADDITIONAL GENERAL REQUIREMENTS 13 33. REMEDIES 14 a. COMPLETION OF CONTRACTOR’S DEFAULT 14 b. CUMULATIVE REMEDIES 14 34. PAYMENT AND PERFORMANCE REQUIREMENTS 14 a. PAYMENT AND INVOICES: 14 b. PAYMENT TO PERFORMANCE MILESTONES 15 c. TAX EXEMPTION 15 d. RELEASE OF LIENS AND CERTIFICATE OF CONTRACTOR 15 e. PAYMENTS TO MATERIAL-MEN AND SUBCONTRACTORS 16 B. SPECIAL NOTICES AND REQUIREMENTS 17 1. CONTRACT ADMINISTRATION SUBMITTALS AND REQUIREMENTS 17 2. MEETINGS 19 3. SURVEYS, MEASUREMENTS AND LAYOUTS 21 4. MISCELLANEOUS REQUIREMENTS 21 C. STANDARD PURCHASE TERMS AND CONDITIONS FOR CIVIL ENGINEERED CONSTRUCTION SERVICES 22 Vegetative material removed as a result of work operations shall be transported off-site and deposited at a legal site in accordance with all applicable federal, state, and local laws and regulations. Removed vegetation will not be allowed to remain in piles or mounds on the easement or surrounding property. 52 APPENDIX A- INSURANCE REQUIREMENTS AND WORKERS’ COMPENSATION REQUIREMENTS 81 APPENDIX B – SAMPLE CONTRACT 89