Loading...
6481-1 Construction of Cedar Street Parking Lot - Addendum 4 (Replacing Addendum 2) - Pricing Sheet (REVISED4)Exhibit 1 REV-2 RFP 6481 - Pricing Sheet for Construction of Cedar Street Parking Lot The respondent shall complete the following sections highlighted in YELLOW, which directly correspond to the specifications. The contractor shall not make changes to this format. 1 2 3 4 5 Total days from Notice to Proceed to Substatial Completion Proposal Pricing: 6 7 8 Pricing: Item # Section 1: Utilities and Site Prep 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Section 2: Hardscape 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Section 2: Hardscape, continued 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Section 3: Softscape 49 50 51 52 53 54 55 56 57 58 59 60 Section 4: Stormwater Mitigation 61 62 63 64 65 66 67 68 Section 5: GreenBlue 'RootSpace' (street tree root protection system) 69 *THIS EXHIBIT 1 MUST BE EMAILED AS AN EXCEL FILE TO EBIDS@CITYOFDENTON.COM* PLEASE NOTE: The quantities indicated on the drawings and in the Technical Specification are believed to be accurate but shall be considered only as estimates. The project requires complete and functional construction in accordance with the Technical Specifications and Technical Drawings. Differences between the quantities of material required and the estimated quantities will not be considered as basis for a change in the unit price for the project. In submitting a proposal, the proposer is stating that he has reviewed the project drawings and specifications and understands their intent and has checked the quantities and dimension and is asserting that the proposal is intended to account for all conditions and quantities to complete the project as described in the plans and specification. Respondent's Name: Principal Place of Business (City and State) Respondent is a Corporation, Partnership, sole Proprietorship, Indvidual? Total calendar days to mobilize after Notice to Proceed is issued by City (maximum 14 days): Total calendar days after Mobilization on site for substatial completion: Base Bid amount to construct project per specifications: Payment and Performance Bonds (enter total cost) Total Bid amount to construct with bonds (evaluated cost) Total Pricing in typed words below: Quantity 1 1 8 600 1.2 2032 1752 294 2 1 5 138 224 293 56 1 5 4 367 92 2980 680 3 126 1687 450 5 48 608 5354 3 114 4 1 3 2 190 10 2 1 315 6 1 2 1 315 6 2 79 280 317 9 6 6 54 8905 1 1 5090 14 21 9 3 950 63 32 158 1700 5620 UOM LS EA EA LF AC SY SY LF EA LS EA CY LF LF LF EA EA EA SY SY SY LF EA SF LF SF EA EA SF SF EA LF LF EA EA EA LF EA EA EA SFF EA EA EA EA SFF EA EA EA EA EA EA EA TONS CY SF EA LS SF EA CY CY EA SF CY CY LF SF CF Product Description Traffic Control Construction Entry Inlet Protection Silt Fence Clearing and Grubbing, Including Tree Removal Concrete Pvmt/Flatwork/Curb Removal Asphalt Pvmt/Flatwork/Curb Removal Demolish Existing Stone Retaining Wall Remove Grate Inlets Remove Grease Trap Catch Basin, Drain Pipe, Detention, Complete in Place Earthwork, Export 6" Storm Drain Pipe 12" Storm Drain Pipe 18" Strom Drain Pipe Electrical Meter/Connection Pedestrian Light Pole Fixtures, Footings, Conduit, Wiring Parking Lot Light Pole Fixtures, Footings, Conduit, Wiring 7" Reinforced Concrete Paving - Dumpster Area 8" Reinforced Concrete Paving - Drive Approach 5" Reinforced Concrete Paving - Parking 6" Integral Curb (Including Drainage Flume) Accessible Ramps Truncated Dome Concrete Pavers Parking Lot Striping Accessible Striping and Pedestrian Crosswalk Accessible Parking Signs Wheel Stops Enhanced Paving 4" Reinforced Concrete Paving, Broom Finish (Base Bid Quantity) Tree wells and Tree Grates 6" Concrete Street Tree Planter Edge 12" Concrete Mow Curb Bicyle Rack (4 bikes) Benches Trash Cans Ornamental Fence Ornamental Fence Column 6' Dumpster Enclosure Gate Screen 6' Dumpster Enclosure Side Gate 6' Dumpster Enclosure Wall 6' Dumpster Enclosure Wall Column Custom Kiosk, Complete in Place 6' Dumpster Enclosure Gate Screen 6' Dumpster Enclosure Side Gate 6' Dumpster Enclosure Wall 6' Dumpster Enclosure Wall Column Parking Lot Monument 3 Gal Shrub 1 Gal Shrub 4" Pot - Groundcover 3" Cal. Shade Tree 30 Gal. Ornamental Tree Limestone Boulder Rio Grande Cobble - small Planting Soil Irrigation Controller, Flow Control Meter Backflow Drip Irrigation Bubblers Large Gravel, 14" Thick (Infiltration Trench) Washed Sand, 6" Thick (Infiltration Trench) Observation Well (Infiltration Trench) Filter Fabric (Infiltration Trench) Planting/Infiltration Media, 24" Thick (Bioretention Cell/Planter Box) Gravel Drainage Layer, 12" Thick (Bioretention Cell/Planter Box) 6" Perferated PVC Pipe(Bioretention Cell/Planter Box) Geotextile Fabric (Bioretention/Planter Box) Excavation/Installation/Soil 0 0 0 Unit Price Subtotal Subtotal Subtotal Subtotal Total Base Bid: Extended Price 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0