Loading...
6304 - Denton Energy Center Waterline Phase 1, 1.Pricing SheetExhibit 1 RFP 6304 Pricing Sheet for Water Line Improvements - Phase 1 DME Denton Energy Center The respondent shall complete the following section, which directly corresponds to the Scope of Services, Payment and Performance Requirements. The contractor shall not make changes to this format. SECTION I - Project: Furnish all supervision, labor, material, supplies, tools, equipment and transportation to complete: Item 1 2 3 4 5 6 7 8 9 10 11 12 13 A1 A2 SECTION II - Hourly Rates for Additional Services Item 14 15 16 17 18 19 SECTION III - Delivery 20 21 Type of Service Requested BASE PROPOSAL GENERAL Mobilization/ Demobilization Payment and Performance Bonds General Site Preparation Traffic Control, Barricades,Barriers, and Warning Signs Temporary Erosion Control WATER 12" C900 DR 14 PVC Water 12" R.J.D.I. Water Carrier Pipe 16" C151 DIP CL 52 24" Steel Casing By Open Trench 12" Gate Valve Fire Hydrant Assembly Connection to Existing Water Line Trench Safety ALTERNATE WATER 16" C151 DIP CL 52 16" Gate Valve PRICES SHALL INCLUDE DELIVERY, FOB DESTINATION Type of Service or Equipment Track Excavator Rubber Tire Front End Loader Rubber Tire Backhoe Compactor Bobcat Skid Steer 12 YD Tandem Dump Total working days (Monday - Friday/Saturday) after Notice to Proceed is issued by City for project start: Total working days (Monday - Friday/Saturday) after Notice to Proceed is issued by City for substantial completion: Proposer's Name Principal Place of Business Quantity 1 1 1 1 1 4786 424 9 420 9 8 1 5219 Quantity 1505 2 Unit Hour Hour Hour Hour Hour Hour Unit LS LS LS LS LS LF LF LF LF EA EA EA LF Unit LF EA Quantity 1 1 1 1 1 1 Unit Price BASE TOTAL (FOR EVALUATION) Unit Price ALT TOTAL Total Base and Alternate Unit Price Extended Price 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Extended Price 0 0 0 0 Extended Price 0 0 0 0 0 0