Loading...
6547 - Concrete Repair Services, 1.REVISED ADDENDUM 2 - Pricing Sheet (2) IFB 6547 - Pricing Sheet for Concrete Repair and Installation Services -Addendum #2 Exhibit 1 Respondent's Business Name Principal Place of Business (City and State) The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. Product Proposal Pricing (PRICING SHALL INCLUDE ALL COSTS TO DELIVER GOODS AS SPECIFIED F.O.B DESTINATION): Will cement supplied for under this contract be manufactured using a dry or wet kiln? Indcate Dry or Wet 1 Number of Business Days to Mobilize to jobsite after notice to proceed? 2 Proposal Pricing: Est. Item #UOMProduct Description Unit Pricing Total Qty. 3$ - $ - 200LFDOWEL-ON INTEGRAL (WITH ONE 3/8" STEEL BAR) 4$ - $ - 5000LFCONCRETE CURB & GUTTER ( WITH FIBERS) (0 TO 250 LF) 5$ - $ - 5000LFCONCRETE CURB & GUTTER ( WITH FIBERS) (251 TO 1000 LF) 6$ - $ - 3000LFCONCRETE CURB & GUTTER ( WITH FIBERS) (1001 TO 5000 LF) 7$ - $ - 2000LFCONCRETE CURB & GUTTER ( WITH FIBERS) (> 5001 LF) 8$ - $ - 500LF30" SURMOUNTABLE CURB/FIBERS (1 to 250 LF) 9$ - $ - 1000LF30" SURMOUNTABLE CURB/FIBERS (251-1000 LF) 10$ - $ - (0 TO 50 SY) 750SY 6'' CONCRETE SIDEWALK WITH FIBER 11$ - $ - (51 TO 100 SY) 750SY 6'' CONCRETE SIDEWALK WITH FIBER 12$ - $ - (101 TO 500 SY) 750SY 6'' CONCRETE SIDEWALK WITH FIBER 13$ - $ - (501 TO 1000 SY) 750SY 6'' CONCRETE SIDEWALK WITH FIBER 14$ - $ - 750SY6'' CONCRETE SIDEWALK WITH STEEL (0 TO 50) 15$ - $ - 750SY6'' CONCRETE SIDEWALK WITH STEEL (51 TO 100) 16$ - $ - 750SY6'' CONCRETE SIDEWALK WITH STEEL (101 TO 500) 17$ - $ - 750SY6'' CONCRETE SIDEWALK WITH STEEL (501 TO 1000) 18$ - $ - 750SY5'' CONCRETE SIDEWALK WITH FIBER (0 TO 50) 19$ - $ - 750SY5'' CONCRETE SIDEWALK WITH FIBER (50 TO 100) 20$ - $ - 750SY5'' CONCRETE SIDEWALK WITH FIBER (101 TO 500) 21$ - $ - 750SY5'' CONCRETE SIDEWALK WITH FIBER (501 TO 1000) 22$ - $ - 250SY5" CONCRETE SIDEWALK (WITH STEEL) 0 TO 50 23$ - $ - 750SY5" CONCRETE SIDEWALK (WITH STEEL) 51 TO 100 24$ - $ - 750SY5" CONCRETE SIDEWALK (WITH STEEL) 101 TO 500 25$ - $ - 750SY5" CONCRETE SIDEWALK (WITH STEEL) 101 TO 500 26$ - $ - 750SY5" CONCRETE SIDEWALK (WITH STEEL) 500 TO 1000 27$ - $ - 1000SY4" CONCRETE SIDEWALK/FIBERS (500 TO 1000 SY) 28$ - $ - 1000SY4" CONCRETE SIDEWALK/FIBERS (51 TO 100 SY) 29$ - $ - 1500SY4" CONCRETE SIDEWALK/FIBERS (101 TO 500 SY) 30$ - $ - 1000SY4" CONCRETE SIDEWALK/FIBERS (501 TO 1000 SY) 31$ - $ - 10SYCONCRETE MEDIANS PATTERNED 32$ - $ - 10SFCONCRETE STEPS 33$ - $ - 5000SYCONCRETE RIP-RAP AND DRAINAGE FLUMES 6" 34$ - $ - 2000LFCONCRETE FLUMES 6" - 7' WIDE W/6" CURBS 35$ - $ - 2000LFCONCRETE FLUMES 6" - 11' WIDE W/6" CURBS 36$ - $ - 5000LFSAW CUT (EXISTING ASPHALT) 37$ - $ - 5000LFSAW CUT (EXISTING CONCRETE) 38$ - $ - 3000CYSTRUCTURAL CONCRETE - (CLASS A) 5-SACK 39$ - $ - 5000CYSTRUCTURAL CONCRETE - (CLASS C) 5 1/2 SACK 40$ - $ - 3000CYSTRUCTURAL CONCRETE - (CLASS S) 6-SACK 41$ - $ - 50CYCONCRETE FOR LIGHT STANDARD BASES 42$ - $ - 100EACONCRETE FOR TRAFFIC CONTROLLER BOX 43$ - $ - 100EAWATER SERVICE ADJUSTMENTS 44$ - $ - 500LSMISC. SPRINKLER SYSTEM ADJUSTMENTS Respondent's Business Name Principal Place of Business (City and State) The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. Product Proposal Pricing (PRICING SHALL INCLUDE ALL COSTS TO DELIVER GOODS AS SPECIFIED F.O.B DESTINATION): Will cement supplied for under this contract be manufactured using a dry or wet kiln? Indcate Dry or Wet 1 45$ - $ - 100EARING & COVER (INLETS 24" LOCKING 124C) 46$ - $ - 50EARING & COVER (INLETS 30" LOCKING 124C) 47$ - $ - 1000SYREMOVE CONCRETE PAVEMENT 48$ - $ - 5000LFREMOVE CONCRETE CURB & GUTTER 49$ - $ - 2500SYREMOVE CONCRETE DRIVEWAY & SIDEWALK 50$ - $ - 3000CYUNCLASSIFIED EXCAVATION 51$ - $ - 1000CYCOMPACTED FILL/EMBANKMENT 52$ - $ - 750SYST. AUGUSTINE SOD 53$ - $ - 1000SYBERMUDA SOD 54$ - $ - 500SY 0" TO 2" ASPHALT PAVE (TYPE D PATCH MATERIAL) 55$ - $ - 1000SY 2" TO 4" ASPHALT PAVE (TYPE D PATCH MATERIAL) 56$ - $ - 1000SY 4" TO 6" ASPHALT PAVE (TYPE D PATCH MATERIAL) 57$ - $ - 1000SY 6" TO 8" ASPHALT PAVE (TYPE D PATCH MATERIAL) 58$ - $ - 559SY4" CONCRETE FLATWORK (COLORED/TEXTURED) (0 TO 100 SY) 59$ - $ - 1000SY4" CONCRETE FLATWORK (COLORED/TEXTURED) (101 TO 500 SY) 60$ - $ - 1000SY4" CONCRETE FLATWORK (COLORED/TEXTURED) (> 501 SY) 61$ - $ - 2000SY6" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 3/8" STEEL ON 18" CENTERS (0 TO 50 SY) 62$ - $ - 2000SY6" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 3/8" STEEL ON 18" CENTERS (51 TO 100 SY) 63$ - $ - 2000SY6" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 3/8" STEEL ON 18" CENTERS (101 TO 500 SY) 64$ - $ - 2500SY6" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 3/8" STEEL ON 18" CENTERS (500 TO 1000 SY) 65$ - $ - 2000SY8" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (0 TO 50 SY) 66$ - $ - 2000SY8" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (51 TO 100 SY) 67$ - $ - 2000SY8" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (101 TO 500 SY) 68$ - $ - 1000SY10" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (0 TO 50 SY) 69$ - $ - 1000SY10" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (51 TO 100 SY) 70$ - $ - 1000SY10" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (101 TO 500 SY) 71$ - $ - 750SY12" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (0 TO 50 SY) 72$ - $ - 750SY12" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (51 TO 100 SY) 73$ - $ - 750SY12" CONCRETE PAVEMENT (RADIUS, ETC.) WITH 1/2" STEEL ON 18" CENTERS (101 TO 500 SY) 74$ - $ - 500CY1 1/2 SACK CONCRETE BACKFILL 75$ - $ - 500CY5 SACK CONCRETE 76$ - $ - GROUT (NO ROCK) 500CY 5 SACK CONCRETE 77$ - $ - 500CY5 SACK CONCRETE GOURT IN PLACE OVER RIP RAP 78$ - $ - 100EAADJUST MANHOLE & INLETS 79$ - $ - 250LSTYPE A HEADWALLS (15" to 36" PER PIPE) 80$ - $ - 250LSTYPE A HEADWALLS (39" TO 72" PER PIPE) 81$ - $ - 250LSTYPE B HEADWALLS (15" TO 36" PER PIPE) 82$ - $ - 250LSTYPE B HEADWALLS (39" TO 72" PER PIPE) 83$ - $ - 100LS6: 1 SETs HEADWALLS for 15" PIPE 84$ - $ - 100LS6: 1 SETs HEADWALLS for 18" PIPE 85$ - $ - 100LS6: 1 SETs HEADWALLS for 24" PIPE 86$ - $ - 100LS6: 1 SETs HEADWALLS for 30" PIPE 87$ - $ - 100LS6: 1 SETs HEADWALLS for 36" PIPE 88$ - $ - 100LS4: 1 SETs HEADWALLS for 15" PIPE 89$ - $ - 100LS4: 1 SETs HEADWALLS for 18" PIPE 90$ - $ - 100LS4: 1 SETs HEADWALLS for 24" PIPE 91$ - $ - 100LS4: 1 SETs HEADWALLS for 30" PIPE 92$ - $ - 100LS4: 1 SETs HEADWALLS for 36" PIPE 93$ - $ - 10EA4' ID MANHOLE (0 TO 6" DEPTH) Respondent's Business Name Principal Place of Business (City and State) The respondent shall complete the following section, which directly corresponds to the specifications. The contractor shall not make changes to this format. Product Proposal Pricing (PRICING SHALL INCLUDE ALL COSTS TO DELIVER GOODS AS SPECIFIED F.O.B DESTINATION): Will cement supplied for under this contract be manufactured using a dry or wet kiln? Indcate Dry or Wet 1 94$ - $ - 1VFEXTRA DEPTH 95$ - $ - 50EA5' X 5" JUNCTION BOX (0' TO 6' DEPTH) 96$ - $ - 1VFEXTRA DEPTH 97$ - $ - 50EA4' X 4' JUNCTION BOX (0' TO 6' DEPTH) 98$ - $ - 1VFEXTRA DEPTH 99$ - $ - 50EA6' X 6' JUNCTION BOX (0' TO 6' DEPTH) 100$ - $ - 1VFEXTRA DEPTH 101$ - $ - 50EA5' INLET (0' TO 6' DEPTH) 102$ - $ - 1VFEXTRA DEPTH 103$ - $ - 50EA8' INLET (0' TO 6' DEPTH) 104$ - $ - 1VFEXTRA DEPTH 105$ - $ - 100EA10' INLET (0' TO 6' DEPTH) 106$ - $ - 1VFEXTRA DEPTH 107$ - $ - 100EA12' INLET (0' TO 6' DEPTH) 108$ - $ - 1VFEXTRA DEPTH 109$ - $ - 25EA15' INLET (0' TO 6' DEPTH) 110$ - $ - 1VFEXTRA DEPTH 111$ - $ - 8EA20' INLET (0' TO 6' DEPTH) 112$ - $ - 1VFEXTRA DEPTH 113$ - $ - 100EA10' RECESSED INLET 114$ - $ - 100EA12' RECESSED INLET 115$ - $ - 100EA"Y" INLET (INCLUDES APRON, RING & COVER) 116$ - $ - 200EA4' INLET -REBUILT INLET (REMOVE & REPLACE TOP) 117$ - $ - 200EA6' INLET -REBUILT INLET (REMOVE & REPLACE TOP) 118$ - $ - 200EA8' INLET -REBUILT INLET (REMOVE & REPLACE TOP) 119$ - $ - 200EA10' INLET -REBUILT INLET (REMOVE & REPLACE TOP) 120$ - $ - 750EA5' TYPE I WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 121$ - $ - 750EA8' TYPE I WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 122$ - $ - 250EA10' TYPE I WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 123$ - $ - 1000EA4' TYPE I WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 124$ - $ - 50EA5' TYPE II WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 125$ - $ - 50EA6' TYPE I WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 126$ - $ - 50EA6' TYPE II WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 127$ - $ - 20EA8' TYPE II WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 128$ - $ - 20EA10' TYPE II WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 129$ - $ - 100EA4' TYPE II WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 130$ - $ - 50EA5' TYPE III WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 131$ - $ - 20EA8' TYPE III WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 132$ - $ - 20EA10' TYPE III WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) 133$ - $ - 75EA4' TYPE III WHEEL CHAIR RAMP (ALL WITH ADA BRICK INSERTS) Estimated Annual Contract $ -