Loading...
6431 GARVER CONTRACT EXECUTED 72817DocuSign Envelope ID: 257B59F8-CCB6-46DF-80D6-E996DFB39FD5 I CITY OF DENTON Docusign City Manager Approval Transmittal Coversheet File 6431 File Name 6431 PSA SLUDGE DEWATERING Purchasing Contact Robyn Forsyth Contract Value $77,772 Piggy Back Option no Contract Expiration December 31, 2017 DocuSign Envelope ID: 257B59F8-CCB6-46DF-80D6-E996DFB39FD5 Request for City Manager Approval of Purchase DATE: 7/25/2017 Questions concerning this acquisition may be directed to DEPARTMENT: Water Treatment Plant Tim Fisher (940) 349-7190. ACM: Mario Canizares SUBJECT Consider recommending approval of a "Professional Service Agreement (PSA)" with Garver, Inc. to perform a solids handling/dewatering study of the Lake Lewisville Water Plant filter backwash and sedimentation basin wash -down residuals; authorizing the expenditure of funds in an amount not -to -exceed $77,772.00 (File #6431). FILE INFORMATION The City of Denton Water Reclamation Plant is experiencing constant issues processing the solids coming from the Lake Lewisville Water Treatment Plant (LLWTP). The wastewater plant staff has requested immediate elimination of sludge/solids discharges into the wastewater collection system and thus into the wastewater treatment plant. LLWTP staff is temporarily pumping all treatment plant solids from the equalization basin into the water treatment plant pond. The pond has limited capacity and a consultant study is needed to find a permanent solution for the solids handling issue. PRIOR ACTIONNIEW (COUNCIL, BOARDS, COMMISSIONS) The Public Utilities Board approved this item on July 10, 2017 (PUB# 17-157) by a vote of 5-0. RECOMMENDATION Staff recommends approval of the Professional Services Agreement with Garver, Inc. in the amount of $77,772.00. BASIS FOR SELECTION Informal Requests for Qualifications (RFQ) were issued to several local consulting firms with prior experience to perform a study and receive a recommendation and preliminary design for a permanent solids handling facility for the Lake Lewisville water treatment plant. Statement of qualifications were received from four (4) engineering firms. The Staff Screening and Selection Committee met March 22, 2017, to evaluate the qualifications. The Committee selected Garver, Inc., based on the proposal and selection criteria. A formalized scope of work was developed by staff and the consultant submitted a quote in the amount $298,596.43 to provide preliminary engineering design for the solids handling facility. Staff negotiated with Garver and modified the scope to eliminate the preliminary design of a facility and instead focus on a sludge dewatering study that will analyze the City's current sludge FILE # 6431 PSA GAVER ENGINEERING DocuSign Envelope ID: 257B59F8-CCB6-46DF-80D6-E996DFB39FD5 Request for City Manager Approval Page 2 handling processes and then provide and analyze alternative dewatering technologies to be considered. The quote provided for the modified scope is $77,772.00. The attached Exhibit 2 provides a detailed scope of services for the project. CONTRACT TERM The services to be provided under this contract are estimated to be completed within six (6) months. FISCAL INFORMATION The Professional Services Agreement with Garver, Inc. will be funded from Water Production job cost account # 630387517 in the amount of $77,772.00. FXHIRITS Exhibit 1: Memo for Consultant Selection Exhibit 2: Agreement for Professional Services with Garver Inc. 4zquraiqk1hX: Name: Tim Fisher, Director Water Administration Respectfully submitted: �J Doc uSigned by: 11./CR�3� y� E. �+3G Purchasing Expenditure Approved: FDxuSign+eiid.. rby: �4.�. nllc vUTAUt, City anager or Designate 7/26/ Date FILE # 6431 PSA GAVER ENGINEERING