Loading...
6576C - Construction of Cooper Creek Interceptor I & II, 4.Drawings/ PlansCOOPER CREEK INTERCEPTOR I 84" / 30" SANITARY SEWER LINE PROJECT # 640295545 COOPER CREEK INTERCEPTOR II 30" SANITARY SEWER LINE PROJECT # 640258545 MAY 2017 0 11 mizo "I ENGINEERING SERVICES SHEET LIST 1 COVER SHEET 2 GENERAL NOTES/CONTROL POINTS/UTILrI Y CONTACTS 3 SHEET LOCATION MAP 4-7 COOPER CREEK (SECTION I) 30"/84" PLAN/PROFILE SHEETS 8 COOPER CREEK (SECTION I) 84" LATERAL BOER 9 COOPER CREEK (SECTION I) 15" LATERAL (DESIGNED BY OTHERS) JAn!ES E_ w°� 83438 a e, 10-13 COOPER CREEK (SECTION II) 30" PLAN/PROFILE SHEETS 14 COOPER CREEK (SECTION II) 1211, 10" AND 8" LATERALS S 15 COOPER CREEK (SECTION H) 18" LATERAL DETAILS* 16-18 CITY OF DENTON — WASTEWATER DETAILS 19-20 CITY OF DENTON — WATER/WASTEWATER SHARED DETAILS *THE DETAILS SHEETS SPECIFICALLY IDENTIFIED ABOVE HAVE BEEN SELECTED BY ME UNDER MY RESPONSIBLE SUPERVISION AS BEING APPLICABLE TO THIS PROJECT. , P.E. DATE GENERAL NOTES 1. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE, ELEVATION AND LOCATION OF UNDERGROUND UTILITIES IS NOT GUARANTEED TO BE ACCURATE OR ALL-INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING DETERMINATIONS AS TO THE TYPE AND LOCATION OF UNDERGROUND AND OTHER UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. ADJUSTMENTS TO FRANCHISE UTILITIES SHOULD BE MADE BY THE APPROPRIATE UTILITY COMPANY TO MEET THE DESIGN OF THIS PROJECT. 2. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AT THE JOB SFE AND NOTIFY THE OWNER'S REPRESENTATIVE OF ANY OMISSIONS, DISCREPANCIES, OR DIMENSIONAL ERRCRS PRIOR TO BEGINNING OR FABRICATING ANY WORK, OTHERWISE THE CORRECTIONS (AND ASSOCIATED COST) 'NILL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. THE LOCATION OF ALL UNDERGROUND PIPING, FRANCHISE UTILITIES AND OTHER UN')ERGROUND STRUCTURES AND UTILITIES ARE BASED ON ORIGINAL CONSTRUCTION PLANS AND LIMITED FIELD SURVEY. THE CITY OF DENTON ASSUMES NO RESPONSIBILITY FOR FAILURE TO SHOW ANY OR ALL OF THESE FACILITIES OR TO SHOW THEM IN THEIR EXACT LOCATIONS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL AFFECTED UTILITIES, WHETHER OR NOT THEY ARE SHOWN ON THE PLANS, TO VERIFY THE MATERIALS, LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING FACILITIES PRIOR TO CONSTRUCTION OR PURCHASE OF MATERIAL AND TO PROVIDE ALL NECESSARY PIPE, FITTINGS AND APPURTENANCES TO MAKE ALL CONNECTIONS AS SHOWN IN THESE PLANS. SUCH VERIFICATION SHALL BE CONSIDERED SUBSIDIARY TO THE COST OF THE PROJECT AND NO ADDITIONAL COMPENSATION WILL BE ALLOWED. (1-800-DIG-TESS) 4. THE CONTRACTOR SHALL DISTRIBUTE LETTERS TO ALL PROPERTY OWNERS PRIOR TO BEGINNING WORK ON EACH PROPERTY. THE LETTERS SHALL INCLUDE NAMES AND PHONE NUMBERS OF CONTRACTOR CONTACTS, A DESCRIPTION OF WORK TO BE DONE, AND TIME FRAME FOR DOING THE WORK. COPIE:i OF THE LETTERS SHALL BE FORWARDED TO THE CITY INSPECTOR. THE CONTRACTOR SHALL NOTIFY OWNERS 18 HOURS IN ADVANCE OF PERFORMING ANY WORK ON PRIVATE PROPERTY. DISTRIBUTION OF LETTERS SHALL BE. CONSIDERED AS SUBSIDIARY TO THE COST OF PROJECT AND NO ADDITIONAL COMPENSATION WILL BE i�LLOWED. 5. THE CONTRACTOR SHALL VIDEO ALL POTENTIALLY IMPACTED PRIVATE PROPERTY AREAS PRIOR TO WORK. VIDEOS SHALL INCLUDE DATE NOTATION AND AUDIO IDENTIFICATION OF PROPERTY AD11RESS AND LINE DESIGNATION. THE PRE -CONSTRUCTION VIDEOTAPING SHALL BE CONSIDERED SUBSIDI/,RY WORK. THE CONTRACTOR SHALL PROVIDE ONE COPY OF THE VIDEO TO THE CITY INSPECTOR PRIOR TO CONSTRUCTION. 6. PROVIDE ACCESS FOR LANDOWNERS AT EXISTING ROADS AND DRIVES AT ALL TIMES. PROPERTIES WHERE ACCESS TO EXISTING ROADS AND DRIVES IS INTERRUPTED MUST HAVE MULTIPLE INGR'=SS/EGRESS POINTS AVAILABLE OR ALTERNATE ACCESS MUST BE PROVIDED BY CONTRACTOR. ALL PROPERTIES OCCUPIED THAT WILL BE DENIED ACCESS TO THEIR DRIVEWAYS SHALL BE NOTIFIED BY THE CONTRACTOR TWO WORKING DAYS PRIOR TO THE CLOSURE OF THEIR ACCESS. 7. THE CONTRACTOR'S PERSONNEL SHALL WEAR IDENTIFYING CLOTHING OR HATS AT ALL TIMES. 8. CONTRACTOR SHALL PROVIDE APPROPRIATE SIGNAGE, BARRICADES, FLAGMEN, ETC. REQUIRED TO MAINTAIN SAFE TRAFFIC FLOW AT ALL TIMES. ALL TRAFFIC CONTROL MEASURES SHALL BE IN ACCORDANCE WITH TXDOT'S MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES. 9. ALL STORM WATER POLLUTION PREVENTION MEASURES SHALL CONFORM TO THE CIFY OF DENTON STANDARDS OR THE APPLICABLE GUIDELINES OF THE NORTH CENTRAL TEXAS COUNCIL. OF GOVERNMENTS WATER QUALITY BEST MANAGEMENT PRACTICES FOR CONSTRUCTION ACTIVITIES, LATEST EDITION OR AMENDMENTS, FOR COMPLIANCE WITH THE NATIONAL POLLUTION DISCHARGE ELIMINATION SYSTEM REQUIREMENTS. THE CONTRACTOR SHALL CONTROL EROSION AND SEDIMENTATION PER THE APPLICABLE LAWS AND REGULATIONS. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING GENERAL SAFETY AT AND ADJACENT TO THE PROJECT AREA, INCLUDING THE PERSONAL SAFETY OF THE CONSTRUCTION CREW AND GENERAL PUBLIC AND THE SAFETY OF PUBLIC AND PRIVATE PROPERTY. 11. THE CONTRACTOR SHALL REMOVE FROM THE PROJECT AREA ALL SURPLUS MATERIAL. THIS SHALL BE INCIDENTAL AND NOT A SEPARATE PAY ITEM. SURPLUS MATERIALS FROM EXCAVATION INCLUDING DIRT, TRASH, ETC. SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE PROPERLY DISPOSED OF OFF-SITE. 12. THE CONTRACTOR IS RESPONSIBLE FOR KEEPING STREETS AND SIDEWALKS ADJACLNT TO THE PROJECT FREE OF MUD AND DEBRIS FROM THE CONSTRUCTION. 13. REMOVE ROCK FROM THE DISTURBED AREAS SUCH THAT IT IS LEFT WITH NO MORE QUANTITY OR SIZE OF ROCK THAN THE ADJACENT LAND. ROCK IS REMOVAL IS A SUBSIDIARY COST AND WILL NOT BE PAID SEPARATELY. 14. THE CONTRACTOR SHALL COMPLY WITH TEXAS HOUSE BILL 1569, EFFECTIVE SEPTEMBER 1, 1989, TO MAINTAIN A VIABLE TRENCH SAFETY SYSTEM AT ALL TIMES. THE CONTRACTOR IS RESPONSIBLE FOR ALL JOB SITE SAFETY AND SHALL BE RESPONSIBLE FOR PREPARING A TRENCH SAFETY PLAN FOR THIS PROJECT. 15. CONTRACTOR IS REQUIRED TO RE -SEED ALL DISTURBED AREAS WHERE WORK IS SHOWN OR REQUIRED FOR A COMPLETE PROJECT. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL DAMAGES TO PROPERTY OUTSIDE OF THE EASEMENT LIMITS, INCLUDING RE -VEGETATION COSTS. 16. ALL REPLACEMENT VEGETATION SHALL BE WATERED DAILY FOR A PERIOD NOT LESS THAN ONE MONTH AFTER RE -VEGETATION. CONTINUE WATERING AS NEEDED UNTIL THE VEGETATION IS RI__ -ESTABLISHED. THE MAINTENANCE PERIOD FOR ALL PLANTINGS SHALL BE ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. IN THE EVENT TRENCH SETTLEMENT OR OTHER CONDITIONS REQUIRE REPAIR WORK TO BE PERFORMED BY CONTRACTOR, THE MAINTENANCE PERIOD WILL BE EXTENDED TO ONE YEAR FROM THE DATE THE AREA IS RESTORED AFTER THE REPAIR WORK. 17, NO TREES MAY BE REMOVED OUTSIDE THE PERMANENT EASEMENT WITHOUT PRIOR APPROVAL OF THE OWNER'S REPRESENTATIVE. THE CONTRACT AMOUNT WILL BE REDUCED BY $5000 FOR EACH TREE WHICH IS REMOVED WHERE NOT AUTHORIZED. 18. CLEARING AND GRUBBING MAY BEGIN NO SOONER THAN ONE MONTH PRIOR TO PI'E TRENCHING OPERATIONS. PIPE STRINGING SHALL BE NO MORE THAN TWO WEEKS PRIOR TO PIPE LAYING. BACKFILL SHALL BE COMPLETED NO MORE THAN ONE DAY AFTER PIPE LAYING. CLEANUP AND SURFACE RESTORATION SHALL BE COMPLETED NO MORE THAN ONE MONTH AFTER PIPE LAYING. THE SITE SHALL BE KEPT CLEAN OF TRASH AT ALL TIMES. FAILURE TO COMPLY WITH THESE REQUIREMENTS MAY RESULT IN WITHHOLDING SOME OR ALL PAYMENT TO THE CONTRACTOR. 19. THE CITY HAS ACQUIRED PERMANENT AND TEMPORARY CONSTRUCTION EASEMENTS AS SHOWN ON THE DRAWINGS. THE CONTRACTOR MAY ACQUIRE ADDITIONAL TEMPORARY CONSTRUCTION EASEMENTS AT HIS OWN COST, IF HE SO CHOOSES. IF THE CONTRACTOR ACQUIRES ADDITIONAL TEMPORARY EASEMENTS, HE SHALL PROVIDE COPIES OF THE WRITTEN AGREEMENTS TO THE CITY. THE CONTRACTOR SHAL_ BE SOLELY RESPONSIBLE FOR ANY DAMAGES AS A RESULT OF THE USE OF ADDITIONAL TEMPORARY EASEMENTS OR WORK CONDUCTED ON PRIVATE PROPERTY AND/OR OUTSIDE THE PROJECTS EXTENTS ENTERED BY DESIGNED BY CHECKED BY PROJ. ENGR. TLM TLM JW RF J. WILDER PROJECT # 640295545 640258545 DATE PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TGENERAL NOTES.DWG REVISION 20. CONTRACTOR SHALL BECOME FAMILIAR WITH THE TERMS AND CONDITIONS SET FORTH IN TEMPORARY CONSTRUCTION EASEMENTS. UNLESS GRANTED BY THE PROPERTY OWNER, INGRESS AND EGRESS TO THE WORK SITE SHALL BE ONLY THROUGH THE TEMPORARY CONSTRUCTION EASEMENTS, EXISTING UTILITY EASEMENTS OR R.O.W. IN THE AREAS WHERE NO CONSTRUCTION EASEMENTS ARE AVAILABLE, CONTRACTOR SHALL LIMIT ACTIVITIES TO WITHIN THE EXISTING UTILITY EASEMENT OR ROW. 21. CONTRACTOR SHALL RECONSTRUCT IN PLACE AND WITH LIKE MATERIALS ANY DRIVES, ROADS, SIDEWALKS, IRRIGATION SYSTEMS, FENCES, UTILITY SERVICES, OR OTHER APPURTENANCES WHICH ARE REMOVED OR DAMAGED DURING CONSTRUCTION. UTILITY SERVICES WHICH ARE CUT OR DAMAGED SHALL BE IMMEDIATELY REPAIRED. 22. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING WATER AND SEWER CONNECTIONS IN WORKING ORDER AT ALL TIMES. IN NO CASE SHALL SERVICES BE ALLOWED TO REMAIN OUT OF SERVICE OVERNIGHT. 23. THE CONTRACTOR SHALL CLEAN UP AND RESTORE THE AREA OF OPERATIONS TO A CONDITION AS GOOD AS OR BETTER THAN THAT WHICH EXISTED PRIOR TO THE PROJECT. 24. NO EQUIPMENT OR MATERIAL SHALL BE DEPOSITED ON PRIVATE PROPERTY WITHOUT WRITTEN PERMISSION FROM THE AFFECTED PROPERTY OWNERS. 25. THE CONTRACTOR SHALL BE LIABLE FOR DAMAGES TO BUSINESSES, HOMES, OR BASEMENTS FROM BACKUP WHICH MAY RESULT DURING THE INSTALLATION OF NEW SEWER PIPE. THE CONTRACTOR WILL BE ALLOWED TO OPEN CLEAN OUTS WHERE AVAILABLE. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL CLEAN-UP ASSOCIATED WITH OPENING CLEAN OUTS AND FOR REPLACEMENT OF REMOVED CAPS. 26. CONTRACTOR IS REQUIRED TO MAINTAIN RESIDENTIAL AND FIRE ACCESS TO RESIDENCES DURING CONSTRUCTION. 27. FOR ALL LOCATIONS WHERE CONSTRUCTION WORK AFFECTS ROAD RIGHT-OF-WAY, CONTRACTOR SHALL SUBMIT A TRAFFIC CONTROL PLAN TO THE CITY FOR APPROVAL PRIOR TO BEGINNING OF CONSTRUCTION. THE TRAFFIC CONTROL PLAN SHALL BE PREPARED AT NO ADDITIONAL COST TO THE CITY. 28. ELECTRIC COMPANIES TYPICALLY REQUIRE THAT SHORING BE USED IN OPEN TRENCHES WITHIN 5' (ANY DIRECTION) OF DISTRIBUTION POLES AND 25' OF TRANSMISSION TOWERS, UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL DESIGN THE SHORING TO ACCOUNT FOR ADDITIONAL SURCHARGE LOADS OF THE POLE AND TOWER FOUNDATIONS ACTING ON THE SHORING. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DESIGNING ALL SHORING AND FOR PROTECTING ALL ELECTRICAL POLES AND TOWERS. 29. WHERE THE RELOCATION OF OVERHEAD ELECTRIC POWER POLES AND GUY WIRES ARE REQUIRED TO INSTALL NEW IMPROVEMENTS, THE CONTRACTOR SHALL COORDINATE THE RELOCATION WITH THE ELECTRICAL COMPANY AND PAY FOR ALL COSTS ASSOCIATED WITH THE ACTIVITIES. OVERHEAD ELECTRIC POWER POLES AND GUY WIRES SHALL BE RELOCATED TO NOT CONFLICT WITH THE NEW IMPROVEMENTS AND SHALL BE PLACE WITHIN THE STREET R.O.W. OR A PUBLIC UTILITY EASEMENT. CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT OF ALL POWER POLES WITHIN 15 FT. OF THE PROPOSED CONSTRUCTION, OR WHERE TEMPORARY REMOVAL OF GUY WIRES IS NECESSARY FOR CONSTRUCTION. FAILURE OF THE CONSTRUCTION PLANS TO SHOW EXISTING POLE LOCATIONS DOES NOT REMOVE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE OR SUPPORT POWER POLES. 30. FOLLOW OSHA (OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION) REGULATIONS AND WORK A SAFE DISTANCE FROM ALL POWER LINES. WHERE CONSTRUCTION IS NEAR OVERHEAD LINES, OSHA REQUIRES THAT THE POWER LINES BE DE -ENERGIZED AND GROUNDED OR THAT OTHER PROTECTIVE MEASURES ARE TAKEN BEFORE WORK IS STARTED. OSHA HAS PRESCRIBED CERTAIN DISTANCES THAT WORKERS, TOOLS AND EQUIPMENT MUST BE KEPT FROM OVERHEAD LINES. A DISTANCE OF 10' SHALL BE MAINTAINED FOR ALL POWER LINES OF 50,000 VOLTS OR LESS. CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL PERSONS WORKING ARE AWARE OF THE LOCATION OF ANY POWER LINES, THE HAZARDS INVOLVED, AND THE PROTECTIVE MEASURES TO BE TAKEN. CONTRACTOR MUST POST WARNING SIGNS AND ENSURE THAT ANYONE WORKING FROM AN ELEVATED POSITION STAYS OUTSIDE THE MINIMUM APPROACH DISTANCE. COSTS ASSOCIATED WITH WORKING SAFELY AROUND EXISTING POWER LINES SHALL BE BORNE SOLELY BY THE CONTRACTOR AND WILL NOT BE REIMBURSABLE BY THE CITY. FAILURE OF THE CONSTRUCTION PLANS TO SHOW EXISTING POWER LINE LOCATIONS SHALL NOT CONSTITUTE A BASIS FOR A DELAY OR COMPENSATION CLAIM BY THE CONTRACTOR TO PROVIDE SAFE WORKING CONDITIONS. 31. FENCES, GATES, GROUND SURFACES, ETC, SHALL BE LEFT IN A CONDITION EQUAL TO OR BETTER THAN THAT FOUND. ALL FENCES SHALL BE REINSTALLED IN ORIGINAL LOCATION AND OF SAME TYPE UNLESS OTHERWISE DIRECTED BY CITY. 32. CONTRACTOR SHALL FURNISH AND INSTALL PIPE DETECTION TAPE OVER ALL SEWER LINES INSTALLED. THE PIPE TAPE SHALL CONTINUOUSLY INDICATE THE PRESENCE OF BURIED SANITARY SEWER PIPE UNDERNEATH. THE PIPE TAPE SHALL BE INSTALLED ON TOP OF THE GRANULAR PIPE EMBEDMENT (18" ABOVE THE PIPE), OR AS SHOWN ON THE PLANS, ALONG THE CENTERLINE OF THE PIPELINE. 33. THE CONTRACTOR SHALL MAKE NECESSARY PROVISION FOR THE SUPPORT AND PROTECTION OF ALL UTILITY POLES, GAS MAINS, TELEPHONE CABLES, SANITARY SEWER LINES, ELECTRIC CABLES, DRAINAGE PIPES, UTILITY SERVICES, ALL OTHER UTILITIES, AND THE STRUCTURES BOTH ABOVE AND BELOW GROUND DURING CONSTRUCTION. THE CONTRACTOR IS LIABLE FOR ALL DAMAGES DONE TO SUCH EXISTING FACILITIES AS A RESULT OF THE CONTRACTOR'S OPERATIONS. 34. IN GENERAL, MAINTAIN 2' MIN. VERTICAL SEPARATION BETWEEN SANITARY SEWER AND WATERLINES AND 1 FT. MIN. VERTICAL SEPARATION BETWEEN SANITARY SEWER AND STORM SEWER AT CROSSINGS. 35. CONTRACTOR SHALL PREPARE AND PRESENT A PLAN TO THE CITY ON HOW TIE-INS BETWEEN EXISTING LATERALS AND THE NEW SANITARY SEWER SHALL BE COORDINATED. NO EXISTING LATERAL LINES WILL BE ALLOWED TO REMAIN UNCONNECTED TO THE COLLECTION SYSTEM OVERNIGHT. TEMPORARY TIE-IN WORK SHALL BE SUBSIDIARY TO THE COST OF PIPE INSTALLATION AND WILL NOT BE PAID FOR SEPARATELY. 36. CONTRACTOR SHALL PREPARE AND PRESENT A PLAN ON HOW TO SUPPORT WATER, STORM DRAIN OR OTHER LINES THAT SPAN THE CONSTRUCTION TRENCH PRIOR TO BEGINNING ANY WORK OF THE PROJECT. 37. EXISTING IN-SERVICE MANHOLES ARE TO BE PROTECTED DURING CONSTRUCTION. ANY DAMAGE TO IN-SERVICE MANHOLES CAUSED BY THE CONTRACTOR SHALL BE REMEDIED BY THE CONTRACTOR AT NO COST TO THE CITY. 38. CONTRACTOR SHALL PROVIDE PAVEMENT REPAIR PER THE STANDARD DETAILS FOR CONSTRUCTION LOCATED IN THE STREET. 39. THE CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH RELOCATION OR TEMPORARY SUPPORT OF POWER POLES. THIS IS TRUE EVEN IF THE PLANS DO NOT SHOW THE POLES IN QUESTION. 40. SERVICE LINE LOCATIONS ARE APPROXIMATE. CONTRACTOR IS TO VERIFY ACTUAL LOCATION IN FIELD PRIOR TO INSTALLING NEW SERVICE LINES. NO PAYMENT SHALL BE MADE FOR REINSTALLATION OF SERVICE LINES DUE TO CONTRACTOR OVERSIGHT OF THIS NOTE. 41. EXISTING SERVICES MAY NOT MATCH TO SIZE OF NEW SERVICE LINES. CONTRACTOR SHALL SUPPLY CONNECTORS/ADAPTORS TO MAKE SERVICE SIZE TRANSITIONS AT NO ADDITIONAL COST. COOPER CREEK INTERCEPTOR I &II GENERAL NOTES/CONTROL POINTS/UTILITY CONTACTS CONTROL POINTS CP NUMBER NORTHING EASTING ELEVATION SHT. NUMBER CCI -I 63 7132715.86 2401663.28 572.09 SHT. 4 & SHT. 8 64 7132858.32 2401549.93 566.46 SHT. 4 65 7132873.30 2401424.67 565.43 SHT. 4 69 7133159.92 2401276.53 570.67 SHT. 4 70 7132984.04 2401304.90 567.76 SHT. 4 71 7133397.41 2400917.28 572.26 SHT. 4 66 7133873.95 2400472.98 577.44 SHT. 5 67 7134130.05 2400264.37 578.33 SHT. 5 72 7133527.37 2400876.39 573.48 SHT. 5 68 7134458.37 2400103.02 581.36 SHT. 6 73 7134604.86 2399922.56 582.14 SHT. 6 74 7134849.38 2399805.58 581.11 SHT. 6 75 7135147.98 2399499.81 582.16 SHT, 7 CCI 51 7135153.04 2399505.21 581.90 SHT. 10 52 7135238.30 2399217.46 583.59 SHT. 10 54 7135409.20 2399145.07 583.24 SHT. 10 55 7135779.25 2399001.57 584.18 SHT. 10 56 7136059.94 2398880.35 586.67 SHT. 11 57 7136302.39 2398672.44 587.84 SHT. 11 58 7136753.43 2398683.40 583.68 SHT. 12 59 7137025.75 2398300.39 586.78 SHT. 12 & SHT. 14 60 7137287.43 2397895.74 587.52 SHT. 13 & SHT. 15 61 7137452.16 2397421.84 589.44 SHT. 13 & SHT. 15 * COORDINATES FOR CONTROL POINTS AND CALLOUTS ON PLANS ARE IN NAD 83 COORDINATE SYSTEM CITY OF DENTON GIS GRID NETWORK UTILITY COMPANIES: ATMOS (LOCAL -GAS) 106 N. BRADSHAW DENTON, TX 76205 (940) 380-7470 ATMOS ENERGY 142 N. FM 730 BOYD, TX 76023 (940) 433-8902 ATTN: RICK BAILEY CHARTER CABLE 15100 TRINITY BLVD. FORT WORTH, TX 76155 (817) 298-3635 ATTN: CONSTRUCTION/JIM FRISKE CO -SERV 7701 S. STEMMONS CORINTH, TX 76210 (940) 321-7800 ATTN: JODY PADRON DATE MAY 2017 SHEET No. 2 OF 20 CITY OF DENTON-COMMUNICATIONS (940) 349-7172 CITY OF DENTON-ELECTRIC (940) 349-7669 EMERGENCY: (940)349-8400 CITY OF DENTON-WATER UTILITIES (940) 349-7150 EMERGENCY: (940) 349-8400 TXDOT 2624 W. PRAIRIE DENTON, TX 76201 (940) 349-1414 0YN_1�0 HOR 1 "= N/A VER 1 "= N/A GRANDE COMMUNICATIONS 500 TITTLE DR. SUITE 400 LEWISVILLE, TX 75056 (940) 270-7016 ATTN: CHRIS LANGSTON VERIZON 2094 MCGEE LEWISVILLE, TX 75077 (972) 318-0264 ATTN: LARRY GUAY EXPLORER/CITGO PIPELINE CO. 6846 S. CANTON SUITE 300 TULSA, OK 74136 (918) 493-5172 CHANCE GIPSON flh tea.. moo, �•�� . JAMES E. WILDER .....................s 83438 �® ° 4 S/g o I= - - POZ SHTTTTTTT�5. SHT. 13 I to P N ND I \ T-1 SIM 12 M R NCIT I . 14 I , Am � I I T- I J � SIFT. 14 LLJ E - sHT.11 I , w Ll� Z Z m ---- o w J R --�-- I Y\ 0 L N �- -1 - ----------------- sin. 10 I SHT. 14\ I " o \ J/ I J I I SHT. 17 I I -- I I I I I I I I I I ml RAN YWIN CD , IC E I QI- z__ I cy. - iILLJ w - JI Q AUDRA — -- >+- J I Q E ( T 00 ENTERED BY TLM PROJECT # 640295545 DESIGNED BY TLM 640258545 CITY CHECKED BY JW DATE REVISION PROJ. ENGR. JW DENTON PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII LAYOUT.DWG ENGINEERING SERVICES I I I I I I \ I FISH RAP FISH TR'P ' I I / ZI ki w w I cel I \ � I I I I O �- /' I I I I I � I I ' I ' T ILIGH wcl- COOPEkCiE KH o --�-- --_- CQC I SIDE '� W I --- I I I - I , I I _ SHT. 6 I HT. o 91 I I I -- ' I I of I I IJ -- -- - <I� � w I SHT. 5 -- ---------- 0 I I SHE 4 -- �-- I; I II I I I I I __ BLA_GG__— I _ AUDRA Ste'• 8 I II I I DATE SCALE �P�� ,97, COOPER CREEK INTERCEPTOR I & II MAY 2017 .........w..oR4 �' HOR 1 "= N/AEgE.9N19D° aaaaa P LAYOUT SHEET SHEET No. VER 1 "= N/A 3 OF 20 _" NEW 30' SAN. SEWER ,� / CP-65 �� STA. 4+24.80 INSTALL F, LONE S R GAS J 5 1-FIBERGLASS T-BASE SSMH STA. 5+34.70 INSTALL a p �• 0 �. (GAS ES T. V.141 G 366) (APPROX. LOCATION REMOVE: RIM ELEV. 565.09 5 i 1-FIBERGLASS T-BASE SSMH �° EXISTING CONC. FL 30" OUT 552.81 (SE) ROCK RIP-RAP FL 84 IN 552.81 (NW) ANGI-180' RIM ELEV. 577.41 a STA. 0+15.00= °¢APPROX. 7498.5 SQ/FT. N-7132959.34 N-713302FL 84- IN738)/OUT (SE) 553.17 ANGLE-161.19' IocA,www STA. 0+00.00 P� E-2401376.55 E-2401290.24 . \ EX UFT Suns INSTALL: �+ CP-70 00 �1-FIBERGLASS T-BASE SSMH +y o s v STA. 7+59.70 40' O' 40' 80' WITH STD. LID ¢�° STA( 4+13.00 nwx X EX 3v�n� O ME (0 o X E AS-WIL S g RIM ELEV. 575.11 ¢ ` FL 30" OUT 551.48 (E) T AND y pl q} 1- ENCH DAM /FL INSTALL: ST BALL BASE SSMH BEGIN PROJECT S. 9,y ' `rE` FL 84" IN 551.48 84" IN 551.48 (N) ANGLE-90' EX. 12 SA S (W) ANGLE-90' B SIDE E-2407386.14 96 RIM 4' IN NW)/ IN (NW)/OUT (SE) 553.90 ANGLE-164.52' STA. 0+00.00 INSTALL ¢,t N-7132677.04 ¢ 13 N-7133215.63 E-2401767.00 NOTES: 1-6' ag E-2401637.74 ' 25� STD. CONCRETE SSMH WITH RAVEN 405 INT. LINING q 00 2+00 00 0 0 00 0 00 5+00 ICU CON g D 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS PER AND STD. LID (SEE NOTE 3) ° ° S� n STANDARDDETAILSUNLESS OTHERWISE NOTED ON RIM ELEV. 574.94 -24�� NEW 84" SAN. --------- SEWE ----- ------ o °0 0 0°0 °o - - NEW fq$ 84" N. SEWER FMF SVT = FL EX. 30" OUT (S) 551.4E �--- ------ --------� 6 `� X00 FL EX. 30q IN (N) 551.41 - - - - - - - - - - , SU - - - - - a:.-SS------ - _ -------------- ) NEW �LSTA. 'SO" SAN. SEWER ` \ HEW r 2. BYPASS FLOW RATES: FL 30 IN (W) 551.41 N-7132677.13 ggAND `� " "" s �` PVC) R_ w wE �+•T* (Z. P> BA / EX. MH `� \ B4a ABANDON m �„ (�� SAN 25 TEMP. CONST. ESMT. 330 0"/24" - PEAK FLOW 11 0 MGD E-2401652.74 EX SSMH �, SE SSsst c1°'�'' PVC ABANDON FL OUT SOUTH SS/.T: (za• EVC) " EX. 24 SAN. SEWER aw %p a) „�, EL 5T.,3 ` EX. SSMH FI ,w ww 554 4± (za nnh `� R �x (Z 3. SSMH 0+00 SHALL BE A CAST-IN-PLACE CUT AND PLUG _6,1 M w ww SSiAt (zs• n IN SOUTH 55*.� (I PC> � OUT SE SS..,: (_•• ah `� MANHOLE FORMED AROUND THE EXISTING 30 DIP. \ EX. 30" SAN. SEWER TO NORTH CP-63 SOIL BORE (SB -7132806.04 +� STA. 3+25.35 FL OUT SE W&3* �T• MAY) (\CITY OF DENTON) \ CONSTRUCT 60' x 25' � �`�\ 8+00 THE EXISTING PIPE SHALL BE LEFT INTACT THROUGH THE MANHOLE UNTIL THE SEWER UNE ON SHT. 8 & AT END OF PROJECT STA. 0+94.46 -2 1573.34 PyJ ° INSTALL: 200 N. MA ILL RD. 12" THICK. GABION MATTRESS �� 25 SAN. SEWER EASEMENT 9+00 -1 THE 84" SEWER UNE THROUGH SSMH 3+25.35 HAVE BEEN LAID AND INSPECTED. THIS IS TO MINIMIZE THE 05 1-FIBERGLASS T-BASE SSMH 10 D INSTALL (CENTERED ON SS AUG ENT) NEW 84 " AMOUNT OF TIME REQUIRED FOR BYPASS PUMPING OF � 1-FIBERGLASS T-BASE SSMH P�`� SEE NOTE 4\ ( ) 39.00 0 \ SAN. SEWER _, THE 30"/24" INTERCEPTOR & THE 12" SEWER UNE RIM ELEV. 572.17 RIM ELEV. 565.51 INSTALL: NT "ATM 0 ON SHT. 8. FL 4 IN (NW)/OUT (S) 551.74 ANGLE-128.30' N-7132756 Pte`°+ �� " FL 84" OUT 552.49 (SE) FL 30 IN 552.49 (NW) ANGLE-180' 1-TRENC AM N-7132907.00 \� CP-69 \� `\ 25 SAN. SE EASEMENT 4. AN INTERNAL PLUG SHALL BE INSTALLED IN THE `� `� 0 E-2401637 28 °+ N-7132898.57 E-2441444,48 (CENTERED ON SS LIGNMENI� 0 " UPSTREAM 30 PIPE OPENING TO PREVENT FLOW P E-2401455.28 qg �`� FROM DOWNSTREAM TRAVELING UPSTREAM INTO NEW (CITY OF C►ENTON ) (JNJ PROMINENCE SQ /HENR RIFE) EX. 24" SAN. SE `� (JNJ PROMINENC SQ. LP.) CONSTRUCTION. THE PLUG SHALL BE CHECKED DAILY / 1201 N. MAYFiILL RD. 1205 N. MAYHILL RD. S ( B-2) �`� �� 1400 N. LOO 288 TO ENSURE A PROPER SEAL IS MAINTAINED. THE \ , N 7133 68.86 PLUG SHALL BE SECURED TO THE TOP OF THE SSMH E 2401106.42 `� CONE WITH A CABLE OR CHAIN UNTIL REMOVED. \ 15 LF OF 30" 30' SAN. SEWER BY OPEN CUT 310 LF OF 84" S N. SEWER BY OPEN CUT 100 LF OF 30' SAN. 575 LF OF 84" SAN. SEINE R BY OPEN CU BACKFILL PER STD. DETAILS BACKFILL PER STD. DETAILS SENER BY OPEN CUT BACKFILL PER STD. DETAILS BACK LL PER STD. D TAILS \ 572 `\ EX. TOP OF GROUND - _ _ 572 \ \ ?op OF EX. TOP OF GROUND \ NEW GABION 568 \ N ATTRESS �' 568 \ 564 \ \ - COOPER CREEK 0 564 STA. 2+3 .6t TRENCH IIAMI - TRENCH DAM Q EX. ATMOS GAS INE T/P 56-,.O± r 560 560 1 NEW 84" SAN. SEWER 0 0.33 cn 556 EX. 12" SS EW 84" SAN. R NEW Be SAN. WER 0 0.33% FL=556 NEW 84" SAN. SEWER NEI V 84" SAN. SDER 0 0.33% ® 3.33% I INE V 30" SAN.E R I I 11 i 00.33% I I 552 Ld 552 40 LF OF CON ENCASEMENT J NEW 30" SAN. SEWER ON E F COOPER CREEK CENTEREL ®0.33% = 0 54800.33% 0) 548 to O .1i co aD ^ to't In CV O� tV pOj Q cn to � O 3 O v 14*O O to O Z^ CA^O IM 'O IMA to LO 544 �or-o^ oo��^ (o d InIn o�•WN•3 0;Z �� r- 544 00 to 0 m .. a 1- Ull m v v aO JMZ +0+w0�_ + o +wMO +wOZ +w� LID w� Z W X O O O W O* 0 Z In x W W _11 2W O O J= W -12 W t 0 Q WFmJJ W M Q Q M O _j _j Q H - J Q w _11 _j Q HmJJ M O a Fm Im O J 540 m (n w U_ (a_ Cn N w lL ILL. in lL N K lL L�. Mw lL (a_ (n 0! La. w W 540 J C.7 J\ CD J\ O J\ 0 J\ O J\ O J\ CD J\ (7 J\ 0 J\ 0 J\ O J\ 0 J\ 0 J\ 0 J 0 J\ CD J J\ J\ J\ J\ CD LL F F- ll H l.L H LL H LL H <L H LL LL F- LL H LL H LL H LL I- LL I- LL F- LL H W H LL LL W l_ F_ LL H M 00 CA (D (o (`I m N d- O O O d' N Ln N O M O n N O O Di to 00 0 Lo N 00 O O N * rn n n O M n O p TO N r') 00 00 d IA P O ,- I[) N (.0 M N OIt O Oo O N (D M O�t (o O r7 n Ip M r O I\ .= O O CV n O I-1 CV (D O r (0 CV O U� CV (0 O M (V (0 O r-i 0 O U7 N) (0 0i td O M O IM O IM M r d d= cN (N (N O (O O Lo O (0 O O U7 O O O (0 O (O LO O IA L0 O (D O 10 O r, O Ln O I` O In O r O 10 O O LO O Ill LO O O r (O O O r, O (O O r (O O O h (O O O r 0+00 1+00 2+00 3+00 4+00 5+00 +00 7+0 8+00 9+00 10+00 ENTERED BY TLM PROJECT # 640295545 jC0174 COOPER CREEK INTERCEPTOR I DATESCALE MAY 2017 ��� Qe:�. .......... DESIGNED BY TLM DATE REVISION Y JW 84" / 30" SANITARY SEWER H OR 1 "= 40, JAA9E......... R .............................� . to �� SHEET No. PROD. ENGR. JW DENTON VER 1 "= 4' �89438�® F�m,. PATH swaw boww\vwv\pm*u\wam cmc nm.ft ENGINEERING SERVICES STA 0+00.00 TO STA 10+00.00 4 OF 20 O CP-71 O + (JNJ PROMINENCE SQ. LP.) \ STA. 16+92.85 =STA. 0+00.00 1400 N. LOOP 288 iSTA. CO STRUCT 60 X 25 13+79.00 INSTALL: 1-FIBERGLASS T-BASE SSMH 12" ROCK ABION MATTRESS INSTALL: 1-TRENCH DAMRIM ELEV. 578.00 (n N-7133628.35 E-2400705.53 FL 84" OUT (SE) 556.95 FL 30" IN (NW) 561.44 ANGLE-57.85' 00 Fl_ 15" IN (NE) 560.90 ANGLE-117.93' 11+00 y �� �P� N-7133858.29 LLJ 12 0 tib E-2400491.93 Z NEIN 84" SAN. SEWER �' 13+00 , °o o ° 0 o °° 0 ° o3' CP-66 J 0 0 o o 0 0 o o° `H 00 40' 0' 40' 80' c 0 00 0 0 00 ° 0 N ° U CP-7-722 �� 15+00 N�wem S30" E a Q ABANDON / NEW 84" SAN. S f�R 16+00 EX. 24" SAN. SEWER / �� 2S , TEMP . i +Op CONST, STA. 13+23.00 r✓� f SMT O O / STA. 13+09.70 I�'STALL T-BASE: SSMH INSTALL: 1-TRENCH DAM -7133588.201-FIBERGLASS XE, , , SOIL BORE (SB .15\ N-7133822.15 _ 18 _ +Op - f N -2400744 56 ABANDON ` / RIM ELEV. 574.03 FL 84" OUT (SE) 555.69 STA. 1 EX. 24" SAN. SEWER E-2400523 _ IX. SSMH (GONG) �y RIM EL 5�.42 25' $ _ qN SfN'fR 1g+p0 yy " FL 30 IN (NW) 555.69 ANGLE-175.49' INSTALL- _ _ F ITE � 52f (24"»x» fS�yl Y ` N-7133578.66 E-2400753.84 1-hBERGLASS T-BASE SSMH (VENTED) RIM ELEV. 574.24 ��\ 20 / FL 30" OUT (SE) 555.95 �.._..-.._.._.__..#_ / G^W�r _ " FL 84 I (NW) 555.95 ANGLE-178.66' 2* wY , REMOVE EX. SSHM N-7133636.02 Lt/ E-2400698.07 ABANDON EX. SSMH \ \ NEW 15" SAN. SEWER J '(SEENOTE E. ) = NOTES (SEE ST9 (JNJ PROMINENCE SQ. LP.) \ 1400 N. LOOP 288 1. ALL Q SSMHS ARE TO HAVE WATERTIGHT \ 10' SAN. SEWER LIDS ESMT. PER STANDARD DETAILS UNLESS (KEN HODGE & ASSOCIATES) 3426 E. UNIVERSITY DR. Ek 5 (CM11) RIM IN WSNW 66OA± (24' CLAY) I SAN. SEWER ESMT. \ \� OTHERWISE NOTED ON THE PLANS. ROUT SE 560.3±(24'C(A» (HENRY RIFE) \ 2. THE 15" SEWER LINE SHALL BE THE LAST 3320 E. UNIVERSITY DR. \ \\ LATERAL LINE INSTALLED ON THIS PROJECT. 310 LF OF 84" SAN SEWER BY OPEN CUT 80 LF OF 30" S.S. 303 LF OF 84" SAN. SEWER BY OPEN UT 307 LF OF 30" SAN. SE BY OPEN CUT - - - - - BACKFILL P STD. DETAILS BY OP N CUT ACKFILL PER . DETAILS BACKFILL PER STD. DETAILS BACKFl PER EX. TOP OF GROUND - - - - - - - _ _ _ _ _ _ 576 S. TAILS ' � _ - - - ' - - - - - - - - - _ coon CREEK - � 576 NEW GABI �---- ------ ------ _ MAITRE - / / r� 572 EX. - _ TOP OF ROUND _ _ _ _ _ - - - - _ / PO SIBLE FUTURE TOP OF GROUND 572 BY OTHERS O TRENCH DAM I TRENCH DAM O 568 0 I O 568 o r- I N I 1� 564 i � 564 1560 I I NEW 3 SAN. SEWER 40 0.38% N 84" SAN. SE R ® 0.33% 560 NEW 84" SAN. SE ®0.:53% NIEW 0" AS � 556 w ;® 3 w 556 J J 2 552 H 0F OF CONC.E 4CASECREEK C ED ON E OF 0o ERM IU- 552 CD OtOO N Io IMP �� O^Oto 548 to N n to to ^ to to (1 100 W .. 00 V) 3 w^ 548 0) to IH N F �v +>?O M > O +0 OZZ W O W O M �OW�Oin 00 IM, Q�"OD COo:12� � E QQ �N ��1 544 J \ J \ J li \ H J IrL \ H J 11 \ J H \ F- J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ li H IrL H li lt.. H E- H U. � IaL H U_ I- N 4 H H lrl H li F-- t0 00 Ln O (D 00 M 00 to N t0 � O � t0 I" 7 to In In M N N (0 O O 4 N O N 0) M � d In t0 O) OR 00 d m t0 M 0D � O n N O * M t0 to 0 r 4 to N I- N to N IA Il to N Ip I- to N n O to M r O M 0 'I M to to t0 M t0 t0 to t0 � t0 (0 (6 n n N n N 06 N 00 N C6 W), ((") to l(7 to u) In to to (17 to lf7 �� O O � r to n O n to r ICI n � - (0 h t0 n t0 r t0 r t0 h (0 r- to n to In 117 O lf) to M7 to u) to I17 to 0 In to In W) In O In O to In In to In tq (n +00 11+00 +00 13+00 14+00 15+0 16+00 17+00 18+00 19+00 20+00 BY LDEGNE TLM PROJECT # 640295545 \ ,�� DATE SCALE ®� D BY TLM DATE REVISION lcoli7 DOPER CREEK INTERCEPTOR I MAY 2017.......... BY JW E.W..... SHEET No.e•. 5 OF 20 DENTON ENGINEERING SERVICES 84" / 30" SANITARY SEWER STA 10+00.00 TO STA 20+00.00 HOR 1"= VER 1 It4 40'................83438.•....... ` '°'C. NZ - ���...•. mmmmmmumms NGR. JW �«�►w�v•w"I�•� n (JNJ PROMINENCk SQ. P.) \ T CONSTRUCT STA. 23+76.42 1400 N. LOOP\ 288 � 1-5' DIA. STD. CONCRETE SSMH (VENTED) RIM ELEV. 582.50 CONSTRUCT \ FL 30" OUT (SE)566.28 1-5' DIA. STD. CONCRETE SSMH \ \ FL 30" IN (NW) 566.28 RIM ELEV. 579.77 \ FL 30" (SE)/(NW) 564.02 RI M20 \ N-7134880.50 W PL IN SSYWS 566.6± (15' h FL EX. 15 CLAY IN (W) 566.31 IN WEbT 566.7± (s Y) 7 ti 50 LF OF 42" STEEL CASING E-239 741.22 n STA. 21+28.52 CONSTRUCT- OUT 5r.5 O5• h N-7134398.66 E'�T - y a C.O.D OR TUNNEL LINER PLATEZ 40' 0' 40' 80' 1-5' DIA. STD. CONCRETE SSMH E-2400073.51 y SX CP-73 DN 97-R0082175 RPR °,� S.4,v FL RIM ELEV. 583.00 30' (SE)/(NW) 563.08 / / , 1"�°� - / ' L a 2 N-7134198.71 2.5 TEMP. CONSTRUCTION ESMT. � / � � 30' TEMP. L "NST. E SMT O O CP-67 E-2400220.03 �� Q' 42" STE CASING R TUNNEL LINER PLA � _ \ -- AA, X h'g4�°��gM.oq V p . "�C; 3� r� / \ GONG RIP-RAP ' vim' n NOTES: N 4+00 S A. 345-+98 25 - 26+ lz ( RI CABLE-SM) 2Q� 1 � s 1. ALL SSMHS ARE TO HAVE WATERTIGHT m� CANOPY 23 0 / 2 -- - CP- O LIDS PER STANDARD DETAILS UNLESS Q F- 21+00 +00 NEyy 30" SAN. SEWER / - IX. 24" CIAY 55 -_ 30"+CONICOTHERWISE E R 0 4COLUYNS BRIDGE.%2 v NOTED ON THE PLANS. 0 00 N. SEWE R NEW 3o / SOVTNWEg7EpLY TOP I, e EX SSMH (GONG) �Y 9 COAG � O + BYPASSW RATES- - C AND PLUG N a 5(� TRF± CANOPY . IN NW 2 CLAY) RIM EL 580.69 \ R IN NW 564.7± (24" CLAY) . FL IN W 565.6± (1z- PVC) 20 SA ESMT. N O . FLOW 400 GPM W Z - / - - - -'2' SAN. SEWER ESMT AN-.S / FL IN WEST 5 LAY) J11N -- TO EAT / PL OUT 3� / n OI RE SB-4 SOIL .SEWER R OUT SE 584.7± (24' CLAY) / � O 15 PEAK FLOW 1600 GPM 12' AVG FLOW 50 GPM , J 5,aco o.) (zA `"' )) Yf ,i 56%o*t ��wo, I / // / -68 ~ N-7134604.67 r E-2399938.78 / CLJ� AND PLUG \ IX. a ( c.) PoN E 581 (zaa• 12 PEAK FLOW 250 GPM (,u vl ,N NE �6 A- VA1 EINE �24'r' l2 ° �'1AF ¢ EX. 11"SAN. SEWER rt a1i" 5ss.i 3. NEW PIPE MUST BE INSPECTED AND �U„ / A ON VALCAN Gj ��` �a // TO EAST ABANDON \ ABAND01� APPROVED BEFORE LIVE FLOW IS / EX. \ \ \ EX. 24" SANR CF[�. 3� / " / EX. SSMH TRANSFERRED TO NEW SEWER LINE Q EX. / / / �• STA. 26+40.00 / �=o M gX �F 0043,FSp NAG (BILL LYNCH)INSTALL VOL. 399, PG. 65 DR f 1-TRENCH DAM o Rp' c 1699 E. UNIVERSITY /� / (JNJ PROMINENCE SQ. �� E-2399929.24 / RpRD5j8j 1400 NJ LOOP 288 ���Qgo STA. 26+50.01 / ry / _ STA. 29+04.31 \ / / CONSTRUCT- CONSTRUCT- ABANDON / 1-5' DIA. STD. CONCRETE SSMH 1-5' DIA. STD. CONCRETE SSMH / EX. 24" :SAN. SEWER 1 I RIM ELEV. 582.19 FL 30" (SE)/(NW) 565.05 / RIM ELEV. 580.89 (380 PARTNERS LTD.) FL 30" (SE)(NW) 566.0E - \ / / I 1 FL EX. 12" IN (SW) 565.91 / / 1701 E. UNIVERSITY _ _N--71-348553.75 00c wqq ' I 1 N-7134627.64 / _ - E-2399807.40 No oFr / 1 E-2399923.76 - N I 387 LF OF 30" SAN. S R BY OPEN CUT 246 LF C F 30" SAN. SEN IER AND 42" SlEEL CASING OR 209 LF OF 30" SAN. SEWE R BY OPEN CUT 108 LF OF 30' SAN. SEWER ACKFILL PER SM. DETAILS TUNNEL LINER PLATES 13Y TUNNEL PER STD. DETAILS BACKFILL PER STM. DETAILS BY OPEP I CUT BACKFILL PER STD. DETAILS _ _ pp 300 50 LF 30 SAN. SEWER D 42" STEEL CASING OR �' DOT STA. 345+9 - TUNNEL LINER PLATE BY NNEL PERS . DETAILS 584 5$4 POSSIBLE FU RE TOP OF GROUND \ BY OTHERS \\ EX. TOP OF GROU - - - - - - 580 580 / / / - - \� _... V / TRENCH DAM EX. TOP OF ROUND - O 5760 576 0 0 N Q X. 30" WATERLINE 572 573.)± 572 EX. 15" CLAY S EX. 12" FL=565. PVC. SS t 568 FL=566.3± 568 - NEW 30 I I NEW 30" SAN. SEWER 0 0.38 0.3896 NEW 30" SAN. NEW 30" SA SEWER ® 0.3 % 1 1 SEWER LINE ®0 3896 564 Lv W 3C" SAN. SEWER NEW 30" SA . SEWER ® 0. % w 564 0.3 _0 J 246 LF OF 42" O.D. X" MIN. STE L CASING 50 LF OF 42 O.D. x W MIN STEEL J = OR TUNNEL LINER PLATE CASING OR TUNNEL LINER LATE _ 560 -H -H 560 Q p oo (0 wn O 00 0 Q c LO (D 0 O0 Ln m to (o (0t0 0 m 00 3 nZi 0)Z�Ln �w 4m to CIDLp W O 556 daj Q °' 000 Z� Mc�3 ova 556 Go u)Z� �- �- 0+>0? 1.- �- +>0? >? >'n0 >�0? w� rnw 03 N W O - M W X O W In n W X O O N WOO M M N W O O Q M M 552 (n inw � lL C J � ii W ceJJJ � W u- U- )-w JJ V) w li U_ inirJJ N � lL u- 552 (7 CO U J C7 \ J\ CO J\ c7 J\ CO J\ C7 J\ U J\ (� J\ C7 J\ CO J\ CO J\ O J\ U J\ 0 J\ 0 J\ 0 J\ 0 J\ CO J\ (7 li F- W H U-li H li H W W F W H 0co p00 o (t N O 't M O N r U) O M OD DO r� t0 n Ln GO � N M � N N N � OD N M O O n w 0) O n M I� h rl O W M M O to r 0 � � 0)d M (0 � w N 00 0)It O � N 0)O w c0 .- cO N 07 N 05 N 06 tM 05 M of IM DO M DO IM c6 14 06 4 4 4 Urs 4 Uri d 4 di IA O Lp O Ln N LA GO (V DO (0 co 0f (O6 rl w 00 0 O 00 w r w n w r t0 rl w r co I- w r (0 h (0 r (0 00 w 00 w 00 w 00 w 00 (0 GO w 00 w w U0 O UO Ln to LA Ln Ln 0 0 U) Ln Ln O U3 to In O U0 to U0 O LO O In O 0 O U) O U7) O If) O Ln to Ln O U) O n to 20+00 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 ENTERED BY TLM PROJECT # 640295545-� CITY COOPER CREEK INTERCEPTOR I DATE MAY 2017 SCALE �q �o�.. °..� � .........•.••••W.,.31E,�� JAMES ... dVILDER DESIGNED BY TLM DAZE REVISION CHECKED BY JW of HOR 1 "= 40 ••-� ro DENTON ENGINEERING SERVICES 84" / 30" SANITARY SEWER STA 20+00.00 TO STA 30+00.00 SHEET No. 6 OF 20 - VER 1"- 4' 83438 �'°� I�� e. , -172-3 /1 PROJ. ENGR. JW PATH ��� \�tt�w•�w"r�•\ �( n c A- ro 1v � OO SpN. - v 1-5' DIA. S)D, CONCRETE SSMH ELEV. 582.21 - 4 FL 30" SE) 567.011 FL 30" N (N 567.011 4 N-713 4.8.E E-239959. ) v A R4 El <I END OF PROJECT STA. 32+46.89= STA. 0+00.00 (COOPER CREEK INTERCEPTOR II) FL 30' 567.31 N-7135086.85 E-2399568.22<- qo t apk ry2000 N. LOOP 288 ,. (PRESCOTT INTEREST LTD.) 32+00 CP -75 /x EW 30 SAN. SEWER 36• CONC BRIDGE �'Q / / �pAl —= NUNS %2 . 36• C N BRA k Rpt 36• CONC BRIDG= COLULWS X2 v 00 ABANDON EX. 24" SAN. 1. STD. CONCRETEdSSMH RIM ELFT 80.45 FL 30" OUT E) 566.60 \ FL 30" IN (NW \N-7134136.53 E-23991576.69 RIN ELE R 21• CLAY %7-5* W7. \ "�/\ 4•-6L WT E) 56].41 Q e v \4 BM#1. BOX CUT IN CONC. SE AT BA IF BRIDGE COLUMN v SUPPORTI THE EXIT. RAMP OF LP 288 TO HWY 380, SOUTH 425' OF MINGO RD. AND WEST 200'+/- OF THE DEAD END OF TWILIGHT RD. ELEV.=581.33 4 v4 Oq� ~gT�Hi 000 2'q`NO�q}r 28D O�Ue�Op4, V NOTES. 96n�q�agM V 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 247 ZV SEWER BY OPEN CUT BACKFILL P STD. DETAILS p 580n R4 El <I END OF PROJECT STA. 32+46.89= STA. 0+00.00 (COOPER CREEK INTERCEPTOR II) FL 30' 567.31 N-7135086.85 E-2399568.22<- qo t apk ry2000 N. LOOP 288 ,. (PRESCOTT INTEREST LTD.) 32+00 CP -75 /x EW 30 SAN. SEWER 36• CONC BRIDGE �'Q / / �pAl —= NUNS %2 . 36• C N BRA k Rpt 36• CONC BRIDG= COLULWS X2 v 00 ABANDON EX. 24" SAN. 1. STD. CONCRETEdSSMH RIM ELFT 80.45 FL 30" OUT E) 566.60 \ FL 30" IN (NW \N-7134136.53 E-23991576.69 RIN ELE R 21• CLAY %7-5* W7. \ "�/\ 4•-6L WT E) 56].41 Q e v \4 BM#1. BOX CUT IN CONC. SE AT BA IF BRIDGE COLUMN v SUPPORTI THE EXIT. RAMP OF LP 288 TO HWY 380, SOUTH 425' OF MINGO RD. AND WEST 200'+/- OF THE DEAD END OF TWILIGHT RD. ELEV.=581.33 4 v4 Oq� ~gT�Hi 000 2'q`NO�q}r 28D O�Ue�Op4, V NOTES. 96n�q�agM V 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. ENTERED BY TLM PROJECT # 640295545 DESIGNED BY TLM DATE REVISION CHECKED BY JW PROJ. ENGR. JW PATH ��••tiow•+avr+"I�+•� «+� n ICO TYF DENTON ENGINEERING SERVICES COOPER CREEK INTERCEPTOR I 84" / 30" SANITARY SEWER STA 30+00.00 TO STA 32+46.89 DATE MAY 2017 SHEET No. 7 OF 20 SCALE H OR 1 "= 40' VER 1 "= 4' JP�9ES E. WILDER 6 83438 51u11-7 247 LF OF 30' SAN SEWER BY OPEN CUT BACKFILL P STD. DETAILS p 580n P OF OROIIND — — _ _ — — 580 576 576 572 572 + NEW 30" SANITARY SEWER UNE ® 0.38% M SEE CCI II , 568NEW 23 "SAN. SEWER 0 o.38ro �( 568 _ —v rn NEW 30 SAN. NEW 30" SA HITARY SEWER WNE 564 SEWER L NE ® 0.38% ® 0.38A, 564 Ld z O 560 = 0- W 560 Q Z Y 556 w ir 556 ow to m a- 460 to to 0 'o N II V 552c:; ~ �� V) C4 M HUD OKJ 552 CD u -i ci r to >? J■ > O+O CLMO3 Io wo MJF w a o 548 ceu- inw FL odd"' WNcn4 548 In 1p r0 0) M N Q6 w O 10 co t0 rn t0 I'l w of t0C3 I� w I� 00 f0 N In Ln 0 LO 0 In In 0 In LO ENTERED BY TLM PROJECT # 640295545 DESIGNED BY TLM DATE REVISION CHECKED BY JW PROJ. ENGR. JW PATH ��••tiow•+avr+"I�+•� «+� n ICO TYF DENTON ENGINEERING SERVICES COOPER CREEK INTERCEPTOR I 84" / 30" SANITARY SEWER STA 30+00.00 TO STA 32+46.89 DATE MAY 2017 SHEET No. 7 OF 20 SCALE H OR 1 "= 40' VER 1 "= 4' JP�9ES E. WILDER 6 83438 51u11-7 BEGIN PROJECT FIBERGLASS T—BASE SSMH (SEE SHT. 5) RIM ELEV. 578.00 FL 84" OUT (SE) 556.95 FL 30" IN (NW) 561.44 FL 15' IN (NE) 560.90 N-7133858.29 E-2400491.93 NEW 84" SAN. SEWER (SEE SHT. 5) NEW 30" SAN. SEWER (SEE SHT. 5) i i i Z i i STA. 1 INSTA ABANDON EX. 12" SAN. SEWER i 1—TRENCH DAM N-7133878.12 E-2400498.85 16' SAN. i INSTALL- -400 L.F. OF 16' WIDE X 12" THICK p5 H (CONG) EL 577.42 FL IN NW 581.5* (24' Olt FL WT E -SE 561-5* (24' NEW 15" SAN. SEWER J STA. 1+24.00 INSTALL - I—TRENCH DAM N-7133975.38 E-2400532.77 STA 1+40.47 DIA. DROP FIBERGLASS SSMH RIM ELEV. 576.54 FL 15" IN (NW) --,567.38 FL 15" OUT (S) 561.18 N-7133990.93 E-2400538.19 CUT AND PLUG EX. 12" PVC SAN. SEWER TO WEST GABION MATTRESS ON CENTER OF / EX. FLOWLINE OF CREEK / / / / / QJM EL ORTI-I O NORTH 588. out w-sw set L / / / 1 ESMT. i 1 / / NEW 15" SAN. SEWER STA 3+83.02 FL EX. 12" IN (NW) 568.4± FL 15" OUT (SE) 568.35 N-7134218.89 E-2400455.36 / 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. THE PROPOSED 15" SEWER LINE SHALL NOT BE INSTALLED UNTIL ALL FLOW ON THE EXISTING 24" VCP SEWER LINE HAS BEEN TRANSFERRED TO THE NEW 30'/84" SEWER LINE. 3. BYPASS FLOW RATES: 15" AVG. FLOW 300 GPM 15" PEAK FLOW 1200 GPM 580 580 12" THICK GABION AATTRESS F�� ENCH DAM OP OF GROUND — 576 F� EX — _ — — _ — 576 EX. SSMH i 1572 TO BE REMOVED I TRENCH DAM / 572 568 EW 15" sAll.SEWER ®0. 96 568 564II II —J 564 NER ��ql NEW 2SAN0 5- ® 0 bt 77 4 560# 560 Z. STA. 0+52 TO STA. 0+90 38' CLASS "G" EMBEDMENT 556 (SEE DETAIL) -H 556 to G cd to tM O t0dam',0 O�0t00 O OD N O^00 0 0 0 Z, 552 �'pl �0D�3 W �'"� 552 FN v Nin F- vvO O-- O to W F -1 104 d+ O�JZ* Z w w a a W W J W O= a to a:"_ o- O 00 rn 00 K W 54� min to w u- li u- Q: li ZHx-1 W to W 548 U CD (D CD C7 f1- H W H W H l- H W H LL F W O 0) 00 O O I") O p (D N d d- N t0 In n N 0 N 00 N O In 00 N N O OD to M �t n O t0 (o Il t0 (o (D I t0 I, n t0 � Il n t0 (6 n n t0 (6 r aD t0 (6 h 00 0 r n OD t0 w n O to O If) to u7 to to 10 10 to N to In to u7 O L0 ENTERED BY TLM PROJECT # DESIGNED BY TLM DATE CHECKED BY JW PROJ. ENGR. JW PATH s:"+at• vjww•pww•*•\atm n 640295545 REVISION ENGINEERING SERVICES COOPER CREEK INTERCEPTOR I 15" SANITARY SEWER LATERAL STA 0+00.00 TO STA 3+83.02 DATE SCALE 4J .................. MAY 2017 .. Po JAMES E. .. WILDER ..... ...................... H OR 1 "= 40 83438 SHEET No. EN:10',", � VER 1 "= 4' ° All - 9 OF 20 5h)/Il {' BEGIN PROJECT 1 1 D STA. 0+00.00= \ \ \ Z STA. 32+46.89 COOPER CREEK INTERCEPTOR I NEW 12" USAN. SEWER FL 30" 567.31 N-7135086.85 STA. 4+67.43 (S E SHT. 14 \` ) \ s• ` ELECZ. 126885 NEW 30 SAN.I SEWER V VY E-2399568.2 CONSTRUCT. CITY OFEX \>dc 1-5 DIA. STD. CONCRETE SSMH OC.a4 0 DENTON RPR \ CUT STA. 10+35.09 (,'TO SOUTH) 1 1 RIM ELEV. 585.44 \ Rp\�RO�i N pP,d oo '0 AND PLUG \ w SAN. SEWER =STA. 10+26.32 O NORTH ,C S'y RAW 0A\ 1R. �"ONSTRUCT' y VEX. 24' ABA SAN. S DON WER v j y I �e.lyv d+F CP-51 FL 30" 569.12 N-7135237.64 E-2399150.63 �p0 \ �c x = N� ` ➢ N \ `�0 EAST 1-5' DIA. STD. CONCRETE SSMIH (VENTED) ` RIM E�EV. 585.73 I �� oo°off 'ao � \ (p >', ° �� ASPHALT 5AW-CUT FL 130 570.79 1 N47135802.63I \\ 1+00 r- ` y ((� *PICAL E-Ir2399095.67 BM #I: BDl( GD IN GONG AT BASE OF BRIDGE �L b HWr 380¶SOU NG E4EMTRAMP OF Low R0� �` W NE 3D" "\ ' O \ ' , 30 TEMP. CONST. CITY OF 1 V� ir'nua"Eiir zoo• /- TRE DEAD-END of C C9Mc WINS ___ RIDGE -- _ SAN SE �� CANS WER 2+( Y m \ APPROX. LOCATION (P ESMT. '" n 40' WIDEAIN.DENES 1 , ow�� , (ELEvmsat.a5) __- -- --___\10' WIDE UTILITY ESMT. Q > o \ a 69ZT EX. DRAINAGE OUTFA •j` D.R.D.C. T. i ( RIXIM E�LEV ) ______ s ' ____ ----_ ______ (z '----__ (TACT 1) '` / oey \ VOL.539 PG. 658 o A ___ o CITY OF DENTON. < \ L LSIG1'r--- _________ - - zI•cur =ssza6 ,cg r sE=ss7.4s ISD• aPPRoz LOGan °N InoE Y -- '---- _ D.R.D.C.T. / ` Acr OL 539 PG. 658 REMOVE AND REPLA SEE NOTE 4 x unurr VOL. )6 NEW 30" S R � .R.D.0 \ 20 LF FEN ill M - ABA�NO o 539. PG D.RD.cr. _-- ----- -------- _____ ----------- - \ 42" ' CASING C :--- \' INSTA� I- S-- G O 00 N EX. J v - 0 H O 6I J� m---- o SOU MES GE "EAV BRUSH - -_-_ - -- s 1M1(CONG) , RIM ELEV=58629 00 - -- - -- - -- ----- ---- T 0 -LIED - _ -- - - + -- I.ANOPy + Oyy� al 101 � P OF BANK P-52 O� 21•CIAY EPSST'569.409 9y A - __ _ __ CA PY A f. } ABAND N V) IX K -A A --- Q Q v A. +90.39 2000 N. LOOP 288 (CITY OF DENTON) EX. S H 1 -- -- -- - D EE GANOp CP- 4 5+�o - ---- - --- -- M �\ AB DON 1 1 GA" "YssM" NG) a 1-5' CONSTRUCT STD. CON RETE SSMH STA• y NDON > N UNE EX. 2 ' WE \ SAN. S 1 21 °z; RM 92 aAr 9W; z CP-55 DIA. ATCH + 2.19 (GAD W) + `, 20' UTL ESMT. ABANDON RIM LEV. 582.65 ABANDON - IJI 0.00 ` - --- J EX. SSHM 30 567.65 " EX. 21 SAN. SEWER %=STA. C CT: REMOVE AND REPLACE 10 I 19 LOOP 288 N-7135163.50 I NOTES: DI STD. CONCR MH ` 20 LF FENCE 3 33 (EDWARD F. WOLSKI) E-2399520.30 RIM ELEV. 4 Or G°"G \ INkALL: I A 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS PER 3. NEW PIPE MUST BE INSPECTED AND APPROVED 30 9 \ m \ RN "(E iv°5)65.59 CITY SUPPLIED GATE i zf•awr="R=s7o.74 Ba+K 2-9'x -20 BOX CULVERTS 12' WIDE STANDARD DETAILS UNLESS 12 NW 571.34 \ OTHERWISE NOTED ON BEFORE LIVE FLOW IS TRANSFERRED TO NEW SEWER � ( ) 9 zIanrsDDn=s7o.74 m 12" L Y WEST=572.29 \ \ � r �¢x 01.00% GROUTED RIP-RAP PER DETAILS '"� cocP� THE PLANS. LINE. N-7135421.54 \ � � ( SEE DET ILS 13 ) E-2399132.74y N-7135701.4± 2. BYPASS FLOW RATES: 4 A GAP IN THE NEW SEWER UNE SHALL BE LEFT STA. 6+59.50 '\ r g a q '\ E-23991 a5.5± ' 12 AVG. FLOW 100 GPM UNTIL FLOW IS READY TO BE TRANSFERRED FROM 2000 N. LOOP 288 INSTALL' A ABANDON SOIL BORE S 5 >A -) 3145 MINGO I (LO, HENRY PANG LIVING TRUST) , , , , w 120 PEAK FLOW 400 GPM " (PRESOTT 1-TRENCH DAM N-7 5434 THE EXISTING 21 SEWER LINE TO THE NEW SEWER 27 �• SSMH \ 40 0 40 80 21 AVG. FLOW 1.3 MGD LINE. REFER INTERESTS , ; TO DETAIL ON SHT. 13. N-7135428.36 E-239151.82 \ 210 PEAK FLOW 8 MGD E-2399132.07 545 LF OF 30 SAN. SEWER BY OPEN CUT - BACKFILL PER STD. DETAILS 104 LF OF 30 SAN. SEW. 370 LF OF 30" SAN. SEWER I 1Y OPEN CUT - BACKFILL PER SM. DETAILS AND 42" STE EL CASING BY BORE PER 3M. DETAILS 22 LF OF 30 SAN. SEW. (UNION PAaFI RAILROAD) BY OPEN CUT r\ BACKFILL AN PAVEMENT 592t REPAIR PER M. DETAILS I , 592 1 I , 18 LF F 30" SAN. SE V. 1 BY OPEN CUT 1 i BACKFILL PER STD. DETA ILS 588 I ', 588 NEW 300 (MINGO RD.) SI11 N. SEWER 00.25% `,-�----__ EX. TOP OF GROUND 584 ---------- ------- - - --- 584 �_____ EX. TOP ----- F GROUND ��--�� ------------- `� `, 0 -- ------------- - - APPROX. LOCATION ATMOS GAS UNE --------- ELEV. UNK OWN 1 580 _ --'--- 580 TRENCH DAM 576 576 X. 21" SAN. SEWER 2-9'X 5' H-20 BOX CULVERT EX. 12" SAN. 3EWER TO BE ABANDONED TO BE ABANDONED FL IN ELEV =578.2± FL 572.5± FL 572.5± FL OUT ELEV=578.1± 572 w 572 1 1 30" SAN. SEWER ®0.39% NEW 30' SAN. SEWER ® 0.25% 1 I J NEW I I I � NEV30' NEW 30" SAN. SEWER ® .39% 2 C> 568 SAN. SEWER SEE NOTE 4 568 104 LF OF 4 " X 0.625" MIN. STEEL CASINGto n LO N II M 564 00 � to N o,oui oINujn 0) 564 an 0 0 Pz � 0_+e (0 > co C410 0 0 tto W) C4 ++> r- ZOO w w +w d,W>s0 _j ++w i (OOW,ON 00w 560 Mtn U. U cnIr1� cn(n��LI_ cn cow u- 560 J \ J \ J \ J \ J \ J \ U_ \ J \ L" \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ ti H Li H l,_ H li H li H 4 E- li H lrL H li 1- Li H LII_ H li H la_ f- Li H Li H Li_ 1- Ii. F l� H Li H Li H Li H M r7 O 0 00 0) to 00 00 a0 rn 00 O N n 0 n 00 to-to n O M to (0 � M r V) <t t0 r Go N0 M rn GO O M O GO O 10 LO O n m N O n w 00 m O N M d' 0 t0 00 O 0) 00 O r7 N M h d• r7 t0 r7 � a0 a0 r 1� n n PZ r7 00 N 03 r7 tD N 00 r7 a0 M Ol 4 0; 4 W4 Of M 05 4 01 N O 6 O 4 O 4 O In O 4 O 4 O"i to o� w 00w o0 w 00 to GO w GO 0 DO (o m to GO w 00 w 00 w 00 w m w D0 w 00 n ao I. GO n GO n 00 n 00 I. 00 n 00 to I In 9) In to 0 to 0 to 0 to 0 O Lo to In to In to In to 0 O 0 0 In to LO O In 10,0 t0 0 to In to In Lol 0 to to to In 0+00 1+00 2+OC 3+00 +00 5+0 6+ +00 8+00 9+00 10+00 10+50 ENTERED BY TLM PROJECT # 640258545 --� CITY COOPER CREEK INTERCEPTOR II DATE MAY 2017 SCALE ®o . �� °°sE•WILDE$� .R � DESIGNED BY TLM DATE REVISION CHECD BY JW of �s .g...83438 SHEET No. DENTON 30t' SANITARY SEWER LINE EXTENSION HOR 1 "= VER 1 "= 40' 4' �® �•®���®e® ® � S�Z3 /il PROJ. EN GR. JW PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG ENGINEERING SERVICES STA 0+00.00 TO STA 10+50.00 10 OF 20 q / 2530 CRAIG LN / ARVIN HUFFMAN) h f I fo I Z I STA. 16+45. I ORq I ESMT. T' 3 / t i 1 j i / - 1 5' DIA. STD. CONCRETETSSMH15R / 1 / I 1G \\1\I // \ t 2524 CRAIG W R IA ELEV. 588.20 I 2520 CRAIG W I / 11 FL 30" 572.34 RONALD P TERS (LEROY BRAZZEL) I I ( ) I 16R / o 2534 CRAI LN j (JERRREY MC DNA I O \ 3009 MISTYWOOD LN / Q N-7136282.78 / / I 1j + \ \ MANDA �`�� SAMPSON)) / / + I I E-2398704.18 I 12 I I t I 14 / / 5 I SS4H(WNQ =5 I `O h 21, CLAY SOlITH925]5.53 �� 0 Q ABANDON \ OLD \ / NORTH RD. O I ABANDON I ABANDON EX.ISSMHI / ORNAMENTAL GARDEN FEN ]NG 1 / W Y glPVDYxEsr 5n5 ig i EX. 21" SAN. SEWER / \\ (EDWARD F WOLSKI) .- J. �� I t I ABANDO I 'o ti \ (BURIm Tal_-- _/ Q �- _2 SAN. �.._.- _ __ _ I N.-2�SAI -S lA Fto / Q________ _ ABANDON +. ABANDON /(summ mF.) CITY OF DENTON I I _ t C 1 K 1 r ° �` is COL N - e I 20' UTIL ESMT\PER PLAT / - - o'_ESMr\v53>.._PG 106 V / 30' P. CO ST. ESM EX. 21 SA SEWER 10' VIDE UTI ESMT. / VOL. 531, PG. 106 /� V I %� ---- 7 GH N NK �( - �Y RI -- - u -- - - - -___-- I C -- - - ------1 - - - ----- ---° --- --------- ---- -- -- --------- y -_ --- - - NEW T0 N. 3 R W z a ;_ _ _ _ _ ° -___ _ 2 _._ N. •k 0_ -__ _____ - ° , - - ------ ---- ------------------ _ + �__ N �{�p W z \/ / GT--- ------------------= RN =589.32 _ _ `` (SEE NO 3 l� 1, a �EW-3D AN• JGnGR' 21'CLA N0RM-5]4.8117+00 2,- 5«MENEW I q SEE S ----- ------ -- ---- ___ -- - --� --- --- 10.00 .;y" tii 3 " SE AR - T L• ES _ U CITY OF DENTON = ' NEW 3p" SA SAM -- -- --- - s 10' WIDE UTILITY ESMT. VOL. 531, PG. 105 C' -5 "- S � SEy�,�rq,� WER k 0 Al Q 20' UTIL. ESMT. D.R.D.C.T. A OP � -i; TGp \ F 2ecOtr°9 Q 5P NOTES: '9 �.. _.._ ST 18+96.80= OUC 0 S N. S is LOOP 288 �X. X pyo 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS J T_ STA__.. t7�-74:50 ONS (EDWARD F. WOLSKI) w o CONSTRU 1-5 DIA. DROP CONCR MH SEE NOTE 4 o o o Pv. F po PER STANDARD DETAILS UNLESS OTHERWISE X 1-5' NOTED ON THE PLANS. u A. STD. CONCR SMH BOK RIM ELE SER �I R TA. 94.05 a� RI V. 589.01 CREEK 30 572.97 CONSTRUCT: a 2. BYPASS FLOW RATES: " FL 30 572.66 FL 10" IN (W) 576.27 Y 1-5' DIA. STD. CONCRETf.�SSTidFT-------------- STA. 13+47.11 �F 10 AVG. FLOW 100 GPM N-7136411.72 N-7136531.48 RIM 585.463.21 1-12' X 5' INSTAU: H s 10 PEAK FLOW 400 GPM E-2398706.50 ff �N � a1".�"I" ' L13 E-2398729.75,,. .FL 30 573.21 � A � � CAT 1 N �� 20 BOX CULVERT 12' WIDI= � ¢ETOL IF - dNE NA ANJ �! N-7136628.19 ® 1.007o WITH GR TED RIP -RAP PER DETAIL: (SEE DETAIL SHT. 13) doe 3. 10" TIE-IN CANNOT OCCUR UNTIL THE GREENBELTANDDRANAGEEASEMENTS �L' E-2398740.03 N-7136051.3 _ F ENTIRETY OF THE NEW 30" LINE IS FULLY CAB. r, PG. 277-278 r.RD.C.T NIXtMNDOD ESTAAT DDIMON GREENBELT do DRAINAGE E l E-2398892.9_ OPERATIONAL. - - - - - - - - - - - - - ---- -------- WES�Ly ANK OOOPER MEW 4. INSTALLATION OF SANITARY SEWER ACROSS EXISTING STORM DRAIN MAY REWIRE REBUILDING OR RELAYING STORM DRAIN AND OUTLET STRUCTURE. STORM DRAIN AND OUTLET SHALL BE REBUILT WITH LIKE 40' 0' 40' 80' MATERIALS AND DIMENSIONS AS EXISTING. 1000 OF 30" SAN. SEWER BY OPEI 4 CUT BACKFILL PER STD. DETAILS 588 EXIS ING TOP OF GROUND 588 EXISTING TOP 0 GROUND 584 ------------ `,- --- - _ ------------ 584 t STA. 13 47.19 i 12 'X 5 H-20 BOX CIILVERT 580 O 0580 i FL INE FL OUT V.=579.12± ELEV.=579.0± 7"RC O FL 581.7± O + Q N 576 Q Q 576 U) W NEW 30" NEW 30" S N. SEWER ® 0.' 5% NEW 30" SAN. SE ® 0.25% SAN. ® 0. EWER 5% SAN. SEWER 00.25% 572 NEW 30" SAN. SEWER ® 0.25% NEW 30" 572 w w z z J J 568 568 F_ Q Q � � 564 564 C4 N C6 560 M n t� 00 o tri II14 00 0 o 560 r-lr�o m 4m r- + to +> tIt + to T to crD o w o ar Ai o = M Q M Q M0 Q M 556 ; Cn w L En U_� ;L� 556 J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ lL H la_ H C I- li H la_ li W �' la_ F- la_ I- H F Li I- Li H Li H U. H (L H lL H lL H ti H 4 F- U. H OD r � N r- N M N � CO� ^ Lq ro O M O N Mo It r n N 00M � NL to O 00 - 03 t 't N to CO 0)) IL ti 4 6 00 n00 Ln ^ Ln � 00 n00 (6co f� 00 n00 c0 1:O n00 n (O 1 00 n 4 00 .- n ED W N n (O N n N r N r N� I N Ln N Ln N(6 M L6 P7 4 MI Lc; to Ln M «) M Ln M Ln M Ln to Ln M In M (n to Lo to � tc) DD n to � 00 n In to 00 I� U� t0 DO n LD U) 11) n tp 00 n Lt7 to 00 LL) n 11) 00 N If) M 00 n Ln to 00 n Ln to 00 Lf) 10+50 11+00 12+00 13+00 14+00 15+00 16+0 7+00 18+00 19+00 20+00 ENTERED BY TLM PROJECT # 640258545 COOPER CREEK INTERCEPTOR II DATE MAY 2017 SCALE RE �• qt gym,.......:... DESIGNED BY TLM DATE REVISION CHECKED BY JWJlAtCOITFy"! E. W�� JAPHES WILD ER SHEET No . DENTON 30" SANITARY SEWER LINE EXTENSION �� HOR 1 = 40 VER 1 = 4' ..... •• ,.•.$ 83438 �® •��,�����®�a�� ®e�•°��° Sl z.3/� PROJ. ENGR. JW PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG ENGINEERING SERVICES STA 10+50.00 TO STA 20+50.00 11 OF 20 NOTES- 1. ALL SSMHS ARE STANDARD DETAILS TO HAVE WATERTIGHT UDS PER UNLESS OTHERWISE NOTED ON " \ /EX. SAW. SEWER \ \ 2903 EMERSON \ (HAROLD E. CA� WEL�(PHILLIPS),; 2901 FME'9S No (BAFINY & KIMBERLE� -lx \ \ ABANDON THE PLANS. / 30011 EMERscN \ \ / (ELVIA AUSTIN)\ \ / \ / I � 6 \ ` EX. 21" SAN. R / 2. BYPASS FLOW RATES: / G 2907 EMERSON \ 2905 EMERSON i (BENNIE G DAY) s'� '' I \ / / 2753 MILL PO D DONALD JUS S " 21 AVG. FLOW 1.3 21 " MGD / (GL N/CYNTHIA DAVIDSO RENNOR ART Dl S G \ / xoRTx EST I�DDxION 33f i \ �' -'' ; ' � � 1tK _ \ `\ � � 2757 MILL POND / (MICHAEL CROSSLEY) / PEAK FLOW 8 MGD / 2534 CRAI 26R / -ABA D0�1 \� CDONALD)/ j NEW 8" SAN. \\\`.\` \ VARIABLE WIDTH/ASEME T 49 (JEFFREY EX. 1" SAN. SEWER Ems• - O NORTHWOODESTATES I (SEE SHT. 14) / MI (TORY KING) GREENBELTAND DRAINAGE EASEMENTS ! \ / CAB. PG. 277-278 .o aR .C.r. % o< `�° o \\ \ ` ABANDON '/ ABANDON l o s�; °Fy \\ \` . 21" SAN. SEWER � EX. SSMH ,,= ,' / ?°• At FToti\\ \ EX vE PLACE 2" OF FLEXBASE FROM TOP OF BANK TO TOP OF BANKSSMHc ! __ ITi ° (60'LF X ° 12' WIDE / =5 \`� ` `. CLAY Nw--579.17 \\ \\i'C YS=579.17 -- _ ` V SSIA1(CDNC) T� 35]6.17 4+ 26+00 27+0D e D \\\ \`\ 29+DD _-_-- -- O - LLICANDY 21 «AY - 2+ -231. • 30" NITA Y E R --_ \--- ---. -= = ---"- '\ 30" SAN. SEWER ANpPY --- - Q SOIL BORE (SB-6) % ----- ------------ -------------- ° N-7136748.16 �--- ----- ---------EK.roP _-_-_ SEE NOTE 2 ° E-2398671.13 - _--------- --___--- / SIL BORE (SB-7) CP-58 ---''- _-- - _ TDP OF IX------ ��� N-7137137.16 . GRADE BREAK BANK O + \ SWTNY.ESIERI-Y SEK �\ STA. .98 ,--'" DooPER / CP-59 Ul O `. CONSTRUCT: ,-'" STA. 26+69.72= � ` 1-5' DIA. STD. CONCRETE SSMH (VENTED) � 1pp�COOpFi2cREEKDRA1NaGEESML STA. 0+00.00 ABANDON STA. 29+93.44 RIM ELEV. 585.67 (PLAT DIMENSIONS CONSTRUCT: EX. SSMH CONSTRUCT: Ago FL 30 573.51 1-5 DIA. DROP CONCRETE SSMH 1-5' DIA. STD. CONCRETE SSMH \ \ N-7136737.32 RIM ELEV. 590.18 RIM ELEV. 591.61 E-2398687.94 FL 30" 574.90 Fl 30" 575.71 __----" 'w, 0' 40' 80' �`\` 579.63 N-7137216.1 ------'- -- VARIABLE WIDTH EASEMENT -' N-7137037.84 -------- E-239795(48 \ ----------E-239=4.65 ---------------------- ------------------ 1000 OF 30" SAN. SEWER BY OPE 4 CUT 592 BACKFILL PER STD. DETAILS 592 '. EX. TOP OF GROUN - -_-_------ ----- 588 ---- ------ ------------- -- --- - - '------ 588 O E). TOP OF GROUND Lj)----------------------------------------------------- \\ Lf) -`-` + 58L� O ��,, EX. 21" CLAY SAN. SEWER 0 FL 579.31 584 Q ~ EX. 21" CLAY SAN. FL SEWER 579.1± Q 580 { 580 II I, NEW 30" 576 NE 30" SAN. SEVER ®0.2596 SAN. SEWER ®0.25 576 NEW 30" SAN. SEWER NEW 30" SAN. SE ® 0.25% W 00.25% W Z 572 J z 572 U I- 0 Q H 568 Q 568 M r0 564 OD c4 c; o tocb 564 +>.n n MO 0)+> t6 n ewe row Ln z +>0) LLI O NwMO C4 -1 560 awM M COW L�U- cnIrt 560 J \ li F- J \ laL F- J \ J \ J \ J \ IrL 1- laL H laL H F- J \ J \ J \ CD J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ J \ la_ Li F- La F-- -O M O d G0 0GO N n O o0 n N t0 O) n h W i- W O O) N K) O 00 n n O 00 N r 0 0 n 0 O GO N (O O r n (n O a0 N O O O) eM ti M N) ui M (0 17 (o M (o ro N N M d (o of r st r N tD 01 n 1[l GO O) 0) N I- N dt r d M r7 * (o to n n (O W rn nDo nDo nDo noo P, 00 P, 00 nDo nGO r, GO <t d I� Oj 4 of Iri of rp Oi nDo nDo wi 0i � m ui O ui O ui C5 u� n u u� u) n to n rn n to n n nm n0 nD0 P, 00 nGo 1n n rn u) 0 0 nGO N0 n0) nrn nrn 20+50 +00 2+00 23+00 +00 1n W) 1n uo ,n 00 6+00 27+00 28+00 In ,n to rn 29+00 30+00 ENTERED BY TLM PRCJECT # 640258545 ,- --� DESIGNED BY TLM DATE REVISION COOPER CREEK INTERCEPTOR II DATE SCALE �..• . CITY I, MAY 2017 .sY CHECKEDBY JW OF HOR er- � 1 - 40 JAMES E. WILDER "....83438..... PROJ. ENGR. JW DENTON 30" SANITARY SEWER LINE EXTENSION SHEET No. VER 1 "= 4' PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG ENGINEERING SERVICES STA 20+50.00 TO STA 30+50.00 12 OF 20 �� S/Z3 A, 0 Lo0 r) Q F- W Z J _ U Q ENTERED BY TLM PROJECT # 640258545 DESIGNED BY TLM DATE REVISION CHECKED BY JW �oF PROJ. ENGR. JW I DENTON PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG ENGINEERING SERVICES COOPER CREEK INTERCEPTOR H 30" SANITARY SEWER LINE EXTENSION STA 30+50.00 TO STA 36+43.44 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. BYPASS FLOW RATES: 21" AVG. FLOW 1.3 MGD 21" PEAK FLOW 8 MGD 18" 593 LF OF " SAN. SEWER 13Y OPEN CUT 1000 GPM Q Q 0 W ZIP o BACKF ILL PER STD. D TAILS 0 or O GROUTE UI GROUTED RIP -RAP VARIES (T RIP -RAP TOP_OF GROUND _---'--� o2 NATURAL ti^a �( N.G. GROUND 1 I EX. GRADE BANK GRADE BANK ICULVERTI TO TOP OF TO TOP OF I I EX. TOP OF GROUND CULVERT AT ��-� `-------- F 4:1 SLOPE 4:1 SLOPE .-' 1 I ti y PROFILE VIEW VARIES ------------------------592 (N.T.S) GROUTEDz J' W< z GROUTED RIP -RAP RIP -RAP m 592 m ---- --- Q'W UI W O a O ao r r PLAN VIEW - -- (N.T.S.) EX. SSMH _____------ TO REMAIN 0 588 588 EX. 24" RCP BYPASS 0 M EX. 1" SAN. SEWER EX. 30" SAN. SEWER (W) TO BE PLUGGED FL 581.65 584 584 Q EX. 21" C Y SAN. SEWER -- FL 580.91 VEX. �I 580 580 30" SAN. SEWER N 4FL 581.62 11 NEW 30" SAN. SEWER 11 0 43.12% NEW 30" SAN. SEWER ® 0.25X W z NEW " SAN. SEWER ®O.i.SX o W 576 0 576 J a U m � O Q 572 572 to CD r cpco00 (O 0 M O , O to ID 06IAT W moi-. n ��i.- II �ow� O O U �v O �vv °�zz 568 568 n LnM0003 r -t +0>: v O Z d' f_ j_ U M tW to Lu W+W r0 MJ= O MOW Opp OM(rOXX M Q Q ro r O Q M W W 564 J Zl-XJJJ 564 J \ J \ J U \ J (� \ J C \ J \ J U \ J CD \ J L� \ J \ J V„ \ H J W \ F- (i F- lrL F- W F- lrL li li u_ F- Li I- IA j- n LO p I"1 N N 0) O In M 0 M n d c0 N O W, d' NIn n0) (0 r7 0) n 01 00 r- p r r'1 N N K) _ 00 IA O 0) ui c0 -:10 (0N (0 t7 (O th (O n r0 t0 n M rn (O n N m (0 n N m t0 n Ki 0) n rn n rn n In rn 117 n O rn 117 n to m I 1n n In 0) I Lo n to rn I Lo In rn I Lo In Lo O 0 O LLT In U7 LLT In ENTERED BY TLM PROJECT # 640258545 DESIGNED BY TLM DATE REVISION CHECKED BY JW �oF PROJ. ENGR. JW I DENTON PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG ENGINEERING SERVICES COOPER CREEK INTERCEPTOR H 30" SANITARY SEWER LINE EXTENSION STA 30+50.00 TO STA 36+43.44 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. BYPASS FLOW RATES: 21" AVG. FLOW 1.3 MGD 21" PEAK FLOW 8 MGD 18" AVG. FLOW 250 GPM 18" PEAK FLOW 1000 GPM PIPE GAP INSTALLATION DETAIL INSERTED PIPE SECTION PREVIOUSLY (PExPE) LAID PIPE COUPLING f- BELL OR / PREVIOUSLY COUPLING / LAID PIPE FLOW 1. COUPLING SHALL BE A STEEL HOUSING COUPLING EITHER: TEEKAY STEPPED COUPLING OR STRAUB FLEX COUPLING. 2. A MAX. 2" GAP SHALL BE ALLOWED BETWEEN THE INSERTED PIPE AND THE PREVIOUSLY LAID PIPE. DATE SCALE MAY 2017 �. JAMES E•WILDER H OR 1 "= 40 . °°°°°°8343810 .40 SHEET No. VER 1 "= 4' &�A 13 OF 20 5Iz3 tr? CULVERT INSTALLATION DETAIL Y � Y Q Q 0 W ZIP o ¢ ` a 0 or O GROUTE UI GROUTED RIP -RAP VARIES (T RIP -RAP o2 NATURAL ti^a �( N.G. GROUND 1 I GRADE BANK GRADE BANK ICULVERTI TO TOP OF TO TOP OF I I CULVERT AT CULVERT AT F 4:1 SLOPE 4:1 SLOPE 1 I ti y PROFILE VIEW VARIES (N.T.S) GROUTEDz J' W< z GROUTED RIP -RAP RIP -RAP m Z,J m W O Q'W UI W O a O ao r r PLAN VIEW (N.T.S.) PIPE GAP INSTALLATION DETAIL INSERTED PIPE SECTION PREVIOUSLY (PExPE) LAID PIPE COUPLING f- BELL OR / PREVIOUSLY COUPLING / LAID PIPE FLOW 1. COUPLING SHALL BE A STEEL HOUSING COUPLING EITHER: TEEKAY STEPPED COUPLING OR STRAUB FLEX COUPLING. 2. A MAX. 2" GAP SHALL BE ALLOWED BETWEEN THE INSERTED PIPE AND THE PREVIOUSLY LAID PIPE. DATE SCALE MAY 2017 �. JAMES E•WILDER H OR 1 "= 40 . °°°°°°8343810 .40 SHEET No. VER 1 "= 4' &�A 13 OF 20 5Iz3 tr? 0 EE CANOPY \ / ABANDON EX. 21' S SEWER CP -54 BEGIN STA. 1-5' DIA. STD. COI! SSM" (SEE HT.,M) RIM ELEV. 585.34 FL 3� 569.8 FL 12" IN, (NW)l 57 /N-713 .54 E-239 1 2.74 / NEW 30" SAN. SEWER / (SEE SHT. 10) 42" STEEL CASING 01 EE SHT. 10) seg /P 6+0 NEW 'SAN. SEWER °o. \ ASPHALT \ / SAW -CUT ¢ /� TYPICAL _ s*P /v \ r\Ifs\ �C,"/" 12" WEST=5]/229 30" SAW J (SEE S T. 10) i tuu \ ,vvn.a lnvv 1. \ 1-5' DIA. STD. CONCRETE SSMH RIM ELEV. 586.68 FL EX. 12" IN (W) 573.5± ° °PY FL 12" OUT (SE) 573.50 N-7135445.14 C E-2399073.06 ` �� C CUT AND PLUG IX. 12" SAN. SEWEF ' A NDON TO EAST a ° `' Lx 120 SAN. SEWER 30' TEMP. CONST. ESMT. \ UTIL. ES T. 64 LF OF 12" SAN. SEWER BY OPEN CUT M 10 orjW W w: NEW 30" SAN. SEWER BACKFILL PER STD. DETAILS �' \ BACKFILL PER STD. DETAILS (SEE SHT. 11) \ (MINGO RD.) \ SEWER '... i � I L�F- 584 I I 588CJC7 to 584 580 M O 1n 580 576 576 mcncnwU- \ NEW 10" SAN. SEWER 1 c\i CUT A 572 ` EX. 12" 3AN. SEWER 572 EX. 21 584 _ NEW 12" SAN. SEWER 0 3.37% 568 -----------� 584 a 568 to - --'"` ,-' ' 00 ri Of STA. 0+53.00 a0 1: BEGIN PROJE T 0j as \ 00 w REMOVE - 00 co STA. 0+00. to t0 ^ 0° to n (0 In 564 000)CO 3 ^`O lcn Z� 564 0OC4 ° W4 CMAMENT� 1-10" RIGID OUPLING 0-++wZ 1-5' DIA. DROP CONCRETE SSMH O+w'0 0CDJe Z a W O N a0J 1t W X N SAI'. SEWER (SEE SHT. 11) M� W.- 10" SAN. SEWER 0 2.72% 560 m in m Jw J in r� zP- w cn _j m t,L G_ 560 572 2530 CRAIG LN FL EX. 10' 577.7± ' FL 30" 572.97 I ° `\ ` \ (MARVIN HUFFMAN) N-7136543.73 ---------------------E=23986-78.t8 -----� 1*In M M N O rn N n 00n c 20'ACCESS to 1n to E-2398729.75 568 0+00 0+50 ENTERED BY TLM DESIGNED BY TLM CHECKED BY JW PROJ. ENGR. JW PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG PROJECT # 640258545 -� DATE REVISION l TY 1 1 I SERVICES 1 ve i e gCP 5 1 � I mz 1 z� 1 y A H� yx I o° 1 oz ya om 1 I I m� I ti I BEGIN PRO ECT i STA. O+0 .00 =STA. 26+6 .72 CONSTR CT: 1-5I ;DIA. DROP CONCRETE S H (SEE SHT. 12) I RIM ELEV. 59 .18 FL 30" 57 .90 FL 8" IN (SW) 57 .63 N-713703.84 E-239822.65 1 I $EW 30" SAN. SEWER (SEE SHT. 12) 1 Joe ,00 I 1 I I 1 I 1 I I I 1 1 I 1 A I _v 1 I I i 592 mm . 1, 576 572 .: COOPER CREEK INTERCEPTOR II SANITARY SEWER LATERALS 12" SAN. SEWER STA 0+00.00 TO STA 0+64.17 10" SAN. SEWER STA 0+00.00 TO STA 0+53.00 8" SAN. SEWER STA 0+00.00 TO STA 2+10.31 II 1 1 1 1 1 I 1 I 1 I i I NOTES: 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. BYPASS FLOW RATES: 12" VCP AVG. FLOW 100 GPM 12" VCP PEAK FLOW 400 GPM 10" PVC AVG. FLOW 100 GPM 10" PVC PEAK FLOW 400 GPM 8" VCP AVG. FLOW 100 GPM 8" VCP PEAK FLOW 400 GPM 26+0 \ NEW 3 " SAN. SEWER (SEE S 12) I ° 27+00 ° I 1 I 1 1 I 1 1 I 1 I I i I I i I 1 II DATE MAY 2017 SHEET No. 14 OF 20 1+00/ I . NEW 8" SAW SEWER CUT & EX. 21" SAN. TO A 211 LF OF 8" SANIJ SEWER BY BACKFILL P R STD. DET Toa OF k\ \ EX. 21" S SEWER' / CUT & PL_ / / \ IX. 21' SA SEWER / fi6 EAST 5 H(NC) MN E =591x8 21'QAYNg2TH=5]8.1] 21*IX Y X T=57&08 8'CLAY Wim=584.23 9 \ / PROJE T \ STA. 2 .3 \ CORE INTO E)" SSMm REBUILD SSMH BOTTOM TO MATCH NE FL EL\f:V. EX. RIM ELEV. 5 1.68 \ FL EX. 8" CLAY ) 584.23 FL 8" OUT (NE) 5 .63 / < N-7136866.53 ABANDON'' EX. 21"\S\AN. SEN CUT Up^000 M 10 orjW W w: NEW 30" SAN. SEWER \ tL + m 0 BACKFILL PER STD. DETAILS (SEE SHT. 11) \ , \I `\ ABANDON EX. SAN. SEWER '... i � I L�F- - I I 588CJC7 to 2526 CRAIG LN 0) M O 1n (LUCIUS WILKERSON) mcncnwU- \ NEW 10" SAN. SEWER 1 \\ d CUT A D PLUG: 18+00 EX. 21 584 _ I--- - TO SOUTH -----------� 584 a \ to - --'"` ,-' ' 580 ri Of STA. 0+53.00 a0 1: BEGIN PROJE T 0j as \ 00 w REMOVE - 00 co STA. 0+00. to to to 0° 1 -EX. In =STA. 18+96.8 576 I CONSTRUCT: ° \ ma CMAMENT� 1-10" RIGID OUPLING 1 1-5' DIA. DROP CONCRETE SSMH IX. 21" TO NORTH & SOUTH ° TIE-IN TO EXI TING 10" SAI'. SEWER (SEE SHT. 11) NEW 10" SAN. SEWER 0 2.72% 572 RIM ELEV. 587.50 572 2530 CRAIG LN FL EX. 10' 577.7± ' FL 30" 572.97 I ° `\ ` \ (MARVIN HUFFMAN) N-7136543.73 ---------------------E=23986-78.t8 -----� FL 10" IN (W) 576.27; N-7136531.48 \ 19 I 20'ACCESS to in E ,o PVC 55 8UT4nYESUT \ E-2398729.75 568 O o coO C4 v art-rAu smucluls aYa/-eAsmar ai m[ LFNIER 6 A ax'ae su Ai lle= ixm�cnw s ° - - SBNH (CONC) '/0,uT/L%/YESMT. -\ 1 --- MN ELEV=588.92--------------------- \ 1- 21'CLAY NOR1H=575.55 ---1 ELE .1 ITM N TH 8581.47 t0' a 1H=581.45 tOVVC ST=581.27 + > In z Mw to + 21'CW SOM=575.53 = \ 10'PV WEST=57 zo,woo .]1 \ N CUT AND PLUG: ap 00Ono NEW 30" S/�N. SEWER \ `, !\ v_ EX. 21" SAN. `"`N\ M (SEE\\lSHT. 11) � ` 0 TO NORTH / \ \ / \ H w2JJ m in ' co r W 564 2534 CRAIG W / U (JERRREY MCDONA / 3001 EMERSON L�F N tM0 (ELVIA AUSTIN) n VARIABLE / / I \ UTIL. ESMT. / LID to to In / I ABANDON \ \`. EX. /21" SAN. SEWER PROJECT # 640258545 -� DATE REVISION l TY 1 1 I SERVICES 1 ve i e gCP 5 1 � I mz 1 z� 1 y A H� yx I o° 1 oz ya om 1 I I m� I ti I BEGIN PRO ECT i STA. O+0 .00 =STA. 26+6 .72 CONSTR CT: 1-5I ;DIA. DROP CONCRETE S H (SEE SHT. 12) I RIM ELEV. 59 .18 FL 30" 57 .90 FL 8" IN (SW) 57 .63 N-713703.84 E-239822.65 1 I $EW 30" SAN. SEWER (SEE SHT. 12) 1 Joe ,00 I 1 I I 1 I 1 I I I 1 1 I 1 A I _v 1 I I i 592 mm . 1, 576 572 .: COOPER CREEK INTERCEPTOR II SANITARY SEWER LATERALS 12" SAN. SEWER STA 0+00.00 TO STA 0+64.17 10" SAN. SEWER STA 0+00.00 TO STA 0+53.00 8" SAN. SEWER STA 0+00.00 TO STA 2+10.31 II 1 1 1 1 1 I 1 I 1 I i I NOTES: 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. BYPASS FLOW RATES: 12" VCP AVG. FLOW 100 GPM 12" VCP PEAK FLOW 400 GPM 10" PVC AVG. FLOW 100 GPM 10" PVC PEAK FLOW 400 GPM 8" VCP AVG. FLOW 100 GPM 8" VCP PEAK FLOW 400 GPM 26+0 \ NEW 3 " SAN. SEWER (SEE S 12) I ° 27+00 ° I 1 I 1 1 I 1 1 I 1 I I i I I i I 1 II DATE MAY 2017 SHEET No. 14 OF 20 1+00/ I . NEW 8" SAW SEWER CUT & EX. 21" SAN. TO A 211 LF OF 8" SANIJ SEWER BY BACKFILL P R STD. DET Toa OF k\ \ EX. 21" S SEWER' / CUT & PL_ / / \ IX. 21' SA SEWER / fi6 EAST 5 H(NC) MN E =591x8 21'QAYNg2TH=5]8.1] 21*IX Y X T=57&08 8'CLAY Wim=584.23 9 \ / PROJE T \ STA. 2 .3 \ CORE INTO E)" SSMm REBUILD SSMH BOTTOM TO MATCH NE FL EL\f:V. EX. RIM ELEV. 5 1.68 \ FL EX. 8" CLAY ) 584.23 FL 8" OUT (NE) 5 .63 / < N-7136866.53 ABANDON'' EX. 21"\S\AN. SEN CUT Up^000 M 10 orjW W w: 53 LF OF 10" SAN. SEWER BY OPEN CUT aa, °D tL + m 0 BACKFILL PER STD. DETAILS 000com�� W oa CO '.. zI-X JJ '... OF GROUND - - - - - - - - - 58p L�F- - EX_TOP 588CJC7 to 00 0) M O 1n WHFa-�JJ mcncnwU- tL EX. SSMH TO BE REMOVED 584 _ -� M 584 580 M to - --'"` ,-' ' 580 Of rn O a0 1: co 1: 0j r- 00 w 03 OD 00 co 10" SAN. SEWER 02.72% to to to 1n to In to In TO REMAIN 576 576 IX. 21" TO NORTH & SOUTH TO BE ABANDONED NEW 10" SAN. SEWER 0 2.72% 572 572 ^ N 568 00000^^^ to in -�o 568 O o coO C4 v M C4^ to w D. + + > In z Mw to + zo,woo ap 00Ono M � z�>J 564 H w2JJ m in F in iR u- Lt co r W 564 0 U L�F N tM0 �j n co n co LID to to In PROJECT # 640258545 -� DATE REVISION l TY 1 1 I SERVICES 1 ve i e gCP 5 1 � I mz 1 z� 1 y A H� yx I o° 1 oz ya om 1 I I m� I ti I BEGIN PRO ECT i STA. O+0 .00 =STA. 26+6 .72 CONSTR CT: 1-5I ;DIA. DROP CONCRETE S H (SEE SHT. 12) I RIM ELEV. 59 .18 FL 30" 57 .90 FL 8" IN (SW) 57 .63 N-713703.84 E-239822.65 1 I $EW 30" SAN. SEWER (SEE SHT. 12) 1 Joe ,00 I 1 I I 1 I 1 I I I 1 1 I 1 A I _v 1 I I i 592 mm . 1, 576 572 .: COOPER CREEK INTERCEPTOR II SANITARY SEWER LATERALS 12" SAN. SEWER STA 0+00.00 TO STA 0+64.17 10" SAN. SEWER STA 0+00.00 TO STA 0+53.00 8" SAN. SEWER STA 0+00.00 TO STA 2+10.31 II 1 1 1 1 1 I 1 I 1 I i I NOTES: 1. ALL SSMHS ARE TO HAVE WATERTIGHT UDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. BYPASS FLOW RATES: 12" VCP AVG. FLOW 100 GPM 12" VCP PEAK FLOW 400 GPM 10" PVC AVG. FLOW 100 GPM 10" PVC PEAK FLOW 400 GPM 8" VCP AVG. FLOW 100 GPM 8" VCP PEAK FLOW 400 GPM 26+0 \ NEW 3 " SAN. SEWER (SEE S 12) I ° 27+00 ° I 1 I 1 1 I 1 1 I 1 I I i I I i I 1 II DATE MAY 2017 SHEET No. 14 OF 20 1+00/ I . NEW 8" SAW SEWER CUT & EX. 21" SAN. TO A 211 LF OF 8" SANIJ SEWER BY BACKFILL P R STD. DET Toa OF k\ \ EX. 21" S SEWER' / CUT & PL_ / / \ IX. 21' SA SEWER / fi6 EAST 5 H(NC) MN E =591x8 21'QAYNg2TH=5]8.1] 21*IX Y X T=57&08 8'CLAY Wim=584.23 9 \ / PROJE T \ STA. 2 .3 \ CORE INTO E)" SSMm REBUILD SSMH BOTTOM TO MATCH NE FL EL\f:V. EX. RIM ELEV. 5 1.68 \ FL EX. 8" CLAY ) 584.23 FL 8" OUT (NE) 5 .63 / < N-7136866.53 ABANDON'' EX. 21"\S\AN. SEN CUT Up^000 M 10 orjW W w: aa, °D tL + m 0 0NFr 000com�� W oa CO '.. zI-X JJ '... 0-+wwm? L�F- O ZNw oa * to 00 0) M O 1n WHFa-�JJ mcncnwU- tL _ -� M O LO M to - 0 n Of rn O a0 1: co 1: 0j r- 00 w 03 OD 00 co m to to to 1n to In to In SCALE HOR 1 "= 40' VER 1 "= 4' CONTRACTOR TO ESTABLISH NEW JAMES E. WILDER 83438 Ite1.320711111211. 073/ 5921 :: 5801 5761 5721 lo 00m CR �01 U 0 } W o� Q z orjW W w: aa, °D tL + m 0 0NFr W oa CO '.. zI-X JJ '... WmwWW L�F- OO M * to 00 0) to 1n JAMES E. WILDER 83438 Ite1.320711111211. 073/ 5921 :: 5801 5761 5721 I I BEGIN PROJECT STA. 0+00.00 e.�A — . -a-. . . CONSTRUCT: 1 6' DIA. STD. ONCRETE SSMH IM ELEV. 596.51 FL 30" 577.31 FL 1 " IN (N) 578.31 N-7137409.69 0 E-2397346.64 �o I Fa I gas g�z4 eax ami 1 s , 1 � 1 1 1 ) NEW 30" SAN. SEWjtR '' i i (SEE SHT. 13) _ I; 11 I i 1 I 1 1 1 1 1 ( 1 1 I 1-----lilA. 7+4Z.UU ----- --- 1 ' 1-5' DIA. DROP CONCRETE SSMH FGM V. 595.68 FL 1 IN 584.53 NEW 1 " S OWER FL 1 OUT 578.59 N-7 37551.66 E:— 97349.82 1 % CO 'L.F. CONCRETE ENCASEMENT CP 61 FR¢M STA. 0+57 TO STA. 1+17 1 I 1 / 1 , CUT AND PLUG EX. 18" SAN. S TO SOUTH END PROJECT 1-5' DIA. STD. CONCRETE SSMH RIM ELEV. 595.93 FL EX. 18" IN 584.8± FL 18" OUT 584.70 N-7137561.13 E-2397339.51 PROP. TEMP. CONMUCTIONESAM ---------------- I OF 18" F679 PS46 PVC ABANDON JW J i EX. 18" SAN. SEWER SEWER BY OPEN ' { REMO 1 f i EX. C C. ,ENCASEMENT DETAILS ® EX. SANS S CROSSING i 1 > 596 I � ,OV Cp]PER I,IfEY pEYNKE � � � I 1 20' X 40' OF 1" TO 4" LOOSE S10N ABANDON i 4" TO 6" DE P i EX. SSMH(SEE � NOTE ' I x ac m" (N) 58x,3 I pA, r,5p GONCL"1E PARKPIG LOT a 30' Pvc ■ rn smro 10.31' DAY ql, (E) SSIA3 I I ,Ra•awYw M59ii.5, _ _ �, I 1 s , 1 � 1 1 1 ) NEW 30" SAN. SEWjtR '' i i (SEE SHT. 13) _ I; 11 I i 1 I 1 1 1 1 1 ( 1 1 I 1-----lilA. 7+4Z.UU ----- --- 1 ' 1-5' DIA. DROP CONCRETE SSMH FGM V. 595.68 FL 1 IN 584.53 NEW 1 " S OWER FL 1 OUT 578.59 N-7 37551.66 E:— 97349.82 1 % CO 'L.F. CONCRETE ENCASEMENT CP 61 FR¢M STA. 0+57 TO STA. 1+17 1 I 1 / 1 , CUT AND PLUG EX. 18" SAN. S TO SOUTH END PROJECT 1-5' DIA. STD. CONCRETE SSMH RIM ELEV. 595.93 FL EX. 18" IN 584.8± FL 18" OUT 584.70 N-7137561.13 E-2397339.51 PROP. TEMP. CONMUCTIONESAM ---------------- ENTERED BY 156 LF OF 18" F679 PS46 PVC CHECKED BY JW PROJ. ENGR. SAN. SEWER BY OPEN CUT BACKRU PER STANDARD DETAILS 596 (COOPER CRON) 596 EX. TOP OF GR UND i i 592 ��, 592 \\) 588 EX. vCP 588 SAN'SEWER L ( EX. 21" CLAY SAN. SEWER 584 A:;:� it FL 581.4±584 'I EX. CONC. ENCASEMENT 4 EX. SAN SEWER CROSS114G TO BE REMOVED NEW 18" SAN. SEWER 580 01.20% 580 NEW 18" SA . SEWER ® 0.2D% Ij 576 576 60 LF. CONC. ENCASEMENT FROM STA 0+57 TO STA. 1+17 572 572 co CD 568 v o CO.- � en In to v tco o CD 1-- O'% Z ° 568 �O+>LoZ a MO^v Or sF>ZO W a ~ O'n>,O -+cow ZO a rq —i W Om +w— �W Op Cp +w d` -W XOp Wla—H�JJH��� 564 mmtowww mw�ii ZH�JJ wmirww 564 M LO d 0) to O P, 0) rl 00 P, 00 Go co ENTERED BY TLM DESIGNED BY TLM CHECKED BY JW PROJ. ENGR. JW PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TCCII.DWG EX CONI. 59.01 RW ELE5 6 R 18' CLAY (NN))�.sl R 16 CLAY WT (5) 55).59.W R 6' PVC IN (N8) 58935 IaiGY.,U\il WPUaUGURLRYEMff VOL WK PG. rte DJW.C.T. PROJECT # 640258545 -� DATE REVISION jC0ltTFy DENTON ENGINEERING SERVICES NOTES. 1. ALL SSMHS ARE TO HAVE WATERTIGHT LIDS PER STANDARD DETAILS UNLESS OTHERWISE NOTED ON THE PLANS. 2. 1"-4" WELL GRADED LOOSE STONE SHALL BE PLACED ON THE CHANNEL BOTTOM WHERE THE NEW 18" CROSSING HAS BEEN MADE. AT LEAST 50% OF STONE (BY WEIGHT) SHALL BE EQUAL TO OR GREATER THAN 3" IN DIA. DISTURBED BANKS SHALL BE HYDROMULCHED TO REESTABLISH VEGETATION. COOPER CREEK INTERCEPTOR II 18" SANITARY SEWER LATERAL STA 0+00.00 TO STA 1+56.00 DATE MAY 2017 SHEET No. 15 OF 20 SCALE H OR 1 "= 40' VER 1 "= 4' 5/Z3 11? GAS SEALED DROP STANDARD DROP ADJUSTABLE FRAME a ROOF OPTIONS => FRAME CAST IN CONC. CONNECTION CONNECTION STD. M.H. FRAME &COVER STD. M.H. FRAME &COVER PROP. TOP OF CURB 4200 PSI AS SPECIFIED AS SPECIFIED CONCRETE OUT OF PAVEMENT IN PAVEMENT PROP. PVMT. rci 30" 4 USE PRECAST °' 30" o n .a CONCRETE GRADE RINGS & NON SHRINK '- GROUT WITH A WATER STD. CAST IRON 4000 PSI STANDARD MH FRAME AND COVER TRAFFIC RATED MH FRAME AND COVER MANHOLE FRAME & CONCRETE NOS: MATE SEALANT FRAME CANNOT REST DIRECTLY ON CONE ;F�RAME CANNOT REST DIRECTLY ON CONE FOR 5' & 6' DIA. M.H.'S MATERIAL AS REQUIREDCOVER L SPECIFIED SEE TRANSITION DETAIL TO RAISE TO GRADE. BY OWNER. USE TRAFFIC RATED CASTINGS IN PAVED AREAS. I (MAX. FRAMEAN INCLUDING USE PRECAST CONC.30" °A INTEROR TO BEGRADE RINGS & NON 0 45'WYE45' WYE SMOOTHED OUT USINGSHRINK GROUT AS o I ° NON -SHRINK GROUT _; 30„ 'REQUIRED TO RAISE vn /// .tn\ w 6" MIN. - 4'-0" no N - EXISTING PAVEMENT TO GRADE 6• MIN.a R USE O-RING RUBBER GASKET (TYP.) INTERMEDIATE RISER REINFORCEMENT (PER ASTM C478) FUTURE CONNECTION TO BE SUPPLIED WITH PLUG AND BOOT i V O ° 4', 5', OR 6' AS SHOWN ON PLANS °. + 8.Q - 8" MIN. 5'-0" & 6'-0" 4200 PSI CONCRETE _ ' POUR v io z CONCRETE GRADE RINGS FOR ADJUSTMENT AS REQUIRED MONOLITHIC of w iO n ? 4'-0• ° NOT N (TYP.) N aN� -=I a BASE RISER YA7H 'BUTT END' INABASE.. CAPPED GAS TIGHT 72"° a 1. PVC OR FRP STUBOUTS ARE TO BE o I o INTO THE 4000 PSI G(6" NON -SHRINK Mlry, 5-0" & 6'-0" g• MIN.FACTORY ATTACHED TO THE MH WALL BY GROUT PLUG) : - -- : 6 AND GLASS -FIBER LAY FIELD N� W m MIN. SLOPE 6 7.12 12" INGUP. LE ATTACHMENT IS ALLOWED. USING FLEXIBLE ADAPTORS IS NOT ALLOWED. ? = g SPRING UNE 167 m rc -RESIN :' PIPE m I iRESILIENT CONNECTOR (PER ASIA C923 IN :d::::: q.:::-::::?.': 12" MIN. TRANSITION DETAIL FOR r za a m z BELL END our. 12" MIN. 5' & 6' DIA. M.H.'S g + 6" MIN. w 4 MIN. m 6" MIN. ROCK FOUNDATION STUBOUTS TO BE A MIN. OF 5' ro z .12" ) < _ 4000 PSI AND FITTED WI1H A WATER Z -MIN. TIGHT STOPPER OR CAP � 6" MIN. > 11 CONCRETE FIRST MAIN UNE JOINT TO BE A MIN. OF 13' LONG FACTORY INSTALLED FRP BENCH/INVERT TO TOP 1r I WITH A 1' LONG GONG. CRADLE (FROM SAME POUR OF PIPE ¢ ROCK FOUNDATION AS BASE) UNDER ENTIRE LENGTH. i rn ¢ w NOTES; 4000 PSI CONCRETE I 4" MIN. 90' LONG RADIUS BEND APPROVED RESILIENT PIPE -TO - SPRING j 1. FIRST MAIN LINE JOINT TO BE A MIN. OF 5' 4000 PSI CONCRETE I MANHOLE CONNECTOR OR PVC OR FRP STUBOUT UNE m -APPROVED RESIUENT PIPE -TO -MANHOLE 4000 PSI CONCRETE GASKET REQUIRED FOR PIPE 12. MIN. CONNECTOR OR GASKET REQ'D. FOR PIPE OTHER THAN CLAY OR CONCRETEO _ r BASE 12" THICK OTHER THAN CLAY OR CONCRETE. 3" ABOVE FLANGE (6" BELOW FLANGE) o- 12" MIN 12" 3000 PSI CONCRETE o < ° 8" MIN. _ ° ' + CAST -IN-PLACE BASE _ jj RADIUS BEND90' LONG o u eo , 12" MIN. 12 MIN. pdpd'dOQ °d�0 .dp0�4�0 4p0�d�0�4l,O�d09 O4�ODd a Od'a d^oa d'a0 o d^o OO'o0 000'00 a0 : d::' 3" (MIN.) WIDE FLANGE TYP. ROCK FOUNDATION`a'' - a :.�. �-� . Q ° a' BACKFILL AND FOUNDATION ROCK FOUNDATION PER STD. CONCRETE MH DETAIL FACTORY INSTALLED FIBERGLASS STUBOUT TO BE FITTED WITH WATERTIGHT STOPPER OR CAP. SOLID BOTTOM WITH 3" (MIN. FLANGE STUBOUTS TO BE A MIN. OF 5' LONG. STUBOUT EMBEDMENT TO BE SAME NOTE AS PIPE EMBEDMENT. USE TRAFFIC RATED CASTINGS IN PAVED AREAS. STUBOUT CONNECTION CAST—IN—PLACE WATERTIGHT FIBERGLASS PRECAST MANHOLE DROP MANHOLE MANHOLE MANHOLE 5107 5102 5103 S1076 z y 2• 2 PICK BARS (SEE DETAIL) (6) 1" DIA. V LETTERS HANDLING HOLES (RECESSED FLUSH) p LEE Y4" LESSERS (R F O (RECESSED FLUSH) �\ / (RECESSED) .oD GROUT MANHOLE at MANHOLE BOTTOM TO SLOPE AS OUT OF PAVEMENT IN PAVEMENT FOOTING SHOWN. a i1au SANITARY SEWER • -d e A EX. MH. FRAME, COVER, GRADE RINGS EX. M.H. FRAME, COVER,M -o.'- AND GONE SECTION TO BE REMOVED GRADE RINGS AND CONE x a���p�(i:v $��� A MANHOLE ''� I -O A & REPLACED WITH TOP SOIL I SECTION TO BE REMOVED. HYDROMULCH OR SOD MAY BE 11<111 o/ REQUIRED AS PART OF 'BSE CONTRACT. PAVING TO BE REPAIRED T `\ 1:12 > AS PER STD. SPEC. o. . _ -TTYP.) 2 CAMs (SEE EXISTING PAVEMENT DE TAIL)O CONE DEPTH a 0.0 f Q IN PAVED AREAS THE TOP 20" OF • -_ .o?_-• BACKFILL SHALL BE 2 -SACK CONCRETE EAST JORDAN IRON WORKS V-1480 ❑D 2 -o - OR APPROVED EQUIVALENT WATERPC:iT MANHOLE COVER o TO BE USED VASH EAST JORDAN IRON WORKS V-1420 OR APPROVED EQUIVALENT MANHOLE FRAME ` SAND COMPACTED TO 90% (959 ASADI 1M Ds/' IN PAVEMENT) OF THE MAXIMUM EAST JORDAN IRON WORKS V-1460 UD 1 COVER PLAN VIEW COVER BOTTOM VIEW EX. WASTEWATER MAIN OR APPROVED EQUIVALENT MANHOLE COVER WITH EAST JORDAN IRON WORKS STANDARD PROCTOR DRY DENSITY AS PER NCTCOG STD. SPEC. OR APPROVED EQUIVALENT MANHOLEOLE FR FRAME T = WALL THICKNESS ITEMS 504.5.3.2.1 & 504.5.3.2.2 PLUG WITH 2000 PSI CONCRETE ASSEMBLY PLAN VIEW AME = MANHOLE DIAMETER z%DA 327 _ PLAN d = PIPE DIAMETER - I Dl 2000 PSI CONC. TOA I 1Tic POINT 6" ABOVE TOP (�.� 32• DIA. ir TOF BENCH. . p TO BE PLUGGED PRIOR r. NEOPRENE GASKET SS NIX BOLT SS FLAT WASHER TO POURING 2000 PSI EX. WASTEWATER MAIN (2) W I.D. 1)4. O.D. NOTE: REFER TO • CONCRETE. - 31Y! SIA. RUBBER WASHER MANHOLE STANDARD T DT-:.. _.: 2• (ouTSIDE aF cRooVE) DRAWINGS FOR ADDITIONAL DETAIL OF _'o -o c - COVER SECTION VIEW BRONZE Loac Luc M.H. - TOP OF 1 EDGE OF TO BE PLUGGED COVER SECTION VIEW GROUTa.T EXISTING PRIOR TO POURING CHANNEL CONC. BASE 2000 PSI CONCRETE 1JE" � _ I HX JAM NUT 2N II I I 3231s OIA 42 3%" --1 T o:: G Ai oi- _ "A. NYLOCK NUT.'. .. F -'a. v'o: :.b: :-O L e... e.G WELD ON JAM NUT OR .160" PEEN END THREADS ON BOLT 30" DIA. SECTION A -A 401Y DIA 1" DIA. HRS ROD 240• _ CAM DETAIL PICKBAR & GASKET GROOVE DETAIL FRAME SECTION VIEW MANHOLE FRAME AND COVER WATERTIGHT MANHOLE COVER SEWERLINE INTERSECTION ABANDONMENT OF MANHOLE WITH CAM LOCKS AND GASKET S104 5105 S106A S106B ENTERED BY COD PROJECT # 640295545 --- DATE SCALE S°�� DESIGNED BY COD 640258545 COOPER CREEK INTERCEPTOR I MAY 2017 ccTY E. WLDER CHECKED BY COD DATE REVISION of COOPER CREEK INTERCEPTOR II HOR 1"= N.T.S. JAMES343 SHEET No. e3�3s PROJ. ENGR. COD DENTON STANDARD DETAILS - WASTEWATER VER 1 "= N/A a"�.��ey®` s�ct lj� PATH S:\Water Engineering\Engr\Design\Projects\COOPER CREEK II\TWastewater Detail Sheet IC-18.dwg ENGINEERING SERVICES 16 OF 20 tN 2- 4" DIP 90- KEY: BENDS FLG X FLG KEY: O WASTERWATER MAIN O WASTERWATER MAIN Q 8" X 4" WYE, PLACED BETWEEN 3 & 9 POSITION.2O WASTERWATER MAIN SIZE X SERVICE SIZE PLACE AT 3 O'CLOCK & 9 O'CLOCK POSITION. Q 4' WASTEWATER LAT. (LENGTH VARIES) 3 4" OR 6" WASTEWATER LAT. (LENGTH VARIES) - 4" COMPRESSION FLANGE AND PELEV. 4 4" X 4" WYE, WITH 45 DEG. BEND, FOR RISER AS REQ'D BY CITY. Q ® 4" X 4" OR 6" X 6" WYE, WITH 45 DEG. BEND, FOR RISER AS REQ'D BY CITY. 4" FLANGED DIP TYPE 316 STAINLESS STEEL 4" STACK (LENGTH VARIES)(SEE 5. 4" OR 6" STACK (LENGTH VARIES) NOTE 4)MESH SCREEN BY }" OPENINGS 4" WASTEWATER RISER WITH CLEANOUT CAP. 6 4" OR 6" WASTEWATER RISER WITH CLEANOUT CAP. O 7Q 4" WASTEWATER PIPE (LENGTH VARIES) 70 4" OR 6" WASTEWATER PIPE (LENGTH VARIES)Z N ® END CAP EXTEND TO EASEMENT LINE AND END CAP. ®END CAP EXTEND TO EASEMENT LINE AND END CAP. 6 r 9Q NATURAL FILL COMPACTED TO 907 STANDARD PROCTOR DENSITY. 9Q. NATURAL FILL COMPACTED TO 907 STANDARD PROCTOR DENSITY. a 0 4000 PSI CONCRETE 1 18" X 14" PLASTIC BOX WITH SEWER LID r a DOWELINTO MANHOLE AND GROUT IN PLACE w w a ow N w CURB AND GUTTER . EXISTING TOP a D w GROUND WITHIN _ _ OF MIN- 01 2-0" 2E 5 O / CURB AND GUTTER 6 9 o 90' LONG RADIUS BEND STANDARD SEWER EMBEDMENT h CURB AND GUTTER I EXIST. PAVEMENT 90' LONG RADIUS BEND ..- . .. 8 9 SLOPE- = 7 45- FLANGE DIP BEND 4000 PSI CONCRETE 3 z inv • *:r 1 2 g 4. r • .•=+;s•:•• 90' LONG RADIUS BEND STANDARD SEWER EMBEDMENT PLOWABLE FILL ✓ ••• ••• •_ VARIES 4> > `/�--_ I • t ~ 4" PAIN END X FLANGE DIP - s::•r #4 BARS A 10" O.C.E.W. G' v • "� / + s w - ° 4 TO BE SET 4" FROM -ACE 3•�' ""°^ ° '^ �c •:: = i •` UTILITY EASEMENT - _ CONCRETE I EM SAM SAME VARIES PLAN VIEW OF MAIN CONNECTION AS USED ON MAIN FLOWABLE FILL12" MIN. CORE INTO MANHOLE WALL AND 90' LONG RADIUS BEND SEAL WITH LINKSEAL WALL SEAL OR APPROVED EQIVALENT NOTES, 1 1. CLEANOUT CASTING TO BE FURNISHED AND PLACED PER SPECIAL CONDITIONS. IN VEHICLE TRAFFIC AREAS AND FOR COMMERCIAL MAINLINE LATERALS, WASTEWATER CLEANOUT CASTING SHALL 1. CLEANOUT CASTING TO BE FURNISHED AND PLACED PER SPECIAL CONDITIONS. IN VEHICLE TRAFFIC AREAS AND FOR T BE OF CAST IRON CONFORMMINGING TO ASTM A48 CLASS 356. COMMERCIAL MAINLINE LATERALS, WASTEWATER CLEANOUT CASTING SHALL BE OF CAST IRON CONFORMING TO ASTM 2. SLOPE LATERAL TO BE 1% MIN., 2% MAX. UNLESS INSTRUCTED OTHERWISE BY OWNER. A48 CLASS 35B. NOTES: S 3. THE WASTEWATER LATERAL SHALL CONSTRUCTED FOR BUILDING LATERAL AND CONSTRUCTED 2. SLOPE OF SHALLOW LATERAL SECTION TO BE 1% MIN., 2% MAX. UNLESS INSTRUCTED OTHERWISE BY OWNER. WI ST IN SUCH A MANNER AS TO CLEAR EXIST EXISTING UTILITIES AND PROPOSED FACILITIES SUCH AS STORM 3. THE WASTEWATER LATERAL SHALL BE CONSTRUCTED FOR BUILDING LATERAL AND CONSTRUCTED IN SUCH MANNER 1. DUCTILE IRON PIPE AND FITTINGS SHALL HAVE 40 MIL POLYETHYLENE INTERIOR COATING. SEWER MAINS, PAVING, SIDEWALKS, RETAINING WALLS, ETC. VERTICAL BENDS (22.5• MAX.) MAY BE AS TO CLEAR EXISTING UTILITIES AND PROPOSED FACILITIES SUCH AS STORM SEWER MAINS, PAVING, SIDEWALKS, 2. ALL BOLTS AND NUTS TO BE TYPE 316 STAINLESS STEEL. USED IF APPROVED BY CITY. RETAINING WALLS, ETC. VERTICAL BENDS (22.5' MAX.) MAY BE USED IF APPROVED BY OWNER. 3. FINISH COATING A. WIRE BRUSH TO REMOVE ALL DIRT AND CONC. AND TO ROUGH UP FINISH 4. THE MAINLINE LATERAL CONNECTION TO THE PRIVATE BUILDING LATERAL SHALL BE AS CLOSE TO 4. THE MAINLINE LATERAL CONNECTION TO THE PRIVATE BUILDING LATERAL SHALL BE AS CLOSE TO THE PROPERTY B- APPLY ONE PRIME COAT OF TNEMEC SERIES 37 CHEM PRIME (GRAY) TO 3 MILS DRY THICKNESS. THE PROPERTY UNE AS POSSIBLE. 5. INSTALL STOPPER OR CAP AT PROPERTY LINE IF BUILDING LATERAL DOES NOT EXIST. UNE AS POSSIBLE. 5. INSTALL STOPPER OR CAP AT PROPERTY LINE IF BUILDING LATERAL DOES NOT EXIST. GIVE SPECIAL ATTENTION AND SECOND COAT TO CORNERS AND BOLTS. 6. THE CLEANOUT STACK & CASTING MAY BE PLACED IN THE PARKWAY, VEHICLE TRAFFIC AREAS, 6. THE CLEANOUT STACK & CASTING MAY BE PLACED IN THE PARKWAY, VEHICLE TRAFFIC AREAS, OR SIDEWALK, IF C. APPLY ONE FINISH COAT OF TNEMEC SERIES 48-38 ALKYD ALUMINUM TO 2 MILS DRY THICKNESS. OR SIDEWALK, IF NECESSARY. NECESSARY. 4. VENT PIPES LONGER THAN 6' TO BE 6" DUCTILE IRON PIPE AND FITTINGS. 7. THE CLEANOUT SHALL BE CENTERED IN PLASTIC BOX. 7. WASTEWATER WYE CONNECTION FITTING TO MAIN TO BE ENCASED IN FLOWABLE FILL ACCORDING TO NCTCOG ITEM 5. REFLECTIVE TAPE TO BE PLACED ON VENT 4.25 FEET ABOVE FINAL GRADE. 8. CENTER OF CLEANOUT TO BE LOCATED NO FURTHER THAN 2'-0" BEHIND BACK OF CURB OR TOP 504.2.3.4. OF SLOPE FOR NON -CURB AND GUTTER SECTION. 8. MAIN AND SERVICE LATERAL WYE MUST BE MANUFACTURED FITTING THAT MEETS WASTEWATER MAIN JOINT REQUIREMENTS. 9. ALL SERVICE LATERAL FITTINGS & PIPE MUST MEET SDR26 THICKNESS REQUIREMENTS. SANITARY SEWER SERVICE DEEP SANITARY SEWER SERVICE VENT MANHOLE WITH SINGLE CLEANOUT WITH SINGLE CLEANOUT 5708 S403 5404 PRECAST GRADE RINGS MAX. 24" INCLUDING FRAME AND LID. INTERIOR TO BE SMOOTHED WITH 30" HEAVY DUTY TRAFFIC RATED NON SHRINK GROUT M.H. FRAME AND COVER AS SPECIDED EAST JORDAN IRON WORKS OR APPROVED EQUIVALENT RING AND LID 3000 PSI CONCRETE CAST -IN -PACE OR WITH 1" LETTERING RECESSED FLUSH PRECAST TOP NOTE, i - THIS DETAIL IS ONLY FOR USE WHEN NEW MAIN WILL NOT MATE WITH EXISTING STUBOUT Q7 BARS AT 12" JOINT DUE TO DIFFERENT DIMENSIONS OR C. -C, BOTH WAYS 17),' \ MATERIALS. REMOVE THE EXISTING STUBOUT AND CONSTRUCT A NEW TIE IN. (CAST -IN- PLACE) 28- H r PRECAST OR CAST - 12' -N," I SEWER I FINISHED GRADE I 14000LPSI CONCRETE E 1 'Fie' 1Yz" �� ^ WHEN NOT IN EX. OR PROP. STREET c y ' 0 4 HOLES 11 Ya" e EQUALLY CUT AND REMOVE 6" MIN. Y %.' CLEAR z ° /J6 BARS AT 12" 8" MIN. � �� C --G BOTH WAYS (CAST -IN -PACE) .. :- (CAST -IN -PACE) o. ONION 1pC 17" SPACED BELL OF EXIST.-? BOOT TYPE CLEANOUT CASTING PIPE 2 -PIECE VALVES MAY BE• USED ON 4" AND LARGER \ a BRASS .` SECTION VIEW OF RING PLAN VIEW OF LID WITH RING COMBINATION AIR VALVE e 3000 PSI CONCRETE CLEANOUT WITH CAP•_ SHALL BE CENTERED STOPPER/CAP BELL AND SPIGOT o ' .� COMBINED AIR AND VACUUM AIR IN METER BOX .'.e ": a RELEASE VALVE FLANGE MOUNTING EAST JORDAN IRON WORKS P34P14D PLASTIC BOX • ` • 6" MIN. ...-..NEW TIE IN ON INLET SIDE Ya" HEX BOLT OR APPROVED EQUIVALENT ?" ( EE NOTE) 6" PVC _ _•c WASHER 4" - _` EXIST. ADAPTER WATER STOP °s <' '- BALL VALVE WITH HAND HEX NUT NYLOCK 2 STUBOUT WHEEL. PLG. X PLG. 4 PLACES TYPICAL 14" 6" PVC SDR35 ASTM 3034 NEW MAIN - - "D INSULATED FLANGE FINE CRUSHED ROCK CONN. ASSEMBLY. cJ II 1: POCKET IN CORNER .a e- MAIN SIZE SHALL BE AS 3'' 1' X i' MIN. (TYPJ :: B e.-:."oe a D SPECIFIED IN THE PLANS 45• WYE " FLANGED OUTLET, -o: --- -o 6" 6" wrn sue aaw MIN. MIN. uoNzr/xe z 6" MIN. PLUG 3000 PSI CONCRETE EMBEDMENT L . .cr .b.: - _ STEEL BOLTS 10" 2000 PSI - - 4" ON ALL SIDES OF ADAPTER CONCRETE CRADLE 18" �- I 4" PVC DRAIN PIPE OR R CK BED EARTH LOCATED ON BOTH SIDES SECTION VIEW OF BOX WITH RING BOTTOM VIEW OF LID 6" OF CONCRETE CRADLE NOTES: MIN. 1. ON 4" AND LARGER TWO PIECE COMBINATION AIR VALVES, THE OUTLET PIPING OF THE SMALL VALVE SHALL BE VENTED INTO THE SIDE OF THE LARGER VENT PIPE. 2. WHEN NOT IN PAVING OR WALK, A 4000 PSI CONCRETE PAD REINFORCED W/#3 BARS AT 12" C -C EACH WAY, SHALL EXTEND A MINIMUM OF V AROUND THE M.H. AND SHALL BE A MINIMUM OF 3" THICK. 3. BRASS PIPE AND FITTINGS TO BE USED FROM BRASS 90' FITTING ON TOP OF AIR RELEASE VALVE UNIT TO VENT OUTLET. 4. VENT PIPE SIZE TO EQUAL OUTLET SIZE OF AIR/VACUUM RELEASE VALVE S. MINIMUM M.H. DIA. TO BE 5'. 6' DIA. M.H. REWIRED FOR VALVES 8" OR GREATER. 18" X 14" PLASTIC BOX SANITARY SEWER SANITARY SEWER MAIN TIE-IN WITH AIR AND VACUUM RELEASE VALVE -TYPE 2 WITH SEWER LID MAINLINE CLEANOUT STUBOUT OF DISSIMILAR SIZE OR TYPE FOR SEWER FORCE MAINS "201 S402 S405 S803 ENTERED BY COD PROJECT # 640295545or 640258545 COOPER CREEK INTERCEPTOR I DATE SCALE° r1 � ....."�. DESIGNED BY COD MAY 2017 CHECKED BY COD DATE REVISION co DENTON COOPER CREEK INTERCEPTOR II �� - HOR 1 - N.T.S. e:: E83 ���� SHEET No. PROJ. ENGR. COD ENGINEERING SERVICES STANDARD DETAILS - WASTEWATER 17 OF 20 „A VER 1 = N/A� ° PATH S:\Water Engineering\Engr\Design\Projects\COOPER CREEK II\TWastewater Detail Sheet 16--18.dwg Db PEF DIAMETER PER PLANS PLAIN END ENTERED BY DESIGNED BY CHECKED BY DIAMETER PER PLANS 442" LENGTH VARIES 18" . , u I: ► lC_mom-1:74 IN 111TY, Im 1 i •m COD COD :OUPUNG )R BELL FLOW DIRECTION COUPLING OR BELL FLOW DIRECTION DIP PER PLAIN ^^"^UNG -LL DI! PER PLAIT. �..., PROJECT # DATE PROJ. ENGR. COD PATH S:\Water Engineering\Engr\Design\Projects\COOPER CREEK II\TWastewater Detail Sheet 16-18.dwg ., 1'il Ali■ �� 157 a31@lh �IC1IiL'lilh 3�';a:1y��ldb1>Ll7i�'J 640295545 640258545 REVISION t__7 CITYF O AMIM DENTON ENGINEERING SERVICES FLOW DIRECTION COUPLING OR BELL LOW DIRECTION NOTES: 1. MANHOLE BASE IS TO BE A MANUFACTURED FITTING OF THE SAME MATERIAL AS THE MAINLINE PIPE 2. ALL UPSTREAM PIPE ENDS SHALL HAVE A BELL OR COUPLING. 3. CHANGES IN FLOW DIRECTION SHALL BE INCORPORATED INTO THE MANUFACTURED BASE FITTING. 4. EACH T—BASE MANHOLE SHALL REQUIRE A MANUFACTURER'S MATERIAL SUBMITTAL SHOWING DIMENSIONS AND DETAILS. COOPER COOPER DESCRIPTION A CREEK CREEK B TEE BASE C INTERCEPTOR INTERCEPTOR FIBERGLASS RISER & CONE WITH PREFABRICATED RISER INVERT & TEE COUPLING E CONCRETE ENCASEMENT 3000 PSI F CONCRETE RISER BASE 3000 PSI H RISER HEIGHT (2' TO 40') ID I II STANDARD DETAILS - WASTEWATER mmm rr_yAwkslrA SHEET No. 18 OF 20 ITEM DESCRIPTION A LINE PIPE B TEE BASE C COUPLING OR BELL D FIBERGLASS RISER & CONE WITH PREFABRICATED RISER INVERT & TEE COUPLING E CONCRETE ENCASEMENT 3000 PSI F CONCRETE RISER BASE 3000 PSI H RISER HEIGHT (2' TO 40') ID RISER ID (48") [•YN_\IIaI HOR 1 "= N.T.S. 1. T—BASE CONCRETE SHALL BE PLACED 2 FEET BEYOND ALL COUPLINGS OR BELLS. 2. T—BASE CONCRETE SHALL BE PLACED BETWEEN 4-6 INCHES FROM THE TOP OF THE TEE RISER. 3. FIBERGLASS RISER BOTTOM SHALL HAVE A PREFABRICATED INVERT THAT INCLUDES A WATER TIGHT COUPLING THAT WILL FIT OVER THE TEE RISER. IT SHALL ALSO HAVE AN ANTI—FLOTATION FLANGE. 4. RISER BASE CONCRETE SHALL ENCAPSULATE THE ANTI—FLOTATION FLANGE. 8-6" LONG #4 DOWELS SHALL BE EQUALLY SPACED AROUND THE RISER BASE CONCRETE AND SHALL PENETRATE A MIN. OF 3 INCHES INTO THE T -BASE CONCRETE. VER 1 "= N/A IYA l 17 12" 0.0. PIPE + 12" 12" EXTENT OF PAVEMENT 5 CSL 5 ALLEY I-� CI SAW CUT PAVEMENT EXISTING TOP OF GROUND O STORM WATER O A SEWER GAS L DR" UTILITY DUCTS 20 n ¢ > COMPACTED TO 95% STANDARD PROCTOR DENSITY SELECT BACKFILL VARIES MECHANICALLY TAMPED IN 12" LIFTS WITH APPROVED MATERIAL D ACCEPTABLE OUTSIDE PAVED AREAS. GRANULAR MATERIAL EMBEDMENT APPROVED BY ENGINEER. 9' MIN. - 20' ROW WATER OR SEWER LINE TRENCH WIDTH (907. STANDARD PROCTOR DENSITY COMPACTION) ROW _ _ .::: .;', WATER AND SEWER FORCE MAINS- SAND EMBEDMENT CLASS B-3 ;'12" MIN: WATER AND SEWER FORCE MAINS: SAND EMBEDMENT CLASS B-3 COMPACTED TO 957. ,i ®`: P' STANDARD PROCTOR DENSITY ITEM 504.5.27 OF NCTCOG COMPACTED TO 95% STANDARD _ _ - �: Oplp� :.` ITEM 504.5.2.7 OF NCTCOG COMPACTED i0 957° STANDARD 6" MIN. PROCTOR DENSITY. _ - •_ PROCTOR DENSITY. 2p SEWER: STANDARD CRUSHED ROCK _ -- - -- - 6" MIN. SEWER: STANDARD SAW CUT " MIN. "MIN. AGGREGATE GRADE 4 ITEM 504.22.1 OF NCTCOG. _ _ _ AGGREGATEGRADECROCK ITEM 504.2.2.1 OF NCTCOG. EXTENT OF PAVEMENT —�{I 5• y C�L ` 5• J NOTE: FOR LINES BEING LAID PRIOR TO STREET CONSTRUCTION, g^ 6^ MIN. MIN. I _ _ _ _ _ _ _ _ — — — — — — — — — — — — — — NEW WHICH WILL LIE BENEATH PAVEMENT OR CURB AND GUTTER, BACKFILL PIPE O.D. + 16" DRY UTILITY DUCTS El OSTORM WATER 0 0 S> GAS L9' NOTE: MIN. OUTSIDE-TO-OUTSIDE SERARATION ABOVE PIPE EMBEDMENT SHALL CONSIST OF SELECT BACKFILL, COMPACTED IN MAX. 6" LIFTS (COMPACTED THICKNESS) TO 95% STANDARD PROCTOR DENSITY. FF'OM WATER LINE TO SEWER LINE APPLIES 9' MIN. A" MANHOLES PER STATE CRITERIA. ROW TYPICAL UTILITY PLACEMENTS TYPICAL SAW—CUT PROPOSED PAVEMENT TRENCH UNPAVED TRENCH U101 U102 0201 0202 8" 3500 PSI CONCRETE WITH PAVEMENT TEMPORARY g3 BARS 0 24" C/C, EW. (MIN.) REPAIR PAVEMENT (18" C/C, E.W. AT DRIVES) REPAIR MATCH EXISTING IF THICKER SAWCUT 2" DEEP BEFORE BREAKING OUT EXISTING SLAB. I ROCK LINE IN CREEK LEAVE EXISTING REINFORCMENT EXPOSED AS DOWELS INTO NEW CONCRETE 2000 PSI (12" MIN. EMBEDMENT INTO NEW SLAB). N A (TMP) 6" MIN. a N w w _T_ > - °. 6 •' - •`2000 s I9 V. MIN PSI CONC. BACKFILL OR STABILIZED BACKFILL AS 1 SPECIFIED ON PLANS. - CONCRETE BACKFILL UNDER EXISTING 2" H.M.A.C. TYPE C PAVED AREAS. MIN. 750 PSI COMPRESSIVE STRENGTH. MAX 1250 c V. 12" MIN. 12" MIN. D ' ' 6" MIN. OVER TOP OF BELLS D - 2000 PSI CONIC. PSI COMPRESSIVE STRENGTH. MAX AGGREGATE SIZE 1r. (TYP) (TYP) 2000 PSI CONIC. :.•- SAWCUT EXISTING6" 2 SACK CONCRETE BACKFILL • •.: -a MIN. -`•• ��••.• PAVEMENT TO UNDER EXISTING PAVED AREAS --.' •, ' STRAIGHT ONES. (TYP) IF LESS THAN 12", THEN I CONCRETE BACKFILL T. GRANULAR NT. ER (SHALL BE BROUGHT TO TOP OF PAVEMENT UNTIL PATCHING TAKES 6" MIN. GREATER THAN 12" GREATER PLACE FOR TEMPORARY REPAIR) PIPE O.D. + 16" PIPE O.D. + 16" ➢ _ 4 A BACKFILL INTERMEDIATE RMED `", 4' D ZONE WITH SELECTED - "j2%_';; WATER AND SEWER FORCE MAINS: BACKFILL COMPACTED TO MIN,, '. SAND EMBEDMENT CLASS 8-3 - -. - - 95% STANDARD PROCTOR _ ITEM 504.52.7 OF NCTCOG "Q Q - DENSITY IN 6" LIFTS. - '. 9 COMPACTED TO 95% STANDARD PROCTOR DENSITY. CLASS ..G» CLASS G-1 n - SEWER- (FOR ROCK DITCHES IN CREEKS) 12' MW. 1 7 MW. 11ymT 2" W 6" MIN. STANDARD CRUSHED ROC( AGGREGATE GRADE 4 ITEM 504.2.2.1 OF NCTCOG. ✓;• MIN B" MIN NOTES: IF LESS THAN 12", THEN 1. D = INSIDE DIAMETER OF PIPE CONCRETE BACKFILL TO GRANULAR EMBEDEMENT. PIPE O.D. + 16" NOTES:_ IF GREATER THAN 12' 1. WHEN REMOVING CONCRETE PAVEMENT THE CONTRACTOR BACKFILL INTERMEDIATE SHALL ENDEAVOR TO LIMIT DAMAGE TO EXISITING ZONE MATH NATIVE OR - "12• _:: WATER AND SEWER FORCE MAINS: REINFORCEMENT SO IT MAY BE EMPLOYED IN THE SELECTED BACKFILL _ NTN,, SAND EMBEDMENT CLASS 9-3 REPLACEMENT OPERATION. IF ORIGINAL REINFORCEMENT IS COMPACTED TO 95%TOR ITEM 504.5.27 OF NCTCOG CUT OR BROKEN, REPLACEMENT BARS OF THE SAME SIZE STANDARD PROCTOR COMPACTED TO 95% STANDARD SHALL BE INSTALLED BY DRILLING AND DOWELLING. DENSITY IN 6" LIFTS. y - PROCTOR DENSITY. - _ SEWER L 2 IF DRIWNG AND DOWELLING IS REQUIRED, DOWELLED BARS SHALL BE DRILLED INTO PAVEMENT HORIZONTALLY BY 6" Mw. '-. _ STANDARD CRUSHED ROCK AGGREGATE GRADE 4 USE OF A MECHANICAL RIG. DRILLING BY HAND IS NOT ALLOWED. DRILLED HOLES SHALL BE BLOWN CLEAN AND ITEM 504.2.21 OF NCTCOG. DOWELS COATED VATH EPDXY RESIN. MINIMUM EMBEDMENT e"MIN IS TO BE 12 INCHES. r8Mp'llN 3. USE SAND TO SMOOTH AND LEVEL SUBGRADE PRIOR TO E O.D. + 16' CONCRETE POUR. EXISTING PAVEMENT TRENCH EXISTING PAVEMENT TRENCH ASPHALT PAVEMENT REPAIR CONCRETE- U203All U203C 0204 ENTERED BY PROJECT # 640295545 640258545 �; 4COITFY41MAY DENTONT COOPER CREEK INTERCEPTOR I COOPER CREEK INTERCEPTOR II DATE 2017 HOR SCALE 1"= N.T.S. "— «•• j• 'E°°° JAAAES E. WILDER .•....8343 �m 83438 °@• DESIGNED BY CHECKED BY DATE REVISION SHEET No. PROJ. ENGR. ENGINEERING SERVICES STANDARD DETAILS- WATER/WASTEWATER 19 OF 20 VER 1 N A / ``����® ~w S�S�Il PATH S:\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK tl\TWATER-WASTEWATER SHT 19-20.DWG LOT LOT LOT I I I LOT I LOT I LOT I I I I I I I I I 'i w sIN Ls _i EXISTING TOP OF GROUND I I I 1vP v 5' VP. 1 1 MECHANICALLY TAMPED IN 6" 1-WAhTiOBL S TYP� II ,r-1---�-- _--_-L-_-r---_--1---T-- - -4 UFTS WITH APPROVED MATERIAL wis 10' MIN. TW. I I IS ACCEPTABLE. w s —I s — GRANULAR MATERIAL EMBEDMENT __ __ _______i_ _,_--__----L_ - JNATOtLftL�i I 1 I ---�1- _ VARIES APPROVED BY ENGINEER. r r� Tr 10' MIN. w 1 S W S (95% COMPACTION) I I 1 w= w= -wT= 6" 1500 PSI CONCRETE rt CL I rt CL rt I I I I 6" MIN. I I I I yp]E$ 1. WATEN METERS PLACLTI IN UNPAVED LOT LOT LOT PUBLIC RO.W. m UT w EASEMENT. MIN. MIN. LOT LOT LOT PIPE O.D. + 16" NOTES 1. WATER LhIERS PLACED IN UNPAVED FOR NARROW WIDTH LOTS PUBLIC RD.W. M umw EASEMENT. _j CONCRETE ENCASEMENT TYPICAL SERVICE LINE LAYOUT ALTERNATE SERVICE LINE LAYOUT U206B U206A 0205 1/4 L 1/2 L 1/4 L FILL SPACE BETWEEN STEEL CASING AND CARRIER PIPE EXISTING TOP OF GROUND (L = LENGTH OF PIPE JOINT) REFERENCE NOTES FOR SPACER TYPE SEAL ENDS OF 2'-0" 2• 0" W/ CELLULAR GROUT 2' 0'• CASING WITH MAX. MORTARED BRICK CARRIER i .�/�\ Imo- 8'-O" ---� /\�� \ __ _ ....,..:::- "...: ;-._ : _ :• .� PIPE CROSSING DETAIL CASING MATERIAL AS STATED JOINT MATERIAL FOR SIZE SEE ON PLANS OR IN SPECIFICATIONS. CARRIER PIPE TO HAVE STEEL CASING 1/2" EXPANSION a' -o" MIN. OR TO Bo7roM of PAVEMENT BASE OR TOPSOIL MINIMUM CASING DIA. SHOWN ON PLANS. INCREASE DIA. AS NECESSARY TO -I B„I BUILT-UP MORTAR ACCOMMODATE RESTRAINT SYSTEM. I` MORTAR INSIDE_ RINGSWELD ALL JOINTS BY HAND INTERIOR JOINTS. WEEP HOLE AT LOW CLAY COMPACTED TO END OF CASING 12" 85% STANDARD PROCTOR NOTES: DENSITY AROUND PIPE 6'-6" 0.0 MAX. SPACING (TYP.) BOTTOM OF TRENCH 4- KEY INTO BOTTOM OF TRENCH AND LOCATE AT PIPE BELL CARRIER PIPE 1, BORE AND CASING SHALL BE INSTALLED AS SHOWN IN PROFILE TWO BANDS OF MORTAR AT QUARTER POINTS. BUILD VIEW OF PLANS WHERE APPLICABLE. THIS DETAIL ILLUSTRATES UP LARGER THAN MAX. DIA. OF EXTERIOR BELL JOINT PLUG ENDS OF CASING WITH GROUT THE GENERAL LOCATION OF CASING SPACERS FOR SUPPORTING MORTAR, TO SUPPORT EACH PIPE SECTION. (6" MIN. WIDTH) CARRIER PIPE AND GROUTING ENDS OF CASING PIPE. END VIEW NOTES, 2. FOR PRESSURIZED PIPE, ALL INTERIOR JOINTS SHALL BE SIDE VIEW 1. CLAY SHALL SERVE AS A WATER STOP. RESTRAINED BY A DUCTILE IRON PIPE RESTRAINING HARNESS. FOR NON—PRESSURIZED PIPE, ALL INTERIOR JOINTS SHALL BE 2. CLAY SHALL HAVE A HIGH P.I. (NOT LESS THAN 18) RESTRAINED BY A DUCTILE IRON PIPE RESTRAINING HARNESS, LOCKING GASKETS OR AN APPROVED MECHANICAL JOINT SYSTEM. 3. SEE PLAN AND PROFILE SHEETS FOR LOCATION OF CLAY DAMS. 3. FOR BORES 150 LF OR LONGER: 12" WIDE 304 STAINLESS BAND AND 2" WIDE PLASTIC OR POLYETHYLENE RUNNERS, PIPELINE SEAL & INSULATOR, INC., MODEL S126-2 OR APPROVED EQUIVALENT. FOR BORES LESS THAN 150 LF: RECON "RACI" CASING SPACERS OR APPROVED EQUIVALENT AND DOUBLE SPACERS AT EACH END. TRENCH DAM INSTALLATION IN STEEL CASING INSTALLATION IN STEEL CASING FOR PVC AND DIP FOR CONCRETE CYLINDER PIPE U208B U208A 5207 DATE SCALE ,_fir ° ENTERED BY PROJECT # 640258545 — /' COOPER CREEK INTERCEPTOR I MAY 2017 � DESIGNED BY ° CHECKED BY CITY COOPER CREEK INTERCEPTOR 11 HOR 1"= N.T.S. JAMES E.°W}LpER DATE REVISION OF SHEET No. 0. DENTON _ = 83438 8 PROJ. ENGR. STANDARD DETAILS WATER/WASTEWATER VER 1" N/A �€N �° S/q/I7 20 OF 20 PATH S -\WATER ENGINEERING\ENGR\DESIGN\PROJECTS\COOPER CREEK II\TWATER-WASTEWATER SHT 19-20.DWG ENGINEERINGSERVICEs