Loading...
HomeMy WebLinkAbout1998-140ORDINANCE NO AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE ADDENDUM # 2 TO THE PROFESSIONAL SERVICES AGREEMENT FOR THE DESIGN OF STREAM PEC-4 STORM DRAINAGE IMPROVEMENTS AND RUDDELL STREET BRIDGE AND CHANNEL IMPROVEMENTS BETWEEN THE CITY AND TEAGUE NALL AND PERKINS INC, AUTHORIZING THE EXPENDITURE OF FUNDS THEREFOR AND PROVIDING AND EFFECTIVE DATE (PSA # 2164 — ADDENDUM 92 — TEAGUE NALL AND PERKINS IN THE AMOUNT OF $18,200 00) WHEREAS, on July 1, 1997, the City entered into a Professional Services Agreement for the design of stream PEC-4 Storm Drainage Improvements and Ruddell Street Bridge and Channel Improvements with Teague Nall and Perkins, Inc , hereinafter referred to as "Base Agreement," for a not -to -exceed amount of $217,647, and WHEREAS, on December 11, 1997 the Council authorized addendum #2 increasing the consultants not -to -exceed figure by $45,163 00 to $262,810 and, WHEREAS, the City desires to expand the scope of work for the above named consultant to include Addendum #2 and to increase the consultant's not -to -exceed figure by $18,200 to $281,010 00, NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I. That the City Manager is hereby authorized to execute Addendum #2 to the Base Agreement between the City and Teague Nall and Perkins, in substantially the form of the attached Addendum #2, which is made a part of this ordnance for all purposes SECTION II. That the City Manager is hereby authorized to expend the funds as set forth in the attached Addendum #2. SECTION III. That this ordinance shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the I921L day of 1998 JAC ER, MAYOR ATTEST JENNIFER WALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM HERBERT L PROUTY, CITY ATTORNEY STATE OF TEXAS § COUNTY OF DENTON § ADDENDUM NO.2 TO PROFESSIONAL SERVICES AGREEMENT FOR THE DESIGN OF STREAM PEC4 STORM DRAINAGE IMPROVEMENTS AND RUDDELL STREET BRIDGE AND CHANNEL IMPROVEMENTS BETWEEN THE CITY OF DENTON AND TEAGUE NALL AND PERKINS, INC. DATED JULY 1, 1997 This Addendum No 2 to that Professional Services Agreement for the design of stream PEC-4 storm drainage improvements (Pecan Creek to P&P Railroad) and Ruddell Street bridge and channel improvements (Ruddell Street to Stream PEC-4) between the City of Denton, a Texas Municipal Corporation, with its principal office at 215 East McKinney Street, Denton, Denton County, Texas 76201, (hereinafter sometimes referred to as "Owner") and Teague Nall and Perkins, Inc , with its corporate office at 915 Florence St , Fort Worth, Tarrant County, Texas 76102, (hereinafter sometimes referred to as "Consultant"), acting herem by and through their duly authorized representatives, hereinafter referred to as "Base Agreement " ARTICLE I. That Section B of Article II "Scope of Services" of the Base Agreement is hereby amended by adding (Items 1 and 2) and deleting (Item 3) the following engineering services for the referenced elements of the project 1 Preparation of three (3) Nationwide 404 permit applications and one (1) individual 404 permit application for various segments of the subject project as required by the Corps of Engineers (COE) Also included in these services will be coordination with COE, attendance at pre -submittal meetings with both the City of Denton and COE, and the PAGE 1 submittal of these 404 permit applications with related mitigation plans as necessary Permit submittals will be based on the pre -submittal meetings and will address City and COE comments Specifically excluded from tins proposed contract amendment fee is the effort necessary to respond to any COE comments after submittal 2 Preparation of boundary surveys and required easements for the area between Woodrow and Ruddell 3 Delete preparation of thirty (30) easements along the project route previously included in the scope of services of the original contract agreement ARTICLE U. That Article V "Compensation," subsection B "Billing and Payment" of the Base Agreement is hereby amended by adding/deleting the following fees to the Consultant's not -to -exceed figure The following additional hourly -based fees are based on the above scope of work descriptions as indicated in Section B of Article II of the Base Agreement 1 COE 404 Permit Applications [Total of four (4) required] Research, preparation of permit and related exhibits, and coordination with COE $ 200 Subtotal Permit Applications $ 18,200 2 Boundary Surveys and Easement Preparation (Woodrow to Ruddell) Surveys and legal descriptions $ 9.000 Subtotal Boundary Surveys/Easements $ 9,000 3 Deletion of thirty (30) easement parcels 30 Easements @ $ 300/each= 000 Subtotal Easement Parcel Reduction ($ 9,000) Total Proposed Additional Engineering Services Fee $ 18,200 PAGE 2 That the total of the additional fees for the above -mentioned services shall increase the not - to -exceed figure of $ 262,810 by $ 18,200, so that the not -to -exceed figure shall now be $281,010 ARTICLE III That save and except as amended hereby, the remaining sections, subsections, sentences, and phrases of the Base Agreement shall remain in full force and effect EXECUTED in three (3) counterparts (each of wh ich is an original) on behalf of Consultant by its Vice President shown, below, and on behalf of Owner by its City Manager as duly authorized by its City Council tlus !i day of /� / , 1998 OWNER: CITY OF DENTON, TEXAS BY Ted Benavides, City Manager ATTEST JENNIFER WALTERS, CITY SECRETARY BY ), 0 -1-0-' , � APPROVED AS TO LEGAL FORM HERBERT L PROUTY, CITY ATTORNEY BY� CONSULTANT. TEAGUE NALL AND PERKINS, INC. BY .^ern' J Ri rd Perkins, P E , Vice President ATTEST BY PAGE 3