ORDINANCE NO q-0-36
AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AUTHORIZING THE CITY
MANAGER TO EXECUTE AN INTERLOCAL ADDENDUM TO JOINT OWNERSHIP AND
OPERATIONS CONTRACT BETWEEN THE CITY OF DENTON AND UPPER TRINITY
REGIONAL WATER DISTRICT REGARDING PARTICIPATION IN THE SANGER
TRANSMISSION LINE, AUTHORIZING THE EXPENDITURE OF FUNDS THEREFOR,
AND PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, the City of Denton ("the City") and the Upper Trinity
Regional Water District (the "UTRWD") entered into a May 6, 1993
Joint Ownership Contract (the "Contract") to ]ointly develop and
operate a water transmission line (the "Joint Transmission Line")
from the vicinity of Lillian Miller Parkway and Interstate 35E, and
extending generally along Lillian Miller Parkway to the vicinity of
Old Alton Road near the south city limits of Denton, and
WHEREAS, construction of the Joint Transmission Line has been
completed and the line is operating satisfactorily, and
WHEREAS, the UTRWD is planning to construct another transmis-
sion line (the "Sanger Transmission Line") that will connect to the
north portion of the City's water distribution system in the
vicinity of Loop 288 and Interstate Highway 35, extending generally
along IH35 to the City of Sanger, and
WHEREAS, the Sanger Transmission Line and its connection to the
City of Denton's system is authorized under a certain contract for
Water Treatment and Transmission Services dated July 21, 1992
between City and UTRWD, and, according to said contract
"Denton may participate, at its own option, in the capital and
operating cost of said pipeline based upon its proportionate
share of the overall transmission capacity of the line, up to
the limit of Denton's extraterritorial ]urisdiction "
WHEREAS, in said July 21, 1992 contract, City agreed to provide
transmission service for UTRWD water through the City water system
to the Sanger Transmission Line and to other delivery points on
City's water system, and
WHEREAS, City desires to participate in the capacity and
proportionate cost of the Sanger Transmission Line to be construct-
ed by the UTRWD, and
WHEREAS, City and UTRWD desire to enable such participation in
the Sanger Transmission Line by an Addendum to the Contract, and
WHEREAS, City has agreed by separate contract to convey to
UTRWD certain pipeline facilities associated with water service to
the City of Corinth and Lake Cities Municipal Utility Authority,
and City and UTRWD desire to increase City's share of the Joint
Transmission Line in Lillian Miller Parkway as consideration for
said property being conveyed, and
WHEREAS, City and UTRWD desire to implement such other contract
provisions as will enable ]oint participation in the Sanger
Transmission Line and to provide for the UTRWD to purchase treated
water from City for resale to Sanger, and
WHEREAS, UTRWD agrees to use its best efforts to design,
construct and complete the Sanger Transmission Line as provided in
this addendum to contract, NOW THEREFORE
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the City Manager is hereby authorized to
execute an addendum to the Joint Ownership and Operations Contract
Between the City of Denton and Upper Trinity Regional Water
District Regarding Participation in the Sanger Transmission Line,
a copy of which addendum to contract is attached hereto and
incorporated by reference herein
,SECTION II That the expenditure of funds as required in the
attached addendum is hereby authorized
SECTION III That this ordinance shall become effective
immediately upon its passage and approval
PASSED AND APPROVED this the `1� day of 1997
JP9K MILLER, MAYOR
ATTEST
JENNIFER WALTERS, CITY SECRETARY
BY
APPROVED AS TO LEGAL FORM
HERBERT L PROUTY, CITY ATTORNEY
By
ADDENDUM TO
JOINT OWNERSHIP AND OPERATIONS CONTRACT
BETWEEN
CITY OF DENTON
AND
UPPER TRINITY REGIONAL WATER DISTRICT
THE STATE OF TEXAS §
3
COUNTY OF DENTON §
This Addendian (the'Addendurn') to an existing ombW styled as JOINT OWNERSHIP AND
OPERATIONS CONTRACT, dated May 6, 1993, (the 'ContracC) by and between UPPER TRINITY
REGIONAL WATER DISTRICT, (the 'Distncr), a conservation and reclamation district created
pursuant to Article XVI, Sedan 59 of the Constitution of the State of Texas, and the CITY OF
DENTON ('Denton'), a munarpal corporates, is made and approved as of the y� day of
_�iIV , 19# (the 'Date of Addendum')
WHEREAS, Denton and District entered into the May 6, 1993 Joint Ownership and
Operations Contract (the 'Contract') to jointly develop and operate a water transmission line (the
'Joint Transmission Line") from the vicinity of Lillian Miller Parkway and Interstate 35E, and
extending generally along Lillian Miller Parkway to the vicinity of Old Alton Road near the south city
limits of Denton, and
WHEREAS, construction of the Joint Transmi-sion Line has been completed and the line is
operating satisfactonly, and
iiddendrn ro oaoaad s.eero.n osy or Denbo and urawo
ReYorddY Bomar TrMembelen une
Peye 2
WHEREAS, the District is planning to constrict another transmission line (the "Sanger
Transmission UrW) that will conned to the north portion of the Denton water distribution system in
the vicinity of Loop 288 and Interstate Highway 35, extending generally along IH35 to the City of
Sanger, and
WHEREAS, the Sanger Transmission Una and its connection to the Denton system are
authorized under a certain contract for Water Treatment and Transmission Services dated July 21,
1992 between Denton and District, and, according to said contract,
'Denton may participate, at its option, in the aipd d and operating cost of said pipeline based
upon its proportionate share of the overall transmission capacity of the line, up to the limit
of Denton's extraterritorial jurisdiction
WHEREAS, in said July 21, 1992 contract, Denton agreed to provide transmission service
for District water through the Denton water system to the Sanger Transmission Line and to other
delivery points on Denton's water system, and
WHEREAS, Denton desires to participate in the capacity and proportionate cost of the
Sanger Transmission Una to be constructed by the District, and
WHEREAS, Denton and District desire to enable such participation in the Sanger
Transmission Line by this Addendum to the Contract, and
WHEREAS, Denton has agreed by separate contract to convey to District certain pipeline
facilities associated with water service to City of Corinth and Lake Cities Municipal Liddy Authority,
and Denton and District desire to increase Denton's share of the Joint Transmission Line in Lillian
Miller Parkway as consideration for said property being conveyed, and
WHEREAS, Denton and District desire to implement such other contract provisions as will
enable joint participation in the Sanger Transmission Line and to provide for the District to purchase
treated water from Denton for resale to Sanger
Addendm to contract Between city of Denton and urawD
Regarding Sanger TranamNeion Line
Page i
NOW, THEREFORE, in consideration of the mutual covenants and agreements herein
contained, the District agrees to use its best efforts to design, construct and complete the Sanger
Transmission Line upon and subject to the terms of the Contract and this Addendum as hereinafter
set furth, to -wit
Soo6on 1.0. Preamble Meorgoratied
That the matters stated in the preamble hereof are true and correct and are incorporated into
the body of this Addendum as if copied in their entirety
Section I.I. Scoga of Addendum
The provisions of the Conrad shall remain in full forme and effect as supplemented by this
Addendum Further, Denton and District agree to add the provisions of this Addendum to provide
for joint participation by Denton and District in the Sanger Transmission Line and to increase
Denton's share of the Joint Transmission Line as reflected in Exhibit A (Revised) attached hereto
and incorporated herein for all purposes
Section 1.2 Pardobation in Regional Treated Waller Prej2d
District and Denton agree that Denton's participation in the Sanger Transmission Line will
increase Denton's participation in the Regional Treated Water Project as specified in the Contract
only as provided herein
a) Denton's participation in the Regional Treated Water Project will increase by the
defined limits of its participation in the Sanger Transmission Line, and
b) Denton will gain a greater share of the Regional Treated Water Project by the
agreement herein to increase Denton's share of the Joint Transmission Line
Seabon 1 3 Participation in Sanger Transmission Line
Denton will participate on a pro rate basis in the Sanger Transmission Line in accordance
with the limits, size and capacities specified in Exhibit C and with cost participation as specified in
Exhibit D, hereto, which Exhibits are incorporated into this Addendum and the Contract for all
purposes The Sanger Transmission Line shall be designed and constructed by the District
Addaad�to coaaract Betwaoa cry of Denson and urrtwo
ReprdNq eaapr Tnnambaion Lbe
Papa 4
Section 1 A Extent of ParticLnation
District agrees to provide for the Sanger Transmission Line between the points and along
the general route and for the capacities delineated in Exhibit C Denton may transport water for
its own use through the Sanger Transmission Line up to the peak day capacities provided for
in Exhibit C
Section 1.& Suesiel Provisions
Denton and District acknowledge and agree to the special provisions related to the Sanger
Transmission Line which are set forth in the attached Exhibit D, which Exhibit is incorporated into
this Addendum and the Contract for all purposes
Section 1.6 sale of Wafer
As provided in the July 21, 1992 contract between Denton and District, Denton reaffirms its
agreement to sell wholesale treated water to District for delivery and resale to Sanger Such sale
of water by Denton shall be on a wholesale basis in accordance with said July 21, 1992 Contract,
as amended or supplemented
Section 1.7 EadY PBYment
Denton may prepay or pay the remaining balance of its share of capital cost participation in
the Sanger Transmission Line or the Joint Transmission Line at any time The amount of such early
payment will be equal to the unpaid balance including any deferred amounts
Section 1.8 Term of Addendum
This Addendum shall be effective on and from the Date of Addendum The term thereof
shall be the same as the term of the Contract and any renewals thereof
Addendum to Contract Bet~n City of Denton and UTRWD
Regarding Sanger Transm Ission Une
Page 5
IN WITNESS WHEREOF, the parties hereto acting under authority of their respective
governing bodies have caused this Addendum to be duly executed in several counterparts, each of
which shall constitute an original, all as of the day and year first above written, which is the Date of
Addendum
UPPER TRINITY
VONA WATER DISTRICT
RichardHuckaby
President, Board of Directors
AT ST
rle mdb ng, w —� [Dlstdct seat]
S rd o ctors
�VED AS TO F RM EGALITY
John F Boyle, Jr , Couns I for the District
CITY/OF PENTON, TEXAS
Ted Benavides, City Manager
TTEST
J nnifer W ters, City Secretary
APPROV AS O LE L FORM
Herb Prouty, City ttor ey
Addendum to Contract Be w tan City of Denton and UTRWD
Raeardine Sanem Tnnamialon Line
paw a
EXHIBIT B
Exhibit B as contained in the original Contract shall remain valid and in effect Said
Exhibit, is modified or supplemented only to the extent provided in this Addendum
NOT TO SCALE
PIPEUNE RWTE
GENERALLY ALONG UWAN MILLER PKWY/
FM 2181 FROM INTERSTATE HIGHWAY 35E
TO OLD ALTON
PIPE SIZES,
27" DIA FROM IH 35E TO FM 2181
20" DIA FROM FM 2181 TO RYAN ROAD
18" DIA FROM RYAN ROAD TO OLD ALTON
CALCULATED CAPACITY OF 27" DIA. PIPE.
TOTAL - 14 3 MGD
DENTON SHARE 72 7% (10 4 MGO)
UTRWD SHARE 27 3% (39 MGD)
CAI Can ATED CAPACITY OF 20" DIA. PIPE.
TOTAL — 6 5 MGD
DENTON SHARE = 39 9% (2 6 MGD)
UTRWD SHARE = 601% (39 MGD)
CAI CI0 ATFD CAPACITY OF 18" DIA. PIPE.
TOTAL = 4 9 MGD
DENTON SHARE = OR (0 0 MGD)
UTRWD SHARE = 100% (4 9 MGD)
PIPELINE LENGTHS
APPROXIMATELY 3 600 LF OF 27" DIA
APPROXIMATELY 5 400 LF OF 20" DIA
APPROXIMATELY 6 500 LF OF 18' DIA
27" DIA �—
Q=143MGD
20" DIA f
Q=65MGD
I
-9: Y�� l
moo• Canetructlan
ROW eY
Qt7 ReelCmtiW `11i.
20 Permanent
0 Canetredion
l
J
18" DIA
Q = 4 9 MGD
DELIVERY
POINT
d
RaW
ary ReaidantY
1
20 Pennona20• Canee
EXHIBIT "A REVISED"
N JOINT TRANSMISSION LINE
UPPER TRINITY REGIONAL WATER DISTRICT
REGIONAL TREATED WATER PROJECT
PHASE 1A PIPELINES
R.0 W I /
Rwd ReaidanOW
2D• Conetruetlon
EXHIBIT B
Exhibit B as contained in the original Contract shall remain valid and in effect Said
Exhibit is modified or supplemented only to the extent provided in this Addendum
a ledd-psd ekb
SANGER TRANSMISSION LINE
PIPELINE ROUTE,
NORTH FROM LOOP 288 ON THE
EAST SIDE OF INTERSTATE HWY
35 TO JUST SOUTH OF RECTOR
ROAD. EAST ON THE SOUTH
SIDE OF RECTOR ROAD, THEN
NORTH ALONG THE EAST SIDE
OF COVAJNG ROAD NORTH TO
THE SANGER DELIVERY POINT
TO PROM CONNECTION POINT
TO DELIVERY POINT 12" dA FROM
MILAM ROAD TO SANGER DELIVERY
CULATED CAPACITY OF
, dA. PIPE, ]§
INITIAL TOTAL m 3 25 MGD
DENTON SHARE a 59R (1 92 MGD)
UTRWO SHARE - 41% (133 MOD)
PIPELINE LENGTH,
APPX 17,000 LF OF 16" DIA PIPE
APPX 18,500 LF OF 12" OIA PIPE
NOTE.
THIS EXHIBIT ILLUSTRATES THE
APPROXIMATE ROUTE OF THE
PROPOSED PIPELINE ALONG THE
GENERAL ROUTE SHOWN ACTUAL
LOCATION OF THE PIPELINE MAY
VARY FOR ENGINEERING OR OTHER
TECHNICAL REASONS IF ACTUAL
PIPELINE SIZES OR LENGTHS
VARY, BY MUTUAL AGREEMENT,
THE SHARE PERCENTAGES SHALL
REMAIN THE SAME
EXHIBIT C
PIPELINE LIMITS
AND CAPACITIES
EXHIBIT D
TO CONTRACT BETWEEN CITY OF DENTON AND UPPER TRINITY
REGIONAL WATER DISTRICT FOR PARTICIPATION IN
THE SANGER TRANSMISSION LINE
SPECIAL PROVISIONS ReGARDING PARTICIPATION
The provisions of this "Exhibit D' form a part of the Contract and are applicable to the
Upper Trinity Regional Water District (the "District') and to the City of Denton ("Denton') as of set
forth in their entirety in the body of the Contract
1. The District vid construct the Sanger Transmission Line as a part of the Project
as defined in the Contract The District will own the Sanger Transmission Line, including the
right-of-way, except as otherwise provided heroin for Denton's share of the line The District will
coordinate routing, design and right-of-way acquisition with Denton Within the City Limits of
Denton, the District's improvements shall not unduly conflict with any Denton master plan for land
development District and Denton agree to coordinate future joint use of said rights -of -way within
Denton for underground utilities District and Denton agree to coordinate arrangements for
parallel or adjoining easements and other rights -of -way, including reciprocal use of such
easements and rights -of -way for temporary use during construction, routine operational
maintenance and for other mutually beneficial purposes
2. It is mutually agreed that, within its share of the easement or nght-of-way for the
Sanger Transmission Line, Denton shall have the right to install and maintain other water Imes,
as well as sewer, underground electric and telecommunication facilities owned by Denton
3. The Distnct will provide the funds to design the Sanger Transmission Line,
including acqu Qition of nghts-of-way The size of the line and capacities in the line for Denton
and District, respectively, shall conform to the requirements of Exhibit C, hereto
4. After design of the Sanger Transmission Line has been completed and after
approval by Denton, the District shall lake competitive bids for construction After receipt of bids
and before a contract (or contracts) for construction is awarded, the District shall give Denton
ExhN* D
Addanduwn to Cordrad 6aaw66 City of Donlan and YTRWD
Regarding Banpar Tranamftsbn Lim
Papa 2
written 'notice of the District's recommendation regarding award of contract(s) and of Denton's
share of the proposed contract to be awarded Unless Denton elects the financing option
described in Paragraph 5 following, Denton shall deposit with the District, within forty-five (45)
dayb, its pro rate share of the proposed construction cost for the Sanger Transmission Line plus
the cost of special appurtenances, it any, requested by and for Denton The funds so deposited
by Denton for construction shall be placed in an interest bearing construction account by District
The District may withdraw funds from the construction account as required to make progress and
final payment according to the construction contract awarded for the Sanger Transmission Line
The District shall maintain an accounting of all direct expenditures for rights of way and for design
and construction of the Sanger Transmission Line, including engineering and geotechnical
services during construction Upon completion of construction, Denton agrees to pay its share,
if any, of contract change orders, direct services during construction, or extra costs required to
complete the Sanger Transmission Line After payment for change orders, services during
construction or extra costs, any surplus funds remaining in the interest bearing account shall be
returned to Denton at completion of the contract(s)
5 At Denton's option, District will provide funds to construct Denton's share of the
Sanger Transmission Line according to this paragraph Subject to the terms of the Contract and
this Addendum, District will provide and pay for the cost of the acquisition, design, construction
and improvement of the Sanger Transmission Line, by issuing its Bonds in amounts which will
be sufficient to accomplish such purposes Denton will make payments as required to pay its pro
rate share of the Annual Requirement, as provided in Section 5 01 of the Contract and this
Addendum To determine Denton's share of the Annual Requirement for the Sanger
Transmission Line, District will calculate the Capital Component of cost for Denton's share
described in Paragraph 4 hereof based on actual costs of completion and the following schedule
Year 1 Capital Component of Cost will be based on the incremental cost (minimum
amount for total incremental cost equals $280,000) to oversize the pipeline from twelve
(12) inch diameter to sixteen (16) inch diameter for the interval indicated in Exhibit C
Years 2 through 8 Capital Component of Cost will be based on a graduated scale in even
increments to transition to a full pro rata cost participation in the tenth (10th) year
HahONt D
AdduMwn 1s CaThad Babwan City a1 Donlan and UTRWD
Reyndtn0 8anpar To. V 0sslon UM
Palls i
Year 10 to Retirement of Bonds Capital Component of Cost will be based on pro rate
share of capacity as indicated in Exhibit C Said capital cost will include an Interest
component (at a rate equal to the interest rate applicable to the Bonds issued to construct
the line) for the amount of pro rate cost deferred under this schedule
Subject to mutual agreement in writing, Denton may pay its share of the Annual Requirement
according to an alternative schedule developed by the District After Denton has paid its full pro
rate share and after retirement of Bonds, the Capital Component of Cost will no longer apply
6. If requested in writing by the District and agreed to by Denton, Denton may acquire
or purchase easements or rights -of -way within the City Limits of Denton on behalf of the District
for the Sanger Transmission Line Specifically, Denton agrees to acquire or to arrange for the
dedication of necessary rights -of -way or easements in the interval from the Denton Connection
Point to the Delivery Point near Milam Road The District will reimburse Denton for all direct cost
associated with Denton's efforts to acquire said easement regardless of whether the easement
is actually purchased If requested by District and agreed to by Denton, Denton may exercise
its power of eminent domain on behalf of the District
7 On behalf of Denton and District, Denton agrees to operate that portion of the
Sanger Transmission Line up to the Delivery Point (meter) and to be responsible for normal and
routine maintenance of said portion of the Sanger Transmission Line according to the standards
of Denton's own water transmission and distribution system Denton will maintain records of the
actual cost of such maintenance and will send periodic reports of cost to District for
reimbursement of cost in proportion to respective share of rated capacity of the pipeline according
to Exhibit C District shall have reasonable access to Denton's records to verify such costs
District hereby agrees that it will make payments to Denton according to the provisions of sections
5 06 and 5 07 of the Contract, which sections are otherwise applicable to Denton If, in the
opinion of Denton, extraordinary maintenance such as pipeline replacement exceeding 1% of the
length of the pipeline is required, Denton shall give written notice of such needed replacement
Exhbk o
Addendum b OoMacl ENwaan CVV of eanisn and eTRWO
PUgeniap Sanger Tmmndsslon Lau
Page 4
to District, and District and Denton shall mutually determine which party shall take appropriate
steps to accomplish such extraordinary maintenance
8 Prior to completion of construction of the Sanger Transmission Line, Denton's
Executive Director of Utilities shall develop a mutually satisfactory written procedure for
coordinating the operation and maintenance of the Sanger Transmission Line and for each party
to notify the other party of any activities which may affect the operations of the other pary's
system
8. The Delivery Point for water by Denton shall be at a mutually agreeable location
at a mid point on the Sanger Transmission Line at the approximate location shown on Exhibit C
10. All meter facilities for the Sanger Transmission Line shall conform to Section 4 03,
"Metering Equipment" of the Contract District shall pay for and install appropriate meter facilities,
including rate of flow controller and back -flow prevention device at the Delivery Point District will
own the metering facilities and Denton will provide normal maintenance and calibration, the costs
of which are eligible for inclusion in service rates
11. Denton may purchase the Distnct's rights, in whole or part, in the Sanger
Transmission Line if District, at any future time, gives notice that its share of the tine is no longer
needed for District purposes The price to be paid by Denton to District to purchase any portion
of the District's share of the Sanger Transmission Line under this paragraph shall be equal to
the original cost thereof for the District's share, less accumulated depreciation plus a credit (not
to exceed said purchase price) for revenues, if any, received by District from Denton and other
public utilities for use of the nghts-of-way included in the Sanger Transmission Line Deprecation
expense will be computed on a straight line basis over a period not to exceed thirty (30) years
for that portion of the pipeline owned by District For that portion of the pipeline owned by TWDB
under a State Participation Agreement, depreciation expense shall start when the District
purchases the TWDB's interest or five (5) years from date pipeline was first used for public
service, whichever date occurs first
E■nN* D
Addandmd b OoMact Batsman C*J of Dadon and UTRWO
Rap gdkv Ban"r To w. slon Lim
Pays 6
12 If Denton purchases the District's share or any portion thereof of the Sanger
Transmission Line under the provisions of this Exhibit, District shall continue to enjoy certain
rights in connection therewith (1) to receive water from Denton, (2) to deliver water to Denton,
and (3) to -deliver water to intervening customers of District along the line as may be provided by
contract, and (4) to have the right of emergency exchange of water between Denton and District
through the pipeline
19 If Denton desires and requests the District to constrict improvements or install
appurtenances for Denton as part of the Sanger Transmission Line, which improvements or
appurtenances are not otherwise needed by District, Denton shall be responsible for the entire
cost of such improvements or appurtenances installed for the sole benefit of Denton
14. In a separate contract dated July 21, 1992 for WATER TREATMENT AND
TRANSPORTATION SERVICES (as supplemented), District agreed to increase Denton's share
of the Joint Transmission Line, as consideration for certain property being conveyed to District
Said increased share shall not cause an increase in the amount to be paid by Denton for its share
of the Annual Requirement for the Joint Transmission Line Rather, the increased share will
result in Denton having larger capacity in the Joint Transmission Line and a corresponding
smalletshare to acquire from the District when and if Denton acquires the District's share of the
Joint Transmission Line under the terms of the Contract See Exhibit A (Revised) for the revised
respective shares of the Joint Transmission Line
15 Notwithstanding any provision in this Addendum and the Contract, Denton shall
have no responsibility for any portion of the Regional Treated Water Project other than the Joint
Transmission Line and the Sanger Transmission Line
DENTOMCONTRACTWDD-PSTL E%D