HomeMy WebLinkAbout1997-168ORDINANCE NO 61f1-1(0 o AN ORDINANCE OF THE CITY OF DENTON AUTHORIZING THE CITY MANAGER TO EXECUTER PROFESSIONAL SERVICES CONTRACT WITH CORGAN ASSOCIATES, INC FOR PHASE II OF THE RENOVATION OF THE DENTON MUNICIPAL COMPLEX (DMC) AND CITY HALL, AUTHORIZING THE EXPENDITURE OF FUNDS THEREFORE, AND PROVIDING AN EFFECTIVE DATE THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I. That the City Manager is authorized to execute a professional services contract between the City of Denton and Corgan Associates, Inc for the second phase of DMC renovation and phase II of the City Hall renovation, under the terms and conditions, contained in said professional services contract, which is attached hereto and made a part hereof SECTION II. That the City Council hereby authorizes the expenditure of funds in the manner and amount as specified In the professional services contract SECTION 111. That this ordinance shall become effective immediately upon its passage and approval PASSED AND APPROVED this the 11+1N day of 1997 JA ILLER, MAYOR ATTEST JENNIFER WALTERS, CITY SECRETARY BY APPROVED AS TO LEGAL FORM' HERBERT L PROUTY, CITY ATTORNEY 1 DATE JUNE 17, 1997 ► t slZ6131 TO Mayor and Members of the City Council FROM Kathy DuBose, Executive Director of Finance SUBJECT, PROFESSIONAL SERVICES CONTRACT FOR RENOVATION OF DENTON MUNICIPAL COMPLEX (DMC) AND CITY HALL - PROJECT II RECOMMENDATION. We recommend that the professional services contract for the second phase (Project II) of the Denton Municipal Complex (DMC) and City Hall be awarded to Corgan Associates, Inc in the amount of $67,150 00 plus a not to exceed $7,000 00 for reimbursibles SUMMARY: This contract provides for planning, construction documents, bid assistance, and construction administration services for Project II of the DMC Renovation and of the City Hall Renovation Included in this fixed cost fee of $67,150 00 are architectural design, structural, mechanical and electric engineering, plumbing and furniture design services The contract is basically the same contract as awarded to Corgan for the first phase of both of these renovation projects Council members were presented an overview of both projects and the architectural contract at there work session meeting of June 10, 1997 State law requires that the most qualified professional for the project be determined and that only then is a price to be negotiated and approved Corgan Associates, Inc provided the professional services for phase I of the projects and was therefore determined to be the most qualified for project I1 PROGRAMS, DEPARTMENTS OR GROUPS AFFECTED. Employees and citizens utilizing the two facilities (DMC and City Hall) FISCAT IMPACT: Funds for this contract are available in account number 457-032-BLDG-9718- 9101 set aside for one time construction expenditures Attachments Corgan Associates, Inc acceptance proposal dated May 9, 1997 Contract agreement City of Denton and Corgan Associates, Inc Memorandum from Bruce Hemngton dated April 30, 1997 Purchase Order #75357 Resp ctfully submitted Kath DuB e Executive erector of Finance A proved _ Name Tom D Shaw, C P M Title Purchasing Agent 876 AGENDA 9 May 1997 Mr Tom Shaw Purchasing Department City of Denton 901 B Texas Street Denton, Texas 76201 Re City of Denton City Hall Renovation Project II, Phase I & H Proposal Dear Tom We are extremely pleased to provide this proposal for the continuation of our professional services contract for Project Il of the Denton Municipal Complex and the City Hall Renovation As requested, we propose to provide the planning, construction documents, bidding and construction administration services at a fixed fee of $67,150, plus reimbursibles (project costs for printin& costs, mileage, etc at 11 x our actual cost), not -to -exceed $7,000. These fees include architectural, structural, mechanical, electrical, plumbing and furniture design, Tom, we appreciate the opportumty to submit this proposal and look forward to working with you on another project. Please do not hesitate to call should you have any questions or need to discuss this proposal further Very truly yours, Corgan Associates, Inc. Accepted: C 0 R G A N �p C-L.Q 1 COAGAN ASSOCIATES INC Louis J. Wolf 501 ELM STREET Associate DALLAS TEXAS 75202 TEL 214 748 2000 FAX 214 653 8281 Enclosure DALLAS cc Bruce Henington/Denton FORT WORTH NEW YORK MIAMI LONDON 95222/00/Al/PHASE2 3 Date AAA050D2 EMENT BETWEEN THE CITY OF DENTON AND CORGAN ASSOCIATES, INC. This Agreement made as of the seventh day of between the City of Denton, Texas, hereinafter "Owner" and Corgan Associates, Inc. hereinafter "Architect" for the following Project Renovation completion of Municipal Building - Project II Architect agree as set forth below. ARCHITECT'S RESPONSIBILITIES 1.1 ARCHITECT'S SERVICES November, 1995 referred to as referred to as of DMC and the The Owner and 1.1.1 The Architect's services consist of those services performed by the Architect, Architect's employees and Architect's consultants as enumerated in Articles 2 and 3 of this Agreement and any other services included in Article 11 1.1.2 The Architect's services shall be performed as expeditiously as is consistent with a very high standard of professional skill and care and the orderly progress of the Work Upon request of the Owner, the Architect shall submit for the Owner's approval a schedule for the performance of the Architect's services which may be adjusted as the Project proceeds, and shall include allowances for periods of time required for the Owner's review and for approval of submissions by authorities having jurisdiction over the Project. Time limits established by this schedule and approved by the Owner shall not, except for reasonable cause, be exceeded by the Architect or Owner, and any adjustments to this schedule shall be mutually acceptable 1.1.3 The services covered by this Agreement are subject to the time limitations contained in Subparagraph 10 4.1. ARTICLE 2 SCOPE OF ARCHITECT'S BASIC SERVICES 2.1 DEFINITION 2.1.1 The Architect's Basic Services consist of those described in Paragraphs 2.2 through 2 6 and any other services identified in Article 11 as part of Basic Services, and include without limitation normal structural, mechanical and electrical engineering services and any other engineering services necessary to produce a complete and accurate set of Construction Documents, as described by and required in Paragraph 2 4 PAGE 1 2.2 SCHEMATIC DESIGN PHASE 2.2.1 The Architect in consultation with the Owner shall develop a written program for the Project to ascertain Owner's needs and to establish the requirements for the Project. 2.2.2 The Architect shall provide a preliminary evaluation of the owner's program, construction schedule and construction budget requirements, each in terms of the other, subject to the limitations set forth in Subparagraph 5 2 1 2.2.3 The Architect shall review with the Owner alternative approaches to design and construction of the Project. 2.2.4 Based on the mutually agreed -upon program, schedule and construction budget requirements, the Architect shall prepare, for approval by the Owner, Schematic Design Documents consisting of drawings and other documents illustrating the scale and relationship of Project components The Schematic Design shall contemplate compliance with all applicable laws, statutes, ordinances, codes and regulations. 2.2.5 The Architect shall submit to the owner a preliminary detailed estimate of Construction Cost based on current area, volume or other unit costs and which indicates the cost of each category of work involved in constructing the Project and establish an elapsed time factor for the period of time from the commencement to the completion of construction. 2.3 DESIGN DEVELOPMENT PHASE 2.3.1 Based on the approved Schematic Design Documents and any adjustments authorized by the Owner in the program, schedule or construction budget, the Architect shall prepare for approval by the Owner, Design Development Documents consisting of drawings and other documents to fix and describe the size and character of the Project as to architectural, structural, mechanical and electrical systems, materials and such other elements as may be appropriate, which shall comply with all applicable laws, statutes, ordinances, codes and regulations. Notwithstanding Owner's approval of the documents, Architect shall prepare documents and specifications sufficient and adequate to fulfill the purposes of the project 2.3.2 The Architect shall advise the Owner of any adjustments to the preliminary estimate of Construction Cost in a further Detailed Statement as described in Paragraph 2.2 5 2.4 CONSTRUCTION DOCUMENTS PHASE 2.4.1 Based on the approved Design Development Documents and any further adjustments in the scope or quality of the Project or in the construction budget authorized by the Owner, the Architect shall prepare, for approval by the Owner, Construction Documents consisting of Drawings and Specifications setting forth in detail PAGE 2 requirements for the construction of the Project, which shall comply with all applicable laws, statutes, ordinances, codes, regulations including, without limitation, the latest ADA state and federal requirements. All state and federal requirements shall be submitted by the architect and gain approval before the bidding process. 2.4.2 The Architect shall assist the owner in the preparation of the necessary bidding information, bidding forms, the Conditions of the contract, and the form of Agreement between the Owner and contractor. 2.4.3 The Architect shall advise the Owner of any adjustments to previous preliminary estimates of Construction Cost indicated by changes in requirements or general market conditions. 2.4.4 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents required for the approval of governmental authorities having jurisdiction over the Project. 2 5 BIDDING 2.5.1 The Architect, following the Owner's approval of the Construction Documents and of the latest preliminary estimate of Construction Cost, shall assist the Owner in obtaining bids and assist in awarding and preparing contracts for construction 2.5.2 If the lowest bid for the construction of the Project exceeds the total construction cost of the Project as set forth in the approval Detailed Statement of Probable Construction Costs of the Projects submitted by the Architect, then the Architect, as its sole cost and expense, shall revise the Construction Documents as may be required by the City to reduce or modify the quantity or quality of the work so that the total construction cost of the Project will not exceed the total construction cost set forth in the approved Detailed Statement of Probable Construction Costs The project shall be bid with a written statement requiring the contractor and subcontractors to sign an agreement to participate in a partnering construction relationship with the City and the Architect. 2.6 CONSTRUCTION PHASE - ADMINISTRATION OF THE CONSTRUCTION CONTRACT 2 6 1 The Architect's responsibility to provide Basic Services for the Construction Phase under this Agreement commences with the award of the Contract for Construction and terminates at the issuance to the Owner of the final Certificate for Payment, unless extended under the terms of Subparagraph 9 3 3 2.6.2 The Architect shall provide detailed administration of the Contract for Construction as set forth below and in the edition of AIA document A201, General Conditions of the Contract for PAGE 3 Construction, current as of the date of this Agreement, unless otherwise provided in this Agreement. 2.6.3 Construction Phase duties, responsibilities and limitations of authority of the Architect shall not be restricted, modified or extended without written agreement of the Owner and Architect. 2.6.4 The Architect shall be a representative of and shall advise and consult with the Owner (1) during construction, and (2) as an Additional Service at the Owner's direction from time to time during the warranty period described in the Contract for Construction, i.e. one year. The Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement unless otherwise modified by written instrument. 2 6.5 The Architect shall observe the construction site at least one time a week, regardless of whether construction is in progress, to become familiar with the progress and quality of the Work completed and to determine if the Work is being performed in a manner indicating that the Work when completed will be in accordance with the Contract Documents. Provided, however, Architect shall not be required to make continuous on -site inspections to check the work Architect shall provide Owner a written report subsequent to each on -site visit. On the basis of on -site observations as an architect, the Architect shall keep the Owner informed of the progress and quality of the Work, and shall exercise the utmost care and diligence in discovering and promptly reporting to the Owner any defects or deficiencies in the work of Contractor or any subcontractors The Architect represents that he will follow the highest professional standards in performing all services under this Agreement Any defective designs or specifications furnished by the Architect will be promptly corrected by the Architect at no cost to the Owner The Owner's approval, acceptance, use of or payment for all or any part of the Architect's services hereunder or of the Project itself shall in no way alter the Architect's obligations or the Owner's rights hereunder. 2.6.6 The Architect shall not have control over or charge of and shall not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection with the Work. The Architect shall not be responsible for the Contractor's schedules or failure to carry out the Work in accordance with the Contract Documents except insofar as such failure may result from Architect's acts or omissions The Architect shall not have control over or charge of acts or omissions of the Contractor, Subcontractors, or their agents or employees, or of any other persons performing portions of the Work. 2.6.7 The Architect shall at all times have access to the Work wherever it is in preparation or progress PAGE 4 2 6.8 Except as may otherwise be provided in the Contract Documents or when direct communications have been specially authorized, the Owner and Contractor shall communioate through the Architect. Communications by and with the Architect's consultants shall be through the Architect. 2.6.9 Based on the Architect's observations at the site of the work and evaluations of the Contractor's Applications for Payment, the Architect shall review and certify the amounts due the Contractor 2.6.10 The Architect's certification for payment shall constitute a representation to the Owner, based on the Architect's observations at the site as provided in Subparagraph 2.6 5 and on the data comprising the Contractor's Application for Payment, that the Work has progressed to the point indicated and that the quality of the Work is in accordance with the Contract Documents. The foregoing representations are subject to minor deviations from the contract Documents correctable prior to completion and to specific qualifications expressed by the Architect The issuance of a Certificate for Payment shall further constitute a representation that the Contractor is entitled to payment in the amount certified. However, the issuance of a Certificate for Payment shall not be a representation that the Architect has (1) made exhaustive or continuous on -site inspections to check the quality or quantity of the Work, (2) reviewed construction means, methods, techniques, sequences or procedures, (3) reviewed copies of requisitions received from Subcontractors and material suppliers and other data requested by the Owner to substantiate the Contractor's right to payment or (4) ascertained how or for what purpose the Contractor has used money previously paid on account of the Contract Sum 2.6.11 The Architect shall have the responsibility and authority to reject Work which does not conform to the Contract Documents. Whenever the Architect considers it necessary or advisable for implementation of the intent of the Contract Documents, the Architect will have authority to require additional inspection or testing of the Work in accordance with the provisions of the Contract Documents, whether or not such Work is fabricated, installed or completed. However, neither this authority of the Architect nor a decision made in good faith either to exercise or not exercise such authority shall give rise to a duty or responsibility of the Architect to the Contractor, Subcontractors, material and equipment suppliers, their agents or employees or other persons performing portions of the Work 2 6.12 The Architect shall review and approve or take other appropriate action upon Contractor's submittals such as Shop Drawings, Product Data and Samples for the purpose of (1) compliance with applicable laws, statutes, ordinances and codes, and (2) determining whether or not the Work, when completed, will be in compliance with the requirements of the Contract Documents The Architect's action shall be taken with such reasonable promptness to cause no delay in the Work or in the construction of PAGE 5 the Owner or of separate contractors, while allowing sufficient time in the Architect's professional judgment to permit adequate review. Review of such submittals is not conducted for the purpose of determining the accuracy and completeness of other details such as dimensions and quantities or for substantiating instructions for installation or performance of equipment or systems designed by the Contractor, all of which remain the responsibility of the Contractor to the extent required by the Contract Documents The Architect's review shall not constitute approval of safety precautions or, unless otherwise specifically stated by the Architect, of construction means, methods, techniques, sequences or procedures. The Architect's approval of a specific item shall not indicate approval of an assembly of which the item is a component When professional certification of performance characteristics of materials, systems or equipment is required by the Contract Documents, the Architect shall be entitled to rely upon such certification to establish that the materials, systems or equipment will meet the performance criteria required by the Contract Documents. 2.6.13 The Architect shall prepare Change Orders and Construction Change Directives, with supporting documentation and data if deemed necessary by the Architect as provided in Subparagraphs 3.1.1 and 3.3.3, for the Owner's approval and execution in accordance with the Contract Documents, and may authorize minor changes in the Work not involving an adjustment in the Contract Sum or an extension of the Contract Time which are not inconsistent with the intent of the Contract Documents. 2.6.14 On behalf of the Owner, the Architect shall conduct inspections to determine the dates of Substantial Completion and Final Completion, and shall issue Certificates of Substantial and Final Completion. The Architect shall also make observation within thirty (30) days of the expiration of the one year warranty period under the performance bond or one year from the date of final completion and shall immediately advise the Owner in writing of any defects in workmanship and material so that the Owner may make an appropriate claim under the bond The Architect will receive and review written guarantees and related documents required by the Contact Documents and assembled by the Contractor and shall issue a final certificate for Payment. 2.6.15 The Architect shall interpret and provide recommendations on matters concerning performance of the Owner and Contractor under the requirements of the Contract Documents on written request of either the Owner or Contract. The Architect's response to such requests shall be made with reasonable promptness and within any time limits agreed upon 2.6.16 Interpretations and decisions of the Architect shall be consistent with the intent of and reasonably inferable from the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations and initial decisions, the Architect shall endeavor to secure faithful performance by both PAGE 6 Owner and Contractor, shall not show partiality to either, and shall not be liable for results for interpretations or decisions so rendered in good faith in accordance with all the requirements of the Owner -Architect Agreement and in the absence of negligence 2.6.17 The Architect shall render written decisions within a reasonable time on all claims, disputes or other matters in question between the Owner and Contractor relating to the execution or progress of the Work as provided in the Contract Documents 2.6.18 The Architect (1) shall render services under the Agreement in accordance with the highest professional standards prevailing in the metroplex area; (2) will reimburse the Owner for all damages caused by the defective designs the Architect prepares, and (3) by acknowledging payment by the Owner of any fees due, shall not be released from any rights the Owner may have under the Agreement or diminish any of the Architect's obligations thereunder. 2.6.19 The Architect shall provide the Owner with one set of reproducible prints showing all significant changes to the Construction Documents during the Construction Phase and shall also provide the Owner with one set of reproducible as -built Drawings for the Owner's file. ARTICLE 3 ADDITIONAL SERVICES 3.1 GENERAL 3.1.1 The services described in this Article 3 are not included in Basic Services unless so identified in Article 2 or 11, and they shall be paid for by the Owner as provided in this Agreement, in addition to the compensation for Basic Services The services described under Paragraphs 3.2 and 3.4 shall only be provided if authorized or confirmed in writing by the Owner. If services described under Contingent Additional Services in Paragraph 3.3 are required due to circumstances beyond the Architect's control, the Architect shall notify the Owner prior to commencing such services. If the Owner deems that such services described under Paragraph 3.3 are not required, the Owner shall give prompt written notice to the Architect If the Owner indicates In writing that all or part of such Contingent Additional Services are not required, the Architect shall have no obligation to provide those services Owner will be responsible for compensating the Architect for Contingent Additional Services only if they are not required due to the negligence or fault of Architect. PAGE 7 3.2 PROJECT REPRESENTATION BEYOND BASIC SERVICES 3.2.1 If more extensive representation at the site than is described in Subparagraph 2.6.5 is required, the Architect shall provide one or more Project Representatives to assist in carrying out such additional on -site responsibilities 3.2.2 Project Representatives shall be selected, employed and directed by the Architect, and the Architect shall be compensated therefor as agreed by the Owner and Architect. The duties, responsibilities and limitations of authority of Project Representatives shall be as described in the edition of AIA Document B352 current as of the date of this Agreement, unless otherwise agreed 3.2 3 Through the observations by such Project Representatives, the Architect shall endeavor to provide further protection for the Owner against defects and deficiencies in the Work, but the furnishing of such project representation shall not modify the rights, responsibilities or obligations of the Architect as described elsewhere in this Agreement 3.3 CONTINGENT ADDITIONAL SERVICES 3.3.1 Making material revisions in Drawings, Specifications or other documents when such revisions are: 1. inconsistent with approvals or instructions previously given by the Owner, including revisions made necessary by adjustments in the Owner's program or Project budget, 2. required by the enactment or revision of codes, laws or regulations subsequent to the preparation of such documents; or 3. due to changes required as a result of the Owner's failure to render decision in a timely manner 3.3.2 Providing services required because of significant changes in the Project including, but not limited to, size, quality, complexity, the Owner's schedule, or the method of bidding and contracting for construction, except for services required under Subparagraph 5.2.5. 3.3.3 Preparing Drawings, Specifications and other documentation and supporting data, and providing other services in connection with Change Orders and Construction Change Directives 3.3.4 Providing consultation concerning replacement of Work damaged by fire or other cause during construction, and furnishing services required in connection with the replacement of such Work. PAGE 8 3.3.5 Providing services made necessary by the default of the Contractor, by major defects or deficiencies in the Work of the Contractor 3.3.6 Providing services in evaluating an extensive number of claims submitted by the Contractor or others in connection with the Work. 3.3.7 Providing services in connection with a public hearing, arbitration proceeding or legal proceeding except where the Architect is party thereto. 3.3.8 Preparing documents for alternate, separate or sequential bids or providing services in connection with bidding, or construction prior to the completion of the Construction Documents Phase. 3.4 OPTIONAL ADDITIONAL SERVICES 3 4.1 Providing financial feasibility or other special studies. 3.4.2 Providing planning surveys, site evaluations or comparative studies of prospective sites 3.4.3 Providing special surveys, environmental studies and submissions required for approvals of governmental authorities or others having jurisdiction over the Project 3.4.4 Providing services relative to future facilities, systems and equipment. 3.4.5 Providing services to investigate existing conditions or facilities or to make measured drawings thereof. 3.4.6 Providing services to verify the accuracy of drawings or other information furnished by the Owner. 3.4.7 Providing coordination of construction performed by separate contractors or by the Owner's own forces and coordination of services required in connection with construction performed and equipment supplied by the Owner 3.4.8 Providing services in connection with the work of a construction manager or separate consultants retained by the Owner 3.4.9 Providing detailed quantity surveys or inventories of material, equipment and labor. 3.4.10 Providing analyses of owning and operating costs 3.4.11 Providing interior design and other similar services required for or in connection with the selection, procurement or installation of furniture, furnishings and related equipment. PAGE 9 3.4.12 Making investigations, inventories of materials or equipment, or valuations and detailed appraisals of existing facilities. 3.4.13 Providing assistance in the utilization of equipment or systems such as testing, adjusting and balancing, preparation of operation and maintenance manuals, training personnel for operation and maintenance and consultation during operation 3.4.14 Providing services other than as provided in Section 2.6.14 of Article 2 and No. 4 of Article 11, after issuance to the Owner of the final Certificate for Payment, or in the absence of a final Certificate for Payment, more than sixty (60) days after the date of Substantial Completion of the Work 3 4.15 Providing services of consultants for other than architectural, structural, mechanical and electrical engineering portions of the Project provided as a part of Basic Services 3.4.16 Providing any other services not otherwise included in this Agreement or not customarily furnished in accordance with generally accepted architectural practice 3 4.17 Preparing a set of reproducible record drawings showing significant changes in the Work made during construction based on marked -up prints, drawings and other data furnished by the Contractor to the Architect (This is for drawings prepared in addition to those called for in Section 2.6 19 ) ARTICLE 4 OWNER'S RESPONSIBILITIES 4.1 The Owner shall consult with the Architect regarding requirements for the Project, including (1) the Owner's objectives, (2) schedule and design constraints and criteria, including space requirements and relationships, flexibility, expandability, special equipment, systems and site requirements, as more specifically described in Paragraph 2.2.1. 4.2 The Owner shall establish and update an overall budget for the Project, including the Construction Cost, the Owner's other costs and reasonable contingencies related to all of these costs 4.3 If requested by the Architect, the Owner shall furnish evidence that financial arrangements have been made to fulfill the Owner's obligations under this Agreement. 4 4 The Owner shall designate a representative authorized to act on the Owner's behalf with respect to the Project The Owner or such authorized representative shall render decisions in a timely manner pertaining to documents submitted by the Architect PAGE 10 in order to avoid unreasonable delay in the orderly and sequential progress of the Architect's services 4.5 The Owner shall furnish surveys describing physical characteristics, legal limitations and utility locations for the site of the Project, and a written legal description of the site The surveys and legal information shall include, as applicable, grades and lines of streets, alleys, pavements and adjoining property and structures; adjacent drainage; rights -of -way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and necessary data pertaining to existing buildings, other improvements and trees; and information concerning available utility services and lines, both public and private, above and below grade, including inverts and depths. All the information on the survey shall be referenced to a project benchmark (this benchmark and the height of intial slab shall be approved by the Owner and City of Denton Engineering Department prior to bidding). 4 6 The Owner shall furnish the services of geotechnical engineers when such services are requested by the Architect. Such services may include but are not limited to test borings, test pits, determinations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, including necessary operations for anticipating sub -soil conditions, with reports and appropriate professional recommendations. 4.6.1 The Owner shall furnish the services of other consultants when such services are reasonably required by the scope of the Project and are requested by the Architect and are not retained by the Architect as part of his Basic Services 4.7 The Owner shall furnish structural, mechanical, chemical, air and water pollution tests, tests of hazardous materials, and other laboratory and environmental tests, inspections and reports required by law or the Contract Documents 4.8 The Owner shall furnish all legal, accounting and insurance counseling services as may be necessary at any time for the Project, including auditing services the Owner may require to verify the Contractor's Applications for Payment or to ascertain how or for what purposes the Contractor has used the money paid by or on behalf of the Owner 4.9 The services, information, surveys and reports required by Paragraphs 4.5 through 4.8 shall be furnished at the Owner's expense, and the Architect shall be entitled to rely upon the accuracy and completeness thereof in the absence of any negligence on the part of the Architect. Nothing in this contract shall relieve the Architect from the responsibility for services performed which were inadequate because they were based on information furnished by the City that an Architect exercising reasonable care and skill would have determined was inaccurate PAGE 11 4 10 Prompt written notice shall be given by the Owner to the Architect if the Owner becomes aware of any fault or defect in the Project or nonconformance with the Contract Documents 4 11 The proposed language of certificates or certifications requested of the Architect or Architect's consultants shall be submitted to the Architect for review and approval at least fourteen (14) days prior to execution. The Owner shall not request certifications that would require knowledge or services beyond the scope of this Agreement. ARTICLE 5 CONSTRUCTION COST 5.1 DEFINITION 5.1.1 The Construction Cost shall be the total cost or estimated cost to the Owner of all elements of the Project designed or specified by the Architect 5.1.2 The Construction Cost shall include the cost at current market rates of labor and materials furnished by the Owner and equipment designed, specified, selected or specially provided for by the Architect, plus a reasonable allowance for the Contractor's overhead and profit. In addition, a reasonable allowance for contingencies shall be included for market conditions at the time of bidding and for changes in the Work during construction. 5 1.3 Construction Cost does not include the compensation of the Architect and Architect's consultants, the costs of the land, rights -of -way, financing or other costs which are the responsibility of the Owner as provided in Article 4 5.2 RESPONSIBILITY FOR CONSTRUCTION 5 2.1 Evaluations of the Owner's Project budget, preliminary estimates of Construction Cost and detailed estimates of Construction Cost, if any, prepared by the Architect, represent the Architect's best judgment as a design professional familiar with the construction industry. It is recognized, however, that neither the Architect nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding or market conditions. Accordingly, the Architect cannot and does not warrant or represent that bids will not vary from the Owner's Project budget or from any estimate of Construction Cost or evaluation prepared or agreed to by the Architect 5.2.2 No fixed limit of Construction Cost shall be established as a condition of this Agreement by the furnishing, proposal or establishment of a Project budget, unless such fixed limits has been agreed upon in writing and signed by the parties PAGE 12 thereto. If such a fixed limit has been established, the Architect shall be permitted to include contingencies for design, bidding and price escalation, to determine what materials, equipment, component systems and types of construction are to be included in, the Contract Documents, to make reasonable adjustments in the scope of the Project and to include in the Contract Documents alternate bids to adjust the Construction Cost to the fixed limit Fixed limits, if any, shall be increased in the amount of an increase in the Contract Sum occurring after execution of the Contract for Construction. 5.2.3 If the Bidding Phase has not commenced within ninety (90) days after the Architect submits the Construction Documents to the Owner, any Project budget or fixed limit of Construction Cost shall be adjusted to reflect changes in the general level of prices in the construction industry between the date of submission of the Construction Documents to the Owner and the date on which proposals are sought. 5.2.4 If a fixed limit of Construction Cost (adjusted as provided in Subparagraph 5 2 3) is exceeded by the lowest bona fide bid, the Owner shall• 1. give written approval of an increase in such fixed limit; 2. authorize rebidding or renegotiating of the Project within a reasonable time; 3. if the Project is abandoned, terminate in accordance with Paragraph 7 3; or 4. cooperate in revising the Project scope and quality as required to reduce the Construction Cost. 5.2.5 If the Owner chooses to proceed under Clause 5.2.4 4 the Architect, without additional charge, shall modify the Contract Documents as necessary to comply with the fixed limit, at the Architect's sole cost and expense in accordance with Clause 2.5.2 The modification of Contract Documents shall be the limit of the Architect's responsibility arising out of the establishment of a fixed limit. The Architect shall be entitled to compensation in accordance with this Agreement for all services performed whether or not the Construction Phase is commenced. ARTICLE 6 USE OF ARCHITECT'S DRAWINGS, SPECIFICATIONS AND OTHER DOCUMENTS 6 1 The Drawings, Specifications and other documents prepared by the Architect for this Project are instruments of the PAGE 13 Architect's service for use solely with respect to this Pro3ect and, unless otherwise provided, the Architect shall be deemed the author of these documents and shall retain all common law, statutory and other reserved rights, including the copyright The Owner shall be permitted to retain copies, including reproducible copies, of the Architect's Drawings, Specifications and other documents for information and reference in connection with the Owner's use and occupancy of the Pro3ect The Architect's Drawings, Specifications or other documents shall not be used by the Owner or others on other projects or for completion of this Pro3ect by others, unless the Pro3ect, or any phase thereof, of the Pro3ect is complete, Architect is in default of this Agreement, or this Agreement is terminated, at which time such documents become property of the City of Denton which allows Owner freedom to use such documents 6 2 Submission or distribution of documents to meet official regulatory requirements or for similar purposes in connection with the Pro3ect is not to be construed as publication in derogation of the Architect's reserved rights. ARTICLE 7 TERMINATION, SUSPENSION OR ABANDONMENT 7 1 This Agreement may be terminated by either party upon not less than seven (7) days' written notice should the other party fail substantially to perform in accordance with the terms of this Agreement through no fault of the party initiating the termination 7.15 The City of Denton may terminate This Agreement after the completion of each basic service phase, as set forth in Article 10.1 2 hereof, upon written notice to the Architect 7.2 If the Pro3ect is suspended by the Owner for more than thirty (30) consecutive days, the Architect shall be compensated for services performed prior to notice of such suspension When the Project is resumed, the Architect's compensation shall be equitably adjusted to provide for expenses incurred in the interruption and resumption of the Architect's services. 7 3 This Agreement may be terminated by the Owner upon not less than seven (7) days' written notice to the Architect in the event that the Pro3ect is permanently abandoned If the Pro3ect is abandoned by the Owner for more than ninety (90) consecutive days, the Architect or the Owner may terminate this Agreement by giving written notice. 7 4 Failure of the Owner to make payments to the Architect in accordance with this Agreement shall be considered substantial nonperformance and cause for termination PAGE 14 7.5 If the Owner fails to make payment to Architect within thirty (30) days of receipt of a statement for services properly performed, the Architect may, upon seven (7) days' written notice to the owner, suspend performance of services under this Agreement Unless payment in full 1s received by the Architect within seven (7) days of the date of the notice, the suspension shall take effect without further notice. In the event of a suspension of services, the Architect shall have no liability to the Owner for delay or damage caused the Owner because of such suspension of services. 7.6 In the event of termination not the fault of the Architect, the Architect shall be compensated for services properly performed prior to termination. MISCELLANEOUS PROVISIONS 8.1 This Agreement shall be governed by the laws of the State of Texas 8.2 Terms in this Agreement shall have the same meaning as those in AIA Document A201, General Conditions of the Contract for Construction, current as of the date of this Agreement 8.3 The Owner and Architect, respectively, bind themselves, their partners, successors, assigns and legal representatives to the other party to this Agreement and to the partners, successors, assigns and legal representatives of such other party with respect to all covenants of this Agreement Neither Owner nor Architect shall assign this Agreement without the written consent of the other. 8.4 This Agreement represents the entire and integrated agreement between the Owner and Architect and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both Owner and Architect. 8.5 Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of a third party against either the Owner or Architect. 8.6 Unless otherwise provided in this Agreement, the Architect and Architect's consultants shall have no responsibility for the discovery, presence, handling, removal or disposal of or exposure of persons to hazardous materials in any form at the Project site, including but not limited to asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances, provided, however, Architect shall have the responsibility to and shall report to the Owner the location of any hazardous material PAGE 15 that an Architect of similar skill and expertise should have noticed. 8.7 Upon receipt of prior written approval of Owner, the Architect shall have the right to include representations of the design of the Project, including photographs of the exterior and interior, among the Architect's promotional and professional materials. The Architect's materials shall not include the Owner's confidential or proprietary information if the owner has previously advised the Architect in writing of the specific information considered by the Owner to be confidential or proprietary. The Owner shall provide professional credit for the Architect on the construction sign and in the promotional materials for the Project 8.8 Architect shall have knowledge in, experience in, and willing to participate/conduct in partnering construction. Partnering construction is defined as: "a long-term commitment between two or more organizations for the purpose of achieving specific business objectives by maximizing the effectiveness of each participant's resources. The relationship is based on trust, dedication to common goals, and an understanding of each other's individual expectations, values, roles and responsibilities." 8.9 The Owner shall have the right to review and approve personnel assigned to specific roles in the performance of this project. Architect agrees that this is a personal services contract and that the key persons who shall be performing most of the work shall be Lyle Burgin and Lou Wolf But, with Owner's permission, Architect may use other qualified and competent members of their firm to perform the work ARTICLE 9 PAYMENTS TO THE ARCHITECT 9.1 DIRECT PERSONNEL EXPENSE 9.1.1 Direct Personnel Expense is defined as the direct salaries of the Architect's personnel engaged on the Project and the portion of the cost of their mandatory and customary contributions and benefits related thereto, such as employment taxes and other statutory employee benefits, insurance, sick leave, holidays, vacations, pensions and similar contributions and benefits. 9.2 REIMBURSABLE EXPENSES - NEED TO BE PRE -APPROVED 9.2.1 Reimbursable Expenses are in addition to compensation for Basic and Additional Services and include expenses incurred by the Architect and Architect's employees and consultants in the interest of the Project, as identified in the following Clauses PAGE 16 9 2.1 1 Expense of transportation in connection with the Project; expenses in connection with authorized out-of-town travel, long-distance communications; and fees paid for securing approval of authorities having jurisdiction over the Project 9 2.1.2 Expense of reproductions, postage and handling of Drawings, Specifications and other documents 9 2.1.3 If authorized in advance by the Owner, expense of overtime work requiring higher than regular rates 9 2.1.4 Expense of renderings, models and mock-ups requested by the Owner. 9.2.1.5 Expense of additional insurance coverage or limits, including professional liability insurance, requested by the Owner in excess of that normally carried by the Architect and Architect's consultants. 9.3 PAYMENTS ON ACCOUNT OF BASIC SERVICES 9.3.1 Subsequent payments for Basic Services shall be made monthly and, where applicable, shall be in proportion to services performed within each phase of service, on the basis set forth in Subparagraph 10.2.2. 9 3 2 If and to the extent that the time initially established in Subparagraph 10 4 1 of this Agreement is exceeded or extended through no fault of the Architect, compensation for any services rendered during the additional period of time shall be computed in the manner set forth in Subparagraph 10 2 3 9.3.3 When compensation is based on a percentage of Construction Cost and any portions of the Project are deleted or otherwise not constructed, compensation for those portions of the Project shall be payable to the extent services are performed on those portions, in accordance with the schedule set forth in Subparagraph 10.2.2 based on (1) the lowest bona fide bid or (2) if no such bid or proposal is received, the most recent preliminary estimate of Construction Cost or detailed estimate of Construction Cost for such portions of the Project 9 4 PAYMENTS ON ACCOUNT OF ADDITIONAL SERVICES 9.4.1 Payments on account of the Architect's Additional Services and for Reimbursable Expenses shall be made monthly upon presentation of the Architect's statement of services rendered or expenses incurred 9 5 PAYMENTS WITHHELD 9 5.1 No deductions shall be made from the Architect's compensation on account of penalty, liquidated damages or other sums withheld from payments to contractors, or on account of the PAGE 17 cost of changes in the Work other than those for which the Architect is responsible. 9.6 ARCHITECT'S ACCOUNTING RECORDS 9 6.1 Records of Reimbursable Expenses and expenses pertaining to Additional Services and services performed on the basis of a multiple of Direct Personnel Expense shall be available to the Owner or the Owner's authorized representative for inspection and copying during regular business hours for three (3) years after the date of the final Certificate of Payment. ARTICLE 10 BASIS OF COMPENSATION The Owner shall compensate the Architect as follows 10.1 BASIC COMPENSATION 10.1.1 FOR BASIC SERVICES, as described in Article 2, and any other services included in Article 11 as part of Basic Services, Basic Compensation shall be the total amount of $67,150 00 with 5% retainage held by the City. 10.1.2 Progress payments for Basic Services in each phase shall total the following percentages of the total Basic Compensation payable: • Phase II - DMC Phase I/City Hall Phase II • Phase I and II • Design and Development 20% $13,430 00 • Construction Documents 45% $TO-,2=0 • Bidding 5% $TTT57-.50 • Phase I Construction 15% $TUTU7=0 • Phase II Construction 15% $0 Total cost without reimbursables $ 67,150 10.2 COMPENSATION FOR ADDITIONAL SERVICES (Not to exceed $7,000 00) 10.2 1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as described in Paragraph 2.2, compensation shall be computed as follows: On an hourly rate basis, based on Article 10.2 2 10.2.2 FOR ADDITIONAL SERVICES OF THE ARCHITECT, as described in Articles 3 and 11, other than (1) Additional Project Representation, as described in Paragraph 3.2, and (2) services PAGE 18 Representation, as described in Paragraph 3 2, and (2) services included in Article 11 as part of Additional Services, but excluding services of consultants, compensation shall be computed as follows: Principals $125 00 per hour Sr. Project Manager $95 00 average hourly rate See Exhibit "A" 10.2.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering services and those provided under Subparagraph 3.4.16 or identified in Article it as part of Additional Services, a multiple of 1.1 times the amounts billed to the Architect for such services 10.3 REIMBURSABLE EXPENSES (Not to exceed $7,000.00) 10.3.1 FOR REIMBURSABLE EXPENSES, as described in Paragraph 9.2, and any other items included in Article 11 as Reimbursable Expenses, a multiple of 1.1 times the expenses incurred by the Architect, the Architect's employees and consultants in the interest of the Project 10.4 ADDITIONAL PROVISIONS 10.4.1 IF THE BASIC SERVICES covered by this agreement have not been completed within fourteen (14) months of the date hereof, through no fault of the Architect, extension of the Architect's services beyond that time shall be compensated as provided in Subparagraphs 9.3.3 and 10.2.2. 10.4.2 Architect may bill the City for hours expended every month, beginning thirty (30) days after the Architect begins the work and the City shall endeavor to pay the Architect within thirty (30) days of receiving an invoice. However, the City shall not be obligated to pay more than 95% of the total contract price to Architect through monthly invoices, until Architect has completed all services required by this Agreement 10.4.3 Payments are due and payable thirty (30) days from the date of the Architect's invoice Amounts unpaid thirty (30) days after the invoice date shall bear interest at the rate of one percent (1%) per month. Provided, however, owner shall not be responsible for paying for any services which have not been satisfactorily performed in accordance with the terms and conditions of this contract and shall not be liable for any interest on such services. PAGE 19 ARTICLE 11 OTHER CONDITIONS OR SERVICES 1. Insurance and Indemnification Architect shall maintain, at no expense to Owner, insurance coverage placed with companies rated at least B+/X by Best's Key Rating Guide, including a professional liability policy in an amount not less than one million dollars ($1,000,000), including contractual liability coverage All applicable insurance policies shall name the Owner as additional insured and shall require the giving of written notice to Owner at least thirty (30) days prior to cancellation, non -renewal or material modification of any policies, evidenced by return receipt of United States Certified Mail. Architect shall furnish Owner copies of said policies or certificates of insurance Architect agrees to indemnify, hold harmless, and defend the City, its officers, agents, and employees from and against any and all claims or suits for injuries, damages, loss, or liability of whatever kind or character, arising out of or in connection with the performance by the Architect of those services contemplated by this Agreement, based upon allegations of negligent acts or omissions of Architect, its officers, employees and subcontractors. 2. Architects' work plan is attached hereto as Exhibit A 3. The parties agree that Ford, Carson & Powell will serve as a consultant to Corgan Associates Architects on the design and construction of City Hall. This agreement entered into as of the day and year first written above. CITY OF DENTON, TEXAS OWNER BY: /� TED BENAVIDES, CITY MANAGER CORGAN ASSOCIATES ARCHITECTS ARCHITECT BY: , J P RA NCIPA PAGE 20 ATTEST: IFS ALTERS, CITY SECRETARY APPROVED AS TO LEGAL FORM: HERBERT PROUTY, CITY ATTORNEY BY: PAGE 21 PROPOSED SCOPE OF WORK DMC AND CITY HALL RENOVATION PROJECT II 97/98 PROJECT II DMC/CITY HALL RENOVATION DESIGN PHASE I/SCOPE OF WORK (DMC) • Finish out approximately 7,000 sf for Customer Service (cashiering and tax) • Main building ADA entrance, two hallways - one leading to Human Resources and one leading to court/police (matching existing wood, ceiling, wall design) • New set of ADA restrooms • One new mechanical entry • New HVAC of existing system (if possible/size chiller) • New entry counter space • Storage space for court records • Fire/security/PAC system • Upgrade telephone system/T-cards • Complete furniture design implementation • Construct one Vision room - 1,800 sf DESIGN PHASE II/SCOPE OF WORK (CITY HALL O'NEIL FORD COMPLEX) • Finish out approximately 10,000 sf of office space • Wood/glass store front as O'Neil Ford • Move Administration Services upstairs • Finish out Legal Department • Modify two restrooms • One break room • Fire system - wet sprinklers/smoke detection • Basement ADA ramp • Removal of radio antenna • Complete furniture design implementation *Note: • Final furniture budget will be determined after construction design • Construction estimate/furniture estimate required in writing before bid • ADA State approval in writing before bid PAGE 22 u < < vI� a2 ym ■ Line 3j ° y 4a %■f o>toYoxa> �w�^ro oo 'eR:+ 1• �i ^ Ri e s > FRoouco7 McLAUGHLIWBRUNSON INS. AGENCY 10828 ESTATE LANE rar> 5,uab YaEpa`g �,t E• 4�4.55Y..�"orYoS'aR'F�'✓�h`a<o` DA7E (LBFDD/Y1T isa<Y,�t3µ v THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE D0E8 NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW COMPANIES AFFORDING COVERAGE SUITE 250 COMPANY DALLAS, TX 73288 214IM1212 A DESIGN PROFESSIONALS INSURANCE COMPANY INSURED COMPANY CORGAN ASSOCIATES, INC B $01 ELM STREET COMPANY SUITE a SOD c DALLAS, TX COMPANY ---- 76202 D �J�3Yy 'SCL�4 6 61 � ry � ia3?E� C @> Ye n/ � ��HI�N£5E'<`V^ia`"<» 3^a` 5• `a n" i5 � r0°a. < , y E �b .. � ;<` ` THIS IS TO CERTIFY THATB THE POUCHES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE HIS ED OR MAV PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDI ONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS TR TYPE OF INSURANCE POLICY xumom DATE (MM POLICY (FYI Lam OENERAL LIABILITY GENERAL AGGREGATE S PRODUCTS COMPIOP AGO $ DOMMERCAL GENERAL LIABILITY CLAILTS MADE 7OCCUR PERSONAL S ADV INJURY $ EACH OCCURRENCE $ OWNERS S CONTRACTORS PROT FIRE DAMAGE (Aroy one fire) $ MED EXP (Any one Person) S AUTOMOBILE LABILITY COMBINED SINGLE LIMB i ANY AUTO BODILY INJURY (Per Peron) f ALL OWNED AUTOS SCHEDULED AUTOS BODILY INJURY (Per exMenC S HIED AUTOS NON -OWNED AUTOS PROPERTY DAMAGE S GARAGE LABILITY AUTO ONLY EA ACCIDENT S OTHER THAN AUTO ONLY ANY AUTO EACH ACCIDENT S AGGREGATE S EXCESS LIABILITY EACH OCCURRENCE $ AGGREGATE S UMBRELLA FORM S OTHER THAN UMBRELLA FORM WORKERS COMPENSATION AND I TSYgM6 EL EACH ACCIDENT S BWLOVMW LIABILITY EL DISEASE POLICY LIMIT S 711E PROPRIETOR! INCL PARTNERSEXECUTIVE OFFICERS ARE EXOL EL DISEASE EA EMPLOYEE S A OTHM PROFESSIONAL PL700643 12/11/88 12/11/90 $ 2,000,000 PER CLAIM/ LIABILITY ANNUAL AGGREGATE DESCRIPTION OF opmATiomwLodAmomwmCLB&IMIAL ITEMS THE CLAIMS MADE PROFESSIONAL LIABILITY COVERAGE IS THE TOTAL AGGREGATE LIMIT FOR ALL CLAIMS PRESENTED WITHIN THE POLICY PERIOD AND IS SUBJECT A 09DUCTIIB�LE aTO �'3� a i�. @>'#�+v �S}`^&<f,Y��h"i�#�:i`ry' #3 $$i dG3i`4O'�`o��'e �%� gY!lF6•� <�$sr � �. 5 SHOULD ANY OF THE ABOVE DEBCRPED POLICIES BE CANCELLED BEFORE THE CITY OF DENTON ATTN MR TOM SHAW OR JODY FAX e817/BS2-7SOD 810 B TEXAS STREET EXPIRATION S W TENAEOF, THE /THE C COMPANY DUEL ENDEAVOR TO MAIL � DAYS WRITTEN xonce m THE CERTIFICATE HOLDER NAMED TO THE LEFT BUT FALURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR B OENTON, TEXAS 732014354 OF ANY Xw0 urow. THE cowAxr, ITS AGENTa OR A A RIRS A A, - � l CITY o/ DENTON, TEXAS MUNICIPAL BUILDING • 215 E McKINNEY • DENTON, TEXAS 76201 (817) 566.8200 • DFW METRO 434.2529 MEMORANDUM TO Tom Shaw, Purchasing Agent FROM Bruce Henington, Facilities Management DATE April 30, 1997 SUBJECT: Hiring of architect for Project II/Denton Municipal Complex/City Hall As you are aware, this project will complete the west wing of the City Hall, add a new main entry in the Denton Municipal Complex and renovate space in order to move Customer Service to the Denton Municipal Complex The Facility Management group is recommending the hiring of Corgan Associates, Inc , for the architectural support in order to begin Project II funded in the 97/98 CIP We are recommending Corgan for the following reasons • Corgan is familiar with the O'Neil Ford design and has already pre -designed the City Hall west wing with the assistance of Boone Powell & Associates • Corgan's fee is 7.44; of the budgeted project, well within the guidelines suggested in a study by the Society of Architects (a study used during the CIP process to set minimum and maximum architectural fees) • Corgan continues to provide a high degree of professionalism and has a good working relationship with the City Council Renovation Committee and City of Denton departments • Corgan completed the Jail, Police, Courts, Human Resources and Information Services phase of the Denton Municipal Complex and is very familiar with the structure and mechanical systems within that building "Dedicated to Quality Service" 27 Hiring of architect for Project II/DMC/CH May 2, 1997 Page Two Our goal is to complete the design and go to bid in September 1997 If successful we will present the construction contracts to the City Council in October or November 1997 The funding for these professional services comes out of 96/97 One- Time Budget account #457-032-Bldg-9718-9101. If you have any questions, please contact me at 8134 tLtr r-- B ce Henin to , CFM Attachments 3758 fm 28 901-8 TEXAS STREET P 0 NUMBER 75357 CORAN ASSOICATES 501 ELM STREET SUITE 500 DALLAS GITY OF DENTON, TEXAS PURCHASE ORDER DENroN rx 76201 DATEIVENDOR NO OOCUMENT T = 05-20-97 C38 5 COR31000 TX 75202 SHIP TO CONFIRMATION ONLY C38 FACILITY MGMT 604 E HICKORY DENTON TX 76201 ITEM ACCOUNT NUMBER UNITS NUMBER DESCRIPTION BID NO LINE AMOLV 01 457 032 BLDG 9718 9101 0.00 BASIC ARCHITECTURAL SERVICES 67,150 0: FOR PROJECT II DMC/CITY HALL DESIGN, BID AND CONSTRUCTION 02 457 032 BLDG 9718 9101 0.00 REIMBURSABLES - NOT TO EXCEED 7,000 00 TOTAL FOR P.O. 74,150 00 The City of Denton, Texasl is tax exempt -House Bill No 20 Reference PO Number on all B/I. Shipments and Invoices. Shipments are F.0.8 City Of Denton, or as indicated By Purchasing Division RA Number I Items Received I Date I Voucher Number I Amount I PURCHASING 29 -