Loading...
HomeMy WebLinkAbout1997-364ORDINANCENO / l--37 AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE ADDENDUM NO 1 TO THE PROFESSIONAL SERVICES AGREEMENT FOR THE DESIGN OF STREAM PEC-4 STORM DRAINAGE IMPROVEMENT AND RUDDELL STREET BRIDGE AND CHANNEL IMPROVEMENTS BETWEEN THE CITY AND TEAGUE NALL AND PERKINS, INC, AUTHORIZING THE EXPENDITURE OF FUNDS THEREFOR, AND PROVIDING AN EFFECTIVE DATE WHEREAS, on July 1, 1997, the City entered into a Professional Services Agreement for the design of stream PEC-4 storm drainage improvements and Ruddell Street bridge and channel improvements with Teague Nall and Perkins, Inc, hereinafter referred to as "Base Agreement," for a not -to -exceed amount of $217,647, and WHEREAS, the City desires to expand the scope of work for the above named consultant to include Alternatives No 5 and 6 and to increase the consultant's not -to -exceed figure by $45,163 to $262,810, NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I That the City Manager is hereby authorized to execute Addendum No 1 to the Base Agreement between the City and Teague Nall and Perkins, Inc in substantially the form of the attached Addendum No 1, which is made a part of this ordinance for all purposes SECTION II. That the City Manager is hereby authorized to expend the funds as set forth in the attached Addendum No 1 ,SECTION III That this ordinance shall become effective immediately upon its passage and approval /� PASSED AND APPROVED this the � day of �/eL' m% eK, 19q ATTEST JENNIFER WALTERS, CITY SECRETARY BY 1 APPROVED AS TO LEGAL FORM HERBERT L PROUTY, CITY ATTORNEY BY � u F \shared\dept\LGL\Our Documents\Ordmances\KAVCHRIZ\teague nall and periuns amendment doe Page 2 STATE OF TEXAS § COUNTY OF DENTON § ADDENDUM NO.1 TO PROFESSIONAL SERVICES AGREEMENT FOR THE DESIGN OF STREAM PEC-4 STORM DRAINAGE IMPROVEMENTS AND RUDDELL STREET BRIDGE AND CHANNEL IMPROVEMENTS BETWEEN THE CITY OF DENTON AND TEAGUE NALL AND PERKIN% INC. DATED JULY 1,1997 This Addendum No 1 to that Professional Services Agreement for the design of stream PEC-4 storm drainage improvements (Pecan Creek to P&P Railroad) and Ruddell Street bridge and channel improvements (Ruddell Street to Stream PEC-4) between the City of Denton, a Texas municipal corporation, with its principal office at 215 East McKinney Street, Denton, Denton County, Texas 76201 (hereinafter sometimes referred to as "Owner") and Teague Nall and Perkins, Inc, with its corporate office at 915 Florence Street, Fort Worth, Tarrant County, Texas 76102 (hereinafter sometimes referred to as "Consultant"), acting herem by and through their duly authorized representatives, hereinafter referred to as "Base Agreement " ARTICLE I That Section B of Article II "Scope of Services" of the Base Agreement is hereby amended by adding the following additional engineering services for the following elements of the project 1 Preparation of construction plans and project specifications/contract documents for Pecan Creek between Stream PEC-4 and Sycamore Street including a study to consider the removal of the Sycamore Street bridge at Pecan Creek, and preparation of a LOMR for this portion of Pei,an Creek after construction is completed Based on the Sycamore bridge study, demolition and utility relocation plans may be added to the scope of work by a later Addendum 2 Preparation of limited construction plans (Owner to construct) for earthen channel improvements on Pecan Creek from Woodrow Lane to Ruddell Street Plans are to consist of representative cross -sections, plan layout sheets, and exhibits for COE 404 Permit preparation, and erosion control plans Provide "as -built" cross -sections after construction by the Owner, and prepare a LOMR for this portion of Pecan Creek ARTICLE II That Article V "Compensation," subsection B `Billing and Payment" of the Base Agreement is hereby amended by adding the following fees to the Consultant's not -to -exceed figure The following additional lump sum fees are based on the above scope of work descriptions as indicated in B of Article II of the Base Agreement ALTERNATE NO.5 — PECAN CREEK (STREAM PEC-4 TO SYCAMORE STREET) Construction Plans, Specifications, and Contract Documents $15,623 (Includes Sycamore Bridge closing feasibility study) Topographuc Survey for Design 7,960 Letter of Map Revision (LOMR) 4.450 Subtotal Engineering Services Fee (Alternate No 5) $28,033 ALTERNATE NO.6 — PECAN CREEK (WOODROW DRIVE TO RUDDELL STREET) Construction Plans $ 3,360 (Representative Cross -Sections, Plan Layouts, and Exhibits) Topographic Survey for Design (Representative Cross -Sections) 3,160 Erosion Control Plans 2,660 Letter of Map Revision (LOMR) 7,950 Subtotal Engineering Services Fee (Alternate No 6) $17,130 Total Additional Engineering Services Fee $45,163 That the total of the additional fees for the above -mentioned Alternatives 5 and 6 shall increase the not -to -exceed figure of $217,647 by $45,163, so that the not -to -exceed figure shall now be $262,810 ARTICLE III That save and except as amended hereby, the remaining sections, subsections, sentences, and phrases of the Base Agreement shall remain in full force and effect EXECUTED in three counterparts (each of which is an original) on behalf of Consultant by its Vice President shown below, on behalf of Owner by its City Manager as duly authorized by its City Council this 1V day off% j('O,/Y/Y/,1,6— , 1997 OWNER CITY OF DENTON, TEXAS BY TediBenavides, City Manager CONSULTANT TEAGUE NALL AND m INC P E , Vice President Page - 2 ATTEST ATTEST JENNIFER WALTERS, CITY SECRETARY r BY BY APP ED A TO LEGAL FORM HE RT L P OUTY, CITY ATTQRNEY FM NCH LGl-WOLI\eharc&*t%GL\Ow Dwuman%\CmMW\taagua nail pakine amendment an Ida. Page - 3