Loading...
HomeMy WebLinkAbout1996-20797ELFCTR ORD NOTE Amended by Ordinance No. 97-236. ORDINANCE NO q6 -aQ1 AN ORDINANCE AMENDING THE SCHEDULE OF ELECTRIC RATES CONTAINED IN ORDINANCE 95-178, AMENDING THE WEEKEND RATE (WK), AMENDING THE STREET LIGHTING (LS) RATE, AMENDING THE DUSK TO DAWN RATE (DD), AMENDING THE ENERGY COST ADJUSTMENT RATE (ECA), PROVIDING FOR A SEVERABILITY CLAUSE, AND PROVIDING FOR AN EFFECTIVE DATE THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS SECTION I That the Schedule of Rates for electrical services as provided for in Chapter 26 of the Code of Ordinances, is amended to read as follows ARTICLE I. ELECTRIC RATE SCHEDULES PAGE R1 Residential Service Rate 2 R2 Residential Service Rate 4 TR Residential Time of Use Rate 6 GSL General Service Large 8 GSS General Service Small 11 TGS General Service Time of Use Rate 14 WK Weekend Rate 18 G1 Local Government Lighting & Power Service Rate 21 (City, County, Independent School District) LS Street Lighting 23 LT Traffic Lighting 25 LO Other Lighting 26 DD Dusk -to -Dawn Lighting (Security Light) 27 DL Decorative Lighting 29 T1 Temporary Service Schedule 30 Pi Interruptible Primary Service 32 ES Standby, Supplementary & Maintenance Service 34 AF Athletic Field 38 IDR Industrial Development Rate 40 APR Appliance Rebate 41 MTR Premium -Efficiency Motor Rebate 46 UPS Uninterruptible Power Supply 48 ECA Energy Cost Adjustment 50 Special Facilities Rider 51 SCHEDULE R1 RESIDENTIAL SERVICE (Effective 10/01/96) APPLICATION Applicable to all electric service used for residential pur- poses in a single family dwelling or an individually metered apart- ment; supplied at one point of delivery and measured through one meter where usage is not in excess of 700 KWH per 30-day month during the billing months of May through October If usage in any such month exceeds 700 KWH, billing will be rendered that month under Rate Schedule R2 and thereafter for a period extending through the 12 billing months of the next year ending with the October billing Annually, in November, the customer may again qualify for the R1 rate provided that consumption has not exceeded 700 KWH per 30-day month during the previous six summer months Where individual dwelling units are being served through the same meter and the KWH in the billing months of May through October exceed 700 KWH times the number of dwelling units, the billing for that month and thereafter will be rendered under Rate Schedule R2 (1) Facility Charge (2) Energy Charge (3) Energy Cost Adjustment Facility Charge MONO)MMMMO $6.70 / 30 days 3 85t / KWH Schedule ECA The City will supply single-phase service at any standard volt- ages available from the City's distribution system through one standard transformation. Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider. PAGE 2 PRORATION OF UTILITY BILLS Billing for the Facility charge shall be based on 12 billings annually and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading period x customer facility charge 30 days ENERGY CHARGE Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula KWH x KWH rate A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 3 SCHEDULE R2 RESIDENTIAL SERVICE (Effective 10/01/96) APPLICATION Applicable to any customer for all electric service used for residential purposes in an individual private dwelling or an indi- vidually metered apartment, supplied at one point of delivery and measured through one meter Also applicable to any customer heat- ing with electric energy, resistance or heat pump Not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider (1) Facility Charge Single Phase Three Phase (2) Energy Charge First 1,000 KWH Additional KWH First 3,000 KWH Additional KWH Billing months of NOV through APRIL $ 7 73 / 30 days $15 45 / 30 days 4 30 / KWH 3.940 / KWH (3) Energy Cost Adjustment Schedule ECA MINIMUM BILLING Single Phase Facility Charge Three Phase Facility Charge PAGE 4 Billing months of MAY through OCT $ 7 73 / 30 days $15 45 / 30 days 5 61G / KWH 6 210 / KWH Schedule ECA TYPE OF SERVICE The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required in advance Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider Billing for the Facility charge shall be based on 12 billings annually and prorated for longer or shorter billing periods using the following formula: Formula: Actual days in reading period x customer facility charge 30 days VDIMI'MeNIM _ Billing for the energy charge shall be based on actual KWH con- sumption during the billing period. Formula KWH in rate block x Rate per KWH in rate block RIA "14MIL61614wit.� A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 5 SCHEDULE TR RESIDENTIAL TIME OF USE (Effective 10/01/96) APPLICATION Applicable to any customer for all electric service used for residential purposes in an individual private dwelling or an indi- vidually metered apartment, supplied at one point of delivery and measured through one meter. Customers applying for the TR rate must remain on this rate for twelve (12) continuous billing per- iods Not applicable to resale service in any event, nor to tempo- rary, standby, or supplementary service except in conjunction with the applicable rider (1) Facility Charge Single Phase Three Phase (2) Energy Charge On -Peak Hours Off -Peak Hours (3) Energy Cost Adjustment MINIMUM BILLING Facility Charge $15.45 / 30 days $20 60 / 30 days 25 55G / KWH 1 41G / KWH Schedule ECA Single-phase or three-phase at sixty (60) cycles at secondary distribution voltage. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required. DEFINITION OF ON -PEAK HOURS The City's on -peak hours, for the purpose of this rate sched- ule, are designated as being from 2 00 P M to 7 00 P M each Monday through Friday, starting on June 1 and continuing through September 30 each year The City's on -peak hours may be changed from time to time and the customer will be notified twelve (12) months before such changes become effective PAGE 6 DEFINITION OF OFF-PEAK HOURS The City's off-peak hours, for the purpose of this rate sched- ule, shall be all hours not designated as on -peak hours SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided sub3ect to the special facilities rider PRORATION OF UTILITY BILLS Billing for the Facility Charge shall be based on 12 billings annually and prorated for longer or shorter periods using the following formula Actual days in reading period x customer facility charge 30 days Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula KWH in rate block x Rate per KWH in rate block A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA M:}_ M-iRM�I Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance PAGE 7 SCHEDULE GSL GENERAL SERVICE LARGE (Effective 10/01/96) APPLICATION The GSL Rate is applicable to any commercial or industrial customer having a minimum actual demand of 250 KVA or 225 KW for all electric service supplied at one point of delivery and measured through one meter Customers with an average actual demand equal to or greater than 200 KVA or 180 KW during the previous twelve month period may be allowed service under this rate, subject to the minimum billing provision Customers other than commercial and industrial may be allowed service under this rate, subject to the minimum billing provision. Customers who elect to discontinue service under this rate are ineligible for service under this rate for twelve months. This rate is not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider. NET ,MONTHLY RATE (1) Facility Charge (2) Demand Charge (3) Energy Charge (GL1) (4) Energy Cost Adjustment $60 60 / 30 days $ 8.64 / KVA (Minimum of 250 KVA billed) 1 414 / KWH Schedule ECA An amount equal to the facility charge, plus a demand charge billed at the above KVA rate, where demand is determined by whichever of the following methods yields the greatest result numerically 1) the actual monthly KVA demand, 2) 250 KVA, or 3) seventy,percent (7046) of the maximum monthly KW/KVA actual demand for any1month during the previous billing months of May through October in the twelve months ending with the current month TYPE OF SERVICE Secondary or primary service available to commercial and indus- trial customers Primary service is rendered at one point on the customer's premises at a nominal voltage of 13,200 volts PAGE 8 Customers who own, operate, and maintain all facilities neces- sary to receive three phase primary voltage service and all trans- formation facilities required for conversion to utilization voltage shall receive a discount of 0 3�/KWH (GL3) Primary service customers utilizing City owned and operated facility and transfor- mation equipment necessary to receive primary voltage service shall receive a discount of O.1G/KWH (GL2) The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage PAYMENT Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance The demand shall be determined by the KVA supplied during the 15-minute period of maximum use during the current month as deter- mined by City's demand meter, but shall not be less than 70$ of the highest monthly KW/KVA actual demand determined during the billing months of May through October in the 12 months immediately preceding the current month. If the current monthly demand is less than 250 KVA, and 70W of the actual demand determined during the previous months of May through October is less than either 250 KVA or 225 KW, a minimum of 250 KVA demand will be billed for the month In all cases, 250 KVA is the minimum demand billable under rate GSL SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided sub3ect to the special facilities rider (a) Billing for the Facility charge shall be based on 12 bill- ings annually and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading period x customer facility charge 30 days PAGE 9 (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading period x KVA demand x Rate 30 days ENERGY CHARGE Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula: KWH x KWH rate A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 10 SCHEDULE GSS GENERAL SERVICE SMALL (Effective 10/01/96) APPLICATION The GSS rate is applicable to any commercial or industrial customer having a maximum demand less than 225 KW for all electric service supplied at one point of delivery and measured through one meter Not applicable to resale service in any event, nor to temporary, standby, or supplementary service except in conjunction with the applicable rider NET MONTHLY RATE (1) Facility Charge (2) (3) (4) Single Phase Three Phase Demand Charge Energy Charge (GS1) Customer with 20 KW or below Block 1 - First 2,500 KWH Block 2 - All Additional KWH $15 15 / 30 days $20 20 / 30 days $ 8 00 / KW (First 20 KW not Billed) Customer above 20 KW. Block 1 - First 2,500 KWH Block 2 - Next 3,500 + B2T* KWH Block 3 - All Additional KWH 6 75G / KWH 3 00� / KWH 6 75C / KWH 3 00C / KWH 2 65G / KWH * The Block 2 Threshold (B2T) establishes the upper threshold for the Block 2 billing rate above 6,000 KWH as a function of demand, and is determined by the following formula- B2T KWH = ((Actual KW demand - 20) x 190) No customer shall be billed for KWH not actually consumed Energy Cost Adjustment PAGE 11 Current ECA Schedule 4KJAM LU 14"rM Nleii An amount equal to the facility charge plus the greater of 1) the actual monthly KW demand charge, or 2) seventy percent (70%) of the maximum monthly actual demand charge for any month during the previous billing months of May through October in the twelve months ending with the current month TYPE OF SERVICE Secondary service available to commercial and industrial customers The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required. Customers who own, operate, and maintain all facilities neces- sary to receive three phase primary voltage service and all trans- formation facilities required for conversion to utilization voltage shall receive a discount of 0 3G/KWH (GS3) Primary service customers utilizing City owned and operated facility and transfor- mation equipment necessary to receive primary voltage service shall receive a discount of 0 1G/KWH (GS2) The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance The demand shall be determined by the KW supplied during the 15-minute period of maximum use during the current month as deter- mined by City's demand meter, but shall not be less than 70% of the highest monthly actual demand determined during the billing months of May through October in the 12 months immediately preceding the current month Billing demand shall be based on an adjusted KW demand which is the highest of the actual monthly demand, less 20 KW or 70% of the maximum monthly actual demand during the preceding months of May through October, less 20 KW In no case, shall billed demand be less than 0 KW PAGE 12 In cases where the connected load is constant, the City may, at its option, estimate the KW demand For neon signs, one volt am- pere shall be considered the equivalent of 3/4 watt SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided sub]ect to the special facilities rider PRORATION OF UTILITY BILLS (a) Billing for the Facility charge shall be based on 12 bill- ings annually and prorated for longer or shorter periods using the following formula Formula. Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading Deriod x adjusted KW demand x Rate 30 days Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula KWH in rate block x Rate per KWH in rate block A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 13 SCHEDULE TGS GENERAL SERVICE TIME OF USE (Effective 10/01/96) APPLICATION Applicable to any customer having a minimum demand of 250 KVA for all electric service supplied at one point of delivery and measured through one meter, with the City providing all facilities necessary to receive primary voltage service Supplementary ser- vice will be available subject to the applicable rider. Not appli- cable to resale or temporary service Customers electing this rate must remain on this rate for a minimum of twelve (12) continuous billing months RIL4 i4.t6RV fi. OV41*I aW (1) Facility Charge (2) On -Peak Demand Charge (3) Off -Peak (System) Demand Charge (4) Energy Charge (5) Energy Cost Adjustment- 000 0,01M;4 040V(H The minimum monthly bill shall Facility Charge, the Off -Peak Demand Charge The October through May measured system demand, plus not 7 maximum monthly on -peak demand for a June through September in the twe preceding the current month. $70 70 / 30 days $10 98 / KVA On -Peak Demand $ 2 16 / KVA System Demand 0 51fi / KWH Per Schedule ECA be the sum of the Customer Charge, and the On -Peak Demand demand charge shall be the ess than 100%- of the actual my month during the months of alve (12) months immediately TYPE OF SERVICE Secondary or primary service available to commercial and indus- trial customers Primary service is rendered at one point on the customer's premises at a nominal voltage of 13,200 volts The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required PAGE 14 PRIMARY SERVICE DISCOUNT Customers who own, operate and maintain all facilities neces- sary to receive three phase primary voltage service and all trans- formation facilities required for conversion to utilization voltage shall receive a discount of 0 3G/KWH (TG5 and TG6) If primary service is provided and the City owns and operates all facilities and transformation equipment necessary to receive primary voltage service, a discount of 0 14/KWH will be applied to the customer's bill (TG3 and TG4) The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option DEFINITION OF ON -PEAK HOURS The City's on -peak hours, for the purpose of this rate sched- ule, are designated as being from 2 00 P M to 7 00 P M each Monday through Friday, for the months of June through September The City's on -peak hours may be changed from time to time and the customer will be notified twelve (12) months before such changes become effective The City's system (off-peak) hours, for the purpose of this rate schedule, shall be all hours not designated as on -peak hours • _ •,_4. • • •.� 9_� • s� • The on -peak demand shall be determined by the KVA actual demand supplied during the fifteen (15) minute period of maximum use each month during on -peak hours as recorded by the City's demand meter, but not less than one hundred percent (1001;) of the actual maximum on -peak demand similarly determined during the billing months of June through September in the twelve (12) months immediately preceding the current month [PPRTRI_4__RE__ •7k • • • • The off-peak demand shall be determined by the maximum KVA actual demand supplied during the fifteen (15) minute period of maximum use during off-peak hours each month as recorded by the City's demand meter The off-peak demand will be billed every month DETERMINATION OF DEMAND BILLING FOR CUSTOMERS WITH NO PEAK DEMAND HISTORY DURING OFF PEAK MONTHS If the customer is new or does not have a history of on -peak use for June through September, and elects to come on the TGS rate, the customer's billed demand shall be the off-peak demand billed at the GSL demand rate The off-peak demand will be billed every month at the GSL rate until the customer establishes a separate on -peak and WiTelmiml off-peak demand during an on -peak month At this time, both on - peak and off-peak demand will then begin billing at the TGS rate Customers requesting standby or supplementary power shall be allowed service under this rate schedule, however, the determina- tion of off-peak demand shall be adjusted to read The off-peak demand shall be the sum of the maximum KVA demand supplied during the fifteen (15) minute period of maxi- mum use as recorded by the City's demand meter plus the KVA nameplate rating(s) of the customer's generator(s) In the event the customer's generator(s) is/are off-line at the time of the establishment of the maximum off-peak demand, the KVA nameplate rating of the generator(s) unavailable for service shall be removed from the determination of the off-peak demand All'services which require special facilities in order to meet the customer's service requirements shall be provided subject to special facilities rider. (a) Billing for the Facility Charge shall be based on 12 bill- ings annually and prorated for longer or shorter periods using the following formula: Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30-day-per- month basis and pro rated for longer or shorter billing periods using the following formula Actual days in reading period x KVA Billed Demand x Rate 30 days wwwke"Keo Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula: KWH x KWH rate PAGE 16 l:;efSK•�w A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance PAGE 17 SCHEDULE WK WEEKEND RATE (EFFECTIVE 10/01/96) APPLICATION Applicable to any commercial and industrial user whose maximum demand load occurs during the period from Thursday at 12 midnight through Sunday at 12 midnight and does not experience a demand load during the period from Sunday 12 midnight through Thursday 12 mid- night that exceeds 80% of the maximum demand load Customers who violate the 80* requirement more than four times during the month, or more than twice on the same day of the week, during the months of June through September, are ineligible for service under this rate for twelve (12) months Not applicable to resale service in any event, nor to temporary, standby or supplementary service except in conjunction with applicable rider. (1) Facility Charge Single Phase Three Phase $20 00 / 30 days $25.00 / 30 days (2) Demand Charge $ 6.40 / KW (First 20 KW not Billed) (3) Energy Charge Customer with 20 KW or below. Block 1 - First 2,500 KWH 6 75G / KWH Block 2 - All Additional KWH 3 00G / KWH Customer above 20 KW: Block 1 - First 2,500 KWH 6 750 / KWH Block 2 - Next 3,500 + B2T* KWH 3.000 / KWH Block 3 - All Additional KWH 2.654 / KWH * The Block 2 Threshold (B2T) establishes the upper threshold for the Block 2 billing rate above 6,000 KWH as a function of demand, and is determined by the following formula B2T KWH = ((Actual KW demand - 20) x 190) No customer shall be billed for KWH not actually consumed (4) Energy Cost Adjustment PAGE 18 Per Schedule ECA MINIMUM BILLING An amount equal to the demand charge as calculated below plus $20 00/month for single phase service or $25 00/month for three phase service, per 30 day billing TYPE OF SERVICE The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required Bills are due when rendered and become past due if not paid within 15 calendar days from date of issuance The demand shall be determined by the KW supplied during the fifteen (15) minute period of maximum use during the current month as determined by the City's demand meter. Billing shall be based on an adjusted KW demand, which is the actual demand less 20 KW The adjusted KW demand will subsequently be used for billing the demand portion of the utility bill In no case, shall billed demand be less than 0 KW All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider. Billing for customer facility charge and demand shall be calcu- lated on a 30-day basis and prorated for longer or shorter billing periods using the following formula (a) Billing for the Customer Facility Charge shall be based on 12 billings annually Formula Actual days in reading period x customer facility charge 30 days PAGE 19 (b) Billing for the Demand Charge shall be based on 12 bill- ings annually Formula Actual days in reading period x adjusted KW demand x Rate 30 days ENERGY CHARGE Billing for the energy charge shall be based on actual KWH con- sumption during the billing period. Formula KWH in rate block x Rate per KWH in rate block � S _ • : • l 4ti_ �1! A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. PAGE 20 SCHEDULE G1 LOCAL GOVERNMENT (Effective 10/01/96) APPLICATION Applicable to any local City, County or School District for all electric service supplied at one point of delivery and measured through one meter Not applicable to resale service in any event, nor to tempo- rary, standby or supplementary service except in con3unction with applicable rider. NET MONTHLY RATE (1) Facility Charge Single Phase Three Phase (2) Demand Charge (3) Energy Charge (4) Energy Cost Adjustment 0._9_4to) ON; _ It � $15 15 / 30 days $20 20 / 30 days $ 6 31 / KW 3 03t / KWH Current ECA Schedule An amount equal to the demand charge as calculated below, but not less than fifty percent (50$) of the maximum monthly demand charge for any month during the previous billing months of May through October in the twelve months ending with the current month, plus the applicable facility charge per 30 day billing period W JMOIa Mftw•p The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance PAGE 21 DETERMINATION OF DEMAND The demand shall be determined by the KW supplied during the 15-minute period of maximum use during the current month as deter- mined by City's demand meter, but not less than 50t of the highest monthly actual demand determined during the billing months of May through October in the twelve months immediately preceding the current month SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider (a) Billing for the Facility charge shall be based on 12 bill- ings annually and prorated for longer or shorter billing periods using the following formula Formula: Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula. Formula Actual days in reading period x KW billed demand x Rate 30 days _laa:j- ,7,evmQ,_Fj;,W Billing for the energy charge shall be based on actual KWH con- sumption during the billing period. Formula KWH x KWH rate ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 22 SCHEDULE LS STREET LIGHTING (Effective 10/01/96) APPLICATION Applicable to all street lighting owned and maintained by the City of Denton NET MONTHLY RATE (1) Facility Charge See table (2) Energy Cost Adjustment Current ECA x Monthly Bulb Wattage Factor Facility Charge Bulb Wattage Factor LS LSA 100 W Sodium Vapor $ 4 90 / 30 Days 48 KWH 150 W Sodium Vapor LSB 250 W Sodium Vapor $ 6 95 / 30 Days 105 KWH LSC 400 W Sodium Vapor $ 8 75 / 30 Days 159 KWH LMA 175 W Mercury Vapor $ 5 65 / 30 Days 70 KWH LMB 250 W Mercury Vapor $ 6 70 / 30 Days 98 KWH LMC 400 W Mercury Vapor $ 8.50 / 30 Days 153 KWH LMD 1,000 W Mercury Vapor $15 45 / 30 Days 380 KWH The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may first be required Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance PAGE 23 PRORATION OF UTILITY BILLS a) Billing for the Facility Charge shall be based on 12 bill- ings annually and prorated for longer or shorter periods using the following formula Actual days in reading period x # of lights per type x 30 days customer facility charge ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 24 SCREDULE LT TRAFFIC LIGHTING (Effective 10/01/96) Applicable to State and Local Government agencies that operate and maintain their own traffic signals NET MONTHLY RATE All KWH TYPE OF SERVICE 5 30C / KWH At the City's available secondary voltage and phase "+'_WDRM�I Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance Maintenance expenses billed at cost SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider IMP-' '-' -' Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula: KWH x KWH rate A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 25 SCHEDULE LO OTHER LIGHTING (Effective 10/01/96) LOA APPLICATION Applicable to State and Local Government agencies that install and maintain their own street lights, other than the City of Denton LS1 250 W Sodium Vapor LS2 400 W Sodium Vapor LM1 400 W Mercury Vapor LM2 1,000 W Mercury Vapor NET MONTHLY RATE 5 30C / KWH 5 30� / KWH 5 304 / KWH 5 30C / KWH Applicable to other unmetered lighting services Total Watts x Hours used per Month x 1,000 BULB WATTAGE FACTOR 105 KWH 159 KWH 153 KWH 380 KWH KWH rate At the City's available secondary voltage and phase Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance Maintenance expenses billed at cost. SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 26 SCHEDULE DD DUSK TO DAWN LIGHTING (Effective 10/01/96) APPLICATION Applicable to any customer within the area served by the City's electric distribution system for outdoor area lighting when such lighting facilities are operated as an extension of the City's distribution system NET MONTHLY RATE (1) Facility Charge See table (2) Energy Cost Adjustment Current ECA x Monthly Bulb Wattage Factor Facility Charge Bulb Wattage Factor DSA 100 W Sodium Vapor $ 7 75 / 30 Days 48 KWH 150 W Sodium Vapor DSB 250 W Sodium Vapor $10 05 / 30 Days 105 KWH DSC 400 W Sodium Vapor $12.35 / 30 Days 159 KWH DMA 175 W Mercury Vapor $ 6 45 / 30 Days 70 KWH DMB 250 W Mercury Vapor $ 7 50 / 30 Days 98 KWH DMC 400 W Mercury Vapor $ 8 35 / 30 Days 153 KWH The City shall furnish, install, maintain and deliver electric service to automatically controlled, mercury or sodium vapor light- ing fixtures conforming to the City's standards and subject to its published rules and regulations. Where necessary for proper illumination or where existing poles are inadequate, the City will install or cause to be installed, one (1) pole for each installed light, at a distance not to exceed eighty (801) feet from said existing lines, at no charge to the customer. Each additional pole span shall not exceed a span spac- ing of one hundred (1001) feet Additional poles required to in- stall a light in a customer's specifically desired location, and not having a light installed on same, shall bear the cost PAYMENT Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance PAGE 27 A two (2) year contract shall be agreed to and signed by each customer desiring Dusk -to -Dawn Lighting Service authorizing fixed monthly charges, which may be reviewed annually, and to be applied to the monthly municipal utilities bill In the event that a cus- tomer desired the removal of the unit or discontinuance of the ser- vice prior to completion of two (2) years, the remainder of the contract period shall become due and payable After the end of the initial two (2) year contract, service shall continue on a month - to -month basis and may be canceled by either party upon thirty (30) days notice SPECIAL FACILITIES All service which requires special facilities in order to meet the customer's service requirements shall be provided sub]ect to special facilities rider WGIMWOR • Y Billing for the Facility charge shall be based on 12 billings annually and prorated for longer or shorter billing periods using the following formula: Formula• Actual days in reading period x customer facility charge 30 days • ' � L _441_�M A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 28 SCHEDULE DL DECORATIVE LIGHTING (Effective 10/01/96) APPLICATION Applicable to any customer on the perimeter of the square ser- ved by the City's electric distribution system for outdoor area lighting when such lighting facilities are operated as an extension of the City's distribution system NET MONTHLY RATE (1) Facility Charge $3.85 / 30 Days (2) Energy Cost Adjustment Current ECA x Monthly Bulb Wattage Factor, based on 415 KWH per Customer TYPE OF SERVICE The City shall furnish, install, maintain and deliver electric service to automatically controlled lighting fixtures conforming to the City's standards and subject to its published rules and regula- tions The service is provided between dusk and midnight Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance All service which requires special facilities in order to meet the customer's service requirements shall be provided subject to special facilities rider Billing for the Facility Charge shall be based on 12 billings annually and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading period x Facility Charge 30 days ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 29 SCHEDULE T1 TEMPORARY SERVICE (Effective 10/01/96) APPLICATION Applicable when a customer requests electric service on a short term or temporary basis where a customer has received a permit from the City of Denton's Building Inspections Department This rate is not applicable after the certificate of occupancy has been issued NET MONTHLY RATE (1) Facility Charge Single Phase $15 15 / 30 days Three Phase $20 20 / 30 days (2) Energy Charge 6 774 / KWH (3) Energy Cost Adjustment Current ECA Schedule MINIMUM BILLING Facility Charge TYPE OF SERVICE At the City's available secondary supply Labor (Regular Time) $60 00 minimum up to 1 hour $60.00 for each additional hour (to be mea- sured to the nearest one -quarter hour) Labor (Overtime) $75 00 minimum up to 1 hour $75 00 for each additional hour (to be mea- sured to the nearest one -quarter hour) Premium time to be added where applica- ble Transportation To be billed by hours or miles, as applicable, according to the estimated cost of operating the equipment Material Material that cannot be salvaged to be billed at Stores cost plus 25% and applicable sales tax PAGE 30 Material At the time a temporary service is re- moved or converted, any loss in the material installed due to negligence or willful action by the customer will be billed separately to the customer at replacement cost plus 25% and sales tax SPECIAL FACILITIES All services which require special facilities in order to meet the customer's service requirements shall be provided subject to special facilities rider See Section 25-23(e) for standard re- quirements Mfly_'. •.� • Billing for the Facility charge shall be based on 12 billings annually and prorated for longer or shorter periods using the following formula - Formula. Actual days in reading period x customer facility charge 30 days ENERGY CHARGE Billing for the energy charge shall be based on actual KWH con- sumption during the billing period Formula KWH x KWH rate A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 31 SCHEDULE P1 INTERRUPTIBLE PRIMARY SERVICE (Effective 10/01/96) Applicable to all customers taking primary service at a firm power load exceeding 1,000 KVA during the months of June, July, August and September and is, by contract, provided service subject to load interruptions The City retains the right to limit the number of customers on this rate if the City's load reduction goals are met NET MONTHLY CHARGE (1) Facility Charge (2) Energy Charge (3) Demand Charge (Estimated Transmission Firm) $ 70 70 / 30 days 0 20G / KWH $ 3 78 / KVA (4) Energy Cost Adjustment Current ECA Schedule MINIMUM BILLING An amount equal to the demand charge as calculated below but not less than one hundred percent (100%-) of the maximum monthly KVA similarly determined during the previous billing months of May through,October in the twelve months ending with the current month, nor less than 1,000 KVA Interruptible primary voltage service (transformation equipment owned by customer) is available to any customer with a 12-month minimum monthly demand of 1,000 KVA or greater. Interruptible pri- mary service rendered at one point on the customer's premises at a nominal voltage of 13,200 volts or 69,000 volts three-phase at the option of the utility. Theiprimary voltage service customer shall own, operate, and maintain all facilities necessary to receive three phase primary voltage service and all transformation facilities required for conversion to utilization voltage The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the Utility's option Where the City elects to meter at secondary voltage, two percent shall be added to the demand charge, the energy charge and the energy cost adjustment charge to account for transformer losses PAGE 32 DETERMINATION OF DEMAND The demand shall be determined by the KVA supplied during the 15-minute period of maximum use during the current month as determined by City's demand meter, but not less than 100t of the maximum monthly KVA similarly determined during the billing months of May through October in the twelve months immediately preceding the current month, nor less than 1,000 KVA SPECIAL FACILITIES All service which requires special facilities in order to meet the customer's service requirements shall be provided subject to special facilities rider. (a) Billing for the Facility charge shall be based on 12 bill- ings annually and prorated for longer or shorter billing periods using the following formula Formula: Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Formula• Actual days in reading period x KVA Demand x KVA Rate 30 days LA1 Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula• KWH x KWH rate � • S • � Yul �Y A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. PAGE 33 SCHEDULE ES STANDBY, SUPPLEMENTARY AND MAINTENANCE SERVICE (Effective 10/01/96) APPLICATION Applicable in all areas served by the City to customers who (1) own and/or operate an electric power generation facility mainly used for non -emergency uses and which has a total nameplate or effective capacity (whichever is lesser) of fifty (50) KVA or more in parallel with the City's electric system for the purpose of generating power for the customer's own consumption, and (2) employ equipment which is compatible with the City's elec- tric system at the customer's delivery point and which will cause no damage to the City's electric system or equipment or present undue hazards to City personnel, and (3) own and/or operate an electrical generating facility which has been certified annually by a registered professional engineer practicing in the utility or Independent Power Production Industry to be a functioning and reliable generating facility (4) operate an electrical power generating system at least 6,500 hours annually (5) execute an agreement for interconnection and parallel operation with the City 1� The customer shall reimburse the City for any equipment or facilities required as a result of the installation by the customer of generation in parallel with the City's electric system. The customer shall pay all costs of the City to extend its facilities or modify them at the time of interconnection, or at some future time in order to permit parallel operation of the customer's facility TYPE OF SE The City shall supply alternating current at sixty (60) cycles and at the voltage and phase of the City's electric system most available to the location of the customer The primary voltage customer shall own, operate and maintain all facilities necessary to receive three phase primary voltage service and all transforma- tion facilities required for conversion to utilization voltage PAGE 34 The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option Where the City elects to meter at secondary voltage, the secondary energy and on -peak demand charges shall apply NET MONTHLY RATE (1) Facility Charge (2) Demand Charges. On -Peak Demand Off -Peak Demand Primary Service $60 60 / 30 days $10 30 / KVA $ 3 80 / KVA (3) Energy Charges: Non -Emergency Energy 0 20G / KWH Emergency Energy 5 25G / KWH (5) Energy Cost Adjustment Current ECA Secondary Service $25 25 / 30 days $10 30 / KVA $ 3 80 / KVA 0 510 / KWH 5 350 / KWH Current ECA If the sum of the Customer Facility Charge, the On -Peak Demand Charge, and the Off -Peak Demand Charge is less than $1 00 per KVA of installed transformer capacity, $1.00 per KVA of installed transformer capacity will be the monthly charge The minimum monthly billing shall be the higher of the following. (1) The sum of the Customer Facility Charge, the On -Peak Demand Charge, and the Off -Peak Demand Charge, or (2) A charge of $1.00 per KVA of installed transformer capacity. The,on-peak demand shall be determined by the KW demand supplied by the City during the fifteen (15) minute period of maximum use during the on -peak hours as recorded by the City' s demand meter, but not less than one hundred percent (100W) of the maximum on -peak demand which occurred during the billing months of June through September in the twelve (12) months immediately preceding the current month PAGE 35 DETF�RMINATION OF ON -PEAK DEMAND - COGENERATION UNITS NOT OPERATING AND CUSTOMER'S PEAK DID NOT CONTRIBUTE TO CITY'S ANNUAL SYSTEM PEAK If a customer's cogeneration unit(s) is/are off during peak hours, and the customer's peak did not contribute to the City's annual off-peak demand, and the cogeneration unit is one (1) MW or larger, then the nameplate rating of the customer's unit(s) shall be deducted from the peak demand The customer shall be charged the appropriate on -peak demand charges for the KW supplied by the City for the succeeding twelve (12) months DETERMINATION OF OFF-PEAK (SYSTEM) DEMAND The off-peak demand shall be determined by the sum of the KW demand supplied during the fifteen (15) minute period of maximum use as recorded by the City's demand meter, plus the KW nameplate rating(s) of the customers generator(s) In no event shall the off-peak demand be less than seventy percent (70W) of the maximum on -peak demand similarly determined during the billing months of June through September in the twelve (12) months immediately preceding the current month. All energy supplied to customers whose generating units are less than one (1) MW capacity Emergency energy is all energy supplied by the City during peak hours of operation to displace energy normally supplied by custom- er's one (1) MW or larger unit. The City's on -peak hours, for the purpose of this rate sched- ule, are designated as being from 2 00 P.M. to 7.00 P.M each Monday through Friday The City's off-peak hours, for the purpose of this rate sched- ule, shall be all hours not designated as on -peak hours SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider PAGE 36 (a) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Actual days in reading period x KW Billing Demand x Rate 30 days Billing for energy shall be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block If Customer -produced energy is fed back into the City's system during on -peak hours, an amount equal to fuel cost calculated in accordance with Schedule ECA, as applicable to such energy is cred- ited monthly, provided that Customer has paid the City for neces- sary added metering, protective and other equipment as determined by the City If Customer -produced energy is fed back into the City's system during off-peak hours, an amount equal to 70% of the billed ECA charge per KWH (for each KWH delivered back into the City's system) will be credited monthly, provided that Customer has paid the City for necessary added metering, protective and other equipment as determined by the City A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA PAGE 37 SCHEDULE AF ATHLETIC FIELD (Effective 10/01/96) APPLICATION Applicable to all electric service metered at one point for use to light specified areas for athletic events where such electrical use will not occur between the hours of 2 00 P M and 7 00 P M for the months of June through September NET MONTHLY RATE (1) Facility Charge Single Phase $20 20 / 30 days Three Phase $30 30 / 30 days (2) Energy Charge Billing months of June through September. 2:00 PM to 7.00 PM (Peak) 7 58c / KWH All Other Hours (Off Peak) 3 79G / KWH Billing months of October through May. All hours 3 79fi / KWH (3) Demand Charge Billing months of June through Sentember. Peak (2 11 11 1 All Other Hours (Off Peak) $1 11 / KW Billing months of October through May. All hours $1 11 / KW (4) Energy Cost Adjustment Current ECA Schedule MINIMUM BILLING Facility Charge TYPE OF SERVICE At the City's available secondary voltage and available phase For use only between the hours of 7 00 P M and 2 00 P M from June through September and all hours from October through May PAGE 38 SPECIAL FACILITIES All services which require special facilities in order to meet customer's service requirements shall be provided sub3ect to the special facilities rider PRORATION OF UTILITY BILLS (a) Billing for the Facility charge shall be based on 12 bill- ings annually and prorated for longer or shorter periods using the following formula Formula Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30 day per month basis and prorated for longer or shorter billing periods using the following formula Formula• Actual days in reading period x KW demand x Rate 30 days Billing for the energy charge shall be based on actual KWH con- sumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block 1ZW A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. PAGE 39 SCHEDULE IDR INDUSTRIAL/ECONOMIC DEVELOPMENT RIDER (Effective 10/01/96) AVAILABILITY This rider is available to the customers who receive service from Rate Schedules GSS, GSL, or TGS APPLICATION This rider is available to electric service supplied at any one location It is for firm electric service applicable to new and existing customers as described below, over a five year period This rider is available to the following classes of customers (1) New customers whose electric service represents demand not previously served by the City at any location in the City's service area in the last 12 months, where such metered demand will be in excess of 225 KVA or 200 KW, as estimated and mutually agreed upon by the Director of Electric Utilities and the customer (2) Existing customers served under Rate Schedules GSS, GSL or TGS who increase their prior existing metered demand by 225 KVA or 200 KW. This increase shall be verified by comparing a three month rolling average of the new level of demand to the prior demand averaged for corresponding months. During periods in which this verification method cannot be applied, the Director of Electric Utilities and the customer may develop a mutually agreed upon formula to estimate the base and additional demand levels NET ,MONTHLY RATE The customer shall be charged under the appropriate applicable rate schedules with the exception that the monthly billing demand (For GSS and GSL) or system demand and on -peak demand (For TGS) will be adjusted in accordance with the following table: Reduction to Billing Time Period Demand or System Demand First Year 50%; Second Year 40%' Third Year 30%- Fourth Year 20%- Fifth Year 10% CONTRACT PERIOD The term of the contract will be for five years PAGE 40 SCHEDULE APR APPLIANCE REBATE (Effective 10/01/96) Application/Program Summary The City of Denton Utility Department is offering cash payments to customers who purchase and install high efficiency air condi- tioners or heat pumps in new or existing residential or commercial facilities The program's objective is to reduce energy demand and consump- tion, thereby saving customers dollars on their utility bills and reducing the peak load of the City of Denton's electric system Program Guideline 1 All installations must be for accounts served by the City of Denton Utility Department and must meet all applicable national, local, and manufacturers' codes and specifica- tions. 2 To qualify for a rebate, equipment must be new when in- stalled. 3 All equipment must be purchased No leased or lease/ purchased equipment will qualify for a cash rebate 4 Installations must be made by licensed contractors and/or dealers 5 No rebate will be paid on a partial replacement of an air conditioner The compressor, condenser and the evaporator coil must be replaced to qualify for a rebate 6 Payments for residential central cooling systems, which include apartments and mobile homes, will be limited to a capacity based on a minimum of 500 conditioned square feet per ton 7 The conditioned area in square feet is required on each residential central system request for payment 8 The rebate will be paid to the purchaser of the qualifying equipment upon verification of compliance with program guidelines 9 Requests for payment must be received by the Director of Electric Utilities within 60 days of installation PAGE 41 10 Equipment and installation are subject to inspection by the City's Building Inspection Department before final approval for payment is issued 11 The Appliance Rebate Program guidelines and payments are subject to change without notice 12 The Appliance Rebate Program may be discontinued without prior notice at any time by the City of Denton GENERAL PROCEDURES A. Application To determine who qualifies for a rebate, an appli- cation for rebate must be completed and sent to the Director of Electric Utilities within 60 days of installation of the equipment Participating dealers have rebate application forms and will complete these forms for the purchaser. It is the purchaser's responsibility to see that the dealer completes the form and submits it to the Director of Electric Utilities B. Inspections Installations of central systems will be inspected by the City's Building Inspection Department and must be approved before rebates will be processed. C. Payments to Participants Cash payments will be made to the purchaser of the qualifying equipment Participating retail equip- ment dealers will receive a cash payment of $20 per unit for the sale of window units, central air conditioning systems, or heat pumps to offset their cost for properly filling out the applications for purchasers. Program participants are responsible for submitting the correct information The Utili- ty Department will not issue any additional payment unless the payment was incorrect due to a mistake in processing by a City employee 1 The twenty dollar ($20 00) payments to dealers will be made only if they supply the qualifying equipment to the customer or builder who is paying for the installation of the equipment Dealers and purchasers may be denied payment for failure to follow program guidelines such as failing to supply correct square footage or SEER/EER figures, installing equipment which is not PAGE 42 new; replacing part of a split system, or failure to fill out rebate forms properly 2 Payments will be made to customers who pur- chase and install new qualifying equipment If a tenant purchases and installs qualify- ing equipment, the payment is made to the tenant If the owner of rental property purchases and installs qualifying equipment, the payment is made to the owner If the purchaser of a mobile or custom home selects and pays for a qualifying unit, the purchas- er will receive the rebate II CENTRAL ELECTRIC AIR CONDITIONERS AND HEAT PUMPS A. A new condensing unit with an inside evaporator coil will qualify if matched, as specified, in the current issue of the ARI Directory of Certified Air Conditioners and Air Source Heat Pumps and the unit meets the minimum ratings as specified in the 1992 Appliance Rebate Program If the unit is not in the current ARI Directory, the manufacturer's latest data approved for publication will be ac- cepted. If the unit is not in the current ARI Directory or data approved for publication, the average of the high and low SEER/EER coil only, not including blower coil, will be accepted as listed in the current ARI Directory B. Computer simulations may be used if ratings are not listed in the current ARI Directory, provided the following criteria are met 1. Systems using mix -matched coils must meet all established program guidelines to quali- fy for a rebate 2. The computer simulations must be signed, certified, and dated by a registered profes- sional engineer and an officer of the compa- ny making the submittal 3 The engineer who certifies a simulation must attest to the accuracy of the input data, the validity of the calculation procedure used, and that the results are in accordance with D 0 E approved methodology 4 A complete set of the input data and an indication of the source of the data must accompany the simulated ratings PAGE 43 C 5 The simulated ratings must be based on the condensing unit's tested combination as listed in the current ARI Directory or latest data approved for publication and identified by the correct model numbers of both the condensing unit and coil as listed in the current ARI Directory 6 Simulated ratings must not exceed 105% of the SEER ratinq of the tested system used as a base 7 An open file of computer simulations will be maintained at the Energy Management Office Supplying erroneous ratings or data can lead to disqualification of those involved from further program participation Program Capacity and Payment Formula 1 The maximum allowable BTU per hour capacity eligible for a residential rebate is deter- mined by dividing the square footage of the conditioned area by 500 and multiplying by 12,000 Example- The Program Capacity for a 1,500 square foot house is 1,500 = 3.0 x 12,000 = 36,000 BTUH 500 The City will pay a rebate on a unit that meets program efficiency standards and is sized at 36,000 BTUH or less 2 Actual payment will be determined by dividing the BTUH of the installed unit (up to, and including the Program Capacity) by 12,000 and multiplying by the incentive. The incentive amounts and SEER ratings are refer- enced on page 5 of the 111992 Appliance Rebate Program Methods Used in Determining Equipment Efficiency and Eligibility," and are incorporated herein as if fully set forth at length Example A• A person in a 1,500 square foot house installs a 30,000 BTUH central air conditioner with a SEER rating of 12 0 1,500 500 = 3 x 12,000 = 36,000 Program Capacity PAGE 44 12 0000 = 2 5 x $100/ton = $250 00 Rebate Amount Example B A person in a 2,000 square foot house installs a 60,000 BTUH central air conditioner with a SEER rating of 12.0 2,000 = 4 x 12,000 = 48,000 Program Capacity 500 48,0•0 = 4 x $100/ton = $400 Rebate Amount 12,000 Example C A person in a 2,000 square foot house installs a 60,000 BTUH central heat pump with a SEER rating of 12 0 2,000 = 4 x 12,000 = 48,000 Program Capacity 500 48,000 = 4 x $100/ton = $400 Rebate Amount Minimum SEER/EER Central Air Conditioning Ratincr Incentive Single Phase (SEER) 12 0 $100 / ton*t Three Phase (EER) 12 0 $100 / ton CentraliHeat Pumps (SEER) 12 0 $100 / ton Single Phase Three Phase (EER) 12 0 $100 / ton Room Air Conditioners 10 0 $ 50 / unit Room Heat Pumps 10 0 $ 50 / unit Geothermal Heat Pumps 12 0 $500 / unit * Refer to 111992 Appliance Rebate Program Methods Used in Determining Equipment Efficiency and Eligibility" t For calculation purposes, one ton equals 12,000 BTUH PAGE 45 SCHEDULE MTR PREMIUM -EFFICIENCY MOTOR REBATE (Effective 10/01/96) APPLICATION/PROGRAM SUMMARY The City of Denton Utility Department is offering cash payments to customers who purchase and install premium -efficiency motors and adjustable speed drives in facilities serviced by Denton Electric Utility The program's objective is to reduce energy demand and consump- tion, thereby saving customers dollars on their utility bills and reducing the peak load of the City of Denton's electric system, thereby conserving energy and improving the power factor PROGRAM GUIDELINES 1 All installations must be for accounts served by the City of Denton Electric Utility and must meet all applicable national, local, and manufacturers' codes and specifica- tions. 2 To qualify for a rebate, equipment must be new when in- stalled All equipment must be purchased; no leased or lease/purchased equipment will qualify for a cash rebate Removed motors must be properly disposed of after inspec- tion and not re -used with the Denton Electric Utility system. Method of disposal must be stated 3. The City will pay the rebate to the purchaser of the qualifying equipment upon verification of compliance with program guidelines 4. Equipment and installation are subject to inspection by the City's Electric Utility before final approval for payment is issued. 5 Replacement motors must be the same horsepower or lower than the original motor Exceptions must be approved in writing by the City's Electric Utility Only motors 20 horsepower and above are eligible for the program 6 All information must be complete on the Motor Rebate Application in order for a rebate to be issued (see Motor Rebate Application) 7 The Premium -Efficiency Motor Rebate program guidelines and payments are subject to change without notice This program may be discontinued with prior notice, at any time by the City of Denton Electric Utility PAGE 46 REBATE METHODOLOGY Rebates for the Premium -Efficiency Motor Rebate Program will be based on the following methodology - REPLACEMENT MOTORS 1 The Denton Electric Utility staff will visit the site to determine the existing motors efficiency If the existing motor is non -operational, an estimate will be made 2. The customer must provide all information on the rebate application concerning the proposed motor purchase 3 A new motor must not exceed the horsepower of the existing motor without express written consent by the Denton Electric Utility, which consent shall be given only if the utility finds an increased efficiency 4 The information concerning the existing and the proposed motors will be entered into the Motor Master software program to calculate the kilowatt (KW) or kilovolt amperes (KVA) savings yield The calculation is based on horsepower, efficiency, RPM, and load information. 5. The KW or KVA yield will be multiplied times the rebate incentive amount of $100/KW or $90/KVA KW yield x $100 / KW or KVA yield x $ 90 / KVA 6 The Denton Electric Utility will to the site to verify installation, and following successful installation, a rebate check will be mailed to the customer NEW MOTORS: New motors will follow the procedure outlined above for replacement motors but the efficiency comparison will be made against�a standard new motor, to be determined by the Motor Master software program used by the City, Department of Energy standards, or the Denton Electric Utility. ADJUSTABLE SPEED DRIVES - The Denton Electric Utility will visit the customer site to determine KW/KVA savings from the proposed Adjustable/Variable Speed Drive Those savings will be awarded on a $100/KW or $90/KVA basis A watt meter will be used before and after installation KW / KVA SAVINGS Rebates in excess of $1,000 00 require advance approval of the Director of Electric Utilities PAGE 47 SCHEDULE UPS UNINTERRUPTIBLE POWER SUPPLY (Effective 10/01/96) �i��+F�•t���E{�l�l Applicable to any customer who, by written agreement, receives service for an uninterruptible power supply for a computer or other electrical equipment Uninterruptible Power Supplies provided by the City of Denton are of the standby type NET MONTHLY RATE (1) Facility Charge: 0 - 300 Watts Uninterruptible Power Supply $ 7 80 / 30 days 301 - 700 Watts Uninterruptible Power Supply $14 90 / 30 days 701 - 1,200 Watts Uninterruptible Power Supply $31 85 / 30 days (2) Installation Charge $25 75 For any Uninterruptible Power Suppply other than above, the monthly customer charge will be based on the following formula (1) Monthly Charge• 5$ of Annual Maintenance Cost PLUS 12 months 6% Annual Return of Investment PLUS 12 months 8$ Interest on a 5 Year Life The City shall furnish, install, maintain an automatically controlled alternating current power backup unit conforming to the City's standards and subject to its published rules and regulations Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance ���F�1��►I�} iii �i �'i All services which require special facilities in order to meet customer's service requirements shall be provided subject to the special facilities rider PAGE 48 (a) Billings for the Facility charge shall be based on 12 billings annually and prorated for longer or shorter billing periods using the following formula Formula Actual days in reading Deriod x customer facility charge 30 days PAGE 49 SCHEDULE ECA ENERGY COST ADJUSTMENT (Effective 10/01/96) ENERGY COST ADJUSTMENT All monthly KWH charges shall be increased or decreased by an amount equal to "X" cents per KWH, to be known as the energy cost adjustment (ECA) The ECA shall be computed during the last month of each fiscal year quarter (December, March, June and September) to be applied to the quarter immediately following The City shall in no case change the energy cost adjustment more than once in any three (3) month period The ECA shall be calculated using the following formula ECA = Projected energy cost for next quarter Projected KWH sales for next quarter In the event that actual plus estimated cumulative costs of fuel, variable costs of Texas Municipal Power Agency (TMPA) energy and purchased energy (excluding TMPA's fixed charges) are greater than or less than the actual and projected ECA revenues by $500,000 or more during the next quarter, the Director of Electric Utilities or his designate shall recompute the Energy Cost Adjustment and, with Public Utilities Board approval, may establish an ECA that collects or returns such difference over the next three month period Such change in ECA shall be applied evenly to each month during the three month period The above formula results in an October estimated ECA as follows ECA = 2 00G / KWH PAGE 50 - December 1996 SPECIAL FACILITIES RIDER (1) All service shall be offered from available facilities If a customer service characteristic requires facilities and devices which are not normally and readily available at the location which the customer requests service, then the City shall provide the service subject to paragraph of this rider (2) The total cost of all facilities reburied to meet the customer's load characteristics which are incurred by the City shall be subject to a special contract entered into between the Utility and the customer This contract shall be signed by both parties prior to the City provi- ding service to the customer PAGE 51 SECTION II That the Executive Director of Utilities is hereby authorized to expend funds to issue rebates to electric utility customers in the form and type set forth in Schedules APR, MTR and TS, as the use of more efficient compressors, motors and thermal storage is in the best interest of the City of Denton, as such will reduce the peak load and conserve energy, which are public purposes of the City SECTION III That if any section, subsection, paragraph, sen- tence, clause, phrase or word in this ordinance, or application thereof to any person or circumstances is held invalid by any court of competent jurisdiction, such holding shall not affect the valid- ity of the remaining portions of this ordinance, and the City Coun- cil of the City of Denton, Texas, hereby declares it would have enacted such remaining portions despite any such invalidity SECTION IV That the Schedule of Rates herein adopted shall be effective, charged and applied to all energy usage occurring on or after October 1, 1996; and a copy of said rates shall be maintained on file in the Office of the City Secretary PASSED AND APPROVED this the /jfN day of v i 1A) , 1996 JAEK MILLER, MAYOR ATTEST. JENNIFER WALTERS, CITY BY. d�sL.d APPROVED AS TO LEGAL FORM: HERBERT1L PROUTY, CITY ATTORNEY BY %a � 2 PAGE 52