Loading...
HomeMy WebLinkAbout1995-028E:\WPDOCS\ORD\TGS.0 ORDINANCE NO. _1_,L--0-21P AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF ELECTRIC RATES BY ADOPTING AN AMENDED SCHEDULE TGS (GENERAL SERVICE TIME OF USE RATE); AND PROVIDING FOR AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION I. That the Schedule of Rates for electrical services, as adopted by Ordinance No. 94-162, is amended by amending the provisions of Schedule TGS (General Service Time of Use Rate), a copy of which is attached hereto and incorporated by reference herein. SECTION II. That this ordinance supersedes Ordinance No. 94- 162 in all respects. SECTION III. That this ordinance shall become effective immediately upon its passage and /approval. PASSED AND APPROVED this the day of f 1995. ATTEST: JENNIFER WALTERS, CITY SECRETARY m AP -NEY SCHEDULE TGS GENERAL SERVICE TIME OF USE (Effective 2/15/95) APPLICATION Applicable to any customer having a minimum demand of 250 KW for all electric service supplied at one point of delivery and measured through one meter, with the City providing all facilities necessary to receive primary voltage service. Supplementary ser- vice will be available subject to the applicable rider. Not appli- cable to resale or temporary service. Customers electing this rate must remain on this rate for a minimum of twelve (12) continuous billing months. NET MONTHLY RATE (1) Customer Facility Charge $70.70/30 days (2) On -Peak Demand Charge (3) System Demand Charge (4) Energy Charge (5) Energy Cost Adjustment (6) Power Cost Adjustment: MINIMUM BILLING $12.20/KW of On -Peak Demand $ 2.40/KW of System Demand 0.51C/KWH Per Schedule ECA Per Schedule PCA The minimum monthly bill shall be the sum of the Customer Facility Charge, the On -Peak Demand Charge, and the System Demand Charge. The October through May demand charge shall be the measured system demand plus not less than 1006 of the maximum monthly on -peak demand charge for any month during the months of June through September in the twelve (12) months immediately preceding the current month. TYPE OF SERVICE Secondary or primary service available to commercial and industrial customers. Primary voltage service is available to any customer with a minimum demand of 250 KW. Primary service is rendered at one point on the customer's premises at a nominal voltage of 13,200 volts. The City will supply single-phase service (or three-phase ser- vice if available at the point of delivery) at sixty (60) cycles and at any standard voltages available from the City's distribution system through one standard transformation. Where service of the type desired by the customer is not already available at the point of service, special contract arrangements between the City and the customer may be required. PRIMARY SERVICE DISCOUNT Customers who own, operate and maintain all facilities neces- sary to receive three phase primary voltage service and all trans- formation facilities required for conversion to utilization voltage shall receive a discount of 0.34/KWH. If primary service is provi- ded and the City owns and operates all facilities and transforma- tion equipment necessary to receive primary voltage service, a discount of 0.i�/KW will be applied to the customer's bill. The City shall own, operate and maintain all metering facilities, either at primary or secondary voltage, at the City's option. DETERMINATION OF ON -PEAK DEMAND The on -peak demand shall be determined by the KW demand sup- plied during the fifteen (15) minute period of maximum use each month during on -peak hours as recorded by the City's demand meter and adjusted for power factor, but not less than one hundred per- cent (100%) of the maximum on -peak demand similarly determined dur- ing the months of June through September in the twelve (12) months immediately preceding the current month. If the customer is new or does not have a history of use for any month during the period June through September, the on -peak demand charge shall begin when the customer establishes a history for any month during the June through September period. The on -peak demand will be billed every month once an on -peak demand history is established. DETERMINATION OF SYSTEM DEMAND The system demand shall be determined by the maximum KW demand supplied during the fifteen (15) minute period of maximum use each month during off-peak hours as recorded by the City's demand meter and adjusted for power factor. The system demand will be billed every month. POWER FACTOR PENALTY The City reserves the right to make tests to determine the power factor of the customer's installation served either by measurement during periods of maximum demand or by measurement of the average power factor for the monthly billing period. If the power factor is below ninety percent, the demand for billing purposes will be determined by multiplying the uncorrected KW billing demand by 90% and dividing by the determined power factor. DEFINITION OF ON -PEAK HOURS The City's on -peak hours, for the purpose of this rate sched- ule, are designated as being from 2:00 P.M. to 7:00 P.M. each Monday through Friday, for the months of June through September. The City's on -peak hours may be changed from time to time and the customer will be notified twelve (12) months before such changes become effective. DEFINITION OF SYSTEM (OFF-PEAK) HOURS The City's system (off-peak) hours, for the purpose of this rate schedule, shall be all hours not designated as on -peak hours. SUPPLEMENTAL POWER RIDER Customers requesting standby or supplementary power shall be allowed service under this rate schedule; however, the determina- tion of off-peak demand shall be adjusted to read: The off-peak demand shall be the sum of the maximum KW demand supplied during the fifteen (15) minute period of maxi- mum use during off-peak hours as recorded by the City's demand meter, plus the KW nameplate ratings) of the customer's gen- erator(s). In the event the customer's generator(s) is/are off-line at the time of the establishment of the maximum system demand, the KW nameplate rating of the generator(s) unavailable for service shall be removed from determination of the system demand. SPECIAL FACILITIES All services which require special facilities in order to meet the customer's service requirements shall be provided subject to special facilities rider. PRORATION OF UTILITY BILLS (a) Billing for the Facility Charge shall be based on 12 billings annually and prorated for longer or shorter periods using the following formula: Actual days in reading period x customer facility charge 30 days (b) Billing for demand shall be calculated on a 30-day-per- month basis and pro rated for longer or shorter billing periods using the following formula: Actual days in reading period x KW Demand x Rate 30 days ENERGY CHARGE Billing for the energy charge shall be based on actual KWH consumption during the billing period. Formula: KWH in rate block x Rate per KWH in rate block ENERGY COST ADJUSTMENT A charge per KWH of energy taken for fuel cost calculated in accordance with Schedule ECA. POWER COST ADJUSTMENT A charge per KW of demand for fixed purchased power cost calculated in accordance with Schedule PCA. PAYMENT Bills are due when rendered, and become past due if not paid within 15 calendar days from date of issuance.