HomeMy WebLinkAbout1994-187E:\WPD0CS\0RD\H0ME0WN.0
ORDINANCE NO. C / /X /
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DENTON, TEXAS,
APPROVING GUIDELINES FOR OPERATION OF THE CITY OF DENTON HOMEOWNER
REHABILITATION PROGRAM AND ELIGIBILITY CRITERIA; AUTHORIZING EXPEN-
DITURES IN EXCESS OF $15,000 FOR PROJECTS MEETING PROGRAM GUIDE-
LINES AND CRITERIA; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Denton recognizes the
need to assist low and moderate income families in securing safe,
sanitary and decent housing; and
WHEREAS, the City of Denton participates in a Homeowner
Rehabilitation Program administered by the City of Denton Community
Development Office and funded through a federal grant from the
Department of Housing and Urban Development; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS:
SECTION I. That it approves the Homeowner Rehabilitation
Program Guidelines and Homeowner Rehabilitation Program Eligibility
Criteria which is attached to this ordinance as Exhibit "A" and
authorizes the City of Denton Community Development Office to
administer this program.
SECTION II. That it authorizes the expenditure of funds in
excess of $15,000 by the Community Development Office for projects
meeting program guidelines and criteria.
SECTION III. That this ordinance shall become effective immed-
iately upon its passage.
PASSED AND APPROVED this the day of 1994.
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
BY ^
AP OVED TO LEGAL FORM:
DEBRA A. D//RRA\AYOVITCH, CITY ATTORNEY
BY14
EXHIBIT "A"
CITY OF DENTON
HOMEOWNER. REHABILITATION
GUIDELINES
O,T.� OF DENTON
��GA� DEPT.
TABLE OF CONTENTS
INTRODUCTION
DESCRIPTION OF PROGRAM PROCEDURES
I ELIGIBILITY REQUIREMENTS
II APPLICATION PROCESSING
III FEASIBILITY OF REHABILITATION
IV CONTRACTOR SELECTION AND MONITORING
V PAYMENT TO CONTRACTOR
VI CONTRACTOR DEBARMENT
VII DESCRIPTION OF FINANCIAL ASSISTANCE PROGRAMS
VIII APPEALS PROVISIONS
GENERAL TERMS AND CONDITIONS
MINIMUM REHABILITATION STANDARDS
APPENDICES
1. Carrying Out Energy -Saving Requirements for Single -Family
Buildings
2. Section 8 Existing Housing/Program
3. QUALIFYING INCOME LIMITS AND RANGES FOR THE CITY OF
DENTON'S FEDERALLY ASSISTED PROGRAMS
STANDARDS OF WORKMANSHIP GENERAL SPECIFICATIONS - 1.0
INTRODUCTION
The City of Denton Homeowner Rehabilitation Program is designed to
assist low and moderate income families in securing safe, sanitary
and decent housing. This program's objective is to rehabilitate
single family owner occupied houses by making needed repairs with
the first priority being to correct code violations.
The Homeowner Rehabilitation Program is administered by the City of
Denton's Community Development Office and funded through a federal
grant from the Department of Housing and Urban Development. The
Community Development Office is located at 110 West Oak Street,
Suite 208.
The following pages contain a detailed description of the program
including policies and procedures. The purpose of these guidelines
is to explain to potential clients and the citizens of Denton, the
Homeowner Rehabilitation Program and types of assistance available.
For further information or clarification of the guidelines, contact
the Community Development Office at (817) 383-7726.
DESCRIPTION OF PROGRAM PROCEDURES
DESCRIPTION OF PROGRAM PROCEDURES
I.
A. To be eligible for rehabilitation assistance, the applicant must
be a citizen of the United States or a legal resident alien. The
applicant must be the owner -occupant of a single family dwelling
unit for no less that two years and should hold Fee Simple Title
to the property. In the event the home is being purchased under
a contract for deed, the seller must provide the purchaser with a
warranty deed on the property before loan settlement occurs. Only
homeowners who qualify on the basis of the most current HUD
Section 8 Housing Program Income Limits shall be eligible for
assistance. The following table shall be used to establish an
applicant's eligibility based on gross annual family income and
family size:
NUMBER IN HOUSEHOLD MAXIMUM INCOME
1 $25,600
2 $29,250
3 $32,900
4 $36,550
5 $39,500
6 $42,400
7 $45,350
8 or more $48,250
B. The applicant's statement of income shall be verified by contact-
ing the applicant's employer and/or obtaining a copy of the
applicant's latest income tax return. Annual income includes
earnings (wages, pensions, etc.) spouse's earnings, interest from
stocks, bonds, savings accounts, income from real estate, public
assistance, child support payments, etc. Also included is any
amount earned by any other adults (18 or over) currently residing
in the unit, unless residence in the unit is a result of a
physical disability.
C. Applicants must exhibit the ability to pay monthly housing
expenses including mortgage payments, property taxes, insurance,
utility bills, etc. All property taxes assessed by the various
taxing agencies in Denton County must be paid in full. Homeown-
ers, on an annual basis, will be required to provide proof of
insurance coverage and payment of taxes when requested in writing
by the Community Development Office.
D. The Community Development Office reserves the right to limit
project costs for any property that has been rehabilitated in the
past with Federal or State grant funds. These limitations will be
as follows:
A property that has been previously rehabilitated at a maximum
cost that was below $11,000 may be considered for additional
rehabilitation seven years from the date of the previous
rehabilitation. These properties will be eligible for project
funds of up to 80 percent of the current maximum limit
allowable for the Major Rehabilitation category.
A property that has been previously rehabilitated at a maximum
cost between $11,000 and $17,000 may be considered for
additional rehabilitation eight years from the date of the
AAA005CE
previous rehabilitation. These properties will be eligible
for project funds of up to 70 percent of the current maximum
limit allowable for the Major Rehabilitation category.
3. A property that has been previously rehabilitated at a maximum
cost between $17,001 and $20,000 may be considered for
additional rehabilitation ten years from the date of the
previous rehabilitation. These properties will be eligible
for project funds of up to 60 percent of the current maximum
limit allowable for the Major Rehabilitation category.
A property that has been previously rehabilitated at a maximum
cost at or over $20,001 may be considered for additional
rehabilitation fifteen years from the date of the previous
rehabilitation. These properties will be eligible for project
funds of up to 50 percent of the current maximum limit
allowable for the Major Rehabilitation category.
II. APPLICATION PROCESSING
A. Any persons wishing to apply for housing rehabilitation assistance
must complete the application and all other required forms
included in the application packet. All information on the
completed applications will be verified by the Community Develop-
ment staff. If any information is found to have been intention-
ally falsified, the application will be rejected and the applicant
will not be allowed to reapply.
B. If it is determined that the applicant is eligible for the
program, a preliminary inspection will be made of the dwelling
unit. The dwelling unit must meet certain standards to be
considered rehabable. These standards are listed below:
1. If the unit is situated in the designated flood -plain area,
some cost limitation may apply.
2. The unit must be classified as a single family owner -occupied
structure and be within the city limits of Denton.
3. The unit must be in an existing condition that would permit
rehabilitation to bring the structure to meet Section 8
Housing Quality Standards. The first priority item in
rehabilitation beyond Section 8 Standards will be to correct
code deficiencies. (See Appendix 2)
4. The unit must be serviced by a City approved water supply,
sanitary sewer and electrical system.
5. The foundation of the structure must be in a stable condition
which would permit lasting rehabilitation efforts.
C. In cases of, both rehabilitation or replacement dwelling, no
reconstruction will net fewer bedrooms than the number of bedrooms
a family has before rehabilitation/reconstruction. Room additions
and improvements to relieve serious overcrowding may be eligible
only with the approval of the Community Development Administrator.
In general the City will follow the standards consistent with the
applicable Housing Quality Standards described at 24CFR
882.209(b)(2) when considering the number of bedrooms needed to
avoid overcrowding:
# of Occupants in Household # of Bedrooms
AAA005CE
Minimum Maximum
2 1 4
3 3 6
4 6 8
Generally, these standards allow for two persons of the same sex
per bedroom.
D. All applicants who meet the minimum eligibility
standards and
whose houses qualify as rehabable, will receive assistance
in date
order that they originaly applied for assistance.
E. Individuals applying will be ranked according to
the following
rating guide. Rankings are for office use only and
do not affect
an applicant's assistance.
REHABILITATION GRANT/LOAN APPLICATION
ELIGIBILITY STANDARDS
Income:
1) Below maximum income level . . . . . . . . .
. . . . . . 5
2) Less than 75% of maximum income level .
. . . . . . 10
3) Below maximum income level and 30% of
monthly income expended on housing . . . . .
. . . . . . 10
4) Less than 75% of maximum income level
and 30% or more of income expended on
housing . . . . . . . . . . . . . . . . . .
. . . . . . 20
Risk Analysis:
1) Does the property owner exhibit the
ability to pay monthly housing expenses . .
. . . . . . 20
TOTAL . . . . . . . . . . . . . . . . . . . . . .
. . . . . . 65
Grant applicants must have a minimum of twenty five (25) points to
be ranked for possible assistance. The applicant must be below
the minimum income levels (5 points) and must exhibit the ability
to pay monthly housing expenses (20 points). However, final
decisions on the applicant's eligibility for assistance will be
determined by the Community Development Administrator. A total of
ten (10) points will be subtracted from the application of any
individual who has previously had a rehabilitation under any
Federal or State program.
III. FEASIBILITY OF REHABILITATION
A. A decision as to whether the property can be rehabilitated to
minimum program standards will be made following a detailed
inspection of the property by Community Development Program staff.
This inspection includes completing a list of deficiencies which
must be corrected in order to bring the structure into compliance
with HUD codes and City of Denton codes as defined in the Uniform
AM005CE
Building Code, 1991. The owner will be advised immediately if any
code violations or other hazards exist.
B. Feasibility of rehabilitating structures under established program
limits will be determined by an assessment of the following
criteria:
The estimated costs needed to correct all code violations and to
correct all deficiencies in order to bring a structure into
compliance with HUD codes and City rehabilitation standards must
fall below program limits and, the estimated cost to rehabilitate
shall not exceed 75 percent of the total estimated after rehabili-
tation appraised value of a structure.
Structures not meeting the above criteria are ineligible for the
Homeowner Rehabilitation Program. The homeowner will be notified
that their property is not feasible for rehabilitation and that
they are eligible to apply for Optional Reconstruction Program.
Assistance will be based on funds available through this program.
IV. CONTRACTOR SELECTION AND MONITORING
All housing rehabilitation recipients are responsible for finding a
contractor who will develop a proposal to make the necessary repairs to
their home. Your contractor's proposal must be submitted to the
Community Development office within thirty (30) days from the date you
receive the work order write-up prepared by the Community Development
Housing Inspector.
Contact any reputable and experienced contractor and request a bid for
the required work.
IF YOU HAVE ANY TROUBLE FINDING A CONTRACTOR, contact any of the
following places for assistance:
• Your local Better Business Bureau.
• Any friends or neighbors who have had remodeling done to their
properties.
• Chamber of Commerce
• Community Development Contractor's List
When a contractor comes to look at your home you should:
• Show him/her the mandatory work items that have been identified by
the Community Development Housing Inspector.
• Advise him/her that the bid proposal must be returned to you or
the Community Development office for submission to the rehabilita-
tion program on or before the due date.
DO NOT SIGN ANY AGREEMENT WITH THE CONTRACTOR.
Bring the contractor's bid proposal to the Community Development office
at 110 West Oak Street, Suite 208 where you made your original
application. The Community Development Housing Rehabilitation Inspector
or Housing Rehabilitation Specialist will review the proposal to verify
that:
1. The contractor is licensed, insured and has Worker's Compensation.
AAA005CE
2. All required improvements have been included in the bid.
The proposed work is in conformance with the program's General
Specifications.
All proposed rehabilitation costs are reasonable.
The contractor you have chosen has not been disqualified (de-
barred) by any local, state or federal government agency.
The bid proposals that are submitted by the homeowner will be reviewed
by the Community Development Housing Rehabilitation Inspector to
determine if the total bid price is reasonable and under the maximum
allowable amount. THE CITY OF DENTON AND THE HOMEOWNER RESERVE THE
RIGHT TO REJECT ANY AND ALL BIDS.
If the bid proposal selected by the homeowner is approved by the
Community Development Administrator, then the Community Development
staff shall proceed with the review of all other forms submitted by the
contractor. Any contractor whose name appears on the most current HUD
or City of Denton Debarred Contractor's List will not be eligible to
participate in this program. References will be checked and claims of
substandard workmanship will be cause to declare a contractor ineligi-
ble. The contractor must also submit all required proof of insurance
forms and bonds (if applicable). Failure to submit these will result
in rejection of the bid proposal.
Once the contractor has been selected and approved, a contract agreement
must be signed. Before the contractor can start work, the homeowner
must issue a notice to proceed.
The contractor's work will be monitored by the homeowner, the Community
Development staff and the City of Denton building code inspector. If
the homeowner considers any work done by the contractor to be unsatis-
factory or incomplete, the homeowner should advise the contractor of the
discrepancy and ask that it be corrected. In the event a dispute exists
between the homeowner and the contractor with respect to the rehabilita-
tion work, the City shall take appropriate action in accordance with the
provisions of the construction contract to assure that the owner is
satisfied before making any payment to the contractor. In the event a
dispute cannot be resolved, the Director of Planning and Development
shall consider all pertinent facts and shall decide an appropriate
course of action to resolve the dispute.
Acceptance of Work
1. Final Inspection - In order for the contractor to close out a
rehabilitation job, a final inspection shall be made by the City
of Denton building code inspector, the Community Development
staff, and the homeowner. If the final inspection results in no
additional work or no specified corrections, the homeowner shall
sign the contractor's release form which states that all work has
been completed to their (homeowner's) satisfaction. The building
code inspector shall sign a final inspection form to confirm the
same. At this time, the contractor is required to submit to the
Community Development office copies of all warranties and releases
of liens from subcontractors and suppliers. Community Development
will not authorize payment to the contractor until these documents
are properly completed and submitted. Community Development staff
will make copies of warranties and other documentation. The owner
will receive original warranty and guarantee documents. The
Community Development office will retain copies of these documents
for the file.
AAA005CE
2. Warranty of Work - As stated in the rehabilitation contract, the
contractor shall guarantee the work performed for a period of at
least one year from the date of final acceptance. The contractor
will return in thirty (30) days and ask the homeowner if any
additional repairs are necessary. Any deficiencies or necessary
repairs to specified work will be completed at this time. If no
repairs are needed, the contractor will request that the homeowner
release the contingency payment.
V. PAYMENT TO CONTRACTOR
The contractor shall receive payment, minus contingency amount, for all
completed contracts within 15 working days after final inspection
approval. The contingency amount equals ten percent (10%) of the total
contract amount and will be withheld for thirty (30) days. After thirty
days, if no additional or warranty work remains, the contractor must
request from property owner an approval to release withheld contingency
funds.
A forty-five percent (45%) interim payment will be made available to the
contractor upon property owner and inspector approval when 50 percent
of the contract work has been completed.
An "All Bills Paid" affidavit and release of lien from all subcontrac-
tors and suppliers must be submitted by the contractor to the Commuitiy
Development office before payment can be released to contractor. All
electrical, plumbing, mechanical, roofing permits and termite
inspection must also be submitted to the Community Development office
prior to releasing contingency payment to the contractor.
VI. CONTRACTOR DEBARMENT
A contractor will be declared ineligible to participate in projects
funded by the City of Denton's Homeowner Rehabilitation Program for one
or more of the following causes:
1. Failure to complete a project within the prescribed contract
period.
2. Failure to complete warranty repairs within a reasonable time
period.
3. Failure to use licensed plumbing and electrical subcontractors.
4. Failure to obtain proper insurance, i.e., both liability and
worker's compensation.
5. Failure to complete work in accordance with program specifications
and/or accepted standards of workmanship.
6. Failure to pay all subcontractors working on the project appropri-
ately and/or submit affidavits of payment signed by all subcon-
tractors.
7. Failure to obtain proper permits for work in progress.
8. Failure to treat homeowners with respect and courtesy.
Contractors will be notified of their proposed debarment and will be
afforded the opportunity to comment or appeal the action. All appeals
AAA005CE
2. a deferred Payment loan with the loan amount being based on
95% of the total project cost. A detailed description of the
deferred payment loan is found below after section VII.C.
*DESCRIPTION OF A DEFERRED PAYMENT LOAN
A deferred payment loan shall carry 0% interest and continues
until the applicant satisfies the conditions listed in the
promissory note executed prior to project start date. There are
no monthly payments. Deferred payment loans are secured by a lien
on the property. The lien will be for 120 months (TEN years).
For each month the homeowner lives on the property, 1/120 of the
total deferred payment loan amount will be forgiven. If the
rehabilitated dwelling is sold or transferred before the lien
period expires, the homeowner is credited for every month spent in
the house. The credit is subtracted from the total loan amount.
The unforgiven balance is owed and becomes due upon sale or rental
of the property to the Community Development Program and received
and used thereof as program income. The City of Denton will be in
the let lien position on all rehabilitated dwellings. However, in
situations where 1st lien position is not feasible, the City will
accept a lower lien position subject to the review and approval of
the Community Development Administrator. The lien will not be
forgiven until the following conditions are met:
1. the homeowner must reside in the unit for a period not less
than ten years; and
2. the property must be maintained to meet city code require-
ments; and
3. mortgage payments must be met on a timely basis; and
4. homeowner must provide documentation of adequate homeowner's
insurance, including casualty and fire coverage, and the City
must be listed on the Certificate of Insurance to be notified
in case of policy cancellation; and
5. in the event of a sale or transfer of ownership during the
ten-year period, the following conditions will apply:
a. sell or offer the assumption of the loan to a low/moder-
ate income family approved by the Community Development
Office; or
b. make the unit available for lease to a low -moderate
income family by making the unit priced affordable and
maintaining the unit to meet applicable city codes.
6. if within this ten-year period the homeowner defaults on their
deferred payment loan, and/or if the homeowner defaults on
payments on their 3% interest loan, the loan will be called
due in full and foreclosure proceedings may be initiated. The
City will make every effort to work with the homeowner to
avoid foreclosure and will examine each situation on a case by
case basis.
D. The level of monetary assistance will be determined prior to
rehabilitation. A structural evaluation will be completed. Each
structure will be assessed and the type and level of assistance
will be determined by the Community Development staff whether the
repairs needed are (a) Minor, (b) Moderate, (c) Major, (d)
Extensive or (e) Reconstruction. Allocations will be as follows:
AAA005CE
must be made in writing to the Community Development Office at least 15
days after the date of the notification letter.
Contractors debarred from the Homeowner Rehabilitation Program may no
longer contact homeowners receiving CDBG or HOME grant funds with the
intent of providing a bid on the project.
VII. DESCRIPTION OF FINANCIAL ASSISTANCE PROGRAMS
The City of Denton has three financial assistance categories for those
who qualify for the Homeowner Rehabilitation Program. These categories
are based on the Qualifying Income Limits and Ranges for the City of
Denton's Federally Assisted Programs (see appendix 3 to these guidelines
for current income limit ranges). A description of the financial
assistance categories and their requirements are:
A. Fifty Percent Reconstruction Loan/Fifty Percent Deferred Payment
Loan•
Clients whose gross annual household income falls above 65% up to
80% of the area median family income limits will qualify for this
two-part loan;
1. a 3% interest loan with the loan amount being based on 50% of
the total project cost. The 3% loan will be amortized over a
10-year period (120 months). The lien will not be released on
this part of the loan until all 120 payments are received in
full by the City of Denton; and
2. a deferred payment loan with the loan amount being based on
50i of the total project cost. A detailed description of the
deferred payment loan is found below after section VII.C.
B. Twenty-five Percent Reconstruction Loan/Seventy-five Percent
Deferred Payment Loan:
Clients whose gross annual household income falls above 50% up to
65% of the area median family income limits will qualify for this
two-part loan;
1. a 3% interest loan with the loan amount being based on 25% of
the total project cost to be amortized over a 10-year period.
The lien will not be released on this part of the loan until
all 120 payments are received in full by the City of Denton;
and
2. a deferred payment loan with the loan amount being based on
75% of the total project cost. A detailed description of the
deferred payment loan is found below after section VII.C.
C. Five Percent Reconstruction Loan/Ninety-five Percent Deferred
Payment Loan
Clients whose gross annual household income falls at 50% or below
of the area median family income limits will qualify for this two-
part loan;
1. a 3% interest loan with the loan amount being based on 5% of
the total project cost to be amortized over a 10-year period.
The lien will not be released on this part of the loan until
all 120 payments are received in full by the City of Denton;
and
AAA005CE
a) Minor Rehabilitation: $1,000 - $11,000
b) Moderate Rehabilitation: $11,001 - $17,000
c) Major Rehabilitation: $17,001 - $25,000
d) Extensive Rehabilitation: $25,001 or above**
e) Reconstruction: See Optional Reconstruction Program Guide-
lines
** Under no circumstances will funds in excess of 75% of the esti-
mated after rehabilitation appraised property value be spent.
Projects that would exceed this program limit are not feasible for
rehabilitation. Property owners will be notified that their home
is not feasible for rehabilitation and that they may apply for the
City of Denton's Optional Relocation Program.
E. Repayment Policy for Financial Assistance: The applicant must
agree to have a lien placed on their property until they have
satisfied the requirements of the promissory note. The lien will
remain until the loan has been paid in full. In the event of
death of the loan recipient, the remainder of the loan must be
paid by whomever becomes the legal owner. If for any reason the
loan recipient decides to sell or rent the property before the
loan is paid in full, the remaining amount will become due at the
time of the sale or upon rental.
Liens will remain in effect until the grantee has met all require-
ments as specified in the promissory note. In the event of the
sale of the property, any unpaid balance of the loan and any
unforgiven portion of the deferred payment loan will become due
immediately. In the event of the death of the grantee, if a
family member who meets the income eligibility requirements
resides on the property the loan will continue as stated in the
original promissory note.
A waiver of these provisions can be requested if the property owner
feels that their circumstances require special consideration. Section
VIII of these Guidelines explains how to request a waiver.
VIII. APPEALS PROVISIONS:
A. Request for Waiver: The City of Denton's Homeowner Rehabilitation
Program has been developed to adhere to a set of guidelines in
order to assure proper administration and management. In the
event that an applicant feels that his circumstances require
special consideration, he can request a waiver from the usual
requirements. All requests for a waiver will be reviewed by the
Community Development Administrator on a case by case basis.
B. Appeals Procedure: Applicants who have been determined by the
Community Development Administrator to be ineligible for rehabili-
tation, may appeal this decision to the Executive Director of
Planning and Development Department. A written appeal must be
submitted.
The Executive Director of the Planning and Development Department
shall issue a written response within fifteen days of receiving
the complaint.
Any applicant who feels that they have been unjustly denied
rehabilitation assistance under the City's Homeowner Rehabilita-
tion Program should follow the appeals procedure outlined above.
AAA005CE
GENERAL TERMS AND CONDITIONS
GENERAL TERMS AND CONDITIONS
1. Property owner agrees to comply with all HUD requirements with respect to
Title VI of the Civil Rights Act of 1964, to not discriminate upon the
basis of race, color, creed or national origin in the sale, lease, rental,
or use of occupancy of the subject property.
2. Property owner agrees to not award any contract for rehabilitation work to
be paid for in whole or in part with the proceeds of the grant to any
contractor who, at the time, is ineligible under the provisions of any
applicable regulations issued by the Secretary of Labor, United States
Department of Labor, the Department of Housing and Urban Development, or
the Community Development Office to receive an award of such contract.
3. Property owner agrees not to pay any bonus, commission or fee for the
purpose of obtaining the Community Development staff's approval of the
grant application or any other approval of concurrence required by the
Homeowner Rehabilitation Program.
4. The. homeowner will continue to occupy the premises during the rehabilita-
tion; but he will cooperate with the contractor in a reasonable manner.
Property owner agrees that existing house utility services will be made
available to the contractor without charge as follows: electricity, gas,
water and telephone (local calls only).
Property owner agrees that the City shall be the agent for the owner and
as such agent shall hold the funds made available to the owner for the
rehabilitation grant for the purpose of the disbursement thereof to the
contractor.
Property owner agrees that it is his sole responsibility to see that the
contractor completes the work specified in his contract to the owner's
satisfaction and that the City of Denton has no responsibility for any
defects, faulty work or incomplete work by the contractor. The owner
further agrees that the City has no liability for warranty of any of the
workmanship or materials furnished by the contractor under the contract.
The owner further agrees that latent or hidden conditions in the property
which were not included in the original inspection and work write-up of
the City are not the responsibility of the contractor nor of the City, but
remain the responsibility of the owner.
8. As part of the consideration for providing the funds to rehabilitate
property as described herein, the property owner agrees to maintain and
keep the property in good repair after the completion of the work to be
performed by contractor, taking into consideration the ability of the
owner to do so.
9. The owner shall issue a written Notice to Proceed within thirty (30) days
from the date of acceptance of the contractor's bid and proposal. If the
Notice to Proceed is not received by the contractor within this thirty
(30) day period, the contractor has the option of withdrawing his bid and
proposal. If the contractor chooses to do this a written notice must be
delivered to the owner with a copy to the City. The contractor shall not
begin the work to be performed until receipt of written Notice to Proceed
from the owner after which the contractor shall begin the work within ten
(10) calendar days of the date of said Notice and shall complete said work
within sixty (60) days or the number of days stated in the Rehabilitation
contract.
AAA005CE
10. The contractor shall not assign the contract without written consent of
the owner and the City and/or its agent.
11. It is agreed between the owner and the contractor that damages due to
delay are impossible to determine and that in the event the contractor
does not complete the work required under the contract within the
specified time, the contractor shall be liable for and shall pay to the
City as liquidated damages the sum of one percent (1%) of the total
contract amount or $55, whichever is greatest, for each calendar day of
delay from the date stipulated for completion in the Rehabilitation
Contract until such work is satisfactorily completed and accepted.
12. The contractor shall not be charged with liquidated damages for any delays
in the completion of work due to the following:
A. Any acts of the government; including controls or restrictions upon
or requisitioning of materials, equipment, tools or labor by reason
of war, National Defense or any other national emergency.
B. Any acts of the owner.
C. Causes not reasonably foreseeable by the parties to this contract at
the time of the execution of the contract which are beyond the
control and without the fault or negligence of the contractor;
including but not limited to acts of God or of the public enemy; acts
of another contractor in the performance of some other contract with
the owner, fires, floods, epidemics, quarantine restrictions,
strikes, freight embargoes and weather of unusual severity such as
hurricanes, tornadoes, etc.
D. Any delay of the subcontractor occasioned by any of the causes
specified in Subparagraphs (A) (B) and (C) above, provided that the
contractor promptly (within 10 days) notifies the Owner in writing
of the cause of the delay. If the facts show the delay to be
properly excusable, the owner shall extend the contract time by a
period commensurate with the period of excusable delay.
13. The contractor shall not be held responsible for preexisting violations of
law including but not restricted to zoning or building code regulations at
the property listed in the contract. Before beginning work, the
contractor shall examine the work write-up for compliance with the
applicable ordinance and codes for the new or replaced work and shall
immediately report any discrepancy to the owner. Where the requirements
of the work write-up fail to comply with such applicable ordinances or
codes for the new or replaced work, the owner and the City will adjust the
contract by change order to conform to such ordinances or code and make
appropriate adjustment in the contract price unless waivers in writing
covering the difference have been granted by the proper authority.
14. The contractor shall comply with all non-discrimination clauses included
in the contract; non-compliance will result in termination of the
contract.
15. Bids or proposals will be submitted at the bidder's risk and the City or
the owner reserve the right to reject any or all bids or proposals.
16. - Subcontractors shall be bound by the terms and conditions of the contract,
insofar as it applies to their work. This shall not relieve the general
contractor from the full responsibility to the owner for the completion of
all work to be executed under this agreement and he shall not be released
from this responsibility by any subcontractural agreement he may make with
others.
AAA005CE
17. When adjacent property is affected or endangered by any work done under
this contract, it shall be the responsibility of the contractor to take
whatever steps are necessary for the protection of the adjacent property
and to notify the owner thereof of such hazards.
18. Repairs shall be made to all surfaces damaged by the contractor resulting
from his work under this contract at no additional cost to the owner.
Where "repair of existing work" is called for by the contract, the feature
shall be placed in "equal to new condition" either by patching or
replacement. All damaged, loose or rotted parts shall be removed and
replaced and the finished work shall match adjacent work in design and
dimension.
19. After the final inspection and acceptance by the owner of all work under
the contract including cleanup, the contractor shall submit to the owner
for approval his requisition for payment. When the required warranties
and the release of liens have been executed by the contractor, the final
payment minus a 10 percent contingency will be made which will include any
amounts remaining due under the contract as adjusted in accordance with
approved change orders and subject to withholding of any amounts due the
owner for "liquidated damages" as may be necessary to protect the owner
against any claim arising from the contractor's operations under the
contract. Payments will be made within 10 days of formal requisition for
payment. Only one partial payment may be made when 50% of the work has
been completed.
20. A Rehabilitation grant may be made only to cover the cost necessary to
bring the dwelling into conformance with Section 8, Existing Housing
Quality Standards. The two categories of repairs listed below are to be
included as priority items:
A. Recuired Repairs: Code violations which create hazardous conditions
in regard to safety or health will generally involve the basic
heating, plumbing or electrical systems.
B. Recommended Repairs: Code corrections or preventive maintenance
efforts which should be undertaken to avoid more costly future
action.
(1) Heating, air conditioning, plumbing and electrical improvements
(2) Weatherization
(3) Exterior work such as roofing, siding, painting, step and porch
repair and retaining walls
(4) Interior work such as renovation and repair of existing kitchen
and bath facilities.
21. Mobile homes are not eligible for rehabilitation assistance.
22. The Denton County Appraisal District automatically reappraises any house
where a building permit is issued. The homeowner should be aware of this
fact. If the home is reappraised, yearly property taxes may also
increase.
23. Change orders may be made to cover an item of work which cannot be
determined until sometime during the course of the rehabilitation work.
The Community Development staff shall not consider a change order proposed
by a bidder that is not called for in the contract document prepared by
the Community Development Office. change orders will be considered as
follows:
A. Change orders are used to add work necessary to correct incipient
items that have been found to be defective after work is in progress
but were not anticipated at the time the contract was executed.
AAA005CE
B. Change order requests will be limited to only those items that must
be corrected to meet Section 8 standards and/or city code require-
ments.
No change orders for recommended or general property improve-
ments will be approved.
The change order amount is limited to a maximum of 10 percent of the
total contract amount. If it is necessary to request a change order
to make required repairs and the contract is already at the program's
maximum allowable expenditure amount, a work item of less priority
will be deleted from the bid proposal in order to compensate for the
added amount. However, if there are no work items of less priority
to delete from the bid proposal, the project's maximum amount must
be approved by the Community Development Administrator.
D. Change orders will be used when it is necessary to delete work from
a contract for any reason. When items are deleted from the contract,
they shall be at their previously bid amount. When items are deleted,
but do not have specific costs, in such cases the contract shall be
reduced by negotiating the cost at prevailing rates.
E. All change orders shall be executed by the homeowner, contractor, and
a member of the Community Development staff prior to work being
completed.
F. Except for the purpose of affording protection against any emergency
endangering life or property, the Contractor shall make no change in
the work or rehabilitation, provide any extra or additional work or
supply additional labor, services or materials beyond that actually
required for the execution of the contract.
G. All change order requests must be submitted by the contractor, signed
by the homeowner and approved by the Community Development Adminis-
trator. No claim for an adjustment of the contract price by the
contractor or homeowner will be valid unless this is done.
H. The approval of a change order shall constitute authorization by the
homeowner and Community Development Administrator to change the grant
amount equal to the cost of the work added or deleted.
I. It may be necessary to change the time of completion due to the
addition of certain work items or delays that are beyond the
contractor's control.
J. If the contractor feels that any of the limitations listed above will
result in the incomplete rehabilitation of the structure as specified
in the contract, he may appeal the limitation to the Executive
Director of Planning and Community Development.
24. If the work completed is not in accordance with the construction contract,
a member of the Community Development staff shall advise the property
owner of the non-compliance who then shall obtain appropriate action from
the contractor. No payment shall be processed on a construction contract
until a contractor has satisfactorily completed all necessary corrective
action.
25. The owner shall be able to select the color and style of certain materials
(i.e. carpet, floor covering, paneling, paint, etc.). No more than one
selection of carpet and vinyl may be made. No more than two interior
paint choices and two exterior paint choices may be made (main color and
trim).
AAA005CE
26. The contract warrants that all materials, fixtures, and equipment
.furnished by the contractor and its subcontractors shall be new, of good
title and that the work will be done in a neat and workmanlike manner.
Neither the final payment nor any provision in the contract nor partial or
entire use or occupancy of the premises by the owner shall constitute an
acceptance of work not done in accordance with the Contract or relieve the
Contractor of liability in respect to any express warranties or responsi-
bility for faulty materials or workmanship. The contractor shall promptly
remedy any defect in the work and pay for any damage to other work
resulting therefrom which may appear within a period of one year from the
date of final acceptance of the work unless a longer period is specified.
The owner will give notice of observed defects with reasonable promptness.
27. Interest of certain federal and other officials:
A. No member or Delegate to the Congress of the United States and no
Resident Commissioner and no federal employee shall be admitted to
any share or part of this contract or to any benefit to arise from
same.
B. No member of the governing body of the City and no other public
official of or within the City or County who exercises any functions
or responsibilities in connection with the administration of the
Community Development Programs and no other employee of the Depart-
ment of Planning and Community Development who exercises any such
functions or responsibilities shall have any interest, direct or
indirect, in rehabilitation proceeds which is incompatible or in
conflict with the discharge or fulfillment of his functions and
responsibilities in connection with the carrying out of the Homeowner
Rehabilitation Program. The length of time this exclusion shall be
in effect is one year following the ending of term of office and
shall be binding upon, but not limited to, all of the individuals and
agencies herein described.
AAA005CE
MINIMUM REHABILITATION
STANDARDS
AAA005CE
MINIMUM REHABILITATION STANDARDS
Roofs: Roofs should not leak and have no evidence of rotted decking, fascia or
soffit. Any roof with two or more layers of roofing must be stripped to the
decking. If it is determined a new roof is necessary the decking must be checked
for broken or rotted decking and shall be repaired or replaced as needed. Where
new decking is required the material shall be one-half inch plywood or one-half
inch waferboard to be used with H clips between sheets. All roofs that all
stripped shall be replaced with new 30 pound felt paper, the proper flashing and
metal drip edge with 240 pound shingles. Any roof with less than a 4/12 pitch
shall be covered with rolled roofing, with at least 12 inches of lap, if
installation of rolled roofing is not sufficient to promote proper run off roof
will be rebuilt.
siding and Trim: All exterior siding and trim shall be free of holes, cracks or
rotted material which might admit moisture into walls. New siding may be applied
only if the cost of new siding and installation is comparable to the repair and
painting costs of the existing siding.
Windows: All windows and hardware shall operate satisfactorily. cracked or
broken windows shall be replaced. Window glazing shall be weather tight and
windows shall be weather stripped so as not to allow entry of air and water
around the glass, sashes or window casings. All windows shall have screens and
working locks.
Drainage: The grade of concrete or dirt should drain at least five (5) feet away
from foundation walls.
Site Improvements: All replaced concrete surfaces are to be level with the
widths to match the existing surfaces.
All steps both concrete or wood that pose a threat to the occupants shall be
repaired or, if necessary, replaced with treated material or concrete.
Foundations and Piers: Skirting shall be six (6) inches underground level. If
it is necessary to install skirting, new 22 or 24 gauge skirting shall be used.
Kitchens: Kitchens shall have a specific area which contains a sink with hot and
cold running water, counter work space, storage space for food and apace for
storage of cooking utensils.
Stairs: All stairs shall provide for the safety of ascent and descent. All
treads and risers should show no evidence of breakage or have evidence of
excessivewear. All stairs shall be equipped with handrails.
Utility Areas: Gas or oil fired water heaters or furnaces shall not be located
in the bathrooms or bedrooms. In addition to all plumbing and electrical codes,
water heaters, air conditioners, and furnaces shall be enclosed with a sealed
door and adequate upper and lower combustion air. All washer and dryer hookups
must meet City Code.
Structural System: The wood, masonry or steel components shall be in serviceable
condition for the expected useful life of the rehabilitated building. Structural
members which are in seriously deteriorated condition shall be replaced.
AAA005CE
Sagging and non -level floors shall be raised and stabilized as level as possible
without causing interior damage.
Termite inspection is required and treatment shall be done if evidence of active
infestations exist. A certified pest control company will carry out the
treatment and present documents of proof and warranty.
Electrical System: All replacement of existing wiring and equipment shall be
done in conformance with the National Electric Code and the City of Denton Code.
Any potential source of electrical hazard or ignition of combustible material
shall be corrected.
GFI outlets shall be used in bathrooms, kitchen, garage, and exterior recepta-
cles. Additional outlets shall be added to eliminate extension cords and, at the
request of the City Inspector, to meet City Codes.
Plumbing: The plumbing system shall operate free of fouling and clogging, and
not have cross -connections which permit contamination of the water supply or back
siphonage between fixtures.
All sinks, lavatories, water closets, water heater, and other plumbing fixtures
shall have accessible cutoff valves. All fixtures shall have P-traps, necessary
vents and be properly connected to a public or private sewage disposal system.
All sewer lines shall have accessible cleanouts. All water heaters shall be
installed with double wall vent stack, a pop -off valve, and overflow to the
exterior of the structure.
Mechanical Equipment: All gas fired heating units must be vented with double
wall pipe and proper upper and lower combustion air. The unit shall not be
installed in a living area such as bedrooms or under stairways.
Rigid gas pipe must be used to supply heating units with a maximum of three (3)
feet of flexible pipe from the stop to the appliance. All duct work shall be
properly sealed from the heat source to the register vent and from the return air
supply to the heat source.
HVAC duct insulation must be R-4 or greater and pipe insulation must be R-2 or
greater.
Insulation and Weatherization: An R-30 insulation value in the attic shall be
required.
Exterior Doors: All exterior doors shall be solid core. All locks shall be
capable of tightly securing the door and shall be readily openable from the
inside without the use of keys. All exterior doors shall be weather stripped so
that there is no significant entry of air or water into the structure.
Porches and Decks: All porches and decks shall be safe and capable of supporting
anticipated loads. All porches and decks in deteriorated condition and which
serve no useful purpose or which are not economically repairable shall be
removed.
Porches and decks thirty (30) inches above grade shall have guardrails and
flights of stairs with four (4) or more risers. They shall have a handrail on
at least one side.
AAA005CE
Gutters and Downspouts: Gutters and downspouts should exist where they are
deemed necessary to promote proper drainage. Gutters will not normally be
installed if they do not already exist.
Downspouts that cannot be connected to drain tiles shall have splash backs with
proper site grading.
Chimneys and Vents: Furnace and water heater vents shall be double wall vent
pipe.
Existing unlined masonry chimneys having open mortar joints or cracks shall be
removed or made safe by installation of a UL approved flue liner.
Vent -a -hood stacks shall be vented through the roof.
Interiors: All floors, walls, and ceilings shall be maintained in good, clean,
and sanitary condition. All peeling paint, cracked or loose plaster, and other
defective surface conditions shall be eliminated. All doors shall be opera-
tional.
Carpet and vinyl that is badly worn, torn or too dirty to be cleaned shall be
replaced. This shall be determined by the C.D. Housing Inspector. Existing
carpet shall be cleaned by a commercial steam cleaner, if necessary.
Bathrooms: An operational water closet, tub or shower, and lavatory should be
in the bathroom. Hot water should flow to the lavatory and tub or shower. Cold
water should be supplied to all fixtures. Either a window or an exhaust fan must
be present to properly vent the bathroom.
Cabinets: Built-in kitchen cabinets shall be repaired up to 50 percent of the
cost of new cabinets. Bathroom cabinets are not required.
AAA005CE
APPENDICES
APPENDICES
Appendix 1 . . . . . . . . . Carrying Out Energy -Saving Require-
ments for Single -Family Buildings
Appendix 2 . . . . . . . . . Section 8 Existing Housing/Program
Appendix 3 . . . . . . . . . QUALIFYING INCOME LIMITS AND RANGES
FOR THE CITY OF DENTON'S FEDERALLY
ASSISTED PROGRAMS
AAA005CE
Appendix 1
Carrying Out Energy -Saving
Requirements for
Single -Family Buildings
Homes consume about 20% of all the
energy used in the U.S. Of this amount,
about 50 to 60% is used for heat.
Another 12 to 15% heats water and
about 5 to 8% is used for air-
conditioning. Lighting and appliances
take from 12 to 20%.
Since so much of the energy goes for
heat and hot water, that is where most
savings can be realized and that is why
weatherizing, or retrofitting, a house is
so important. Just how much energy a
particular house will use depends on
many factors, including;
1. The climate where the house is
located
2. The size and design of the building
and its orientation to the sun
3. How well the building is currently
insulated
4. How effectively the existing caulking
and weatherstripping prevent air
infiltration
5. Whether the building is air-
conditioned
6. The occupants' energy.consumption
habits
Chapter 2 provided an overview of the
general and particular requirements for
single-family buildings. This chapter will
help rehabilitation specialists, single-
family property owners, HUD Area
Applying the Cost-EBective,l nergy Standards In Rehabilitation Projects
Office personnel, and others focus on
ways of reducing heat loss and
conserving energy in accordance with
those requirements.
DEFINING A
SINGLE-FAMILY BUILDING
A single-family detached house is a
single dwelling unit that stands alone
with four sides exposed. Single-family
attached structures are dwellings such w
duplexes (which are, in effect, two
single-family houses that share a
common wall) and rowhouses or
townhouses (several single-family
houses attached to each other).
In addition, there are large, usually
older, structures consisting of two to fou
separate dwelling units that are struc-
turally similar to the single-family
detached house.
This chapter pertains primarily to single
family buildings with either a wood -
frame construction (in which wooden
studs, joists, and beams matte up the
building's frame) or a masonry construc
tion. However, the calculation tables for
single-family buildings are applicable
only to wood -frame construction types
IS
that have cavities in the walls where
insulation may be placed.
ENERGY REVIEW
To pinpoint the areas in a single-family
building that can benefit from energy
conservation measures, an energy review
is needed. The energy review is actually
part of the rehabilitation inspection.
While inspecting the structural condition
of a building's roof and walls, for
example, the person conducting the
inspection would also make note of
insulation needs, the absence of storm
windows, and so forth. Upon completion
of the combined rehabilitation inspection -
energy review, he or she would use the
calculation tables shown in Chapter 2 to
determine the most cost-effective
measures.
REDUCING HEAT LOSS
As noted in Chapter 2, HUD Energy
Standards recognize that energy -saving
improvements must be tailored to the
type of building and the kind of
rehabilitation being carried out. In all
cases, however, the improvements must
be cost-effective.
In most houses, the first practical step
toward energy savings is blocking the
flow of air into (infiltration) and out of
(exfiltration) the building. To minimise
this heat loss involves, among other
things, caulking or weatherstripping all
cracks or joints including those around
windows and doors that are tightly shut.
Reducing heat loss in this way is so
clearly cost-effective, it is a general
requirement for any project approval
under the HUD rehabilitation programs
mentioned in Chapter 1.
Some Facts About Air Flow
Heat flows from its source to a colder
area Hot air also rises. For these
reasons, when houses are heated in
winter, the hot air is always trying to get
out and the cold air is always trying to
come in. In summer, of course, the
opposite is true. Air cooled by air-
conditioning will be pushed outside by
the flow of warmer air coming in.
Movement of heat results from radia-
tion, conduction, or convection, or some
combination of these three.
Radiation occurs when a source of heat,
such as the sun or a hot radiator, sends
out heat waves. Heat radiation through
glass windows is welcomed in the winter,
but in the summer, it can introduce
unnecessary heat into a building.
Conduction is the flow of heat through
one physical material to another or just
out into the air. Insulating materials help
to reduce heat conduction substantially.
Convection occurs because warm air is
lighter than cold air and will move
upward. As cold air becomes warm, it
rises. More cold air moves in to replace
it, and it too becomes warm and rises.
An air current develops that moves
heated air around a space in a
predictable direction. For this reason,
most heating devices are put in or close
to the floor.
Combinations are frequently involved
in the movement of hot air. Radiators
radiate heat and warm an entire room
due to convection. Radiators also
conduct through their metal casing. In
the winter, heat radiated by the sun and
conducted through glass windows can be
a welcome additional source of warmth
for a home.
Studies have shown that a substantial
amount of indoor heat is lost as it moves
through cracks and openings in the
building, including electrical outlets and
switches in outside walls. Major beat
losses also result from convection as
warm air moves up furnace flues and
fireplace chimneys. Caumng and weathw-
stripping are two energy -saving improve-
ments designed to reduce this beat loss
that causes high heating and cooling
bills.
Caulking'
Caulking is a very simple way to greatly
reduce unwanted air flow. Filling cracks
and openings in outside walls with a
caulking compound is an easy, economi-
cal way to realize large savings in energy
costs. Homeowners can maximize their
savings, of course, by applying caulking
themselves rather than paying someone
else to do it. It is not a difficult job.
When selecting caulk, note that materi-
als of different quality are available.
There are three basic types of caulk. Oil -
or resin -based caulk is the least
expensive, but it is also the least
effective. It is readily available and will
bond to most surfaces, but it tends to
harden and crack after 2 to 4 years.
Some how-to guides advise against using
it.
Latex and butyl -based caulks are a
little more expensive, but they are much
more durable than oil -based caulks.
They usually last from 6 to 20 years a- '
hold up well to building expansion at J
contraction caused by. changes in
temperature.
Elastomeric caulks, such as polyure-
thanes, silicones, or polysulfideS, are the
most durable and most expensive caulks.
They will last 20 years or more and are
exceptionally good at withstanding the
type of expansion and contraction
caused by extreme temperature fluctua-
tions. Elastomeric caulks can also be
used with filler material, such as oakum,
caulking cotton, sponge rubber, or
fiberglass, to close large cracks.
Most caulking compound comes in
tubes. Directions on the tube tell how to
cut the nozzle and apply the compound
with a caulking gun. Caulking guns are
inexpensive and readily available at
hardware stores and building -supply
houses.
Apply caulking to all fixed joints, for
example:
■ Around windows and doors where
frames meet siding
*This is a general requirement.
16 Applying the Cost -Effective Energy Standards in Rehabilitation Projects
%pyLiWX �.f�xy,•:n.Wh..�vsww:S'ij! k 3' zi't:�� 6°....*..�a�»;1`.e..-, w=iw, �^ '
■ Between windowsills and siding
■ Between plates and foundation
■ Around all holes for pipes, ducts, or
electric conduits through outside walls
■ Around all holes through a wall
separating heated and unheated
-spaces, such as attached garages,
storerooms, or attics .
■ Between unheated porches and the
main body of the house
■ Where the chimney or masonry meets
the siding
■ Around the outside of water faucets
This list is not exhaustive. For more
information, refer to the reference guides
suggested at the end of this chapter.
WEATHERSTRIPPING+
Weatherstripping, like caulking, reduces
unwanted air flow. Caulking is applied to
fixed joints; weatherstripping is applied
to the moving parts of doors and
windows. Weatherstripping comes in
strips of thin -spring metals, rolled vinyl,
felt sweeps, or foam rubber. These
materials help to seal windows and
doors tightly to prevent air -leaks. While
most weatherstripping can be applied to
both doors and windows, some types are
designed to be used on either one or the
other.
ilia -spring metal weatherstripping
can be used on both doors and windows.
Though it is somewhat difficult to install,
it is the most durable (and most
expensive) type of weatherstripping. It is
virtually invisible', when in place.
Rolled, or flexible, vinyl is durable and
easy to install. It is made with a metal
backing for doorsand without a backing
for windows.
Felt and foam -rubber weatherstrip-
ping are inexpensive and easy to install,
but they are not very durable. They tend
to shrink after a short period of time.
Some types have a self-adhesive
. , backing. These types should never be
used where friction occurs.
*This is a general requirement.
Door sweeps, consisting of vinyl or felt -
backed metal strips, can be applied to
the bottom of doors to reduce air
infiltration.
Many how-to guides are available that
provide detailed, step-by-step instruc-
tions for installing weathersttipping.
Some of these guides are listed at the
end of this chapter.
INSULATING REPLACEMENT
HVAC SYSTEMS*
Because of conduction, as much as 40%
of heating and cooling energy can be lost
through uninsulated pipes and ducts in
cold areas. For this reason, when
replacing heating, ventilating, and air-
conditioning systems, HUD Energy
Standards require that all pipes and
ducts be insulated.
All supply and return pipes and ducts in
the new HVAC system should be
insulated to the following specifications
whenever they run through uncondi-
tioned spaces: duct insulation must be
R-4 or greater, and pipe insulation must
be R-2 or greater. (Refer to the section
on insulation later in this chapter for an
explanation of R-values.)
it is not difficult to insulate pipes and
ducts. Duct insulation generally comes
in blankets 1 or 2. inches thick. A vapor
barrier should be attached to the exterior
side of insulation for air-conditioning
ducts. Seal the insulation joints tightly to
stop condensation. Before you insulate,
seal all duct seams tightly and tape any
leaks. Various how-to guides discuss the
application of pipe and duct insulation.
(See references at the end of this
chapter.
Pipe insulation is available either as ure-
thane foam or fiberglass. Urethanejoam
can be purchased as a foam tube 6 or 8
feet long. To apply, simply make a slit
*This is a general requirement only if
the system is being replaced. It is
desirable at other times if the pipes
are accessible.
Applying the Cost -Effective Energy Standards in Rehabilitation Projects
along the side of the tube and slip it over
the pipe, sealing it with duct tape at the
joint.
Fiberglass pipe insulation often comes
with a paper barrier backing. This
backing may not be suitable for use as a
vapor barrier. Be sure to read the
instructions. To apply fiberglass insula-
tion, make a slit down the length of the
side of the fiberglass and wrap it around
the pipe. Seal the joints with duct tape or
the paper backing.
Unlike heating and cooling systems, in a
home hot-water pipes for domestic
systems are used only sporadically. A
rehabilitation specialist should deter-
mine whether it is feasible and cost-
effective to insulate the hot-water pipes.
HIGH -EFFICIENCY
HVAC SYSTEMS'
A HVAC system that is improperly
adjusted or is poorly suited to a building
may waste an enormous amount of
energy. For instance, a system that is
"oversized" operates inefficiently. An
oversized system is one that produces
more heat or air-conditioning than the
space it is servicing requires. For
example, if a heating system runs on a
steam boiler, it would be inefficient to
boil more water than is needed to heat
the house. The oversized system burns
fuel and heats up the room too quickly.
and then shuts off. Excess heat that
ordinarily would have been pushed into
the room by a properly sized system now
merely remains in the pipes because
the system is turned off. Often this
excess heat is lost through the furnace
flue or simply cools down in the pipes.
Furthermore, the constant on -and -off
action of the system wastes fuel. In
contrast, a properly sized system that
matches building needs may run longer
but will use less fuel because it burns
fuel at a slower rate.
*This is a general requirement only if the
system is being replaced. It is desirable
at all times if the present system is
oversized.
17
666-,96 0 - 82 - 2 , p1 3
11,
For these reasons, the Energy Standards
require replacement HVAC systems to
have high -efficiency systems and bumers
that are not oversized by more than
15%. A competent installation contrac-
tor can determine which system is most
efficient for a residence.
The efficiency of a system is often
affected by its size, relative to the
building needs, as well as by any
changes made to save fuel. Any energy -
conserving improvement —such as in-
stalling insulation in ceilings and walls
or adding storm windows —can cause a
heating system to become oversized. It is
a good idea to recheck the system after
making modifications and correct any
oversizing. Oil or gas system parts can
sometimes be repaired or replaced at
minimal effort and expense. For in-
stance, the amount of fuel consumed by
an oil furnace may be reduced as much
as 20% simply by repairing a faulty
burner nozzle or by installing a smaller
one. Although such modifications do not
require replacement of the entire HVAC
system, they are generally cost-effective
and should be considered.
ADDITIONAL ENERGY
CONSERVATION MEASURES*
The Energy Standards require such
thermal improvements as the installation
of insulation and storm doors and
windows only if it is cost-effective and
feasible to do so. (See Chapter 2.) If the
proposed rehabilitation requires the
removal of interior or exterior walls,
ceilings, or floor coverings, the level of
insulation may need to be upgraded If it
involves replacing window sashes or
similar extensive repairs, storm windows
and doors may also need to be added
Although the Energy Standards only
require that these measures be taken in
that portion of the building being rehabi&
tated, consideration should also be
given to adding insulation in attics and
installing storm doors and windows
where and whenever it is cost-effective.
*Required only if cost-effective.
Although not required if the structural
component is not affected, such improve-
ments can save a considerable amount of
energy and reduce fuel costs signifi-
cantly.
In most circumstances, if the energy
savings do not pay for the required im-
provements over either the term of
the loan or the useful life of the improve-
ment (whichever is shorter), the im-
provement should not be made. (See
Chapter 2 for procedures to determine
cost-effectiveness.)
Insulation*
An adequate level of insulation will
benefit a house or building in many
ways: Insulation slows down the rate of
heat conduction, keeping heat in living
areas for longer time periods. As a
result, less heat is used in winter and air
conditioners usually operate for shorter
periods in summer without sacrificing
comfort.
Adequate insulation may also affect the
efficiency of heating and cooling systems
and permit "downsizing." For instance,
more efficient furnaces, furnace flues, air
conditioners, and duct systems may be
installed Smaller, more efficient units or
downszzed nozzles may be possible to
use to improve efficiency and savings.
Additionally, insulation helps to sound-
proof. Because it is usually fire resistant,
insulation may serve as a deterrent to the
spread of fire.
The type of insulation and the best
installation method may vary from one
case to another. The level of effective-
ness of an insulation material is stated as
its R-value. R value is the degree to
which a material is able to resist heat
flow. The higher the material's R-value,
the greater is its ability to insulate.
Building materials as well as insulation
materials have different R-values. These
must be considered in determining the
total thermal resistance of a building.
*This is required if cost-effective and
when rehabilitation involves that
portion of the building to be insulated.
Most insulation packages list the
R-value of the contents in compliance
with Federal Trade Commission (FTC)
regulations. However, for insulation
previously installed, the R-value can be
estimated by first measuring in inches
the thickness of the insulation. This
figure is then multiplied by 3.0 for an
approximate R-value.
There are several types of insulation:
baits and blankets, loose -fill, and rigid
board.*
Batt and blanket insulation, like most
home insulation, is made of mineral
fibers, either processed fiberglass or rock
wool. Batts and blankets are used to
insulate unfinished attic floors, un-
finished attic ceilings, unfinished walls,
and the underside of floors. This type of
insulation is best suited to a standard
joist or ratter spacing of 16 or 24 inches.
Both baits and blankets come in widths
.of 15 and 23 inches. They are availaF•'-
either with or without a vapor barrio :, )
backing. Batts generally come ., �✓
sections 4 or 8 feet long. Blankets come
in long rolls that are cut to the desired
length for installation.
Loose -till Insulation is either poured in
or blown into floors or walls. Poured -in
loose -fill is made from cellulosic fiber,
rock wool, fiberglass, granulated cork,
vermiculite, slag, and other fibers. It is
used to insulate unfinished attic floors.
Blown -in loose -fill is made from cellu-
losic fiber, rock wool, or fiberglass. It is
used to insulate unfinished attic floors,
finished attic floors, and finished frame
walls. It can be poured into the cores of
masonry blocks. Loose -fill insulation is
the best type to use for irregularly
spaced joists or rafters or in areas where
there are many obstructions: If an
existing wall has any insulation, or if a
vapor barrier does not exist, or if not
being made accessible, the Energy
Standards do not require blowing or
pouring additional insulation.
*The U.S. Consumer Product Sala J
Commission has banned the use of
formaldehyde foam insulation.
18 Applying the Cost -Effective Energy Standards in Rehabilitation Projects
As loose -fill insulation, cellulosic fiber
has approximately 30% more insulating
value than rock wool for the same
number of inches installed. It is
chemically treated for fire and moisture
resistance. Check the bags, which should
be clearly labeled to show the material
meets federal specifications for fire
resistance.
Rigid board insulation is made from
fiberglass, polystyrene, and polyure-
thane. It is usually 10 to 24 inches wide
and 48 inches long and comes in a
variety of thicknesses with a high
insulating value. This type of insulation
is in basement walls, on the outside of
stud walls as sheathing, or as perimeter
insulation on masonry walls and in
.cathedral ceilings. Polystyrene and
polyurethane rigid board installed on the
inside wall surface must be covered by
Si -inch gypsum wallboard for fire
resistance and should be installed by a
reputable contractor.
Storm Doors and Windows*
A rehabilitation specialist will determine
whether the application of storm doors
and windows is feasible and cost-
effective. Storm windows are usually a
good idea. However, three layers of
window glass are not recommended.
Three layers are cost-effective only
when existing windows are double -
glazed or when the sash is completely'
replaced. If the sash is replaced, .
insulating frames should be installed in
very cold areas.
A storm door or thermal door is
recommended if the primary door is
hollow -core or if it is more than 25%
glass. A storm door is a glass door that is
installed outside of the primary door. A
thermal door is a tight -sealing door made
with insulating material and is installed
in place of the primary door.
Storm doors and windows reduce heat
loss and air infiltration by creating a
'This is required only if cost-effective
and when rehabilitation involves that
portion of the house.
dead air space between themselves and
the primary door or window.
Storm doors and windows may be
installed in several ways. Make -it -
yourself doors and windows are assem-
bled by the homeowner and then
installed. Ready-made doors and win-
dows come already assembled and are
purchased in the most suitable size.
Custom-made doors and windows are
specially made to the exact measure-
ments. Custom-made windows and
doors fit best and last longer than the
other types, but they are more ex-
pensive. Regardless of the type installed,
storm doors and windows should fit well
and be properly caulked and weather-
stripped.
If it is not possible to install storm doors
and windows throughout the building,
they should be installed on the sides
facing north and toward the prevailing
winds, where they will be most cost-
effective. In existing houses, storm
windows tend to be more cost-effective
than double -pane windows for two
reasons: They reduce air infiltration
around the window sash, and they are
less expensive to install.
A number of types of storm windows i
available.
Single -pane glass, plastic sheet, or
rigid plastic storm windows are easily
installed in the fall and removed in the
spring.
Triple -track glass or combination
storm windows are used for double -
hung or sliding windows. These come
with screens and can be easily opened
and closed for ventilation. (Double-tra,
units without screens are available at
lower cost.) If installed properly, plasti
storm windows are as effective as glass
ones.
MOISTURE PROBLEMS
After thoroughly insulating and weathe
izing a house, moisture problems coulc
occur because all the leaks through
which moisture could escape have bee:
closed off. In the home, people generar
moisture from bathing, cooking, and
body heat. There is always moisture it
the air. The trick is to stop it from
condensing. Vapor barriers and ventila
lion are two simple answers to this
potential problem.
Figure 1 FLOW OF MOISTURE IN A BUILDING
OUTSIDE
Cold Air
�E—
Exterior Surface
Insulation
INSIDE
Warm Air
WARM VAPOR
BARRIER
-E- -*-
FLOW OF
MOISTURE
E— r(—
COLD VAPOR
BARRIER
Applying the Cost -Effective Energy Standards in Rehabilitation Projects
Vapor Barriers
A vapor barrier is a specially treated
paper, thin plastic sheet, or low-
permeance paint that prevents condensa-
tion of water vapor inside a house. The
term "vapor barrier," which is com-
monly used in construction, is somewhat
misleading. Vapor barriers do not
completely bar the transmission of water
vapor. They are actually vapor -resistant
membranes that should have a vapor
permeance (the rate that moisture can
pass through materials) of not more than
one perm (see Glossary). For this
reason, the term "vapor retarder" is
often used for vapor barrier.
Moisture generated inside tries to move
out of the building. (See Figure 1.)
Vapor barriers are important because
they stop this moisture in a warm area
where it will not condense. For this
reason, vapor barriers should be applied
to the plasterboard or drywall of a wall
or ceiling next to existing insulation and
on the warm side of insulated floor
sections over crawl spaces.
U additional insulation is put in, be sure
that a second vapor barrier is not applied
between layers of insulation. A second
vapor barrier would trap moisture
between layers of insulation and
eventually ruin it. Moisture that is
trapped within a building wall could also
cause the structural members to rot.
Consult an energy auditor or rehabilita-
tion specialist for the proper use of vapor
barriers in ceilings.
Ventilation
Proper ventilation in attics is important
to remove excess moisture from the
house. If an attic has insulation but no
vapor barrier, a good rule of thumb for
determining the minimum ventilation
area is to take the square footage of the
floor area of the attic and divide it by
150. Thus a 1,500-square-foot attic .
should have 10 square feet of clear,
unobstructed ventilation area (1,500
150 = 10 sq ft). If the attic has both
insulation and a vapor barrier, find the
ventilation area by dividing the floor
area by 300 (for example, 1,500 _ 300
=5sq. ft.)
Attic ventilation works best with two or
more vents to permit circulation of air. If
possible, use a high and a low vent —for
example, an eave or soffit vent at the
bottom of the roofline and a gable or
ridge vent in the upper part of the roof.
CASE STUDY
The following case study is intended to
show how rehabilitation specialists
determine the best application of energy -
saving improvements to a rehabilitated
dwelling.
Examining a Single -Family Home
The owners of a single-family home in
Boston have applied for a Section 312
Rehabilitation Loan. They have been
told that they are eligible for a loan at
3% for 20 years. A rehabilitation
specialist has undertaken an energy
review, and has obtained the following
information.
■ Heating oil at $1.05 per gallon is used
to heat the house.
■ Electric air-conditioning at $0.08 per
Kwh is used to cool the house.
■ Boston has a total of 5,634 heating
degree days.
■ Boston has a total of 800 cooling
hours.
■ The current ceiling insulation has a
value of R-2. There is no insulation or
vapor barrier in the walls and no insu-
lation in the floor over the basemen•
The rehabilitation specialist also noea—
that the basement and attic were not
heated and the windows are all single -
glazed. No replacement of mechanical
equipment is recommended at this time.
Using this information and the calcula-
tion tables shown in Chapter 2, the
rehabilitation specialist develops the
following summary chart:
SUMMARY CHART
a Location: Boston, Massachusetts
a Section 312 Rehabilitation Loan program
(Finance terms, 20 years @ 3%)
FUEL TYPE
Building
Component
Oil Gas
@ $1.05/gal @ $0.55/therm
Electricity
@ S0.08 Kwh
ceiling
R 38
R 38
R 38
Floor
R19
R19
R19
wail
R 13
R 13
R-13
Glazing
Double
Double
Double
Door
Storm or Thermal
Storm or Thermal
Stony or Thermal
20 Applying the Cost -Effective Energy Standards in Rehabilitation Projects
Planning the Rehabilitation
The proposed rehabilitation involves the
removal of coverings for three exterior
walls and most of the ceiling. Removal
of the floorboards over the unheated
basement will also be necessary.
Replacement of the primary storm
sashes is contemplated where exterior
walls will be removed. A vestibule is
planned for the front entrance, which
should help to conserve energy.
Applying Energy -Saving Improvements
Given the proposed rehabilitation and
the recommended energy -saving im-
provements, the rehabilitation specialist
can make the following recommenda-
tions concerning the application of
improvements.
Ceilings. Although the ceiling does
not have a vapor barrier between the
rock lath and current insulation, if
adequate ventilation is provided, a vapor
barrier can be omitted. Since the
recommended insulation level is R-38
and the current insulation value is R-2,
Table 6 (page 12) indicates that as much
insulation as possible should be added
up to the R-38 level. Thus it is cost-
effective to add approximately 9 inches
of batt and blanket insulation up to the
depth of the structural member.
Walls. Since no interior vapor barrier
and no insulation currently exist, an
effective vapor barrier and insulation
should be installed up to the level of R-
13. Loose -fill or batt and blanket
insulation could be used.
Floor (Over Unheated Space). The
recommended insulation level of R-19
can be achieved within the depth of the
joists. However, due to the presence of
electrical wiring. Piping, and bracing in
the basement ceiling, the installation of
insulation might not be cost-effective.
Installation cost -estimates should be
reviewed before a decision is made.
Windows. Since the primary sashes
for windows on three walls are going to
be replaced, double- or triple -glazed
windows could be added. However,
while double -glazing reduces conductive
heat loss, it is not as effective at reducing
air infiltration as storm windows.
Therefore, storm windows should be
applied to all windows.
Door. The proposed vestibule pre-
vents the need for a storm or thermal
door at the front entrance. However, for
side and back entrances, storm or
thermal doors should be installed.
Building Envelope. Caulking and
weatherstripping should be applied
wherever it is nonexistent or inadequate.
Since the building is located in a cold
climate, a durable elastomeric caulk
should be applied. Spring bronze
weatherstripping is recommended for
doors and windows since it is the most
durable type.
RECOMMENDED READING
Several weatherization guides are avail-
able to help make homes energy
efficient. The following three booklets
are particularly useful.
insulation Manual: Homes/Apart-
ments. 2nd Edition (Prepared by
NAHB Foundations, Inc., Rockville,
Maryland, September 1979, 148 pages).
This detailed guidebook discusses all
aspects of insulation. A variety of
installation techniques are covered,
most of which assume some basic
knowledge of construction on the part of
the reader. (Available from NAHB,
Publication Order, 15th and M Streets,
N.W., Washington, D.C., 20005. Price
$10.00.)
How to Save Money by Insulating
Your Home. .(Federal Energy Ad-
ministration, National Mineral Wool
Association, Inc., September 1974, 16
pages). This well -illustrated guide dis-
cusses installation techniques for
weatherstripping and caulking as well as
insulation. (Available from Office of
Weatherization, Department of Energy,
Washington, D.C., 20461. Also avail-
able from National Mineral Wool
Association, Inc., Summit, N.J., 07901.
Price 304, discounts for large orders.)
In the Bank or Up the Chimney?
(Department of Housing and Urban
Development, April 1975, 72 pages).
This guidebook provides simple, detaile
instructions for either contractor or do-
it-yourself installation of caulking,
weatherstripping, storm doors and win-
dows, and insulation (attics, floors, and
walls). (Available from Superintendent
of Documents. U.S. Government Print-
ing Office, Washington, D.C., 20402,
Stock Number 023-000-W297-3. Pric
$1.70. )
Another excellent resource for free
publications on do-it-yourself weatheri-
zation techniques is the Residential
Energy Services Department (or a
similar consumer -oriented office) main-
tained by most local utility companies.
Applying the Cost -Effective Energy Standards to Rehabilitation Projects
Appendix 2
SECTION 8 EXISTING HOUSING/PROGRAM
5-882.109 Housing quality standards - Housing used in this program shall meet
the Performance Requirements set forth in this section. In addition,
the housing shall meet the Acceptability Criteria set forth in this
section except for such variations as are proposed by the PHA and
approved by HUD. Local climatic or geological conditions or local
codes are examples which may justify such variations.
(A) Sanitary Facilities - (1) Performance Requirement. The
dwelling unit shall include its own sanitary facilities which
are in proper operating condition, can be used in privacy, and
are adequate for personal cleanliness and the disposal of human
waste. (2) Acceptability Criteria. A flush toilet in a
separate, private room, a fixed basin with hot and cold running
water, and a shower or tub with hot and cold running water
shall be present in the dwelling unit, all in proper operating
condition. These facilities shall utilize an approved public
or private disposal system.
(B) Food Preparation and Refuse Disposal - (1) Performance Require-
ment. The dwelling unit shall contain suitable space and
equipment to store, prepare, and serve foods in a sanitary
manner. There shall be adequate facilities and services for
the sanitary disposal of food wastes and refuse, including
facilities for temporary storage where necessary. (2)
Acceptability Criteria. The unit shall contain the following
equipment in proper operating condition: cooking stove or
range and a refrigerator of appropriate size for the unit,
supplied by either the owner or the Family, and a kitchen sink
with hot and cold running water. The sink shall drain into an
approved public or private system. Adequate space for the
storage, preparation and serving of food shall be provided.
There shall be adequate facilities and services for the
sanitary disposal of food wastes and refuse, including facili-
ties for temporary storage where necessary (e.g. garbage cans).
(C) Space and Security - (1) Performance Requirement. The dwelling
unit shall afford the family adequate space and security. (2)
Acceptability Criteria.
A living room, kitchen area, and bathroom shall be present; and
the dwelling unit shall contain at least one sleeping or
living/sleeping room of appropriate size for each two persons.
Exterior doors and windows accessible from outside the unit
shall be lockable.
(D) Thermal Environment - (1) Performance Requirement. The
dwelling ;unit shall have and be capable of maintaining a
thermal environment healthy for the human body. (2) Accept-
ability Criteria. The dwelling unit shall contain safe heating
and/or cooling facilities which are in proper operating
condition and can provide adequate heat and/or cooling to each
room in the dwelling unit appropriate for the climate to assure
a healthy living environment. Unvented room heaters which burn
gas, oil or kerosene are unacceptable.
(E) Illumination and Electricity - (1) Performance Requirement.
Each room shall have adequate natural or artificial illumina-
AAA005CE
tion to permit normal indoor activities and to support the
health and safety of occupants. Sufficient electrical sources
shall be provided to permit use of essential electrical
appliances while assuring safety from fire. (2) Acceptability
Criteria. Living and sleeping rooms shall include at least one
window. A ceiling or wall type light fixture shall be present
and working in the bathroom and kitchen area. At least two
electric outlets one of which may be present and operable in
the living area, kitchen area, and each bedroom area.
(F) Structure and Materials - (1) Performance Requirement. The
dwelling unit shall be structurally sound so as not to pose any
threat to the health and safety of the occupants and so as to
protect the occupants from the environment. (2) Acceptability
Criteria. Ceilings, walls and floors shall not have any
serious defects such as severe bulging or leaning, large holes,
loose surface materials, severe buckling or noticeable movement
under walking stress, missing parts or other serious damage.
The roof structure shall be firm and the roof shall be weather
tight. The exterior wall structure and exterior wall surface
shall not have any serious defects such as serious leaning,
buckling, sagging, cracks or holes, loose siding, or other
serious damage. The condition and equipment of interior and
exterior stairways, halls, porches, walkways, etc., shall be
such as not to present a danger of tripping or falling.
elevators shall be maintained in safe and operating condition.
In the case of a mobile home, the home shall be securely
anchored by a tie -down device which distributes and transfers
the loads imposed by the unit to appropriate ground anchors so
as to resist wind overturning and sliding.
(G) Interior Air Quality - (1) Performance Requirement. The
dwelling unit shall be free of pollutants in the air at levels
which threaten the health of the occupants. (2) Acceptability
Criteria. The dwelling unit shall be free from dangerous
levels of air pollution from carbon monoxide, sewer gas, fuel
gas, dust, and other harmful air pollutants. Air circulation
shall be adequate throughout the unit. Bathroom areas shall
have at least one openable window or other adequate exhaust
ventilation.
(H) Water Supply - (1) Performance Requirement. The water supply
shall be free from contamination. (2) Acceptability Criteria.
The unit shall be served by an approved public or private
sanitary water supply.
(I) Lead Based Paint - (1) Performance Requirement. (i) The
dwelling unit shall be in compliance with HUD Lead Based Paint
regulations, 24 CFR, Part 35, issued pursuant to the Lead Based
Paint Poisoning Prevention Act, 42 U.S.C. 4801, and the owner
shall provide a certification that the dwelling is in accor-
dance with such HUD Regulations. (ii) If the property was
constructed prior to 1950, the Family upon occupancy shall have
been furnished the notice required by HUD Lead Based Paint
regulations and procedures regarding the hazards of lead based
paint poisoning the symptoms and treatment of lead poisoning
and the precautions to be taken against lead poisoning. (2)
Acceptability Criteria. Same as Performance Requirements.
(J) Access - (1) Performance Requirement. The dwelling unit shall
be usable and capable of being maintained without unauthorized
use of other private properties, and the building shall provide
an alternate means of egress in case of fire. (2) Acceptabil-
AAA005CE
ity Criteria. The dwelling unit shall be usable and capable of
being maintained without unauthorized use of other private
properties, and the building shall provide an alternate means
of egress in case of fire.
(K) Site and Neighborhood - (1) Performance Requirement. The site
and neighborhood shall be reasonably free from disturbing
noises and reverberations and other hazards to the health,
safety, and general welfare of the occupants. (2) Acceptabil-
ity Criteria. The site and neighborhood shall not be subject
to serious adverse environmental conditions, natural or man--
made, such as dangerous walks, steps, instability, flooding,
poor drainage, septic tank backups, sewage hazards or mud
slides; abnormal air pollution, smoke or dust; excessive noise,
vibration or vehicular traffic; excessive accumulations of
trash; vermin or rodent infestation; or fire hazards.
(L) Sanitary Condition - (1) Performance Requirement. The unit and
its equipment shall be in sanitary condition. (2) Acceptabil-
ity Criteria. The units and its equipment shall be free of
vermin and rodent infestation.
(M) Congregate Housing. The foregoing standards shall apply except
for paragraph (b) of this section, Food Preparation and Refuse
Disposal. in addition the following standards shall apply:
(1) The unit shall contain a refrigerator of appropriate
size.
(2) The central dining facility (and kitchen facility, if
any) shall contain suitable space and equipment to store,
prepare and serve food in a sanitary manner, and there
shall be adequate facilities and services for the
sanitary disposal of food wastes and refuse, including
facilities for temporary storage where necessary (e.g.,
garbage cans).
AAA005CE
roH0
10
VI
yKJ�
H 111
J
0)
0
d�
W
N
MH
0W
ca H htl
O W
Wnmm
CJH
k
00H3U
k ro
N
m
0 y
Ctl O t<J
L
I
K t-J
0 H
H H
x W
H >4 tJ t'1
to
v�
N
N
N
N
N
N
N
N
ul Ul
tJ M 0
t7
J�
co
A
0
P
N
W
10
W
0\
W
N
N
10
N
0
00
0P dP
z ('j
tJ
C7
z M [J H
00
to
01
O
O
N
O
In
O
tJ
ty En
O
O
O
O
O
O
O
N k
H 10W
d
H y
1
1
1
1
1
1
1
1
w
y
ro
N
N
N
N
N
N
N
N
tJ
O ro
w "tl d
W
W
10
w
01
w
W
N
N
N
N
t7
F4
0 H
'd 0
0
V L.
tLj
r
Qo
m
O Ji
0
z
AH
%0
ON
00
m
0
r
O
r
t0
0
y z
sdrozz
KOc.� tip
H-3
0yt-i
LL
Hy
H pu
C]
M to 00w
LHJ
t"yyH
H
j
Ea
z[14
yOHy
Hti
O
LJ
H� tp
� 0
N
W
N
W
N
W
N
W
N
N
N
N
N
N
N
N
�l N
U I U I
yHy
N M C
W to
V)
A
N
�O
a•
W
O
dP dP
14 "' z
H
r
M
.P
r
�t
J
J
W
O ro
0• H y
W H
H
ID
00
to
r
0
H
�o
O
w y
yHy
ro 0
In
to
O
O
In
In
O
0
O7 b
y+
N t9 H ri
'•d
i+J
I
I
I
I
I
I
I
I
b4
O
W
N
N
N
N
N
r
r
tJ
O
y p
z M ,d y
w
tH+
O
r
0)
w
QI
to
P
N
00
O
tow
O
t" Oy
O
H L7
txjlzHH
H
yr
H
to
r
O
r
O
r
to
r
to
H
0
r
0
H
yy Y
Z�
000
H
[J
OOZh�71
HtxxJ
£
Ht�
.h1k
V%C
W 3
y tJ
tJ
yy
H- H yyyy
z
ai
N
N
N
N
N
N
N
N
N
10 N
O
0
O
OU
0�
A.
O
co
M
O ry��j
tJ y H
H
m
O
to
O
O
O
O
O
N
O
In
O
O
O
0
O
O 0>
�
O N
b
1
I
I
I
I
I
1
I
tJ to
o W y
0
oz
w
oz
z°
oz
z
x
w
�'
y H N
W
to
tq
W
W
W
UJ
W
eJ 0
0
4 co 8
O
r
0
t'
r
t'
t1
t"
t'
O z
tJ
z t7
O
O
O
O
O
O
O
O
;n
z
H
H N
O
�
Rtz yz+
H
yk
to tJ
d
F S
H
11
P4
H
a
0
H
H
14
I
W,
aro
w 0
m a
a%
0w
O
�P
STANDARDS OF WORKMANSHIP
STANDARDS OF WORKMANSHIP
GENERAL SPECIFICATIONS - 1.0
INDEX
Item
Page
Item
Pape
I.
Foundation
VII.
Windows
1.
Leveling
1
1.
Wood Units
7
2.
Skirt
1
2.
Aluminum Units
7
3.
Creephole Door
1
3.
Window Screens
7
4.
ventilation
1
4.
Reputty
8
5.
Floor Framing
2
5.
Window Glass
8
6.
Floor Joists
2
6.
Replace Sills
8
7.
Weatherstripping
8
II.
Walls
(exterior)
8.
Storm Windows
8
1.
Replace Stud Wall
2
2.
Repair Asbestos Siding
2
VIII.
Exterior
Trim
3.
Repair Comp. Siding
2
1.
All Exterior Trim
8
4.
Straighten Walls
2
2.
Masonry
8
5.
Replace Siding
3
IX.
Finish Floors
III.
Porches
1.
Wooden
9
1.
Removal
3
2.
Tile Installation
9
2.
Replace Wooden Flooring
3
3.
Carpet
9
3.
Wrought Iron
3
4.
Wood Columns
3
X.
Walls
(interior)
5.
Concrete Porch
3
1.
Dry Wall Products
10
6.
Stoops
4
2.
Wainscot
10
7.
Steps
4
3.
Ceiling Insulation
10
8.
Handrails
4
4.
Ceiling Finishes
10
9.
Guardrails
4
XI.
Mill
Work
IV.
Walks
and Drives
1.
Material
11
1.
Walks
4
2.
Workmanship
11
2.
Driveways
4
3.
Approaches
5
XII.
Painting
1.
Material
11
V.
Roof
2.
General Requirements
12
1.
Level -
5
3.
Preparation of Surfaces
12
2.
Decking
5
4.
Exterior Painting
14
3.
Gutter and Downspout
5
5.
Masonry Painting
14
4.
Flashing and Valley
5
6.
Interior Painting
14
5.
Repair Comp. Roof
5
7.
Caulking
14
6.
New Built-up Roof
5
8.
Application
14
7.
New Built-up over Old
5
8.
New Comp. over old
5
XIII.
Finish Hardware
9.
All Roofing Work
6
1.
Finish Hardware
15
VI.
Doors
XIV.
Miscellaneous
1.
Exterior Doors
6
1.
Counter Tops
15
2.
Frame
6
2.
Attic Vents
15
3.
Threshold
6
3.
Mechanical Ventilators
15
4.
All New Openings
6
4.
Vent -a -hoods
15
5.
Remove & Close Opening
6
5.
Built-ins
16
6.
Wooden Screen Doors
7
6.
Attic Insulation
16
7.
Interior Doors
7
7.
Clean up
16
8.
Storm Doors
7
8.
Site Drainage
16
Item Page
XV.
Plumbing
1. Bathroom Accessories
16
2. Heating
16
3. Air Conditioning
16
4. Plumbing Lines
16
5. Septic Tanks
16
XVI.
Electrical
1. Electrical Lines
17
XVII.
Energy Conservation
1. Doors and Windows
17
2. Openings
17
3. Pipe Insulation
17
4. Duct Insulation
17
5. Design Insulation
17
6. ceiling Insulation
17
7. Wall Insulation
17
XVIII.
Span Tables
1. ceiling Joists
18
2. Rafters
19
3. Floor Joists
20
XIX.
Miscellaneous
1. Construction Code Info
21
2. Safety Standards
22
GENERAL SPECIFICATIONS
TRADE NAMES: Are used to establish a guide as to quality and type
of material required.
MATERIALS: Shall be new, in good condition and of standard grade
unless otherwise specified.
REPAIRS: Where repairs of existing work are called for, the
feature is to be placed in "equal or new" condition either by
patching or replacement. All damaged, loose or rotten parts shall
be removed and replaced, and the finished work shall match adjacent
work in design and dimension.
IMPLIED WORK: Work specified and not shown on drawings or drawn
and not specified will be executed as if fully described by both
methods; and any work or materials which are not directly noted in
the specifications or drawings, but necessary for the proper
carrying out of the obvious intentions thereof are to be understood
as implied work and will be provided for by the contractor in his
proposal as fully as if specifically described and drawn.
EXAMINATION OF PREMISES: It is understood and agreed that the
Contractor has by careful examination, satisfied himself as to the
nature and location of the work, the character and quality of the
materials to be encountered, the general and local conditions, and
all matters which can in any way affect the work under this
contract. The proposal shall be based on the plans, specifications
and contract documents supplemented by the conditions at the site.
REMOVAL OF PORTIONS OF THE STRUCTURE: Removal of portions of the
structure shall be done in a workmanlike manner with a minimum
amount of damage to the remaining portions of the structure.
I. FOUNDATION
1. LEVELING: Shall be done in accordance with the
building code.
2. SKIRT: Shall be constructed of conforming materials
with 8 inches 22 or 24 gauge galvanized flashing with
2 inches overlap on bottom of skirt and extended into
ground.
3. CREEPHOLE DOOR: Shall be hinged and constructed of
such rodent proof material as to conform with founda-
tion skirt, and shall be adequate size for entrance to
crawl space. (Size: 24 inches x 24 inches hatch and
stops).
4. FOUNDATION VENTILATION: Under -floor areas shall be
ventilated by openings in exterior foundation walls.
Such openings shall have a net area of not less than
AAA005CE -1-
1 square foot for each 150 square feet of under -floor
area.
Openings shall be located as close to corners as
practical and shall provide cross ventilation. The
required area of such openings shall be approximately
equally distributed along the length of at least two
opposite sides. They shall be covered with corro-
sion -resistant wire mesh with mesh openings of 1/4
inch in dimension.
5. FLOOR FRAMING: Replace all rotten or deteriorated
flooring pieces with a standard grade material. All
materials should comply with existing codes.
6. FLOOR JOISTS: Reference specifications as noted on
Page 20.
II. WALLS EXTERIOR
1. WALL FRAMING: Replacement studs shall conform with
existing wall framing. In the event an entire wall is
added or replaced, the following criteria shall be
applied: stud grade 2 x 4's located at load -bearing
walls shall have a maximum height of 10 feet, shall be
spaced a maximum 24 inches OC, supporting roof and
ceiling only, shall be spaced a maximum 16 inches OC
supporting one floor, roof and ceiling. Stud grade 2
x 4's located at non -load -bearing walls shall have a
maximum height of 14 feet; shall be spaced a maximum
24 inches OC. Utility grade studs shall not be spaced
more than 16 inches OC nor support more than a roof
and ceiling, nor exceed 8 feet in height for exterior
walls and load -bearing walls, or 10 feet for interior
non -load -bearing walls.
2. REPAIR ASBESTOS SIDING: Replacement shall be conform-
ing pattern, type and color. If unable to match the
structure shall be painted to make color conform.
3. REPAIR COMPOSITION SIDING: Replacement shall be of
conforming pattern, type and color. If unable to
match, the structure shall be painted to make color
conform. Asphalt minimum weight 105# per square,
insulated composition minimum weight 225# per square.
4. STRAIGHTEN WALLS: Walls shall be straightened by
removing necessary wall boards (either exterior or
interior) in order to work wall framing to a straight
and even plane. Replace such structural members as
required and brace properly. Reinstall siding and
other components in a workmanlike manner. Caulk all
exterior joints before painting.
AAA005CE -2-
REPLACE SIDING: All wood siding shall be D grade or
written approved equal material. Siding shall have a
minimum thickness of 3/8 inch unless placed over
sheathing that has an ICBO (International Code of
Building Officials) approval. Siding patterns known
as rustic, drop siding or shiplap shall have an
average thickness of not less than 3/8 inch. Bevel
siding shall have a minimum thickness measured at the
butt section of not less than 7/16 inch and a tip
thickness not less than 3/16 inch. All weather
boarding or siding shall be securely nailed to each
stud with not less than one nail, or to solid 1 inch
nominal wood sheathing or 1/2 inch plywood sheathing
with not less than one line of nails spaced not more.
than 24 inches OC in each piece of the weather board-
ing or siding. All fasteners used for the attachment
of siding shall be of a corrosion -resistant type.
PORCHES
1. REMOVAL: Shall be done in such a manner as to cause
a minimum amount of damage to the remaining structure.
Adequate bracing and strengthening shall be done as
necessary for the main structure after removal.
2. REPLACE WOODEN FLOORING: Flooring shall be of tongue
and groove type, and preservative treated to prevent
deterioration unless otherwise specified.
3. WROUGHT IRON COLUMNS: Colonel Logan or written
approved equal.
WOOD COLUMNS: Shall be a minimum 4 inches x 4 inches
dimension. Columns and posts located on concrete or
masonry floors or decks exposed to the weather or to
water splash which support permanent structures shall
be supported by concrete piers or metal pedestals
projecting above floors, unless approved wood or
natural resistance to decay or treated wood is used.
The pedestals shall project at least 6 inches above
such floors. Individual concrete or masonry piers
shall project at least 8 inches above exposed ground
unless the columns or posts which they support are of
approved, wood of natural resistance to decay or
treated wood is used.
CONCRETE PORCH: Shall have a compressive strength at
28 days of at least 3000# PSI. Concrete will be
deposited when temperature is 360F or above and
rising. Concrete shall not be deposited on frozen
around. Shall be reinforced with minimum 6-6 x 10-10
wire mesh.
AAA005CE -3-
6. STOOPS: Are to be constructed of such material as to
conform with existing roof, and shall have all neces-
sary structural members required to form a structur-
ally sound unit.
7. STEPS: If steps are called for, they shall be poured
monolith ically, and shall have an 8 inches maximum
rise and 9 inches minimum run.
8. HANDRAILS: Handrails shall be required for stairways
having four or more risers and serving one individual
dwelling unit. Handrails shall be placed not less
than 30 inches nor more than 34 inches above the
nosing of treads and shall extend not less than 6
inches beyond the top and bottom risers. The handgrip
portion of handrails shall be not less than 1 and 1/4
inches nor more than 2 inches in cross -sectional
dimension or the shape shall provide a written ap-
proved equal gripping surface. The handgrip portion
of handrails shall have a smooth surface with no sharp
corners.
9. GUARDRAILS: All unenclosed balconies or porches which,
are more than 30 inches above grade or floor below
shall be protected by a guardrail. Guardrails shall
be not less than 42 inches in height. Open guardrail
and stair railings shall have intermediate rails or an
ornamental pattern such that a sphere 6 inches in
diameter cannot pass through.
IV. WALKS DRIVES
1. SIDEWALKS: Concrete shall have a compressive strength
at 28 days of at least 3000 P.S.I. Concrete will be
deposited when temperature is at 36 degrees Fahrenheit
or above the rising. Sidewalks shall be reinforced
with a minimum single layer of 6-gauge mesh, 2 layers
of 10-gauge mesh, or #3 rebar 18 inches O.C.E.W.
Sidewalks shall have a minimum grade of 1/4 inch per
foot.
2. DRIVEWAYS: Concrete shall have a compressive strength
at 28 days of at least 3000 P.S.I. Concrete will be
deposited when temperature is 36 degrees Fahrenheit or
above and rising. Driveways shall be reinforced with
a minimum single layer of 6-gauge mesh, 2 layers of
10-gauge mesh, or #3 rebar 18 inches O.C.E.W. All
driveways shall have a minimum concrete thickness of
5 inches, with a minimum grade of 1/4 inch per foot.
Expansion joints, constructed from wood of natural
resistance to decay, such as the heartwood of redwood,
bald cypress, or the cedars, shall be placed at a
maximum of 30 feet intervals.
AAA005CE -4-
3. DRIVE APPROACHES: Prior to beginning any ,work in the
public right-of-way, contact the Building Inspection
Department,at 566-8360.
V. ROOF
1. LEVEL: Install sufficient bracing to remove and
prevent recurrence of sway and to maintain a true and
even plane.
2. DECKING: Repair by replacing defective sheathing
boards leaving new deck surface smooth and clean, and
adequately secured to structural members. Nails to be
8d common or box for shiplap; all other 1 x 242
materials shall have 8d common or box nails and 6d
common or box nails for plywood sheathing 6 inches OC
along all edges and 12 inches OC along intermediate
members for plywood. Plywood is to be sheathing grade
no less than 3/8 inch but be same thickness as exist -
in . Floors shall be trimmed flush at any change in
elevation in excess of 1/8 inch.
GUTTER AND DOWNSPOUT: Shall be of galvanized metal
properly hung with 1/4 inch hardware cloth screen to
prevent entrance of foreign materials, and shall have
a concrete inches splash guard inches under the
downspout. Minimum 2 strap anchorage 7 feet - 0
inches height.
4. FLASHING AND VALLEY MATERIAL: All shall be 26 gauge
galvanized iron. Valley tin shall be a minimum of 20
inches wide.
5. REPAIR OF COMPOSITION ROOF: All missing or broken
shingles shall be replaced. Re -nail all loose shin-
gles. Replacement shall be of same color, design,
weight and brand (if possible) as existing roofing
material.
6. NEW BUILT UP ROOF: Nail one (1) ply of 30# felt. Mop
two (2) ply with 15# felt properly mopped with hot
tar. Apply hot mop and gravel, properly spread to
create a uniform and durable roof.
7. NEW BUILT UP ROOF OVER OLD: Thoroughly clean surface.
Install two (2) ply of 15# felt properly mopped with
hot tar. Apply hot mop and gravel properly spread to
create a uniform and durable roof.
NEW COMPOSITION ROOF OVER OLD: Properly repair
structural wood material by replacing all rotten and
defective decking, overhang, rafter ends, fascia and
cornice. Apply 235# composition roof with 1 1/4
inches galvanized roofing nails. Install according to
AAA005CE -5-
manufacturer's recommendations. Install 1 inch x 1
1/2 inches metal edging over all exposed edges of
roof. No more than one overlayment or two layers of
composition roof shall be applied to any structure.
Maximum allowable span for rafters specified on
attached tables.
9. ALL ROOFING WORK: (either new or old) Shall be
accomplished in a workmanlike manner, and shall be
done in accordance with manufacturer's recommenda-
tions, and installed in such a manner (with proper
flashing, counter flashing and all other necessary
components) to prevent leaks of any kind. Provide
temporary covering for roof when adverse weather
conditions prevent the roofing and associated work
from being installed and protection is required.
Maximum allowable span for rafters specified on
attached tables - page 16.
VI. DOORS
1. EXTERIOR DOORS: Shall be of exterior standard grade
with a minimum thickness of 1 3/4 inches. Doors shall
be six panel solid core type paint to match exterior.
All exterior doors shall be weatherstripped with M-D
Nu-Koil, vinyl and aluminum, or written approved
equal. Threshold, set in mastic and door bottom
weatherstrip. New door should conform to existing
dimensions unless otherwise specified. Installation
of a door includes new keyed lock, dead bolt and all
new hardware.
2. FRAME: Shall be of 2 inches material, properly plowed
jamb, to receive 1 3/4 inches door.
3. THRESHOLD: Shall be of proper height and width for
the particular opening.
4. ALL NEW OPENINGS: 4 feet wide or less in bearing
walls shall be provided with headers consisting of
either two pieces of 2 inch framing lumber placed on
edge and securely fastened together or 4 inch lumber
of written approved equal cross section. All openings
more than 4 feet wide shall be provided with headers
or lintels. Each end of a header or lintel shall have
a length of bearing of not less than 1 1/2 inches for
the full width of the lintel. All non -bearing loads
shall be constructed with two 2 x 4 headers placed in
such a manner as to remove all trace of closing.
5. REMOVE AND CLOSE OPENING: After removal, structure
shall be properly strengthened and openings shall be
covered with conforming exterior and interior finish
AAA005CE -6-
materials in such a manner as to remove all trace of
closing.
6. WOODEN SCREEN DOORS: Shall be of select preservative -
treated Western Ponderosa Pine with dowel joint
construction and furnished with 18/16 mesh corrosion
resistant aluminum screen wire. Minimum thickness 1
1/8 inches.
7. INTERIOR DOORS: Shall be of interior standard grade
with minimum thickness of 1 3/8 inches. Ideal Brand
or written approved equal. Door frame shall have a
minimum thickness of 3/4 inch.
8. STORM DOORS: Storm Doors are to be of aluminum,
baked -enameled, factory finished. Unit is to include
threshold, weatherstripping, closer chain stop and
lock assembly. Door is to be hinged on the same side
jamb as exterior door, or as indicated in drawing on
work write-up. Door must .give a tight fit when
closed. (Larson Model Number 290 and 280 or written
approved equal.)
VII. WINDOWS
1. WOOD UNITS: Shall be constructed of type "S" or "T"
stiles, check rail or plain rail. Material shall be
of preservative -treated Western Ponderosa Pine. Ideal
brand standard grade or written approved equal.
Minimum thickness of 1 3/8 inches. All windows shall
conform to existing dimensions unless otherwise
specified. All shall be double pane with screens.
ALUMINUM UNITS: Shall be constructed of heavy gauge
extruded aluminum sections (minimum thickness .062).
Exposed surfaces of all aluminum members shall be
extruded of First Class Finish material with no
serious defects or blemishes. All joints shall be
neatly fitted, secure, and made water -tight. operat-
ing sashes are to be properly weather-stripped to
minimize entrance of air and moisture. Double pane
shall be Allenco, Jordan or written approved equal
brand. Double pane (thermal insulated) windows shall
always be installed unless otherwise specified. All
windows shall conform to existing dimensions unless
otherwise specified. All shall be double pane with
screens.
3. WINDOW SCREENS: Wood screens shall be constructed of
3/4 inch material; header and sides shall be minimum
of 2 inches in width; base shall be minimum of 3
inches in width; and shall be properly doweled at
joints and screen wire shall be 18/16 mesh aluminum or
galvanized screen wire. Aluminum screens shall be of
AAA005CE -7-
VIII.
standard design and construction with a minimum cross
rail and frame width of 1/2 inch, and thickness of 3/8
inch, and wired with 18/16 mesh corrosion -resistant
aluminum wire. All window screens shall be full
screens.
REPUTTY: Surfaces shall be properly prepared by
removal of all cracked or otherwise unsound glazing
material. Proper holding devices will be installed.
New glazing compounds shall be of a good grade and
applied according to manufacturer's specifications.
Type glazing compound shall conform with usage.
WINDOW GLASS: All broken or cracked glass shall be
replaced with minimum of DSB glass. (Tempered glass
6. REPLACE SILLS: Wooden sills shall be of preservative
treated Western Ponderosa Pine, and shall be made to
join neatly with the window jamb and structure.
Caulk, prime and two coats of finish paint.
WEATHERSTRIPPING: Shall be applied in such a manner
as to prevent the entrance of air and moisture.
STORM WINDOWS: Furnish aluminum double hung storm
window and screen unit in all openings specified in
the Bid Work Write-up. Size unit to install on either
new or existing window as specified. Exposed surfaces
of aluminum shall be free of surface blemishes and
uniform in color. Furnish aluminum fixed panel storm
window and screen where specified. If no existing
fastening system is present, units shall be installed
with suitable fasteners to allow a tight fit, water-
proof seal, but still provide removal of unit.
Erection shall be by experienced mechanics only.
Windows shall be provided with all necessary hardware
for installation. Perimeter shall be caulked,
grouted. Window shall be installed plumb, true to
plane and firmly secured. Leave frame and opening in
a like new condition (Allenco, Jordan or written
approved equal brand).
EXTERIOR TRIM
1. ALL EXTERIOR TRIM: (Corner boards, bird boards,
fascia boards and other moldings) shall be of D grade
and applied in a workmanlike manner. Replace all trim
if existing trim style is not available.
MASONRY: All masonry work shall be applied in a
workmanlike manner. Where brick is installed, there
shall be a continuous reinforced concrete grade beam
with proper footings. All joints shall be properly
AAA005CE -8-
IX
tooled and left in a clean condition. Building face
brick shall be of gas -fired solid clay or shale units.
Structural clay tile, concrete masonry units and stone
shall require written approval of equal quality.
FINISH FLOORS
1. WOODEN: All damaged portions shall be removed and new
flooring of the same type and material applied. All
surfaces shall be properly sanded, filled, sealed and
varnished with two coats of gloss varnish. Bruce
Flooring and finishing products or written approved
equal. All damaged sub -flooring shall be replaced
with materials similar to existing. Floors shall be
trimmed flush at any change in elevation in excess of
1/8 inch. Floor joists shall conform to attached span
tables - page 17.
2. TILE INSTALLATION: All vinyl -asbestos or inlaid
linoleum floor covering shall be minimum 10 mils.
Surfaces shall be properly prepared either by sanding
and removing all foreign material from surfaces,
filling properly, and cleaned; or by installing an
underlayment in a neat and workmanlike manner accord-
ing to manufacturer's recommendations. Floor covering
shall be a first -line inlaid linoleum or a first -line
vinyl asbestos tile. Covering shall be installed in
a workmanlike manner, and with mastic materials
recommended by manufacturer. Remove base trim and
replace after placing floor covering. Install quarter
round base trim if no trim exists.
3. CARPET: Prepare floor area by correcting subfloor of
any irregularities. Clean the area thoroughly prior
to laying carpet. Lay carpet and pad wall to wall in
conformance with manufacturers directions. All carpet
shall have a face weight of 24.5 oz. or more. Carpet-
ing shall be stretched tight, free from puckers,
scallops, and ripples. Carpeting shall be cut evenly
and fitted close to walls and all other projections.
It shall be cut to fit closely and evenly into trim
strips and to and through thresholds where carpet
joins together in doorways. Filler strips in carpet-
ing shall not be less than 12 inches wide and 36
inches long. All carpet shall be lined up so that all
lines (weaving) of carpet match as woven. Both in
width and length. Re -fit all doors as necessary so
that they clear carpeting completely when opening and
closing. Remove all loose threads and clean any spots
with spot remover, final vacuum. Allow only a minimum
number of seams; no T or head seams will be allowed.
Make seams parallel and perpendicular to walls. Do
not make seams perpendicular to doors. Make cuts
under doors at the mid -point of the door thickness
AAA005CE -9-
when the door is in the closed position. Lay all
carpet with the tufting or nap in one direction.
Installation on Stairs: Place seams at the bottom of
risers. Use carpeting that is full width of the
widest part of the stairway. Wrap carpet and pad
around balustrades; fasten to the tread and riser
face. Fasten carpet and pad at the top and bottom of
each riser. Where gaps exist at bottom of finished
wall after installation of carpet, base molding,
either wood or rubber, must be installed (not quarter
round).
X. WALLS (INTERIOR
1. DRYWALL PRODUCTS: All drywall products shall be a
minimum thickness of 3/8 inch where framing is not
greater than 16 inches OC. Where framing is 24 inches
OC, drywall products shall be no less than 1/2 inch in
thickness. All drywall products are to be installed
in a workmanlike manner. Where repairs are being
made, drywall products shall be of the same thickness
as existing material. All drywall products shall be
taped, bedded, floated, sanded and textured in a
workmanlike manner, and dried properly (minimum of 24
hours drying period between each coat shall be al-
lowed).
2. WAINSCOT: Where Masonite or temper tile is used, it
shall be installed with metal trim and sealed properly
to prevent entrance of moisture. Where ceramic tile
is used, it shall be installed with an adhesive
recommended by the manufacturer, or installed on metal
lath and masonry mortar, and grouted properly to make
moisture proof. All wainscot shall be installed a
minimum of 4 feet high (off floor) in all bathrooms,
and shall be a minimum of 70 inches above the drain
inlet around showers and bathtubs.
3. CEILING INSTALLATION: Install wallboards with long
dimensions at right angles to the supporting members,
ends rest on supporting members. Stippled ceiling -
remove all loose and chipped paint and sand surfaces
of semi -gloss or paint surfaced. Apply joint compound
and tape if necessary to any sub -surface cracks or
nail pops and allow to dry overnight. Apply a 3/16
inch minimum to 6/16 inch maximum skim coat of ready
mix joint compound as evenly as possible over prepared
surface. Immediately push soft brush into compound
and pull out perpendicular from surface. Any design
must be approved by Owner. Joint compound shall not
exceed 1 1/2 gallons per 100 square feet of surface.
Joist placement shall conform with attached span
tables - page 15.
AAA005CE -10-
XI.
XII
4. CEILING FINISHES: Drop ceilings shall be 1/2 inch
Gypsum. A cove molding (3/4 inch or 1 1/2 inches)
shall be provided where ceiling butts wood or paneled
walls. Finish shall be heavy texture or as specified
by Owner. Install 1 inch by 3 inches furring strips
12 inches square ceiling tile. (Acoustical) Tile
shall be interlocking, pattern and color to be se-
lected by Owner. Provide manufacturers molding to the
perimeter. Suspended ceilings shall have exposed "T"
Bar or un-exposed "T" Bar, as specified, to be in-
stalled per manufacturers directions.
1. MATERIAL (GRADE AND SPECIES): Material shall be of a
select grade of white pine or written approved equal.
Plywood shall be of AD grade or written approved
equal.
WORKMANSHIP: All measurements and dimensions shall be
verified at the job and the General Contractor shall
be responsible for any work that does not fit prop-
erly. Rough carpentry shall be self fitted and nailed
and drawn up tight. Finish work shall be finished
smooth, free of machine or tool marks, abrasions,
raised grain, etc., on exposed surfaces, and shall be
machine sanded and hand dressed to a smooth finish.
Joints shall be tight and so formed as to conceal
shrinkage. Mill assemblies shall be joined with
concealed nails and screws where practical, or with
mortise and tenons with glued blocks where practical.
All molded members and trim shall be mitered or coped
at corners. Nails in exposed work shall be set.
Running flat finish shall have kerfed or worked hollow
backs and shall be on commercial lengths. Trim around
doors and openings shall be full length and jointed
only at corners. Scribing, mitering, and joining
shall be done accurately and neatly.
PAINTING*
1. MATERIALS: Paint shall be well ground, shall not
settle badly, cake, or thicken in the container, shall
be readily broken up with a paddle to a smooth consis-
tency and have easy brushing properties. Paint shall
be ready mixed except that tinting and thinning may be
done at the job. All paint materials shall be deliv-
ered in original unopened containers, with labels and
tags intact. All materials shall be of the highest
quality and be used for the purpose for which it was
manufactured. USE OF A LEAD BASE PAINT SHALL BE
PROHIBITED. All raw wood should be primed and painted
to match existing as closely as possible. Include
AAA005CE -11-
this in the bid for the installation of the new
material.
GENERAL REQUIREMENTS: Maintain temperature of rooms
where varnish or enamel is being applied at 70°F, or
more, and at 50OF or more during other interior
painting. Exterior painting shall be performed when
the air temperature is 50OF or higher and in dry
weather. Field painting will not be required on items
specified to be completely finished at factory or on
aluminum, copper, brass, and bronze, or on glazing
compound in aluminum windows. Sack prime wood trim
with one coat of linseed oil paint. Allow paint to
dry hard between coats (2 to 5 days). Protect all
work from damage by the use of drop cloths. Remove
paint stains completely from finished work. Covering
shall be complete. When color, stain, dirt, or
undercoats show through the final coat of paint the
work shall be covered by additional coats until the
paint is of uniform color and appearance and coverage
is complete. Where two coats or more of paint are
specified, the coat applied prior to the finish coat
shall be applied noticeably lighter in shade than the
final coat. Hardware and accessories, fixtures, and
similar items placed prior to painting shall be
removed or protected during painting and replaced on
completion of painting. Sand interior enamel surfaces
lightly between coats. In the selection of paints, a
reasonable choice of colors shall be offered to the
homeowner.
3. PREPARATION OF SURFACES: Perform preparation and
cleaning procedures in accordance with paint manufac-
turer's instructions and as herein specified, for each
particular substrate condition.
Remove hardware, hardware accessories, machined
surfaces, plates, lighting fixtures, and similar items
in place and not to be finish -painted, or provide
surface -applied protection prior to surface prepara-
tion and painting operations. Remove, if necessary,
for complete painting of items and adjacent surfaces.
Following completion of painting of each space or
area, reinstall removed items.
Clean surfaces to be painted before applying paint or
surface treatments. Remove oil and grease prior to
mechanical cleaning. Program cleaning and painting so
that contaminants from cleaning process will not fall
onto wet, newly -painted surfaces. All surfaces
requiring finishing shall be thoroughly cleaned and
dry prior to painting.
AAAOO5CE -12-
Exterior Surface Preparation: Remove existing loose,
scaling, peeling or cracking paint; scrape, sand or
wire brush surfaces to smooth condition to receive
finish, feather edges into sound adjoining surfaces
and dust clean. Such treated surfaces to receive two
coats of paint. Protect glass, screen and finished
surfaces adjacent to painted surfaces. Remove paint
misapplied to non -painted surfaces. Perform the
following preparation operations for various interior
substrates as indicated:
Wood: Shellac knot holes, pitch pockets and sappy
portions, or seal with knot sealer. Remove projecting
nails, screws, or hooks. Fill nail holds, cracks and
defects after first coat, with putty matching color of
stain or paint.
Steel and Iron: Remove grease, oil, dirt and dust.
Touch-up chipped and abraded primer on items that have
been shop primed, using same type of primer.
Plaster, Concrete, Masonry: Check for high moisture
and alkali content. If high alkali is present, dry
out the surfaces. Prime new materials.
Gypsum Wallboard: Clean and sand existing surfaces.
Apply one coat of texture, sealer and primer to new
material.
Painted and Stained Surfaces: Remove loose paint,
dirt, fungus and other foreign materials from the
surface. Smooth surfaces with steel wool or sandpa-
per.
Wallpaper: Remove all paper to firm subsurface.
Patch holes in subsurface, and apply seal coat.
Interior Surface Preparation:' Remove existing loose
cracking, scaling, peeling and/or blistered paint;
scrape sand or wire brush surfaces to smooth condition
to receive finish, feather edges into sound adjoining
surfaces, and dust clean, perform the following
preparation operations for various interior substrates
as indicated.
Wood: Remove projecting nails, hooks or screws.
Shellac knot holes, pitch pockets and sappy portions,
or seal with knot sealer. Fill nail holes, cracks and
defects after first coat, with putty matching color of
stain or paint. Prime new materials; spot prime
existing materials.
AAA005CE -13-
Steel and Iron: Remove grease, oil, dirt and dust.
Touch-up chipped and abraded primer on items that have
been shop primed, using same type of primer.
Plaster, Concrete, Masonry: If high alkali is pres-
ent, neutralize to suitable levels. If high moisture
is present, dry out the surfaces.
Painted, Wallpapered and Stained Surfaces: Remove
loose paint or wallpaper, dirt, fungus or other
foreign materials from the surface. Smooth surfaces
with steel wool or sandpaper.
* All raw wood should be primed and painted to match
existing as closely as possible. Include this in the
bid for the installation of new materials.
4. EXTERIOR PAINTING: Exterior woodwork shall be painted
to cover as follows: First coat shall be exterior
primer, and additional coats shall be oil base or
exterior latex paint. Pittsburgh Weather Fresh 33-110
paint or written approved equal.
5. MASONRY PAINTING: (All exterior concrete masonry
except face brick): All exterior masonry surfaces
shall receive a minimum of overcoat of primer and
filler as manufactured by a masonry paint company, and
a minimum of coat of acrylic, and shall be applied in
strict accordance with the manufacturer's recommenda-
tions.
6. INTERIOR PAINTING: Kitchen, wood doors, wood trim,
and other finish woodwork shall be painted to cover
with (primer on new work) oil based enamel (gloss
selected by owner). Walls, ceilings and all drywall
products shall be painted to cover with latex enamel
paint. (Color selected by owner). All paint contain-
ers shall bear a label containing the product name and
the manufacturer, together with an Underwriters
Laboratories, Inc. label, which indicates the required
surface covering and resulting flame spread character-
istics for various applications (Pittsburgh Wall Fresh
68-6 paint or written approved equal).
7. CAULKING: Completely seal, with caulking compound,
joints around frames of doors, windows and other
openings in exterior masonry walls, joints where
masonry abuts other exterior surface finishes and
other joints indicated or specified to be caulked.
caulking compound shall be Grade 1, or written ap-
proved equal, and be delivered to the job in the
manufacturer's unopened containers.
AAA005CE -14 -
APPLICATION: Work shall be done by skilled mechanics
and shall be uniform in appearance, of approved color,
smooth and free from runs, sags, skips, and defective
brushing. Make edges of paint adjoining other mold-
ings or colors, sharp and clean without overlapping.
Should workmanship of finish be found defective,
proper preparatory work shall be done and additional
coats applied as necessary to give a finish in accor-
dance with specifications. At completion, touch up
and restore finish where damaged or defaced and leave
in first class condition. Painted or finished sur-
faces cut in fitting or erection shall be restored.
XIII. FINISH HARDWARE
1. FINISH HARDWARE: All exterior door locks shall be
properly installed with key -in -knob and deadbolt,
Weiser, Schlage, Kwikset or Westlock brand -- not less
that "contractor" grade; i.e., Kwikset Titan series,
Schlage Contractor Series, etc. Where more than one
new lock is installed to the exterior of building,
these locks shall all be keyed alike. All exterior
door butts shall be minimum of 3 1/2 inches x 3 1/2
inches in size with minimum of 3 butts to each door.
All new interior passage locks shall be of Weiser,
Schlage, Kwikset, Westlock brand -- not less that
"contractor" grade -- and shall match as nearly as
possible the existing locks. All interior door butts
shall be minimum of 3 inches x 3 inches in size with
a minimum of 2 butts to each door. All cabinet
hardware shall be polished finished material and
properly fitted as required for the particular use.
XIV. MISCELLANEOUS
1. COUNTER TOPS: Tops material shall be securely bonded
to reinforced steel core or to 3/4 inch plywood or
other written approved equal material. Top material
shall be phenolic laminate, vinyl plastic covering,
linoleum, ceramic tile, stainless steel, or be of
written approved equal material suitable for its
intended use. At least a 3 inch backsplash shall be
provided when abutting walls. All edges shall be of
same material as cabinet top. Where formica, lino-
leum, orsplastic materials are used for cabinet top,
all sinks shall be installed with Hudee rim. All
sinks shall be stainless steel, standard grade.
ATTIC VENTS: Attic vents and louvers shall be con-
structed of either heavy gauged galvanized iron or
wood. They shall be of adequate size for proper
ventilation of the structure.
AAA005CE -15-
3. MECHANICAL VENTILATORS: All mechanical ventilators
shall be vented through the roof, and shall be covered
with a rain -proof of galvanized metal (minimum 16
gauge).
4. VENT -A -HOOD: See work write up for numbers and makes.
BUILT-INS: (oven and cooking top - gas or electric)
See work write-up for model, make and size.
6. ATTIC INSULATION: Attic insulation shall be a minimum
of 6 inches thick rock wool, fiberglass cellulose
blown insulation, and evenly blown (from exterior
plate to exterior plate) over the entire attic of
habitable rooms. Shall have an R value of 30.
CLEAN UP: Wash all windows, leave all floors,
porches, and walks in "broom" clean condition. Remove
all debris from the premises.
8. SITE DRAINAGE: Where required by a change in the
exterior building lines or to correct an existing
condition where surface water runs toward or stands
against the walls or foundation, the ground surface
shall be graded in such a manner as to effect adequate
drainage away from the structure and/or structures.
XV. PLUMBING*
BATHROOM ACCESSORIES: Each complete bathroom shall be
provided with at least: Grab bar 250# pull and soap
dish at bathtub, toilet paper holder at water closet.
Soap dish at lavatory (maybe integral with lavatory),
towel bar, mirror and a medicine cabinet or written
approved equal enclosed shelf space. In all cases
where shower head is installed, provide a shower rod
or shower door. Tub kit should be two piece fiber-
glass unit with overlapping edges (medium grade).
2. HVAC: For all air conditioning, wall furnaces, floor
furnaces and forced air furnaces, BTU output should be
adequate to heat area. This should be based on the
square feet of the area the unit is intended to heat.
The installing contractor must provide documentation
showing the Energy Eff. Rating.
3. AIR-CONDITIONING: Addition or replacement of HVAC
systems shall have high -efficiency systems and burners
that are not oversized by more than 15%. The install-
ing contractor shall provide documentation showing the
unit's size and the energy efficiency rating.
AAA005CE -16-
4. PLUMBING LINES: All plumbing stacks shall be con
cealed in wall and extended through roof, with roof
flashing.
5. SEPTIC TANK: Removal shall be done in such a manner
as to cause a minimum amount of damage to the sur-
rounding structures and landscaping. Fill shall be of
such consistency as to prevent subsequent settlings of
the fill. Fill with sand.
* All plumbing components, installations, modifica-
tions shall meet the codes and ordinances of the City
of Denton, Texas. All work must be done by properly
licensed individuals.
XVI. ELECTRICAL*
1. ELECTRICAL LINES: All electrical lines shall be
concealed or encased in an approved conduit.
* All electrical components, installation, modifi-
cations shall meet the codes and ordinances of the
City of Denton, Texas. All work must be done by
properly licensed individuals.
XVII. ENERGY CONSERVATION STANDARDS
These standards provide the mandatory levels in the
rehabilitation of residential structures. It is realized
that not all of the requirements can be followed in all
situations due to existing building conditions and funds
available. Any one or more of these requirements may be
eliminated to the extent they are not practical, consider-
ing economic feasibility, program need and type of
construction involved. See work write-up for specifica-
tions.
1. Doors must be weatherstripped and windows must be
reputtied or caulked.
2. All openings, cracks or joints in the building enve-
lope must be caulked or sealed.
3. Heating, ventilation and air conditioning systems must
have pipe insulation to a value of R-2.*
4. Heating, ventilation and air conditioning systems must
have duct insulation to a value of R-4.*
5. Heating, ventilation and air conditioning systems must
be of a high efficiency design and must be no greater
than 15% oversize.*
6. Ceiling insulation must be to a value of R-30.*
AAA005CE -17-
7. Wall insulation must be to a value of R-11.*
* Applies only when construction elements become
exposed or when new materials are installed.
* For additional specifications and standards of
workmanship see appropriate local code (page 18).
AAA005CE -18-
CEILING JOISTS
LUMBER+121'191
MUM ALLOWABLE SPAN"
GRADE & SPECIES
SPAC
2 X 8
2 X 10
2 X 12
26' 2"
33' 5"
40' 8"#2
DOUGLAS
23' 10"
30' 5"
36' 10"
FIR
24"
15' 9"
20' 10"
26' 6"
32' 3"
12"
16' 1"
21' 2"
27' 1"
DOUGLAS
16"
14' 7"
19' 3"
24' 7"
FIR
24"
IT 9"
16' 10"
21' 6
;9'l
12"
19' 6"
25' 8"
32' 9"
#2
YELLOW
16„17'
8"
23' 4"
29' 9"
PINE
24"
15' 6"
20' 5"
26' 0"7
31' 7"
#3
12114148'
8"
24' 7"
31' 4"
37' 4"
YELLOW
PINE
1
22' 4"
28' 6"
34' 3"
2
19' 6"
24' 10"
29' 8"
#2
1
24' 0"
30' 7"
37' 2"
SPRUCE-
PINE-
16"
16' 6"
21' 9"
27' 9"
33' 9"
FIR
24"
14' 5"
19' 0"
1 24' 3"
28' 0"
#3
12"
11' 3"
16' 1"
23' 4"
29' 9"
SPRUCE-
PINE-
16"
10' 3"
16' 11"
21' 2"
27' 1"
FIR
24"
81111,
14' 1"
18' 6"
23' 8"
THESE SPANS ARE INTERPOLATED BY USE OF THE FOLLOWING TABLES OF THE 1991 EDITION OF THE UNIFORM
BUILDING CODE:
TABLE NO. 25-A-1 -- ALLOWABLE UNIT STRESSES - STRUCTURAL LUMBER
ALLOWABLE UNIT STRESSES FOR STRUCTURAL LUMBER -- VISUAL GRADING
(NORMAL LOADING. SEE ALSO SECTION 2504)
TABLE NO. 25-U-J-6 -- ALLOWABLE SPANS FOR CEILING JOISTS - 10 LBS PER SO FT LIVE LOAD
DESIGN CRITERIA: DEFLECTION FOR 10 LBS PER SO FT LIVE LOAD. LIMITED TO SPAN IN INCHES DIVIDED BY 240.
STRENGTH -LIVE LOAD OF 10 LBS. PER SQ .FT. PLUS DEAD LOAD OF 5 LBS PER SQ FT DETERMINES THE REQUIRED
FIBER -STRESS VALUE.
AAA005CE -19-
RAFTERS
LUMBER
MAXIMUM ALLOWABLE SPAN*
GRADE & SPECIES
SPACING OC
2 X 6
2 X 8
2 X 10
2 X 12
#2
DOUGLAS
FIR
12"
16' 5"
21' 8"
27' 8"
33' 8"
16"
14' 3"
18, 9"
24' 0"
29' 1"
24"
11' T'
15' 4"
19' 7"
DOUGLAS
FIR
12"
12' 7"
16' 7"
21' 2"
25' 9"
16"
10, 11 "
14' 4"
18' 4"
22' 4"
24"
81111,
11' 9"
14' 11"
18' 2"
#2
YELLOW
PINE
12"
16' 2"
21' 4"
27' 2"
33' 1"
16„
14' 0"
18' 5"
23' 7"
28' 7"
24"
11' 5"
15' 1"
19' 3"
1 23' 4"
#3
YELLOW
PINE
12"
12' 3"
16' 111
20' 7"
25' 0"
16"
10' 7"
13' 11"
17' 10"
21' 8"
24"
8' 8"
11' 5"
14' 5"
17' 8"
#2
SPRUCE-
PINE -
FIR
12"
13' 8"
18' 0"
23' 0"
27' 11"
16"
11' 10"
15' 7"
19' 11"
24' 2"
24"
9' 8"
12' 9"
16' 3"
19' 9"
#3
SPRUCE-
PINE-
FIR
12"
10' 4"
13' 7"
17' 5"
21' 2"
1611
811111
11' 9"
15, 1"
18' 4"
24"
7' 4"
9' 7"
12' 3"
14' 11"
THESE SPANS ARE INTERPOLATED BY USE OF THE FOLLOWING TABLES OF THE 1991 EDITION OF THE UNIFORM
BUILDING CODE:
TABLE NO. 25-A-1 -- ALLOWABLE UNIT STRESSES - STRUCTURAL LUMBER
ALLOWABLE UNIT STRESSES FOR STRUCTURAL LUMBER -- VISUAL GRADING
(NORMAL LOADING. SEE ALSO SECTION 2504)
TABLE NO. 25-U-R-13 -- ALLOWABLE SPANS FOR HIGH SLOPE RAFTERS SLOPE OVER 3 IN 12
20 LBS PER SO FT LIVE LOAD (LIGHT ROOF COVERING)
DESIGN CRITERIA: STRENGTH - SEVEN LBS PER SO FT DEAD LOAD PLUS 20 LBS PER SO FT LIVE LOAD DETERMINES
REQUIRED FIBER STRESS. DEFLECTION - FOR 20 LBS PER SO FT LIVE LOAD. LIMITED TO SPAN IN INCHES DIVIDED
BY 180. RAFTERS: SPANS ARE MEASURED ALONG THE HORIZONTAL PROJECTION AND LOADS ARE CONSIDERED
AS APPLIED ON THE HORIZONTAL PROJECTION.
AAA005CE -20-
FLOOR JOISTS
LUMBER
MAXIMUM ALLOWABLE SPAN'
GRADE & SPECIES
SPACING OC
2 X 6
2 X 8
2 X 10
2 X 12
#2
DOUGLAS
FIR
12"
10, 11 "
14' 5"
18' 5"
22' 5"
16"
9' 11 "
13' 111
16' 9"
20' 4"
24"
8' 8"
11' 5"
14' 7"
17' 9"
DOUGLAS
FIR
13' 10"
17' 8"
21' 6"
12' 7"
16' 0"
19' 6"
424l181
11' 0"
14' 0"
17' 0"
#2
YELLOW
PINE
14' 2"
18' 0"
21' 11"
12' 10"
16' S"
19' 11 "
11' 3"
14' 4"
17' 5"
#3
YELLOW
PINE
#2
SPRUCE-
PINE-
FIR
12"
10' 3"
13' 6"
17' 3"
21' 0"
16"
So 4"
12' 3"
15' 8"
19' if,
24"
12"
8' 2"
10, 0"
10' 9"
13' 2"
13' 8"
16' 10"
16' 8"
20' 6"
16„
9 12
0 1
15 3
18 7 „
24"
7' 11"
1 10' 6"
13' 4"
16' 3"
#3
SPRUCE-
— PINE -
FIR
12"
9' 9"
12' 10"
16' 5"
19,111,
1611
81 10
ill81,
12 11
18,ill
24"
7' 9"
10' 2"
13' 0"
15,101,
THESE SPANS ARE INTERPOLATED BY USE OF THE FOLLOWING TABLES OF THE 1991 EDITION OF THE UNIFORM
BUILDING CODE:
TABLE NO. 25-A-1 -- ALLOWABLE UNIT STRESSES - STRUCTURAL LUMBER
ALLOWABLE UNIT STRESSES FOR STRUCTURAL LUMBER - VISUAL GRADING
(NORMAL LOADING. SEE ALSO SECTION 2504)
TABLE NO. 25-U-J-1 -- ALLOWABLE SPANS FOR FLOOR JOISTS - 40 LBS PER SQ FT LIVE LOAD
DESIGN CRITERIA: DEFLECTION - FOR 40 LBS PER SO FT LIVE LOAD. LIMITED TO SPAN IN INCHES DIVIDED BY 360.
STRENGTH - LIVE LOAD OF 40 LBS PER SO FT PLUS DEAD LOAD OF 10 LBS PER SO FT DETERMINES THE REQUIRED
FIBER STRESS VALUE.
AAA005CE —21—
XIX. MISCELLANEOUS
1. COMMERCIAL AND MULTI -FAMILY INFORMATION CONCERNING
CITY CONSTRUCTION CODES
The construction codes which have been adopted for use
in the City of Denton are:
a. 1991 Uniform Building Code with Amendments
b. 1973 Uniform Mechanical Code with Amendments
C. 1984 National Electrical Code with Amendments
d. 1979 Uniform Plumbing Code with Amendments
Copies of these codes may be read in the Building
Inspection Office.
Permits are required on the following:
Building New or Remodeling Swimming Pool
Plumbing Fence
Electrical Sign
Heating, Ventilating & Cooling Sidewalk
(if in Right -of -Way)
Driveway Approach
Lawn Sprinkler
Following are required inspections and phone numbers
to request those inspections:
BUILDING
566-8363
Approach
Foundation
Framing
A C Duct
Fireplace
A C Final
FINAL BUILDING
Fence
Parking
Setback
Sign
Swimming Pool
ELECTRIC
566-8361
Saw Service
Rough In
Slab Rough In
Service Lateral
Underground
Temp Power
FINAL ELECTRIC
Sign
Mobile Home
Pool Grounding
Pool Final
Re -Connect
PLUMBING
566-8364
Rough -In
Partial Rough
Water Yd Line
Sewer
Gas Yd Line
Stack Out
Gas Pressure Test
PLUMB & GAS FINAL
Vacuum Breaker
Roof Drain
THESE INSPECTIONS MUST BE REQUESTED BY THE CONTRACTOR
DOING THE WORK.
PLEASE USE THE PHONE NUMBER INDICATED ABOVE, UNDER THE
TYPE INSPECTION REQUIRED, TO REQUEST THAT INSPECTION.
AAA005CE -22-
When area separation walls
within the attic shall be
before ceiling is installed.
are required the portion"
completed and inspected
It is the responsibility of the individual permittee
to obtain required inspections before a building or
use is completed or occupied. A CERTIFICATE OF OCCU-
PANCY must be issued on commercial projects, as
required by the Zoning Ordinance and Building Code,
before any structure is released for public use.
2. SAFETY STANDARDS:
Every sleeping room below the fourth (4th) story shall
have at least one (1) operable window or exterior
door approved for emergency egress or rescue. The
units shall be operable from the inside to provide a
full clear opening without the use of separate tools.
All egress or rescue windows from sleeping rooms shall
have a minimum net clear opening of 5.7 square feet.
The minimum net clear opening height dimension shall
be 24 inches. The minimum net clear opening width
dimension shall be 20 inches. Where windows are
provided as a means of egress or rescue they shall
have a finished sill height not more than 44 inches
above the floor.
Every dwelling and guest room in lodging houses and
every dwelling unit within an apartment house shall be
provided with smoke detectors approved by Underwriters
Laboratories or Factory Mutual. In dwelling units,
detectors shall be mounted on the ceiling or wall at
a point centrally located in the corridor or area
giving access to rooms used for sleeping purposes.
Where sleeping rooms are located on an upper level,
the detector shall be placed at the center of the
ceiling directly above the stairway. All detectors
shall be located within 12 inches of the ceiling.
When actuated, the detector shall provide an alarm in
the dwelling unit or guest room.
Every attic or furred space in which a warm -air
furnace is installed shall be readily accessible by an
opening and passageway as large as the largest piece
of the furnace and in no case less than 30 inches by
22 inches continuous from the opening to the furnace
and its controls. The opening to the passageway shall
be located not more than 20 feet from the furnace
measured along the center line of such passageway.
Every passageway shall be unobstructed and shall have
solid continuous flooring not less than 24 inches wide
from the entrance opening to the furnace.
AAA005CE -23-
A kitchen type exhaust hood which requires a vent
shall be vented through the roof and not into the
attic space.
Exhaust fans vented to the outside or into ventilated
attic space are required in all bathrooms unless an
openable window is provided in the bathroom.
Gas -fired water heaters may not be located in a
bedroom or bathroom or in a closet opening into a
bathroom or bedroom.
Gas -fired water heaters located in garages must be
elevated at least 18 inches above the garage floor and
shall not be located in the pathway of an automobile.
The number and location of receptacle outlets shall be
as required by the 1981 National Electrical Code.
AAA005CE -2 4 -