HomeMy WebLinkAbout1992-069ALL001AD\1705 5 3
ORDINANCE NO / c2'C) 9
AN ORDINANCE OF THE CITY OF DENTON, TEXAS, AMENDING THE SCHEDULE OF
ELECTRIC RATES BY ADOPTING AN AMENDED SCHEDULE TGS (GENERAL SERVICE
TIME OF USE RATE), AND PROVIDING FOR AN EFFECTIVE DATE
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the Schedule of Rates for electrical services,
as adopted by Ordinance No 90-168, is amended by amending the
provisions of Schedule TGS (General Service Time of Use Rate), a
copy of which is attached hereto in Exhibit "A" and incorporated by
reference herein
SECTION II That this ordinance shall become effective May 1,
1992
PASSED AND APPROVED this the4',-V& day of 1992
ATTEST
JENNIFER WALTERS, CITY SECRETARY
BY
APPROVED AS TO LEGAL FORM
DEBRA A DRAYOVITCH, CITY ATTORNEY
BY�
EXHIBIT "A"
SCHEDULE TGS
GENERAL SERVICE TIME OF USE (TGS)
(Effective
Applicable to any commercial and industrial user for all
electric service supplied at one point of delivery and measured
through one meter who has peak electrical loads during off peak
hours
Customers electing to utilize the TGS rate may change to this
rate only during the month of June and must remain on this rate for
a minimum of twelve (12) continuous billing months
Not applicable to resale service in any event, nor to
temporary, standby or supplementary service except in conjunction
with applicable rider
(1) Customer Facility Charge $25 00/30 days Single Phase
$30 00/30 days Three Phase
(2) On -Peak Demand Charge $12 50/KW of On -Peak Demand
(3) System Demand Charge
(4) Energy Charge
(5) Energy Cost Adjustment
MINIMUM BILLING
$ 4 00/KW of System Demand
$ 01/KWH
Per Schedule ECA
The minimum monthly bill shall be the sum of the Customer
Facility Charge, the On -Peak Demand Charge, and the System Demand
Charge, but not less than 70W of the maximum monthly total demand
charge for any month during the preceding months of May through
October
Secondary service available to commercial and industrial
customers
The City will supply single-phase service (or three-phase
service if available at theipoint of delivery) at sixty (60) cycles
and at any standard voltages available from the City's distribution
system through one standard transformation Where service of the
type desired by the customer is not already available at the point
of service, special contract arrangements between the City and the
customer may be required prior to its being furnished
The On -Peak Demand shall be the maximum KW demand supplied
during the fifteen (15) minute period of maximum use during the on
peak hours as recorded by the City's demand meter and adjusted for
power factor The minimum monthly bill for On Peak Demand shall be
one hundred percent (100W) of the maximum on -peak demand, similarly
determined during the previous billing months of June through
September in the twelve (12) months ending with the current month
he On -Peak Demand will be billed every month
The System Demand shall be the maximum KW demand supplied
during the fifteen (15) minute period of maximum use as recorded by
the City's demand meter and adjusted for power factor, but not less
than one hundred percent (100%) of the maximum system demand
similarly determined during the previous billing months of June
through September in the twelve (12) months ending with the current
month
The City reserves the right to determine the power factor of
the customer's installation served during the period of maximum
demand or by measurement of the average power factor for the
monthly billing period If the power factor is below ninety
percent (90*), on -peak and average demand for the demand for
billing purposes will be determined by multiplying the unadjusted
billing demand by ninety percent (90t) and dividing by the
determined power factor
The City's on -peak hours, for the purpose of this rate
schedule, are designated as being from 1 00 P M to 8 00 P M each
Monday through Friday, starting on June 1 and continuing through
September 30 each year The City's on -peak hours may be changed
from time to time and the customer will be notified twelve (12)
months prior to such changes becoming effective
The City's off-peak hours,
schedule, shall be all hours not
SUPPL•EMEM " nnWER RT11 R
for the purpose of this rate
designated as on -peak hours
Customers requesting standby or supplementary power shall be
allowed service under this rate schedule, however, the
determination of system demand shall be adjusted to read
The system aemand shall ne t"e sum of the maximum KW aemara
supplied during the fifteen (15) minute period of maximum use as
recorded by the City's demand meter plus the KW nameplate ratirg(s)
of the customer's generator(s) In the event of the customer s
generator(s) is/are off line at tre time of the establishment of
tl,e maximum system demand, the KW nameplate rating of the
generator(s) unavailable for service shall be removed from the
determination of the system demand In no event shall the system
demand be less than seventy percent (70U of the maximum system
demand similarly determined during the previous billing months of
June through September in the twelve (12) months ending with the
current month
All service which requires special facilities in order to meet
the customer's service requirements shall be provided subject to
special facilities rider
(a) Billing for the Facility Charge shall be based on 12
billings annually using the following formula
Actual day in reading period X Customer Charge
30
(b) Billing for demand shall be calculated on a 30-day-per-
month basis and pro -rated for longer or shorter billing
periods using the following formula
Actual days in reading period x KW Demand x Rate
30
A charge per M of energy taken for fuel cost calculated in
accordance with Schedule E C A
Bills are due when rendered, and become past due if not paid
within fifteen (is) calendar days from date of issuance
TGSRATE