HomeMy WebLinkAbout1990-091ORDINANCE NO. 0 AN ORDINANCE AUTHORIZING THE MAYOR TO EXECUTE AMENDMENT NO. 2 TO THE AGREEMENT OF FEBRUARY 16, 1988 BETWEEN THE CITY OF DENTON AND FREESE AND NICHOLS, INC. RELATING TO PROFESSIONAL ENGINEERING SERVICES FOR THE DESIGN OF THE LAKE RAY ROBERTS WATER TREATMENT PLANT; AUTHORIZING THE EXPENDITURE OF FUNDS THEREFORE; AND PROVIDING AN EFFECTIVE DATE. THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS: SECTION I. That the Mayor is authorized to execute Amendment No. 2 to the agreement between the City of Denton and Freese and Nichols, Inc. relating to the design of the Lake Ray Roberts Water Treatment Plant under the terms and conditions contained within said amendment, a copy of which is attached hereto and made a part hereof. SECTION II. That the City Council hereby authorizes the ex- penditure of funds not to exceed Two Hundred Fifty -Three Thousand Five Hundred Thirty -Five ($253,535) Dollars for the services required pursuant to Amendment No. 1 and No. 2 of the Agreement. SECTION III. That this ordinance shall become effective immediately upon its passage and approva . PASSED AND APPROVED this the R—eloday of , 1990. BOB CASTLEBERRY, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY BY: n,.AA A APPROVED AS TO LEGAL FORM: DEBRA A. DRAYOVITCH, CITY ATTORNEY BY: f) A04ZL� -4 5906 AMENDMENT NUMBER 2 TO THE AGREEMENT FOR ENGINEERING SERVICES BETWEEN THE CITY OF DENTON AND FREESE AND NICHOLS, INC., FOR LAKE RAY ROBERTS OFFSITE WATER TRANSMISSION FACILITIES The Agreement for Engineering Services entered into on the 16th day of February 1988 and as amended on the 7th day of November 1989, by and between the City of Denton (OWNER) and Freese and Nichols, Inc., (ENGINEER) shall be amended as set forth below. The said Agreement and Amendment No. 1 are attached and are hereby amended as follows: That portion of Amendment No. 1 within Section I which describes Phase II is hereby amended by the addition of the following language after the first paragraph of Section I on Page 1 of Amendment No. 1. Prepare the design of a booster pump station and ground storage tank, that includes the following: 1. Two (2) preliminary site layouts with two (2) proposed pump station building floor plan and elevation alternatives. 2. Pump station building to enclose three (3) vertical turbine pumps with space for three (3) vertical turbine pumps to be added in the future. Building is to have appearance of a high quality modern residential home. 3. One partially buried rectangular cast -in -place concrete storage tank with a capacity of approximately three million (3,000,000) gallons. 4. Emergency chlorine scrubber system with audible, visual and remote alarms. 5. Temporary off -site crushed stone access drive from Sherman Drive to the pump station site. 6. Attend six (6) project coordination meetings. That paragraph within Section VI, Subsection B, on Page 14 of the Agreement which obligates the Engineer to submit a maximum fee to the Owner for Phase II Detailed Design Phase and Phase III Construction Phase Services is hereby amended by the addition of the following language: The ENGINEER shall be paid for the increased scope of work under Phase II- Detailed Design Phase, described above in Amendment No. 2, and for the additional scope of work under Phase III - Construction Phase Booster Pump Station and Ground Storage Tank, described in the Prime Agreement, as set forth in Exhibit "A" of the original Agreement, Schedule of Charges, with the total additional fee not to exceed the amount listed below (Phase III is based on a twelve (12) month construction period in lieu of nine (9) months): Booster Pump Station and Ground Storage Amendment No. 1 Phase II & III Amendment No. 2 Phase II & III Total Estimated Phase II & III Partial payments to the Engineer will be made on statements rendered to and approved by the Owner; circumstances shall any monthly statements exceed performed at the time a statement is rendered. Additional Fee Not to Exceed $147,850 $1055685 $253,535 the basis of monthly however, under no the value of work All other provisions, terms, conditions and obligations of the Agreement between Owner and Engineer and Amendment Number 1 to the Agreement which are not expressly amended here shall remain in full force and effect. Said Agreement Amendment and this Amendment shall be construed together as a single contractual agreement. T s Amendme Number 2 is executed in two counterparts, on this thetof 1990. CITY OF DENTON, TEXAS, OWNER AT JE BY 17 APPROVED AS FOR LEGAL FORM: DEBRA ADAKI DRAYOVITCH, CITY ATTORNEY BY: e FREESE AND NICHOLS, INC., ENGINEER BY: ROBERT L. NICHOLS, PRESIDENT ATTEST: A-0�� SEC ET Y Freese AND Nichols, INC. CONSULTING ENGINEERS May 18, 1990 Mr. C. David Ham, P.E. Director of Water and Wastewater Utilities Service Center/Warehouse 901-A Texas Street Denton, Texas 76201 Dear Mr. Ham: ORIGINAL Re: Proposed Amendment Off -Site Facilities DTN 89844-3.10 SIMON W. FREESE, P.E. LAMES R. NICHOLS, P.E. ROBERT L. NICHOLS, P.E. LEE B. FREESE, P.E. ROBERTS. GOOCH, P.E. JOE PAUL (ONES, P.E. ROBERT A. THOMPSON III, P.E. T. ANTHONY REID, P.E. GARY N. REEVES, P.E. ROBERT F. PENCE, P.E. THOMAS C. GOOCH, P.E. RONNIE M. LEMONS, P.E. MICHAEL L. NICHOLS, P.E. GARRY H. GREGORY, P.E. W. ERNEST CLEMENT, P.E. TERRY L. FLEMING, P.E. MICHAEL G. MORRISON, P.E. IOHN L. TONES, P.E. R. NEIL PRUITT, A.I.A. COY M. VEACH, P.E. RAYMOND R. LONGORIA, P.E. No. 2 Lake Ray Roberts Phase II & III As per your request, we are pleased to submit a proposal for the increased scope of Engineering Services for Phase II (Detailed Design) and Phase III (Construction Phase) of the Lake Ray Roberts Off -Site Facilities. In general, this will include a 3 MG underground concrete reservoir and a building to enclose the high service pumps in lieu of an above ground welded steel tank with exposed high service pumps. The services to be provided are as indicated in the original contract for Engineering Services- Lake Ray Roberts Off -Site Water Transmission Facilities Section III, Phase II and Phase III dated February 16, 1988, Amendment No. 1, dated November 7, 1989 and the attached Amendment No.2. Freese and Nichols proposes that this project be bid under one construction contract and a revised estimate of the sheets required for the plans is as follows: 1. Cover Sheet 2. Index/Notes/Vicinity Map 3. Site Layout 4. Site Grading Plan 5. Pump Station - Mechanical 6. Misc. Mechanical Details 7. Pump Station Foundation Structural 8. Pump Station Structural Details 9. Ground Storage Tank Layout 10. Ground Storage Tank Plan and Sections 11. Ground Storage Tank Structural Details 12. Ground Storage Tank Structural Details 13. Ground Storage Tank Roof Structural Details'* 14. Ground Storage Tank Roof Structural Details * 15. Ground Storage Underdrain Collection System Plan and Details 16. Pump Station Building Floor Plan/Finish Schedules/Door Schedules 17. Pump Station Building Sections and Details * 18. Pump Station Building Elevations and Details TELEPHONE 817 336-7161 811 LAMAR STREET FORT WORTH, TEXAS 76102-3683 METRO 817 429-1900 FAX 817 877-4267 Mr. David Ham, P.E. May 18, 1990 Page 2 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. 32. 33. 34. 35. 36. 37. 38. 39. 40. Pump Station Foundation Plan and Details Pump Station Roof Framing Plan and Details Chemical Room Plans and Details Chemical System Piping Plan and Details Emergency Chlorine Scrubber System Plan, Scrubber System Enclosures and Details Flow Tube Vault Holding Tanks Access Road Plan and Profile Access Road Plan and Profile Access Road and Drainage Details Pipeline - On -Site Layout Pipeline - Plan and Profile Pipeline - Plan and Profile Pipeline Details Sprinkler System Layout and Details Electrical Site Plan Electrical Schematics Electrical Pump Station Building Plan Misc. Electrical Details Misc. Electrical Details Supervisory Control and Instrumentation Elevations and Details * * Denotes Additional Drawing Required for Increased Scope of Work. See Attachment 1 for manhours per drawing breakdown. Below is an estimate of the additional manhours and cost (based upon the multipliers in the existing contract) for the increased scope of work: PHASE II (Amendment No. 2) Additional Additional Manhours Raw Salary Cost Principal -in -Charge 10 $ 360 Project Manager 145 3,915 Project Design Engineer 164 3,444 Structural Engineer 288 5,188 Architectural Designer 126 2,520 Electrical Engineer 112 2,016 Technician 468 7,956 Clerical 36 324 Subtotals 1,349 $25,719 Mr. David Ham, P.E. May 18, 1990 Page 3 Total Raw Salary w/ multiplier of 1.4136 x 2.3 $83,620 Expenses w/ multiplier of 1.0 3,230 Estimated Increase in Engineering Fee - Phase II $86,850 Additional Additional PHASE III (Amendment No. 2) Manhours Raw Salary Cost Principal -in -Charge 5 $ 175 Project Manager 39 1,005 Construction Engineer 102 2,193 Design Engineer 42 924 Construction Technician 67 1,139 Technician 0 0 Clerical 20 180 Subtotals 275 $5,564 Total Raw Salary w/ multiplier of 1.4136 x 2.3 $18,090 Expenses w/ multiplier of 1.0 745 Estimated Increase in Engineering Fee - Phase III $18 835 Estimated Total Increase (Phase II & III) $105,685 Freese and Nichols proposes to perform the services for Phase II and Phase III on the basis of salary cost times a multiplier of 2.3 plus direct expenses times a multiplier of 1.0 with a maximum ceiling not -to -exceed $105,685 without written authorization by the Owner. (Salary cost is equal to 1.4136 times payroll.) Freese and Nichols will be available to provide resident representation during the Construction Phase (III) in accordance with Section IV.I of the prime engineering contract, if requested by the City. Since the number of meetings with the City and the local neighborhood residents are unable to be determined, we propose that services for these meetings be compensated as Additional Services under the prime engineering agreement. Mr. David Ham, P.E. May 18, 1990 Page 4 We appreciate this opportunity to submit this proposal to the City of Denton. If you have any questions or require additional information, please call. Yours very truly, FREESE AND N�IICHOLS, INC. Robert L. Nichols, P.E. President Enclosure xc: Lee Allison Bob Nelson Renee Baker Mike Nichols -4 m-0NM W WNNNrrrrrrrrr O 0-1-0 -5 O V •A W O QD v 01 to A W N r 0 rt 0 rD rD O . . . . . . . . . . . . . . sv rr n tom. �I J• J. J. rD _� fin 3mrnm'O-0-a-uC)mC)C)m .C) CA n• N• (D -1 rD a O O O O O O C+ SW 0) 3 n n C -g 'O C c C C c C c A� v•tG O y m �, am (A N (A (A C.M. C. C. a C. !D O r+ r+ rF r+ rt (D (A C Co - n W rL W Cw rN N rN tN tN N (D n - - (A rD (D Pi t< r+ r+ r+ r+ r+ r+ r+ rt r+ r+ a• r+ r+ g n (AJ• J• 0 0 0 0 0 0 rD rD ri- N NS===C1 =w w w w w wO f r+ to cm to to cm to 3 O c+ n rD 0 M S CO CO (D rD (D rD rD rD 3 Z 0 a c c O C. o J. p 'S a r+ p rr a rD C. C. C. C. C 7 C 7 3 to Q1 (A (D L) n -n J. J. J. (D 7r 77 7t' 77 7r -A -••Ai 0•��•O n wto to tQ a;o ;a N (A-0O O O N -5 9 -S O O r+ r+ — 'T C a C C C J• m (A -i A) 0 O Z' S a, H i a= (D -fi fiC C C 3 -1 W (D a' CM rD f) 0 3 n n S (D -' rt C V) (D < r+ O rN N rF r+ 07 0 r+ O Aj r+ O 0 i -S -5 -S C. M Co O N O rL (D r+ r+ rD M N 0) rD to rD (D rL N tv C n C C O O n p -0 r+ � a tv C. T J. w W (+ (+ J. a O) (A a C p y OJ O 3 0i al C J.0 (D 3 f (D (D N 7 (D r+ v r+ O N (D (D 0 0 (D -� P+ N C+ Ai W 7 0 m m(A n (D -. rt to S a to (A (A rD (D CA 7F rD O v 0) lw ' rl' r+ J. J. rD v O O CA CA (A p O O C. a 0 C o a rD N rt o n w (D S J• r+ (D L11 C. (A J. C J �J CA rD N �F b+ r O O r A r+,) W Ul l01 O O tT N N W W N N N N N N N N N N Ln O% W L" W .p. A N W A N N W? •A A W N A N 0 0 0 m O ?? N Cl O O O .A r N I W N Na N N OM 0) W O N O A ON OD W I A -P N W 4A N N W .P _r� W 4l N N OONO)O ??NOON OO W L N O� ON ? a z -a M^ • I F•i m m v Z S O C S m m A C M S m m m Z N r