AN ORDINANCE APPROVING THREE CHANGE ORDERS TO THE CONTRACT
BETWEEN THE CITY AND TONTO CONSTRUCTION, INCORPORATED, APPROVING
PAYMENT IN THE AMOUNT OF $25,055 42, AND PROVIDING AN EFFECTIVE
DATE
WHEREAS, on February 17, 1987, the City awarded a contract
for the construction of improvements to the city's Water
Treatment Plant, and
WHEREAS, the City Manager and his staff have recommended
approval of three change orders to said contract to provide for
changes in the scope of services, NOW, THEREFORE,
SECTION I That the City Council hereby approves the change
orders a copy of which orders are attached hereto and
incorporated by reference herein
SECTION II That the expenditure of funds in the amount
$25,055 42 is hereby authorized
PASSED AND APPROVED this the �`Sf day ofk F 1987
ATTEST
JENTER W LTERS, CITY SECRETARY
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
BY L
CHANGE OR EXTRA WORK ORDER
PROJECT Denton Water Treatment Plant Upgrade - Phase 2
CONTRACT No 9657
OWNER. City of Denton, Texas
CONTRACTOR. Tonto Construction Co
CHANGE ORDER NO Two (2) DATE July 1, 1987
CHANGE OR EXTRA WORK TO BE PERFORMED
Install a 5-inch double wall exhaust duct from the top of the revised
Bayco Drying Oven to a minimum of 30-inches above the roof of the
Maintenance Building as shown on attached drawing CO2-1
Amount to be Added
$278 30
The compensation agreed upon in this Change or Extra Work Order is a
full, complete and final payment for all costs the Contractor may incur
as a result of or relating to this change whether said costs are known,
unknown, foreseen or unforseen at this time, including without
limitation, any cost for delay, extended overhead, ripple or impact
cost, or any other effect on changed or unchanged work as a result of
this Change or Extra Work Order
Previous Contract Amount $ 3,592,000 00
Net Increase in Contract Amount $278 30
Revised Contract Amount $ 3,592,278 30
Net Change in Contract Time of Completion NO CHANGE
Revised contract time of completion June 13, 1988
Recommended by
FREESE AND NICHOLS, INC
Approved by OWNER
By G' o..
Approved by CONTRACOR
By
MAPLE3
ASMARS
ARCHITECTS
ENGINEERS
PLANNERS
2 4 IV
RXF RVAlr,
FILTERS
DF,V /ud/ W T
PROJECT - LEN TON , 72-NAS
PROJECT NO DATE HARCN 27 /9B7
SUPPLEMENTAL DRAWING NO jP6 SHEET
PROPOSED CHANGE ORDER NO /
ADDENDUM /
REFERENCE SpF� SecT/D/{ l/,[ Imp 1,0/ OF
le "I
G14„
ONE PANEL E)MEM
(APAWO X 21 6"
PANT flafA Y
JBI MODAL DB -G8 / HOD/FIED 45 S90WN
DRAW //JG No
CO2-/
CHANGE OR EXTRA WORK ORDER
PROJECT Denton Water Treatment Plant Upgrade - Phase 2
CONTRACT No 9657
OWNER City of Denton, Texas
CONTRACTOR Tonto Construction Cc
CHANGE ORDER NO Three (3) DATE August 5, 1987
CHANGE OR EXTRA WORK TO BE PERFORMED
1 Upgrade the redwood used in the construction of baffles in basins 1
and 2 from construction grade redwood to vertical grain clearheart
redwood
Amount to be Added $1,680 59
2 Extend masonry wall between room 203 and 205 and revise the wall
finish as indicated on the attached Plate No 1
Amount to be Added $6 390 75
The compensation agreed upon in this Change or Extra Work Order is a
full, complete and final payment for all costs the Contractor may incur
as a result of or relating to this change whether said costs are known,
unknown, foreseen or unforseen at this time, including without
limitation, any cost for delay, extended overhead ripple or impact
cost, or any other effect on changed or unchanged work as a result of
this Change or Extra Work order
Previous Contract Amount $ 3,592,278 30
Net Increase in Contract Amount $ 8,071 34
Revised Contract Amount $ 3,600,349 64
Net Change in Contract Time of Completion NO CHANGE
Revised contract time of completion June 13, 1988
Recommended by
FREES AND NICHOLS, INC
By sw-
Approved by OWNER
By
�7
i
Approved by CONTRACT$
By
•J� Y Y Y4.2
MAPLES
ASSOCIATES
ARCHITECTS
ENGINEERS
PLANNERS
H
PROJECT - ~� W" TEXAS , / I
MISG PROJECT NO DATE JUNrE5,I967
MASONRY REV151ON5 SUPPLEMENTAL DRAWING NO 5D 2 reV BHEET
PROPOSED CHANGE ORDER NO
ADDENDUM
v REFERENCE OF
NOTES
1 Revise the masonry around the Training Room 203 to be structural
glazed facing the (SGFT) where exposed to the Inside of the training
room Tile shall match existing in color and texture Use 2" soaps
around concrete columns and 4" thick units elsewhere Where short
wall occurs between Training Room 203 and Hall 205 use two wyes of
4" thick SGFT with a void Wall inside Tng Am 203 shall over -lap
over existing wall as necessary to cover an area of un-finished
surfaces that occurs where a chase Is to be removed
2 Install a 1/2" gypsum wall board fury down between the ceiling
and the existing glazed partition This furr down will cover existing
wall surfaces which are not suitable for finish walls
3 New partitions as described above need not extend to the bottom
of steel joists, but may terminate just above the suspended ceiling
TRAINING R
CsW6 PURR ON 70
RETRACE GTV=0
20%;2o CALL BO
PRE
:4%C1 J IjV1.L
11
e�cisTTJ4 I 1
WA,A,9 TO
❑
QtNpa.1 `
EXISTWCa
WALL TO CZ I I
G/AiR+
f4m"r-0 � I
ba 11' ox
040
STAIRS
210
i
�I
REPAIR W.
U!
Z
L.k1IT11� PrT
204
a
11
SNAG
.
•,
PART/AL at4o FLOOR PLAN
NOT io SGALE PfT9TE No /
0
+1
C H,9,vr,,c On OZR Ala
CHANGE OR EXTRA WORK ORDER
PROJECT Denton Water Treatment Plant Upgrade - Phase 2
CONTRACT No 9657
OWNER City of Denton, Texas
CONTRACTOR Tonto Construction Co
CHANGE ORDER NO Four (4) DATE August 11, 1987
CHANGE OR EXTRA WORK TO BE PERFORMED
1 Revise sludge draw -off boxes to include a cast in place concrete
cover to support geared floor operators for plug valves as indicated in
Plate 2 Replace sixteen (16) DeZurik Model 1200, Fig 118F6RS17ANG
eccentric plug valves with sixteen (16) Dezurik Model 1200, Figure
118F6RS17AGG6H8EMX071-74 eccentric plug valves complete with floor
stand mounted geared operators
Amount to be Added $16 705 78
The compensation agreed upon in this Change or Extra work order is a
full, complete and final payment for all costs the Contractor may incur
as a result of or relating to this change whether said costs are known
unknown, foreseen or unforseen at this time including without
limitation, any cost for delay, extended overhead, ripple or impact
cost, or any other effect on changed or unchanged work as a result of
this Change or Extra Work order
Previous Contract Amount $ 3,600,349 64
Net Increase in Contract Amount 16,705 78
Revised Contract Amount $ 3,617,055 42
Net Change in Contract Time of Completion 16 Days
Revised contract time of completion June 29, 1988
Recommended by Approved by OWNER
FREESE AND NICHOLS, INC By
By
Appro/veedd) by CONTRACTOR
cc
FREESE 6 NICHOLS
CONSULTING ENGMEM
Ycrr
Verrf� Hole ftr
Pluq Volve Stem
------
I
�- + +
1 1
I �
I I
1
Orahncq
ME
B
SPLA N .
cole
Frbergloes Skr�'
And Grotrng Tc
fie Flush --\
Addihonal W 6
Bar rop F' Boft
SECTION 0
Sco/c qb"-/4-0"
MY Sfude
S 44" %
\ A� S @ /? 9e
each Wo y
Tapel0tt
i� �Xrstrn9
CITY OF OCNTON r TEXAS
WATER TReATMemr PLANT UPGRAOC
PHA t IT
e%"v oreTPL n