AN ORDINANCE APPROVING AN AGREEMENT BETWEEN THE CITY OF DENTON AND
LUTZ, DAILY & BRAIN III FOR ENGINEERING SERVICES, AND PROVIDING AN
EFFECTIVE DATE
THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I That the City Council hereby approves and auth-
orizes the Mayor and City Secretary to execute and attest,
respectively, the agreement between the City of Denton and Lutz,
Daily & Brain III for engineering services to prepare a
feasibility study for the projected heating, cooling and energy
center, under the terms and conditions contained in said agreement
which is attached hereto and made a part hereof
SECTION II That the City Council authorizes the expenditure
of funds not to exceed Nineteen Thousand and Five Hundred Dollars
($19,500 00)
SECTION III That this ordinance shall become effective
immediately upon its passage and appro al
PASSED AND APPROVED this the y*day of 1987
ATTEST
JE F T RS, CITY SECRETARY
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
/IILOw
LUTZ DAILY & BRAIN
CONSULTING HNOINEERB
THE STATE OF TEXAS §
COUNTY OF DENTON 4
AGREEMENT BETWEEN
THE CITY OF DENTON, TEXAS AND
LUTZ, DAILY & BRAIN III
FOR ENGINEERING SERVICES
THIS CONTRACT, made and executed in duplicate this 16�'of io((%%,����ee
19� , by and between the City of Denton, Texas, a municipal �-
tif, hereinafter called the City, and LUTZ, DAILY & BRAIN III, Con-
sulting Engineers, a general partnership of Shawnee Mission, Kansas,
P 0 Box 718, hereinafter called the Engineer, Party of the Second
Part
WHEREAS The Denton Civic Center area buildings which include the
Civic Center Building, Library, Auditorium and Senior Citizen home
owned by the City and the Post Office and Court Buildings owned by the
Federal Government are in close proximity to each other and,
WHEREAS The buildings have heating and cooling systems that are high
energy usage, and a low efficiency system that is not suitable for
present day energy conservation requirement and,
WHEREAS This campus of local and federal government buildings are
located so that a single high efficiency energy plant could
effectively serve the heating and cooling requirements with a central
distribution system and,
WHEREAS The City has selected Lutz, Daily & Brain (Engineer) to
prepare a feasibility study for the projected heating, cooling and
energy center and to estimate the cost that would be associated with
the central energy plans and,
WHEREAS The City desires to enter into Contract for Professional
Engineering Services as required for the purposes above stated, and
the Engineer hereby offers Professional Engineering Services as re-
quired for the work above
WITHESSETH
That in consideration of the mutual covenants herein contained, the
City agrees to employ the Engineer to perform the types of services
hereinafter mentioned and agrees to pay them for the services rendered
according to the schedule of fees herein contained
PAGE 1
LUTZ OAILV & BRAIN
CONSULTING BNSINBBRS
SECTION I The services which the Engineer hereby agrees to perform
are as follows
A Central heating and cooling system study at Civic Center Building
Complex
1 Task Description
a Determine and project the existing and planned heating
and cooling requirements for the Civic Building Complex
Determination will be made by reviewing the existing
drawings of the mechanical systems in each building A
walk through mechanical audit will be performed to ver-
ify installed capacity
b Develop load duration curves for the heating and cooling
systems in the buildings Develop a load diversity
factor based on load duration curves for a central heat-
ing and cooling plant
c Perform a life cycle cost analysis of the following
types of heating and cooling systems
(1) Individual heating and cooling systems for each
building (base case)
(2) Central heating and cooling system for the building
complex
(a) Central electric chiller with gas/oil boiler
(b) Central absorption chiller with gas/oLl boiler
(c) Central steam driven chiller with gas/oil
boiler
d Conduct a walk through energy audit of building com-
plex Identify potential energy conversation opportun-
ities (ECO's) for each building Estimate energy sav-
ings for each ECO based on past engineering experience
e Prepare cost estimates for the central heating and cool-
ing plant Prepare cost estimates for the heating and
cooling distribution system to serve the building com-
plex
f Perform an economic analysis of a gas turbine -generator
energy plant in conjunction with the central heating and
cooling facilities Assume that the electrical energy
produced will be supplied to and used by the city
building complex served by the energy plant
PAGE 2
LUTZ DAILY & BRAIN
CONSULTING BNGIN261118
g Prepare a report for the central heating and cooling
system with the required auxiliary heating, cooling and
power sources
B Other Engineering Services
During the term of this agreement, the Engineer shall perform
such other Engineering Services as the City of Denton may
request in writing regarding the utilities system and any
modification shall be reduced to writing and made an addendum
to this contract This shall all be in accordance with
Section III, K
SECTION II
The City agrees
A To pay the Engineer for engineering work performed under Section
I -A a sum not to exceed $19,500 00 based on hourly rates and ex-
penses as hereinafter stipulated
1 The Engineer will charge the City at the following hourly
rates for personnel assigned and working on the Project
Partners
Principal Engineers
Senior Design Engineers
Design Engineers
Engineering Technicians
Senior Draftsmen
Draftsmen
Stenos/Word Processing
Clerks
$42 41 per hour
28 85 per hour
22 67 per hour
19 26 per hour
15 89 per hour
15 33 per hour
14 32 per hour
11 10 per hour
9 56 per hour
plus 54 percent of the hourly rate for direct payroll
overhead, plus 94 percent of the hourly rate for general
and administrative overhead and profit, plus printing
cost of plans and other expenses at actual cost, plus
personal automobile expense at 22 cents per mile
B It is understood that the rates for personnel and mileage in Sec-
tion II -A are those effective as of January 1, 1987, and that
subsequent modification may be necessary The City agrees to
review with the Engineer the above rates for personnel upon ini-
tiation of services and at yearly intervals on January 1 thereaf-
ter, to compare the index of cost of living and other appropriate
referenced professional level surveys of cost levels It is
intended that the above rates be modified as reflected in the
above referenced indices and surveys This must be mutually
agreeable to both parties and any modification shall be reduced to
writing and made an addendum to this contract
PAGE 3
LUTZ, GAILY & BRAIN
CONSULTING BNGIN6BRS
C Payments to the Engineer as defined by the method of compensation
in this Section shall be made by the City within 30 days after
receipt by the City of invoices from the Engineer provided that
the invoices are detailed and accurate This provision will not
hold for invoices in question that are improperly prepared
SECTION III
It is further agreed that
A The work herein will not include test borings, property line sur-
veys, material tests, or asbestos survey and removal in areas
which would affect construction These services shall be con-
tracted for by the City
B When the work involves construction of facilities, the Engineer
shall make periodic visits to the site at intervals appropriate to
the stage of construction to observe the progress and quality of
the executed work and to determine in general if the work is pro-
ceeding in accordance with the contract documents, he will not be
required to make exhaustive or continuous on -site inspections to
check the quality or quantity of the work, he will not be respon-
sible for and will not have control or charge of construction
means, methods, techniques, sequences, or procedures, or the
safety precautions and programs in connection with the work, he
will endeavor to guard the City against defects and deficiencies
in the work of the contractor, but he will not be responsible for
the contractor's failure to carry out the work in accordance with
the contract documents, and during such visits and on the basis of
his on -site observations as an experienced and qualified design
professional, he will keep the Owner informed of the progress of
the work
C The Engineer will not be responsible for nor have control or
charge over the acts or omissions of any contractor, any subcon-
tractor or any of the contractor's or subcontractor's agents or
employees or any other person (except his own employees and
agents) at the Project site or otherwise performing any work of
the Project
D Because the Engineer has no control over the cost of labor, mater-
ials or equipment, or over the contractor's differing methods of
determining bid prices, or over competitive bidding or market
conditions or other factors, the estimates of construction cost
provided for herein are for informational purposes, are not guar-
antees and bids or construction costs may exceed such estimates
E The Engineer will cooperate with the Owner in furnishing necessary
engineering information to the Owner so that the Owner can submit
all necessary applications to secure the proper permits required,
in the work which has previously been described
PAGE 4
LUTZ OAILV & BRAIN
CONSULTING 6146INKERS
F The Engineer will make an initial interpretation of the terms and
conditions of the contract documents and he will be the impartial
,judge of the performance of the Owner and the contractors there-
under
G Neither the Engineer's authority to act under these provisions nor
any decision made by him in good faith either to exercise or not
exercise such authority shall give rise to any duty or responsi-
bility of the Engineer to contractor, any subcontractor, supplier
or manufacturer, any of their agents or employees, or any other
person performing any of the work
H The duties, responsibilities and the limitation of the authority
of the Engineer as the Owner's consultant shall not be modified or
extended without written consent of the Owner and the Engineer
I The Engineer shall and does hereby agree to indemnify and hold
harmless the City from any and all damages, loss or liability of
any kind whatsoever occasioned by any error, omission or negligent
act of Engineer, its officers, agents employees, invitees and
other persons for whom it is legallyliable, with regard to the
performance of this agreement, and Engineer will, at its cost and
expense, defend and protect the City of Denton against any and all
such claims and demands
J The Engineer will not discriminate against any employee or appli-
cant for employment because of race, color, religion, sex, age,
disability or national origin The Engineer will take affirmative
action so that applicants are employed, and that employees are
treated during employment without regard to their race, color,
religion, sex, age disability or national origin Such action
shall include, but not be limited to, the following employment,
upgrading, demotion or transfer, recruitment or recruitment adver-
tl.SLng, layoff or termination, rates of pay or other forms of
compensation, and selection for training, including apprentice-
ship The Engineer will post in conspicuous placed, available to
employees and applicants for employment, notices setting forth the
provisions of this nondiscrimination clause
K In the event that the City desires additional work, the Engineer
shall give the Owner an estimate of the cost of services requested
before performing the services The Engineer shall not exceed
this estimated cost for these services by more than 15 percent
until the Owner has reviewed the work thus far completed and au-
thorized the charge for additional work In the event the Owner
does not grant such authorization, the Engineer shall not be obli-
gated to perform further services
L The Engineer shall perform Designated Services as expeditiously as
is consistent with professional skill and care and the orderly
PAGE 5
LUTZ DAILY & BRAIN
CONSULTING ENGINUERS
progress of the work Engineer shall exercise the same degree of
care, skill, and diligence in the performance of the services as
is ordinarily provided by a professional engineer under similar
circumstances The Engineer shall submit for the City's approval
a time schedule for the performance of the Engineer's services
which shall be adjusted as required as the Project proceeds, and
shall include allowances for periods of time required for the
City's review and approval of submissions and for approval of
authorities having ,jurisdiction over the Project This time
schedule, when approved by the City, shall be adhered to by the
Engineer, except for delays not caused by the Engineer
M The Agreement may be terminated by the City at any date or time,
upon written notice of 60 days given by the Owner and delivered to
the Engineer, by U S Registered Mail, or return receipt and post-
age prepaid, addressed to the Engineer at their principal place of
business, 6400 Glenwood, Overland Park, Kansas 66202, of the
City's intention to so terminate the services of such Engineer,
and upon payment to the Engineer of any sums due for services
authorized and performed by them, as set forth above in this con-
tract up to and including the date of written notice of termLna-
tion
N Further, the within Agreement may be terminated by the Engineer at
any date or time upon prior written notice of 60 days to the
Owner, by U S Registered Mail, return receipt and postage pre-
paid, delivered to the Owner at its administrative office, pre-
sently located at the Municipal Building, 215 E McKinney, Denton,
Texas 76201 The City agrees to pay promptly to Engineer upon
receipt of such written notice of termination by the Engineer any
and all sums due to the Engineer for services, expenses and other
costs incurred by the Engineer as hereinabove provided for in this
Agreement
PAGE 6
LUTZ, GAILY & BRAIN
CONSULTING ENGINEERS
IN WITNESS WHEREOF, the Parties have hereunto set their hands and
seals on the date first above written
CITY OF DENTON, TEXAS
By
RAY S' P S / OR
ATTEST
J I R L ERS
CI Y SECRETARY
CIT OF DENTONt TEXAS
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
CITYM D!TE_XAS
BY
LU Z� DAILY
CONSULTING
PAGE 7
& BRAIN III
ENGINEERS