HomeMy WebLinkAbout1987-0880923L AN ORDINANCE AUTHORIZING THE EXECUTION CONTRACT BETWEEN THE CITY OF DENTON AND AND PROVIDING AN EFFECTIVE DATE OF A CHANGE ORDER TO A CALVERT PAVING COMPANY, WHEREAS, on February 18, 1986, the City awarded a contract for the construction of certain improvements to the Yellowstone and Sheraton Drainage Project, and WHEREAS, the City Manager having recommended to the Council that a change order be authorized to amend such contract and said change order being in compliance with the requirements of art 2368a, V A C S , NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF DENTON SECTION I That the change order to the contract between the Thousand Two Hundred Calvert Paving S ven y eightthe Dollarsamount ($19,27g)Nineteen is hereby approved and the expenditure of funds therefor is hereby autnorized SECTION 11 Tnat this ordinance shall become effective immediately upon its passage and approval PASSED AND APPROVED this the 12th day of May, 1987 RAY STIEPKENS,fMAYUK CITY C4 DENTON, TEXAS ATTEST JENNI *DENN, RS, CI SR ARY CITY TEXAS APPROVED AS TO LEGAL FORM DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY CITY OF DENTON, TEXAS BY DATE May 12, 1987 CITY COUNCIL REPORT TO Mayor and Members of the City Council FROM Lloyd V Harrell, City Manager SUBJECT BID$ 9575 - YELLOWSTONE SHERATON DRAINAGE P O # 72432 CHANGE ORDER #2 RECO191ENDATION We recommend this change order be approved for $19,278 00 to Calvert Paving, the Contractor for the project SUMMARY The original cost of this project with Change Order If1-$14,495 00, was $681,381 42 When we add this Change Order for $19,278 00 the total project cost will be $700,659 42 This Change Order is to cover the items explained on the at- tached memo from David Salmon BACKGROUND Memorandum - David Salmon, Engineering Dept, PROGRAMS, DEPARTMENTS OR GROUPS AFFECTED Street and Drainage Improvements FISCAL IMPACT Account # 432-002-0010-SI18-9100 There is no additional impact on the General Fund Respectfully submitted Lloyd V Harrell City Manager Prepared by Ye John J Marshall,CPMle Purchasing Agent Approved Pe4ci Name John J Marshall, C Ti tl a Purchasing Agent C/TY 01 DNNTON / 215 E McKinney / Denton, Taxes 76201 MEMORANDUM DATE May 6, 1987 TO Rick Svehla, Deputy City Manager FROM David Salmon, E I T /Civil Engineer SUBJECT Sun Valley Flume The flume was originally constructed to allow trash vehicle access in the rear of the subdivision Loads from the trash vehicles destroyed this flume so we added it to the contract to allow all the major drainage systems in the basic vicinity to be upgraded Work started on the project several times but weather created problems When a few good days occurred in early April, the contractor hurried to get some work done In our haste, the contractor and City crews made combined surveying errors that compounded some basic design errors in a 582 foot section of the flume Our inspector did not catch the grade difference so the flume was poured much too high It was determined after significant evaluation, that the flume had to be removed and replaced We also decided to lower the 200 foot section that had been designed too high to guarantee that the flume would work to catch all water from adjoining properties As part of the redesign, Kings Row had to be lowered with transitions back east and west to allow reasonable slopes to the low point Costs for the modifications follow Item Quantity Unit Price Total Remove Concrete Flume 711 sy $ 8 $18 SO/sy 00/sy $ 6,046 00 $12,804 00 Install Concrete Flume 711 sy Lump Sum 4,000 00 $ 4,000 00 Pumping $ Liming GRAND TOTAL $22,850 00 Because both the City and the contractor were in error, it was decided to share the cost of removing and replacing the flume Calvert Paving agreed to deduct $9,500 00 from the price of removing and replacing the flume and to split the cost of pumping and liming which is $4,000 00 ge 2 of 2 pages The cost of the original Kings Row design and the cost of the new design is as follows Item Quantity Unit Price Total Remove Concrete Pavement 70 sy $ 8 50 $ 595 00 Remove Conc Curb $ Gutter 40 if 2 50 100 00 Unclassified Excavation 60 cy 5 00 300 00 Trevira 130 sy 90 117 00 3 1/2" Asphalt 130 sy 7 50 975 00 1 1/2" Asphalt 130 sy 3 50 465 00 8" Asphalt Valley Gutter 40 sy 14 00 S60 00 Saw Cut Existing Concrete 8 if 1 00 8 400 00 00 Concrete Curb & Gutter 40 if 10 00 TOTAL $3,510 00 Remove Concrete Pavement Remove Conc Curb $ Gutter Remove Conc Driveway $ Sidewalk Unclassified Excavation Trevira 3 1/2" Asphalt 1 1/2" Asphalt 8" Asphalt Valley Gutter Concrete Curb $ Gutter Concrete Lriveway Saw Cut Existing Concrete NEWEW U�ESI�GN 70 sy $ 8 50 $ 595 00 240 if 2 50 600 00 40 sy 8 50 340 00 170 sy 5 00 850 00 500 sy 90 450 00 460 sy 7 50 3,450 00 460 sy 3 50 1,610 00 40 sy 14 00 560 00 40 sy 10 00 1,900 00 40 sy 25 00 1,000 00 8 if 1 00 8 00 1UTAL $11,363 The difference in price of the two designs is $7,853 00 This extra street work is necessary as part of a design change It would not be fair to impose any of this on the contractor The total cost to the City for the modifications on the Sun Valley Drainage Flume is $11,425 + $7,853 - $19,278 Excellent bids on the project from Calvert Paving provide enough funds from the original budgeted amount to cover these corrections and reworking of the Kings Row street section avi a mon 0464E