AN ORDINANCE APPROVING AN AGREEMENT BETWEEN THE CITY OF DENTON
AND CAMP, DRESSER AND MCKEE FOR ENGINEERING SERVICES, APPROVING
THE EXPENDITURE OF FUNDS THEREFORE, AND PROVIDING FOR AN
EFFECTIVE DATE
NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY ORDAINS
SECTION I
That the City Council hereby approves and authorizes the
Mayor and City Secretary to execute and attest, respectively,
the agreement between the City of Denton, and Camp, Dresser and
McKee providing for engineering services under the terms and
conditions being contained in said agreement which is attached
hereto and made a part hereof
SECTION II
That the City Council authorizes the expenditure of funds in
the manner and amount as specified in the Agreement
SECTION III
That this ordinance shall become effective immediately upon
its passage and approval
PASSED AND APPROVED this the & day of 1986
RA P EN , MAYOR
CITY OF DENTON, TEXAS
ATTEST
APPROVED AS TO LEGAL FORM
DEBRA ADAMI DRAYOVITCH, CITY ATTORNEY
CITY OF DENTON, TEXAS
BY
1653L
THE STATE OF TEXAS S
COUNTY OF DENTON S
ENGINEERING SERVICES AGREEMENT
BETWEEN THE CITY OF DENTON AND
CAMP, DRESSER AND MCKEE
This Agreement is made and entered into this � day of
Dece-_Mk Y' 19869 by and between the City of Denton, here-
ina ter re erre to as the "City", and CAMP, DRESSER $ MCKEE,
hereinafter referred to as "ENGINEER"
WHEREAS, the CITY desires the professional services of
ENGINEER to perform engineering services, to serve as the CITY's
professional engineering consultant and advisor in connection
with a Study to evaluate and make recommendations for Capital
Recovery fees for the City as described in Exhibit A, "Scope of
Work", and,
WHEREAS, the CITY has designated the DIRECTOR OF UTILITIES to
serve as the PROJECT MANAGER for the CITY to direct the day-to-
day activities of the ENGINEER,
NOW, THEREFORE, the CITY and ENGINEER, for the mutual con-
sideration hereinafter stated, agree and understand as follows
I Scope of Services for ENGINEER
A The Scope of Services to be rendered under this Agreement
is set forth in Exhibit A, attached to and made a part
hereof, relating to an evaluation and recommendations
regarding the adoption of capital recovery fees by the
City of Denton Any deviations from the attached Scope of
Services, or other provisions of this Agreement, may only
be made by written agreement signed by both parties
B If authorized by CITY, additional services related to the
scope of work will be performed by ENGINEER for an addi-
tional professional fee as the parties may subsequently
agree
II CITY'S Responsibilities
A CITY shall perform the following in a timely manner so as
not to delay the services of ENGINEER
Provide all criteria and full information as to CITY'S
requirements for the Study and designate in writing a
person with authority to act on CITY'S behalf on all
matters concerning the Study
2 Furnish to ENGINEER all existing reports and other
available data pertinent to the Study, obtain or
authorize ENGINEER to obtain or provide additional
reports and data as required, and furnish to ENGINEER
services of others required for the performance of
ENGINEER's services hereunder, and ENGINEER shall be
entitled to use and rely upon all such information and
services provided by CITY or others in performing
ENGINEER'S services under this Agreement
3 Arrange for access to and make all provisions for
ENGINEER to enter upon public and private property as
required for ENGINEER to perform services hereunder
4 Perform such other functions as are indicated as City's
responsibilities in Exhibit A, "Scope of services"
5 Bear all costs incidental to the requirements of this
Section
6 Provide labor and safety equipment to inspect or
investigate any existing facilities as required by the
ENGINEER
III Period of Service
A ENGINEER'S basic services will commence within fifteen
(15) days of the date of this Agreement The Part 1
Report shall be completed within sixty (60) days from
execution of Agreement, and the Part II Report, if
authorized in writing, shall be completed within sixty
(60) days after authorization to proceed
B ENGINEER'S basic services under this Agreement will be
considered complete at the earlier of (1) the date when
Part II, item 1 9 and Part II, item 2 7 in the "Scope of
Work" is accepted by CITY or (2) sixty (60) days after
the date when the report is submitted for final
acceptance, and the amount of time, in each case, if
applicable, as may be considered reasonable for obtaining
approval of governmental authorities having jurisdiction
to approve the Study
C ENGINEER'S additional services will be performed and
completed within the time period agreed to in writing by
the parties at the time such services are authorized
IV Payments to ENGINEER
A ENGINEER will undertake the "Scope of Services" under
this Agreement for a fee of $17,800 for Part I and
Page 2
$17,100 for Part II For and in consideration of the work
performed hereunder, CITY agrees to compensate ENGINEER on
a monthly basis Each month, ENGINEER will submit to
PROJECT MANAGER an invoice for services performed by
ENGINEER during the previous month The amount invoiced
will be based upon the percentage of completion of work
authorized under this Agreement Terms of each invoice
shall be net thirty (30) days Late payments will incur a
late penalty of one percent (1%) per month from the
original date of the invoice Payments in excess of sixty
(60) days late may be cause for a suspension of work
B Any required change in the "Scope of Services" will be
accompanied by an adjustment in the fixed cost amount of
this Agreement, subject to mutual consent of CITY and
ENGINEER
V Cost Control
A Opinions of probable construction cost, financial
evaluations, feasibility studies, economic analyses of
alternate solutions and utilitarian considerations of
operations and maintenance costs prepared by ENGINEER
hereunder will be made on the basis of ENGINEER'S
experience and qualifications and shall represent
ENGINEER'S best judgment as an experienced and qualified
design professional
VI General Matters
A Neither City nor ENGINEER shall assign, sublet or transfer
any rights under or interest in, including, but without
limitation, monies that may become due or monies that are
due, this Agreement without the written consent of the
other, except to the extent that any assignment, subletting
or transfer is mandated by law or the effect of this limi-
tation may be restricted by law Unless specifically
stated to the contrary in any written consent to an assign-
ment, no assignment will release or discharge the assignor
from any duty or responsibility under this Agreement
Nothing contained in this paragraph shall prevent ENGINEER
from employing such independent professional associates,
subcontractors and consultants as ENGINEER may deem appro-
priate to assist in the performance of services hereunder
B Nothing under this Agreement shall be construed to give
any rights or benefits in this Agreement to anyone other
than CITY and ENGINEER, and all duties and responsibil-
ities undertaken pursuant to this Agreement will be for
the sole and exclusive benefit of CITY and ENGINEER and
not for the benefit of any other party
Page 3
C This Agreement (consisting of pages 1 to 9 inclusive),
together with Exhibit "A", constitute the entire Agree-
ment between CITY and ENGINEER and supersede all prior
written or oral understandings This Agreement may only
be amended, supplemented, modified or cancelled by duly
executed written instrument
D In the event the Engineer's PROJECT MANAGER is removed
from the performance of this Agreement, CITY will have
the right to interview and approve or disapprove of his
replacement
VII Indemnification
A ENGINEER shall and does hereby agree to indemnify and
hold harmless CITY from any and all damages, loss or
liability of any kind whatsoever, by reason of injury to
property or third persons occasioned by any error, omis-
sion or negligent act of ENGINEER, its officers, agents,
employees, invites, and other persons for whom it is
legally liable, with regard to the performance of this
Agreement, and ENGINEER will, at its cost and expense,
defend and protect the CITY against any and all such
claims and demands
VIII Mailing Addresses
A All notices and communications under this Agreement to
be mailed or delivered to CITY shall be sent to the
address of PROJECT MANAGER as follows, unless and until
ENGINEER is otherwise notified
Denton Municipal Utilities
215 E McKinney St
Denton, TX 76201
ATTN Robert E Nelson, P E
(817) 566-8230
B Notices and communications to be mailed or
ENGINEER shall be sent to the address of
follows, unless and until PROJECT MANAGER
notified
Camp, Dresser and McKee
Three North Park East, Suite 400
8800 North Central Expressway
Dallas, TX 75231
ATTN Roger Hartman
(214) 987-1900
delivered to
ENGINEER as
is otherwise
Page 4
Any notices and communications required to be given
in writing by one party to the other shall be con-
sidered as having been given to the addressee on the
date the notice or communication is posted by the
sending party
In WITNESS WHEREOF, the Parties hereto have made and executed
this agreement as of the day and year first above written
ATTEST
M..aI_� � MM
ATTEST
ENGINEER
CAMP, DRESSER AND MCKEE
BY
CITY OF DENTON, TEXAS
n
BY P'ry
RAY ITEPHENS, MAYOR
APPROVED AS TO LEGAL FORM
J
DEBRA ADAMI DRAYO ITCH
NI E
WAL RS
D
UTY
ITY SECRETARY
CITY ATTORNEY
CI
Y OF
DENTON, TEXAS
CITY OF DENTON, TEXAS
Page 5
EXHIBIT "A"
SCOPE OF SERVICES
Pur ose of Study The primary purpose of this study is to eval-
uate t e nee or a capital recovery fee, as well as alternatives
to such a fee, and their respective impacts on rates and charges
for water and wastewater services The study consists of two
parts - Part 1 and Part II If a capital recovery fee is recom-
mended as a result of this initial evaluation, and approved by
the Denton City Council, the second phase of study will develop
such a capital recovery fee Part II will only be authorized
and payment made therewith if the Denton City Council so directs
by written resolution
PART I
1 0 Preliminary Assessment
1 1 Review existing financial, planning and capital improve-
ment plans and documents
1 1 1 Collect existing financial, budget, and planning
reports on existing and proposed City facilities
1 1 2 Review existing reports and data
1 1 3 Review existing legal and institutional arrange-
ments and constraints Review City's commitments
to provide water and wastewater services to
surrounding entities
1 1 4 Consult with City to identify and convene Citizen's
Capital Recovery Fee Advisory Committee, hereafter
referred to as "Committee"
1 2 Project annual operating and maintenance (0$M) and debt
service costs, and system usage through 1995, using
current utility capital improvements programs, planning
reports and studies
1 2 1 Using data and information from Section 1 1, pro-
ject system costs through 1995
1 2 2 Using data and information from Section 1 1, pro-
ject system usage through 1995
1 2 3 City shall make available all information being
developed for City's ongoing utility rate study
Exhibit A/Page 1
1 3 Establish revenue requirements through 1995 for each
utility system and conduct Workshop No 1 with Committee
1 3 1 Distribute Working Paper No 1 and agenda to Com-
mittee one (1) week prior to Workshop No 1
1 3 2 Working Paper No 1 will be based on work completed
in Sections 1 1 through 1 2 3
1 3 3 Conduct workshop with Committee
1 3 4 Review and evaluate workshop comments and results
with City
1 4 Identify and examine up to three (3) alternative
financing mechanisms for City's capital programs(s)
1 4 1 Alternative financing mechanisms shall include
a current method assigning all debt service to
rate base
b capital recovery fee method using a range of
estimated fee (high and low)
c special improvement assessment method for some
proposed capital improvements
1 4 2 Define "new" and "existing" customers for each
utility
1 4 3 Evaluation shall include an assessment of impacts
of each of the alternatives from Section 1 4 1 on
rates and charges for water and wastewater service
using City's existing rate and charge structures
1 5 Conduct Workshop No 2 with Committee
1 5 1 Distribute Working Paper No 2 and agenda to
Committee one (1) week prior to session
1 5 2 Working Paper No 2 will be based on work
completed in Sections 1 4 through 1 4 3
1 5 3 Conduct workshop with Committee
1 5 4 Review and evaluate workshop comments and results
with City
1 6 Submit preliminary draft report on feasibility of capital
recovery fee and conduct Workshop No 3 with Committee
Exhibit A/Page 2
1 6 1 Distribute twenty-five (25) copies of preliminary
draft report to Committee and Public Utilities
Board and City one (1) week prior to session
1 6 2 Preliminary draft report will include findings and
recommendations regarding the feasibility of a
capital recovery fee
1 6 3 Conduct workshop with Committee and Public
Utilities Board and City
1 6 4 Review and evaluate workshop comments and results
with City Incorporate comments from Board,
Committee and City into final draft report
1 7 Submit twenty-five (25) copies of final draft report and
present findings and recommendations to Denton City
Council (Council) Incorporate Council comments into
final report
1 8 Submit twenty-five (25) copies of final report to City
PART II
2 1 Develop basis for capital recovery fee program
2 1 1 Identify facilities to be funded by the fee
2 1 2 Identify legal constraints and guidelines,
regulations, etc , of the Public Utilities
Commission and the Texas Water Commission
regarding such fees
2 2 Develop capital recovery fee program
2 2 1 Identify and examine up
methods for determining
recovery fee, including
a "buy -in" concept
to three (3) alternative
the level for a capital
b marginal cost approach based on recent or near -
term system additions
c debt service apportionment concept
2 2 2 Evaluation shall include an assessment of the level
of fee associated with each alternative, projection
of revenues to be collected, and impact on rates
paid by existing customers
Exhibit A/Page 3
2 2 3 Evaluate and recommend unit of measure for fee
assessment
2 2 4 A discussion of the advantages and disadvantages
of each concept will be developed
2 3 Conduct Workshop No 4 with Committee
2 3 1 Distribute Working Paper No 4 and agenda to
Committee one (1) week prior to session
2 3 2 Working Paper No 4 will be based on work
completed in Sections 2 1 through 2 2 4
2 3 3 Conduct workshop with Committee
2 3 4 Review and evaluate workshop comments and results
with City
2 4 Submit preliminary draft report on capital recovery fee
program and conduct Workshop No 5 with Committee,
Public Utilities Board and City
2 4 1 Distribute twenty-five (25) copies of preliminary
draft report to Committee and Public Utilities
Board and City at least one (1) week prior to
session
2 4 2 Preliminary draft report will include findings and
recommendations regarding the capital recovery fee
program
2 4 3 Conduct workshop with Committee and Public
Utilities Board and City
2 4 4 Review and evaluate workshop comments and results
with City Incorporate comments from Board,
Committee and City into final draft report
2 5 Submit twenty-five (25) copies of final draft report and
present findings and recommendations to Denton City
Council Incorporate Council comments into final report
2 6 Submit twenty-five (25) copies of final report to City
Exhibit A/Page 4
w W y�
CDR is proposing to conduct the Capital Recovery Fee Study for the City of
Denton, using the project management team, technical approach, and schedule
outlined in this proposal
With a current population in excess of 50,000 and expected steady growth,
Denton, like most cities, is faced with deciding how to finance utility
system improvements while maintaining a reasonable rate structure and ac-
ceptable level of service The basic question is, "Should existing utility
System customers share the cost of financing capital projects that are pri-
marliy needed to serve growth?"
The primary objective of the Capital Recovery Fee Study will be to evaluate
the need for such a fee as well as alternatives to such a fee and their as-
sociated costs CDM recognises that such fees are sensitive issues, and
that sometimes the final decision is made subjectively If a Capital
Recovery Fee is recommended, the study will enter a second phase in which
the details of the possible capital recovery fees will be developed and
tested for suitability to each of the various needs of the City of Denton
Our proposal is divided into six major sections covering these topics
o Introduction
o Technical Approach
o Project Staffing
o Project Schedule
o Summary Statement, and
o Camp Dresser & McKee Qualifications
In Appendix A we have included a summary of the Management and Financial
Services Division's areas of practice, Appendix B contains resumes for all
of the staff members who will be assigned to the study, Appendix C contains
brief descriptions of several related studies we have performed across the
United States, and Appendix D contains corporate brochures
-1-
TECHNICAL
APPROACH
COM's approach to conducting the Capital Recovery Fee Study will include a
series of
interrelated tasks focusing on evaluation of the financial im-
pacts of
the existing facilities and their operations, as well as proposed
facility
improvements, on utility rates and charges, bond ratings, etc
The method by which capital improvements are financed will have a major
impact on
the study results and, therefore, the analyses must include com-
parisons
of alternatives both with and without a Capital Recovery Fee The
tasks will ultimately encompass the analysis, projection, and computer
modeling
of the utility system's historic and anticipated capital program,
financing arrangements, operating costs, and system usage, as they relate
to total
revenue program requirements recovered through user -charges and
possible
connection fees An outline of proposed tasks includes
Task
Task Description
?l
1
Initial Project Meeting with City
2
Review Utility Department Financial Statements
and various Planning Documents
3
Review Capital Improvement Program (CIP) and
Financing Plan
q
Project Annual om Costs and System Usage
5
Determine Revenue Requirements
6
Workshop with City Staff to Review Revenue
Requirements
7
Evaluate CIP Impacts with Capital Recovery
Fees
B
Evaluate CIP Impacts without Capital Recovery
9
Assess CIP Impacts on Components of Rates and
Charges
10
Determine Need for Capital Recovery Fees
11
Workshop with City Staff and Public Utility
Board to Review Impact of Capital Recovery Fee
-2-
12 Develop Capital Recovery Fee Program (if
recommended)
13 Prepare Preliminary Report and Review with
City Staff
14 Prepare Final Report and Present Conclusions
and Recommendations to the Public Utilities
Board and City Council
CDM assumes that City staff will be available to collect, organize, and
transmit the necessary data and water and wastewater system records
PROJECT STAFFING
CDM's approach to this project will make full use of our extensive in-house
rate, financial, and management staff from our Management and Financial
Services Division, with water and wastewater technical su000rt from roe
engineering staff
CDM Vice President, Ashok Varma will serve as officer -in -Charge with the
ultimate responsibility for overall quality assurance of the work
Mr Roger Hartman, Manager of CDM's West Region Management and Financial
Services, with over 14 years of utility system management and consulting
experience, will serve as Project Manager with responsibility for the
development of all aspects of the study, including contract management
Mr Hartman will provide day -today and task -by -task direction of the work
in terms of data analysis, evaluation techniques, task relationships, and
communication with the City of Denton's Utility Department
The Project Manager will be supported by CDM Financial Specialist Brent
Hoots who is experienced in the preparation of all phases of financial
planning, rate review, and revenue programs He will be responsible for
executing the analytical work, including impact evaluation, revenue pro-
jections, etc
-3-
With a strong technical knowledge of both water and sewer systsms, Mr Ken
Adams will provide engineering support to the overall project effort, and
participate in the development of project tasks
Providing additional technical review assistance to the project
o Roger Fry and Richard Thompson - engineering review
o Dave Laredo - financial review
Resumes of the project staff are included as Appendix B
CDM proposes to submit Part 1 of the study, the Capital Recovery Fee need
determination within four weeks of receipt of a notice to proceed Work-
shops which encourage participation of City Staff, the Utility Board, and
perhaps the City Council will help determine the need and applicability of
such a fee If a Capital Recovery Fee is recommended, Part 2 will develop
the structure and level of the Capital Recovery Fee Therefore, we antic-
ipate that it, too, will require four weeks Assuming two weeks for the
City to review the draft report and subset comments to CDM, a final report
should be submitted to the City in approximately three months
SUMMARY STATEMENT
CDM is excited about the prospect of working with the City of Denton on
conducting the proposed Capital Recovery Fee Study we believe our com-
pany's experience and the proposed project team places CDM in an excellent
position to successfully complete the study in a timely fashion After you
have had the opportunity to review our proposal, please call us at your
convenience
CAMP DRESSER & MCKEE QUALIFICATIONS
Camp Dresser & McKee Inc (CDM) is the largest multi -disciplined profes-
sional consulting organization specializing in the environmental field and
-4-
ranked filth overall among the top 500 architectural/engineering design
firms in the United States Providing consulting services since 1947, CUM
currently has a staff of over 1,600 professionals located in 50 offices
throughout the United States and abroad CDM is an employee owned, totally
independent consulting firm and does not engage in the contracting or
supply of goods and equipment
-5-
INMANAGEMENT
AND FINANCIAL SERVICES
EXPERIENCE
CDM's management and financial services group provides focused consulting
to water,
wastewater, and stormwater utilities in financial, institutional,
and management areas The members of this group combine engineering
backgrounds
with advanced degrees in finance, economics, law, and business,
providing alternative viewpoints for the successful implementation of
engineering solutions. The value of the integrated perspective provided by
this diverse group is extremely important, given the ever -changing nature
of organizations, institutions, regulations, and project financing. The
following is a brief description of the areas on which the management and
financial services group focuses.
SERVICES
iFINANCIAL
CDM's experience in financial analyses for utilities covers the entire
spectrum of such services from capital project and program planning through
budgeting for facilities operations. The various categories of work and
analyses required often overlap, and in many instances encompass activities
which can be classified as management and/or institutional studies The
categories of these services are described below.
o User charge studies -- CDM's user charge studies include
determining the amount of revenue required to support a utility's
short- and long-term activities These activities may include debt
service, facilities operation and maintenance requirements, and the
needs of various service delivery programs and other supporting
activities Once revenue requirements are determined, alternative
schedules of rates and charges designed to equitably recover the
required revenue from the various user classes are recommended for
implementation. Parallel studies, including detailed cost of
service analyses, accounting system and administrative procedure
reviews, and management audits, often provide significant input
into user charge studies CDM has completed over 100 user charge
studies over the past five years
o General feasibility and sources of funds -- CDM services include
determining the financial requirements, in terms of total dollars
and cash flow, of various programs both public and private
Sources of funds to meet various levels of program implementation
are identified and a recommended plan to utilize the various
sources presented
Feasibility analyses can be related to master planning, specific
-
capital improvement programs, or to ongoing or new operational and
administrative programs. Often these financial studies are
predicated on management and institutional studies which define the
increases or decreases in financial resources necessary for the new
or continuing programs.
o Capital programming and budget preparation -- CDM services include
studies to prepare capital improvement plans and operating budgets
for new facilities as well as ongoing operations. Often such
engagements stem from the financial feasibility projects, and may
involve user charge studies. The significant tasks in such studies
includes determination of contracting, financing and other related
costs for capital works, and all direct labor, overhead, fringe
benefits and material and power costs related to operating budgets
o Bond ros ectus report -- CDM prepares engineering, project need
an rate mpact reports that are part of bond prospectus documents
The reports review the technical, managerial, and financial aspects
of the utility or agency implementing the program for which the
bonds are being issued. Such reports address the amount of risk
assumed by the prospective bond buyers Factors reviewed include
the history of the operating entity, the strength of the agency's
management team, the technical soundness and financial viability of
the planned project, and legal obstacles and/or liability faced by
the agency involved.
o Certification re orts to meet bond covenants -- These reports are
"
required by covenants and ordinances that form the basis of
municipal bond offerings. The covenants ordinarily require a
review, on an annual basis, by a firm with expertise in the
_
technical, managerial and financial aspects of public utility
the bond trustee(s)
operation. The review is required to assure
that the utility is well managed, is making sufficient investments
in operation and maintenance to protect the condition of the assets
paid for with bond proceeds, and is in compliance with various
flow
stipulations of the bond issue regarding revenue recovery and
of funds
o Enterprise funds and accounting system studies -- Several CDM
engagements have involved the study and establishment of enterprise
funds and utility accounting systems Enterprise fund revenues are
(the enterprise),
funds solely dedicated to a particular program
for instance a community's wastewater collection and treatment
system Such engagements require establishing systems for the
0
proper accounting of costs and revenues involved in the program
Similar accounting studies not involving enterprise funds have also
been conducted
INSTITUTIONAL SERVICES
CDM's experience in institutional studies for utilities covers the three
broad areas of program implementation, inter -agency and inter -governmental
agreements, and legal requirements Our services in institutional studies
are described below.
o Strategic Planning -- The strategic plan of an organization is a
compos tee — systematic blueprint of management's answers to the
three basic strategic questions facing any enterprise (1) What is
Nour purpose, what will it be, what should it be?, (2) What
objectives do we want to achieve?, (3) How are we going to manage
the organization's activities so as to achieve the chosen
objectives?
From developing the strategic planning framework to implementation
and monitoring of the strategic gameplan, CDM combines the diverse
backgrounds of a multi -disciplined staff with over 40 years of
infrastructure experience to provide the expertise necessary for
managing the strategic planning process
o Organization planning -- Organization planning projects usually
Ha into one o two categories (1) determining which existing
agency (or group of agencies) should implement a particular
program, and how the organization should be structured to
facilitate the program's operation, and (2) for new agencies
determining what structure should be established to implement a
particular new program.
In both cases, CDM's typical analysis presents recommendations on
the optimum organizational structure, manpower levels, the mix of
skills required and descriptions of the systems and procedures the
agency should utilize to perform its mission
o Program develoPme�ntt -- Program development projects are those in
w ch nisi ew activities required by statute or regulation are imposed
upon utilities or public works agencies. For the most part, CDM's
services in these projects have focused upon new programs for
existing agencies EPA's industrial pretreatment program
requirements are a prime example On projects of this type, CDM
matches the program needs to the agency's available resources, and
presents recommendations on how any deficiencies can be overcome,
including the new systems and procedures required, additional
personnel or training of existing personnel and necessary budget
increases required for the new program
o Program evaluation and agency interaction -- CDM services on this
type of project typically require the evaluation of particular
public works or utility projects on both the macro and micro
levels. Agency interaction studies are often included in such
evaluations as few large programs are concentrated in single
agencies
Program evaluations focus on the results of various programs
compared to the expectations These studies examine the methods by
which the results are achieved, the level of interagency
relationship required, and the coordination mechanisms utilized
o Statu�tor /re ulator review -- Projects of this type require a
etd ailed rev ew of the statutes and regulations pertinent to
particular projects. This review leads to a determination of the
permits needed, the special features a project must incorporate,
all the government agencies involved in the approval process and
the type and number of public hearings required This analysis is
often critical as many elements, especially those involved with
permitting, require specific timeframes for review and public
comments on permit applications.
CDM's services on these projects typically include an
implementation plan which indicates the required application dates
for specific permits, the state, federal, and local agencies
involved in the process, and the type of information required for
each permit. In some cases, CDM actually prepares the applications
for our client's review and submittal
o Legal authority and enabling legislation -- This type of project
ordinarily requires an analysis the legal basis for program
implementation While not providing legal advice directly, CDM,
working through our clients' legal counsel, has often aided in the
interpretation of enabling legislation and prepared drafts of
required enabling legislation and ordinances for the implementation
of various programs
' o inter -governmental agreements and service contracts -- This type of
project requires evaluation or formulation of agreements between
two or more governmental entities for provision of public services,
including water supply, wastewater collection and treatment, and
solid waste disposal. CDM services with regard to these agreements
often stem from the legal analyses discussed above
o Litigation support -- CDM has provided litigation support services
tovarious goernment jurisdictions involved in law suits
concerning construction claims, violations of various ordinances or
regulations, by system users or permit holders and noncompliance
actions (consent decrees) In addition to many of the elements of
service described above, litigation support usually involves the
skills to negotiate settlements
'.J
0
0
MANAGEMENT SERVICES
CDM's experience in utility management studies have focused on the
evaluation of the overall performance of utilities, and the systems they
utilize in performance of their mission The outputs of these studies
provide implementabie recommendations designed to significantly improve
operations. Past engagements have been directed towards the utility as a
whole, and/or to specific functions or systems utilized by component
groups. The services are described below
o Management audits and diagnostic evaluations -- Typical management
audits performed by CDM determine the functions and supporting
activities of a particular utility, the systems and procedures used
to perform these functions, and the relationship of the functions
to the goals and objectives of the organization Further analyses
determine if systems in place allow the goals and objectives of the
utility to be met.
The analysis methodology on such projects consists of interviews
with the utility's management team (and other government
officials), reviews of reports and file data and field observation.
Through a diagnostic evaluation, CDM provides specific
recommendations aimed at improving the effectiveness and/or
efficiency of the utility as a whole, or anyone of its component
parts. Recommendations typically include revised procedures,
incorporation of new systems, analytical techniques or technology,
revisions to the skills mix in various groups, and development of
other improvements to operations (such as preventive maintenance
programs, management information systems, or career development and
training programs).
o Organizational studies -- Typical CDM services on these engagements
are directed tower evaluating the organizational structure of a
utility, and the relationship of the structure to the utility's
performance of its mission. In effect, these studies center on
groups within the organization and how they relate to one another
in a particular department, and to the utility as a whole Such
studies -- and specific recommendations on organization structure
-- are geared toward enabling the utility to carry out its
responsibilities in an optimal fashion
o Contract o erations -- Typical CDM services related to contract
opera ons nvo ve analyses to determine which portions of an
ongoing or planned operation could be more effectively or
economically provided by the private sector The analyses include
many of the elements in management audit and diagnostic evaluations
described above, and require a detailed cost of service study to
determine the utility's actual cost for all components of a given
0
function. In addition, various socio-political factors must be
included in the decision making process, as well as a detailed
evaluation of the capabilities of the private sector to provide the
required services.
General management -- CDM services related to general management
studies usually fall into one of two categories (1) analyses of
how utilities function, and what changes would be necessary to
Implement new functions or programs, (2) general descriptions of
various utility programs and how these relate to utility operations
as a whole. The analyses for such projects are more descriptive
and less diagnostic in nature than those described above. The
objective is geared more toward providing information to the
utilities and the public at large Often these studies act as a
preamble to more detailed management and organization studies
discussed above.
ROGER B HARTMAN, Ph D
Senior Environmental Engineer
Management Consulting Services
Camp Dresser 6 McKee
QUALIFICATIONS SUMMARY
Mr Hartman has over 13 years' experience in civil and environmental
engineering relating to the management, planning, design, and construction
of water and wastewater treatment facilities, and stormwater control
facilities He has served as Director of Engineering for the Metropolitan
Denver Sewage Disposal District and as Director of Utilities for the City
of Boulder, Colorado
ZVERIENCE
As Director of Engineering for the Metropolitan Denver Sewage Disposal
District, Dr Hartman was responsible for activities and services related
to the planning, design, construction and modifications of wastewater
transport and treatment facilities, solids processing, and recycling for
the Denver metropolitan area. Dr. Hartman also coordinated and developed
the District's Long -Range Master Plan Study, focusing on alternative future
service area concepts through the year 2035 For the City of Boulder, he
served as Director of Utilities in charge of the administration and
management of the City's water, wastewater and flood control utilities,
including billing, finance, maintenance, treatment, and engineering
functions As Assistant Director for Treatment Operations in Boulder, Dr
Hartman was responsible for administration, management, and engineering for
vaster and wastewater treatment operations
Dr Hartman has participated in cost of service and rate determination
studies for public water and wastewater agencies in Colorado, California,
and Now Jersey included in these studies were analyses of various cost
recovery alternatives for operating and capital expenses, impact on
customer classes, and impact an water consumption He also has appeared
before various boards and commissions offering testimony regarding rate
analyses As project manager, he is developing a strategic plan for future
water and wastewater service for the City of Fort Worth, Texas This
includes projecting service requirements, developing alternative service
delivery concepts, estimating capital and operating costs for various
alternatives, and investigating possible institutional arrangements for
service through year 2010.
REGISTRATION Professional Engineer Colorado
EDUCATION B S - Civil Engineering, Ohio University, 1970
M S - Civil Engineering, Ohio university, 1972
Ph D - Environmental Engineering, University of
Colorado, 1977
PROFESSIONAL rater Pollution Control Federation
SOCIETIES American Water Works Association
American Public Works Association
PL0786
BRENT F HOOTS
Financial and Institutional Analyst
Camp Dresser b McKee
QUALIFICATIONS SUMMARY
Mr Hoots has experience in financial, analyses, rate studies,
institutional and regulatory analyses, and management information systems
for water and wastewater utilities and other public agencies
EXPERIENCE
Mr Hoots' recent project involvement includes the financial and
performance analysis of the Louisville Water Company, and a water and sewer
rate study for the City of Allentown, Pennsylvania The Louisville project
included a comprehensive analysis of financial statements and operating
utilities instheoUeSallTherresultseofotherAllentownh Pennsylvaniarproject
included a computerized financial model for the utility's in-house use, an
analysis of intermunicipal service agreements for the retail customers, and
the development of a framework for applying various capital cost recovery
techniques.
His additional experience includes the regulatory review of proposed
hazardous waste control plans for two U.S Air Force installations in the
western United States, determining the tax implications of various
financing alternatives for resource recovery facilities, and, developing
computer applications for the financial analysis of utilities
EDUCATION B S - Civil Engineering, University of Illinois,
1982
M B A - Finance, University of Denver, 1984
SOCIETIES American Society of Civil Engineers
American Water Works Association
M
rr is /cc
1
KENNETH C ADAMS
' Senior Environmental Engineer
Camp Dresser i McKee Inc
fQIAbIFICATIONS SUMMARY
Mr. Adams has more than twelve years experience in the operation, planning,
' process design, detailed design, construction administration, startup and
operator training for municipal and industrial water and wastewater pro-
jects. To these projects he brings the operator's perspective and a flair
' or Annovative solutions to problems
EXPERIENCE
Mr Adams is currently a senior environmental design engineer in CDM's
Dallas office, serving as project manager on a number of projects and
project engineer an others. Since joining CDR, he has managed many pro-
jects for the Town of Flower Mound, Texas, including a wastewater treatment
plant expansion study, along with the subsequent design and construction -
related services Be has also served this client an many other smaller
ass gnmgnts, and will now menaggee a full-scale water and wastewater master
pl ing study IF
Mound is currently undergoing very rapid yrowhh
The management of this growth, and particularly the requirements for water
and wastewater planning and development, have made it necessary for the
Town to have someone of Mr. Adams' experience to aid in making prudent and
practical decisions
Mr Adams is also the project engineer for a new wastewater treatment plant
' for,Denison, Texas. Of particular concern in this project is the handling
of significant quantities of high strength industrial wastes, a high degree
of inilltratiorVinflow, and a requirement that the project be completed in
a very short timeframe. Mr. Adams' abilities as a coordinator and process
designer have been of great importance in this project In spite of the
time constraints, the resulting facilities are tailored to the personnel
and unique conditions in Denison.
Prior to joining CDM, Mr. Adams worked for consulting engineering firms in
Missouri and Now Mexico, gaining appreciation for the geographical and
cul¢ural influences an water and wastewater projects. Having worked in
sma 1 consulting firms, he has gained experience in all phases of water and
was r ter treatment and pimping facilities and water distribution and
wastewater collection systems projects, including planning, budget prepare-
ti ,scheduling, facilities design and preparation of contract documents,
bi ing, contract administration, project close-out, startup, operator
tra ning, and quality ca►trol.
' EDUCATION M.S. - Environmental Engineering, Oklahoma University,
1974
B.S - Civil Engineering, Oklahoma University, 1973
REGISTRATION Registered Professional Engineer in four states
ASHOK VARMA
Vice President
Camp Dresser i McKee Inc
QUALIFICATION SUMMARY
Mr Varna is the Manager of Dallas' CDM office and has twenty years of
design and project management experience in both environmental and
engineering projects, including water treatment plants, wastewater treat-
ment plants, pumping systems, waste heat recovery systems, and air
control systems Ne is also experienced in MVAC and plumbing
pollution
systems design
'
EXPERIENCE
In the field of water treatment and transmission Mr Varma's recent pro-
jects include evaluating performance of and determining trihalomethane con-
trol methods of Odessa's Water Treatment Plant, and design and services
during construction of Odessa Water Treatment Plant's 100-mgd finished
water pump station and treatment plant improvements from 35-mgd to 70-mgd,
Mr Varma has been respon-
and City of Garland's Water Distribution study
sible for major water treatment plant improvements for North Texas Munici-
pal Water District; 250-mgd to 400-W expansion of City of Dallas' East
Side Plant, and other smaller plants in Austin, Commerce, and Livingston
In the field of wastewater Mr Vanma's recent projcts include serving as
project engineer on Dallas' 1980 Wastewater Plan — a comprehensive study
jof
Dallas' collection and treatment systems through 2000; and project
manager on study, design, and construction administration for rehabilating
and improving the Dallas Central Plant's 115-mgd activated sludge processes
and Ithe plant's centralized instrumentation and controls He also served
i
as project manager for Dallas' Wastewater Sludge Master Plan and design of
and upgrading of existing S-mgd North
City of Baton Rouge's rehabilitation
Plant and 16-mgd South Plant to secondary facilities using trickling
dewatering, and energy recovery
jfilters
with sludge digestion,
i
r
EX=TICN 8.9 - Mechanical Engineering, Bihar College of
India, 1967
Engineering, Patna University, Patna,
M.S - Mechanical Engineering, Oklahoma State
University, 2969
REGISTRATION Professional Engineer Texas
PROFESSIONAL
SOCIETIES American Society of Mechanical Engineers
American Society of Refigeration and Air Conditioning
Engineers
American Water Works Association
Water Pollution Control Federation
ROGER G FRY
' Associate
Camp Dresser 8 McKee
QUALIFICATIONS SUMMARY
Mr Fry has extensive experience in water resources, supply, and distribu-
tion projects, and drainage and flood control projects His experience
includes consulting, preparing planning and feasibility studies, designing
physical facilities, performing financial and institutional studies,
teaching, and providing expert testimony in court cases and hearings
EXPERIENCE
r�
Mr Fry has been principal -in -charge or project manager for more than 40
planning studies and more than 30 design projects in California, Arizona,
Washington and Alaska He managed the development of structural flood con-
trol alternatives for the Central Arizona Water Control Study Other flood
control projects include a reconnaissance level flood control study of the
Agua Caliente Wash in Tucson, Arizona, the San Lorenzo River in Santa Cruz
.. County, California, and Alhambra Creek in Martinez, California Mr Fry
. managed the urban runoff and basin drainage study for Metropolitan Seattle,
a drainage master plan (including an environmental assessment) for
Bellevue, Washin ton, the hydraulic analyses and design phase of the Corte
Madera Creek project, California, and the erosion control master plan for
IF Las Trampas Creek, Contra Costa County, California
Mr Fry has managed numerous water supply, transmission, and distribution
studies for cities and districts in California and has prepared master
water plans in the cities of Benicia, San Bernardino, Pleasanton, Vallejo,
and Scotts Valley He was project manager of a water resources study in
Marin County, California, involving two reservoirs, imported water, and
flood control.
Mr Fry has designed, or has been responsible for the design of numerous
physical facilities, including pipe and conduit systems, pump stations,
channels and flood control structures, dams and spillways, detention
basins, lakes, and reservoirs Examples are an 8-mile long interior
drainage channel on the Chena River in Fairbanks, Alaska, a 2,000-gpm
booster pump station in the City of Tracy, California, an 8-million-gallon
prestressed concrete reservoir in Pleasanton, California, a 2-mile long
levee and river bank stabilization project near Phoenix, Arizona, and a
200-acre marsh restoration project along the shoreline of San Francisco
Bay
EDUCATION B S - Civil Enggineering, University of California,
Berkeley, 1956
M S - Civil Enggineering, University of California,
Berkeley, 1958
REGISTRATION Professional Engineer California, 1959, Arizona, 1964,
Nevada, 1969, Washington, 1973, Nebraska, 1978
DAVID LAREDO
Associate
Camp Dresser A McKee Inc
QUALIFICATIONS SUMMARY
Mr. Laredo has had over 22 years of experience in all phases of water
resources, including planning, management,
and financial studies, final
designs, contract administration, field engineering, and environmental
assessments.
EXPERIENCE
Mr Laredo has been responsible for the management, financial, and
insLeontional Countyl Floridases relHisnPast experienceinstormadrainage utility
work includes directing similar
studies for Loveland, Colorado and Prince
George's County, Maryland, and he participated in the
wastewater and
drainage rate projects for Denver, Colorado He was responsible for the
managemento financial, and institutional
work for the Loveland Drainage
Utility Study and communities in the Northeast and Southwest, as well
for
as
a group of industries in Memphis, Tennessee, and the Boston Water and
Sewer Commission. He actively
participated in management and financial
studies for the Manchester, New Hampshire and Waterbury, Connecticut water
works and In
e Ciy of Detroi
(including inputs tinto nthe elegal settlement yofothe hrate tcases), tthe
i
andt
Georgia Department of Environmental Control
Mr. Laredo has extensive overseas experience in management and financial
consulting and water supply and
wastewater master planning studies for
Metropolitan Bangkok, Thailand, Istanbul, Turkey, Karachi, Pakistan, and
the Republic
of Seychelles.
In addition, Mr Laredo has directed water supply studies for many towns in
New England and New York, and has
f
and prepared the final designs for wastewater
treatmentin New ersey
Virginia and
His masterlants
planningMexperiencetincludesservicehaseIsland
project,
manager for water Quality management studies in the Dallas/Fort
Beaumont
Port Authority Worth and
he statewide rthe aPiedmont
Pennsylvania Department areas ofEnvi onmentaltResources,
and Triad
Council of Governments' 11 county jurisdiction in North Carolina
EDUCATION B.S. - Civil Engineering, City College of New York,
1960
M S - Civil Engineering, New York University, 1964
REGISTRATION Professional Engineer Massachusetts, New York, Texas
Registered Thailand
HONORS Diplomate, American Academy of Environmental Engineers
IN
IN
r
CLIENT NAME Manchester Water Works, Manchester, New Hampshire
rPROJECT NAME Water Rate Study
DESCRIPTION
The Manchester Water Works is a publicly -owned municipal water utility that
owns and operates the water treatment and distribution system serving the
City of Manchester and the surrounding towns of Londonderry, Hooksett,
Goffstown, Bedford, and Auburn, New Hampshire The population of the
service area is approximately 110,000
CDM was engaged to prepare and present a water rate study to the New
Hampshire Public Utilities Commission The rate study included a cost of
service analysis to determine private and public fire protection charges;
in city and out -of -city retail water rates; direct charges for service and
meter installations, and a rate of return to the City of Manchester The
proposed rates and charges were accepted by the Public Utilities Commission
as filed
In addition, MCS prepared a water rates manual which described, in detail,
the procedures for conducting future water rates and cost of service
�., studies
YEAR COKPLE'M 1979
CLIENT NAME Orange Water and Sewer Authority
Carrboro, North Carolina
' PROJECT NAME Water and Wastewater Rate Study
DESCRIPTION
■ The Orange Water and Sewer Authority is a public non-profit organization
which owns and operates water and sewer systems in southeastern Orange
County, North Carolina (including the Chapel Hill campus of the university
r of North Carolina) The Authority acquired properties from the towns of
Chapel Hill and Carrboro, and the university of North Carolina in February
1977
During 1978, CDM's Management Consulting Services Group prepared a new
study of water and wastewater rates for the Authority The study was
divided into two tasks The first task was the preparation of an interim
report analyzing various rate making methodologies and approaches This
analysis included: an evaluation of the use of a service charge based on
meter or service size as opposed to a minimum charge which includes a water
allowance;
an examination of alternative water pricing policies including
uniform rates, seasonal surcharges, and increasing and decreasing block
rates; and a comparison of uniform rates and high strength surcharges with
charges based
an customer class as methods of charging for sewer service
Recommended approaches to the water and Wastewater rates for the Authority
were made The second task was the preparation of a report that presented
water and wastewater rates for the Authority based on the Task 1
I
recommendations. These rates were designed to recover, from the
appropriate customers, the full costs of providing basic water and sewer
service, public and private fire protection, service and meter
installations and other services The final rates were formally adopted to
include water and sewer service charges, uniform commodity charges for
water and sewer and high strength waste surcharges Also included were
charges which recovered the costs of providing treatment and transmission
capacity for future water and sewer customers based on expected demand and
density of development
a
YEAR COMPLETED 1978
r
CLIENT NAME
DESCRIPTION
City of Raleigh, North Carolina
Water and Wastewater Rate Study
The Public Utilities Department of the City of Raleigh provides water and
sewer service to retail customers inside and outside its corporate
boundaries and to neighboring municipalities on a wholesale, contract
basis To ensure the continuing ability to provide services, the City
undertook a major capital improvements program to increase the capacity of
both the water and sewer systems Because of the importance of the
financial considerations associated with this program, Camp Dresser a McKee
(CDM) was engaged to conduct a comprehensive water and sewer rate study
This study was conducted in three phases, each of which was presented in an
interim report In the first phase CDM examined alternative caneptual
methods of establishing and recovering revenue requirements In phase two
CDM developed revenue requirements separately for the water and sewer
systems and determined the allocation of these revenue requirements to
wholesale and retail customers In the third phase CDM examined
alternative rate structures, chose the structure best suited to Raleigh and
then calculated the water and wastewater rates
An important aspect of this study was the development of capital cost
recovery mechanisms based on reserve capacity to ensure that the City's
residents would not be required to subsidize the costs of system expansion
to serve outside communities The results of all three phases were
summarized in a rates manual that was designed to allow the City to revise
its rates as necessary
'M— —COMPLETED ,1981
^' µ p
CLIEPT! NAt9: City of San Antonio, Texas
PFWL''CP ton Water Rates Li -valuation Study
DESCRIPTION
The City of San Antonio engaged Camp Dresser & McKee to cc ct an
evaluation ro the dater Board's rate increase request, financial planning,
capital improvements program, and policies affecting their rates The City
Water Hoard is an operating entity of the City which provides retail and
wholesale water service and public and private fire protection services to
the City of San Antonio and the surrounding communities
CDR conducted this evaluation study in two phases First, a series of
interim reports were submitted which addressed rate structures issues and
alternatives and provided objective evaluations Then, after obtaining
input from City and City Water Board officials, a final report was prepared
presenting CDM's conclusions and recommendations Through this process of
considerations easlwell as to basic rait consideration te-making objectives Rial and ecommendations
were made regarding the determination of revenue requirements; of service allocationructure;he the cost
extension, Policy;system; the rate and charge structure] the Board's
the relationshipbetweenPlanning,
n' the Water improvements
planning; and
YEAR CWLSTEDa 1979
Mx
Fairfax County, Virginia
Wastewater User Charges
Management Consulting Services of MM completed a five year financial
projection study for this urban County's wastewater system The County
operates a large, advanced waste treatment (ANT) plant and has purchased
capacity in the ANT plants operated by four other jurisdictions Complex
issues resulting from the phased conversion to ANT, the rapid growth of the
County's population, and legal limitation on uses of the various forms of
revenues, made the projections subject to a wide range of variables The
final report proposed. specific rate determination algorithms; annual rate
adjustments; and rates to be adopted through 1982
1977
CLIENT NAME Fairfax County, Virginia
PROJECT NAND: Annual Financial Report in Support of
County Bond Program
DESCRIPTION
The Fairfax County Department of Public Works administers a county -wide
sewer system serving over 400,000 persons and a yearly budget of $40
million CON has been retained by the DPW to provide annual services
required by the County's Bond Ordinances These services include
reviewing the operating and capital budget to assure proper funding is
provided; inspection of physical plant to assure proper maintenance is
being carried out; reviewing rates and revenues in light of required costs;
recommending changes or additions as required, to the Capital Improvement
Program and; or the maintenance programs and; changes to the budget or rate
and charge structures to provide proper funding of faciltiies
YEAR CONPLETED Ongoing (1979, 1980, 1981, 1982)
i
�r i
CLIENT RAMS
Boca Raton, Florida
rPRDJECT NME Water and Sewer Rate Litigation
DESCRIPTION
The City of Boca Raton was sued by class action over certain city ordi-
nances pertaining to water and sewer rate charges in 1973 The plaintiffs
were a class of apartment owners that felt they were being discriminated
against by the City's metering and resultant rate determination policies
for water and sewer service The plaintiffs claimed damages of same
$250,000 plus interest, attorney's fees and court costs
In early 1980, the City engaged Camp Dresser & McKee (CDM) to appear as an
expert witness on behalf of the City for the upcoming trial CDM reviewed
the plaintiff's complaint, background law, and the basis for the rates
Pretrial depositions were taken by the plaintiff's attorneys from a CDM
utility rates specialist On the strength of the pretrial depositions, the
. plaintiffs settled out of court for attorney's fees plus a nominal am, two
days before the start of the trial
COMPLETION DATE 1980
CLIENT NAME Orange County, Florida
PROTECT NAME Cost -Benefit Analysis of the Orlando Easterly
Regional Water Pollution Control Program
DESCRIPTION
CDM conducted a benefit -cost analysis of a proposed 24 million gallon per
day advanced wastewater treatment (ANT) plant that would serve the City of
Orlando and portions of Seminole and Orange Counties Required by state
and federal regulatory agencies to meet stringent discharge standards, the
An plant proposed state -of -the art biological treatment technology Its
high energy and chemical requirements for operation meant high annual oper-
atinq costs The CDM analysis addressed the question Do the economic
benefits of ANT justify its high costs?
The analysis entailed two steps First, the instream water quality impacts
Of AWT and lesser treatment options had to be assessed Both a lake and a
river were examined, with eutrophication being the main concern at the lake
and dissolved oxygen being the principal consideration in the river Sec-
ond, the economic benefits associated with the water quality impacts had to
be identified The following types of benefits were examined for the lake
and rivers recreation, commercial fishing, fish and wildlife propogation,
public health, land values, aesthetics, aquatic weed control, and water
supply Because of the subjectivity involved, a Benefits Assessment Panel
comprising various CDM experts was assembled to assign such benefits to
water quality impacts
YEAR COMPLETED 1978
C]
N
CLIENT NhME Greenville Utilities Commission
Greenville, North Carolina
PROJECT NMZ Water and wastewater Rate Study
DESCRIPTION
The Greenville Utilities Commission provides water, sewer, gas and
electric service to approximately 40,000 customers in the City of
Greenville and unincorporated portions of the county Because the
Commission was incurring significant costs constructing new water and
wastewater treatment facilities, they wanted to develop new rates
schedules that reflected the cost of providing services
Camp Dresser and McKee was engaged by the Commission to design rates
that provide sufficient revenues to meet expenditures for operation,
maintenance, debt retirement, and limited expansion; were equitable
between classes of users based on the allocated cost to the classes,
and included charges reflecting the cost of fire protection services
CDM prepared an interim report that presented alternative methods of
determing revenue requirements, reviewed current and alternative rate
j structures, and recommended rate structures and charges To determine
rates for the Commission that met their objectives, CDM conducted a
thorough review of the Commissions operations and accounts Based on
this review, CDM developed projects of Commission expenses for a five
year period and allocated the projected expenses to types of service
These expenses were then allocated to classes of customers to
determine the revenues that should be recovered from each class of
customer CDR also prepared a computer bill analysis of water and
wastewater use to determine the amount of use by each class of custo-
mer by meter size through various ranges of consumption Because the
Commission had been charging customers outside the City limits rates
that were two times the In -City rates, the analysis of the costs to
provide service to these outside customers was an important component
of the study
The proposed water rates included three block declining rate schedules
that were different for In -City and Out -of -City customers A separate
rate schedule for out -of -city industrial users was developed due to
their unique water use requirements A service charge, that increased
by meter size was also developed To recover the costs of providing
fire protection services, CDM developed private fire service charges
based an service size, and public fire service charges based on type
of customer. CDM also reviewed the Commission's connection charges
and recommended methods to periodically update them
The proposed wastewater rates also included a service charge, sur-
charges for wastewater discharges that were higher strength than
normal domestic wastewater, and rates for wastewater service based on
metered water use
YEAR O0HPLEM 1983
CLIENT NAM* City of Lompoc, California
MPROJECT
NAM* Water Rate Study/System Evaluation
DESCRIPTICK.
CDM was retained by the City of Lompoc to conduct a comprehensive water
rate study, including an evaluation of the existing water system The
services provided by CDM'B Management Consulting Services included
An evaluation of the existing water system, including analyses
of water wells and hydrology, watertreatment plant, and
distribution system
Establishing a Capital Improvement Program (including individual
elements, scheduling, and capital costs) based on the evaluation
of the existing system and projected future needs
Review of the Water Department's historic and projected financial
status including an analysis of existing rates and charges,
historic water sales and service connections, and past and
projected operation and maintenance costs
Developing a computer model to analyze the rate impact of
alternative Capital Improvement Programs
Revising the City's water rates and service charges based upon
the City's existing rate structure policy, with consideration
given to: capital replacement fund requirements, and, optional
financing methods give alternative economics and growth
assumptions
r
YEAR COMPLETED 1986
r
r
a
PROJECT water and wastewater Rate Study
LOCATICN Stuart, Florida
DESCRIPTION
Camp Dresser i McKee was retained by the City of Stuart to perform a
water and wastewater rate study CDM's analyysis, revealed that an
overall increase in operating revenue of 23 2 percent was needed For
the water system, the required revenue increase was 20 7 percent; for
the wastewater system the increase was 26 4 percent our review
revealed that no revision to the water rate structure was needed
However, CDM recommended three modifications to the wastewater rate
structure which included converting the Residential Customer class to a
rate structure incorporating a charge per thousand gallons of metered
water consumption; a metered water out -off of 10,000 gallons per
dwelling unit for wastewater charges for the Residential and Apartment
House Customer Classes; and establishing a separate customer category
for Apartment Houses
Since Stuart's last actual rate increase seven years prior to CDM's
study, operating and maintenance costs, capital costs, renewal and
replacement needs, bond covenant revenue requirements, along with
general inflation, had increased such that current cost recovery methods
were inadequate to meet revenue requirements Capital expenditures
relating to the wastewater deep well rehabilitation program also
resulted in an increase in 06M costs and a depletion of capital
reserves
In addition to revising the water and wastewater rates, surcharges for
water conservation were also developed and analyzed, along with the
recommended rates, for their effects on various customer categories,
both inside and outside the City CDM found the existing outside City
surcharges of 50 percent for the water system and 25 percent for the
wastewater system valid and should not be changed
In developing a fair and equitable schedule of rates, CDM determined
revenue requirements for both the water and wastewater systems, examined
operating expenses, capital improvements, forecasted cash flow through
FY 1984-1985, estimated growth in water production and consumption,
examined wastewater flows, future renewal and replacement and debt
service costs, and various methods of cost recovery
PROJECT DATE 1983
PROJM' Litigation Support
LOMTION Waterford Township, MI
Several apartment owners in Waterford Township, believing that the
Township's water and wastewater charges were discriminatory, brought suit
against the Township over the rates and fees they were charged
Specifically, the plaintiffs believed they were Unfairly charged for
o One-time water service connection fees
o One-time sewer service connection fees
o Minimum water service rates and charges
o Minimum sewer service rates and charges
The plaintiffs were charged one-time sewer connection fees based on the
number of apartment units Each unit was charged a fee equal to the
charge for a single family residence (equivalent dwelling unit) The
plaintiffs claimed they should be charged at less than one equivalent
dwelling unit per apartment as apartments use less water and discharge
less sewage per apartment than do single family homes Further, the
one-time water and wastewater connection fees established by the township
provide for deferred payments over a number of years, with interest, by
those buildings existing prior to the ordinance passage with no deferment
for buildings constructed after the passage of the ordinance The
Plaintiffs also claimed this was unfair Finally, the minimum water and
wastewater charges for apartment buildings was based on the number of
apartment units and was equal to that charged to single family
homeowners The plaintiffs claimed this also was unfair because they
' used less water than single family buildings
Though the rates and fees were not established by CDM, the township asked
CDM to assist them in defending the case A CDM utility rate specialist
consulted with the Township attorneys, helped prepare for the case, and
provided depositions
' After both sides took depositions from the experts, settlement
discussions began A settlement was reached before trial which resulted
in no change in the one-time connections fees and a minor change in the
way water and wastewater service minimum charges were to be calculated in
the future
n'R COMPLETED 1985
CLIENT 11, City of Redlands, California
PROJECT tom: Water Rate Study/Revenue Program !Valuation
DESCRIPTION
CDR was retained by the City of Redlands to conduct a comprehensive
water rate study, including an evaluation of the existing water system
The services provided by CDM's management Consulting Services included:
Establishing a Capital Improvement Program (including individual
elements, scheduling, and capital costs) based on the evaluation
of the existing system and projected future needs
Review of the Water Department's historic and projected financial
status including an analysis of existing rates and charges,
historic water sales and service connections, and past and
projected operation and maintenance costs
Developing a computer model to analyze the rate impact of
alternative Capital Improvement Programs, and financing
alternatives
Revising the City's water rates and service charges based upon
the City's eca xistent economics
existing
grrate structure
policy,
with consideration
financing methods give alternative ats, and, optional
assumptions ce and growth
YEAR 00MLETED. 1986
CLIENT NAME City of Pittsburg, California
PROJECT NAMES Water Rate Impact Study/Revenue Program Evaluation
DESCRIPTION
CDR was retained by the City of Pittsburg to conduct a water rate
impact study, including an evaluation of the existing revenue program
The services provided by CDM's Management Consulting Services included
Evaluating the impacts of alternative Capital Improvement Program
on the revenue program (including individual elements,
scheduling, and capital costs) based on the evaluation of the
existing financial and projected future needs
Review of the Water Department's historic and projected financial
status including an analysis of existing rates and charges,
historic water sales and service connections, and past and
projected operation and maintenance costs
Developing a computer model to analyse the rate impact of
alternative Capital Improvement Programs
Developing financing plans to adequately address upgrading and
expansion needs
YEAR COMPLETED 1986
LOCATION
WATER AND SEPE R RATE STLM AND COMPUTER MMEL
Allentown, PA
rDESCRIPTION
rAfter several years of increasing operating expenses in both Allentown's
water and sewer utilities due to normal inflationary pressure and more
costly federal regulations regarding drinking water and wastewater, CDM's
Management and Financial Services Consulting Group was asked to analyse
Allentown's water and sewer rates CDM analyzed past and projected sewer
and water utility expenses along with the estimated signatory revenues
obtained from the projected expenses to derive the proposed water and sewer
rates
' In determining the water rates, CDR performed a cost of service study,
allocating water utility expenses to the categories of billing and
collection, fixed costs, average day use, peak period usage and fire
service.
In reviewing these cost allocations along with the projected water consump-
tion by Allentown's signatories, CDM recom ended a system of service
charges based on customer's meter size to recover the costs associated with
billing and collection in keeping with the current trend away from the
traditional declining block system of rates whereby users pay less the more
water they use, CDM developed three optional water rate schedules in
response to this growing consumer interest in the rate setting process
The options included a flat or uniform charge, a block rate schedule by
differing customer class and a two -block decreasing rate schedule variant
on the current rates
' Similar to the water system, CDM recommended a system of service charges
based an meter size for the sewer system to recover billing and collection
costs. Rates based an metered water consumption and wastewater quality
were derived to recover the remaining costs.
The impacts of the proposed systems of charges for both utilities,
including the effects of the three optional water rate schedules, were
examined for their effects an typical customers and on each of the
signatories
CDM's water and sewer rate study for Allentown was unique in that an
extensive computer model was designed for each utility to be used by City
personnel for periodically updating the water and sewer rates and for
quickly and accurately showing the impacts of various financial and
managerial decisions on all categories of users