HomeMy WebLinkAboutApril 11, 2000 Agenda AGENDA CITY OF DENTON CITY COUNCIL April 11, 2000 Agendll No. Agenda Item,, Date_ After determining that a quorum is present and convening in an Open Meeting, the City Council will convene in a Closed Meeting of the City of Denton City Council on Tuesday, April 11, 2000 at 5:15 p.m. in the City of Denton Council Work Session Room, Denton City Hall, at 215 East McKinney, Denton, Texas to consider specific items when these items are listed below under the Closed Meeting section of this agenda. When items for consideration are not listed under the Closed Meeting section of the agenda, the City Council will not conduct a Closed Meeting at 5:15 p.m. and will convene at the time listed below for its regular or special called meeting. The City Council reserves the right to adjourn into a Closed Meeting on any item on its Open Meeting agenda consistent with Chapter 551 of the Texas Government Code, as amended, as set forth below. 1. Closed Meeting: [**Before the Denton City Council may deliberate, vote, or take final action on each of the agenda items posted as a competitive matter in a Closed Meeting under the provisions of TEX. GOV'T. CODE Section 551.086(c), the City Council must first make a good faith determination, by majority vote of its members, that the particular agenda item is a competitive matter that satisfies the requirements of Section 551.086(b)(3). The vote shall be taken during the Closed Meeting and shall be included in the certified agenda of the Closed Meeting. If the City Council fails to determine by a majority vote that the particular agenda item satisfies the requirements of Section 551.086(b)(3), the City Council may not deliberate or take any further action on that agenda item in the Closed Meeting.] Deliberations Regarding Certain Public Power Utilities: Competitive Matters --- Under TEX. GOV'T. CODE Section 551.086.** Deliberations Concerning Real Property --- Under TEX. GOV'T. CODE Section 551.072. Consultation With Attorney --- Under TEX. GOV'T. CODE Section 551.071. (1) Receive information from Staff, discuss, deliberate, consider, and provide Staff with direction respecting the valuation of, and the possible sale, transfer, assignment, or other divestiture of real property pertaining to the City of Denton's electric utility system, including, without limitation: the Gibbons Creek generation facility located in Grimes County, Texas; the Spencer generation facility located on Spencer Road in Denton County, Texas; the two hydroelectric facilities located in Denton County, Texas; and other components of the City's electric generation assets. Conduct a consultation with the City's attorneys in order to obtain the advice and recommendations of the City's attorneys concerning the above-referenced issues, where to discuss such issues and matters in a public meeting would conflict with the attorneys' duties and professional responsibilities to their client under the Texas Disciplinary Rules of Professional Conduct. B. Consultation with Attorney - Under TEX. GOV'T. CODE Sec. 551.071 Discuss and receive briefing from attorneys on status and possible settlement of litigation styled Municipal Administrative Services, Inc. v. City of Denton, Cause No. 99-50263-367 currently pending in the 367th District Court of Denton County, Texas. City of Denton City Council Agenda April 11, 2000 Page 2 ANY FINAL ACTION, DECISION, OR VOTE ON A MATTER DELIBERATED IN A CLOSED MEETING WILL ONLY BE TAKEN IN AN OPEN MEETING THAT IS HELD IN COMPLIANCE WITH TEXAS GOVERNMENT CODE, CHAPTER 551, EXCEPT TO THE EXTENT SUCH FINAL ACTION, DECISION, OR VOTE IS TAKEN IN THE CLOSED MEETING IN ACCORDANCE WITH THE PROVISIONS OF SECTION 551.086 OF THE TEXAS GOVERNMENT CODE (THE "PUBLIC POWER EXCEPTION"). THE CITY COUNCIL RESERVES THE RIGHT TO ADJOURN INTO A CLOSED MEETING OR EXECUTIVE SESSION AS AUTHORIZED BY TEX. GOV'T. CODE, SECTIONS 551.001, ET SEQ. (THE TEXAS OPEN MEETINGS ACT) ON ANY ITEM ON ITS OPEN MEETING AGENDA OR TO RECONVENE IN A CONTINUATION OF THE CLOSED MEETING ON THE CLOSED MEETING ITEMS NOTED ABOVE, IN ACCORDANCE WITH THE TEXAS OPEN MEETINGS ACT, INCLUDING, WITHOUT LIMITATION SECTIONS 551.071- 551.086 OF THE TEXAS OPEN MEETINGS ACT. Work Session of the City of Denton City Council on Tuesday, April 11, 2000 at 6:00 p.m. in the Council Work Session Room in City Hall, 215 E. McKinney Street, Denton, Texas at which the following items will be considered: NOTE: A Work Session is used to explore matters of interest to one or more City Council Members or the City Manager for the purpose of giving staff direction into whether or not such matters should be placed on a future regular or special meeting of the Council for citizen input, City Council deliberation and formal City action. At a Work Session, the City Council generally receives informal and preliminary reports and information from City staff, officials, members of City committees, and the individual or organization proposing council action, if invited by City Council or City Manager to participate in the session. Participation by individuals and members of organizations invited to speak ceases when the Mayor announces the session is being closed to public input. Although Work Sessions are public meetings, and citizens have a legal right to attend, they are not public hearings, so citizens are not allowed to participate in the session unless invited to do so by the Mayor. Any citizen may supply to the City Council, prior to the beginning of the session, a written report regarding the citizen's opinion on the matter being explored. Should the Council direct the matter be placed on a regular meeting agenda, the staff will generally prepare a final report defining the proposed action, which will be made available to all citizens prior to the regular meeting at which citizen input is sought. The purpose of this procedure is to allow citizens attending the regular meeting the opportunity to hear the views of their fellow citizens without having to attend two meetings. 1. Receive a report from Willie Hudspeth regarding tree removal from his property. Receive a report, hold a discussion, and give staff direction regarding a follow-up report to the Teasley Lane Corridor Traffic Study. o Consider approval of the Preliminary Design Report by Freese & Nichols for the Modifications to Lake Ray Roberts Surface Water Treatment Plant. Receive a report, hold a discussion, and give staff direction regarding a resolution of the City Council of the City of Denton, Texas determining competitive matters re,peering certain public power utilities which are subject to protection under the Texas Open Meetings Act and the Texas Public Information Act; adopting declarations and findings in the preamble; and providing for an effective date. City of Denton City Council Agenda April 11, 2O0O Page 3 Receive a report, hold a discussion, and give staff direction concerning dually certified service areas between the City of Denton and Argyle Water Supply Corporation. CERTIFICATE I certify that the above notice of meeting was posted on the bulletin board at the City Hall of the City of Denton, Texas, on the day of ~ 2000 at o'clock (a.m.) (p.m.) CITY SECRETARY NOTE: THE CITY OF DENTON CITY COUNCIL WORK SESSION ROOM IS ACCESSIBLE IN ACCORDANCE WITH THE AMERICANS WITH DISABILITIES ACT. THE CITY WILL PROVIDE SIGN LANGUAGE iNTERPRETERS FOR THE HEARING IMPAIRED IF REQUESTED AT LEAST 48 HOURS IN ADVANCE OF THE SCHEDULED MEETING. PLEASE CALL THE CITY SECRETARY'S OFFICE AT 349-8309 OR USE TELECOMMUNICATIONS DEVICES FOR THE DEAF (TDD) BY CALLING 1-800- RELAY-TX SO THAT A SIGN LANGUAGE INTERPRETER CAN BE SCHEDULED THROUGH THE CITY SECRETARY'S OFFICE. Agenda IteJfl / AGENDA INFORMATION SHEET AGENDA DATE: DEPARTMENT: CM: April 11, 1999 City Manager's Office Mike Jez, City Manager~ SUBJECT Receive a report from Willie Hudspeth regarding tree removal from his property. BACKGROUND Council has requested staff to place this item on a Work Session to allow Mr. Hudspeth an opportunity to present his report in full rather than having to attend multiple Council meetings to present his report under Citizen Reports. R~e.~ft;[lly submitt?: Sf~)~i~e~ Wj~lters Secretary AGENDA DATE: DEPARTMENT: CM/DCM/ACM: AGENDA INFORMATION SHEET April 11~, 2000 / / Dave Hill, 349-831~~5 A{lenda Agenda item., Dm_ SUBJECT Receive a report, hold a discussion, and give staff direction regarding a follow-up report to the Teasley Lane Corridor Traffic Study. BACKGROUND This agenda item is the second phase ora three-part study. Two new documents have been prepared for Council review, a revised Teasley Lane Corridor Traffic Study (Exhibit # 1) and a Level of Service Evaluation (Exhibit #2). Staffwill present summaries of these reports during the April 11th work session. The primary focus of the discussion is the issue of transportation concurrency, which is intended to address the problems and solution options associated with the installation of roadway improvements concurrent with (or in advance of) the needs generated by new development. The last phase of the study, tentatively scheduled for May 23rd, 2000, is intended to outline a capital improvements strategy needed to serve the Teasley Area at an acceptable Level of Service. During the February 8th, 2000 Council work session, staff presented the Teasley Lane Corridor Traffic Study, which estimated the roadway capacity needs of Teasley Lane and connecting thoroughfares given assumed land uses and densities for the study area. The major conclusions of the study indicated that new travel demand caused primarily by new home construction in Denton and Corinth has nearly exceeded roadway capacity. The major concem identified by staff was the five to six-year time delay likely to be encountered in expanding Teasley Lane from two to six lanes. The staff conclusions and options preferred by City Council following February 8t~ work session discussion are included in Exhibit #3. Traffic Study Revisions New elements of the revised Teasley Lane Corridor Traffic Study include: (1) New traffic counts were taken in March 2000, and Teasley Lane Levels of Service have declined since February 1999; and (2) The study assumptions were revised from an assessment of lane needs to a more realistic assessment of a probable improvements schedule. For example, though Teasley Lane traffic counts indicate a need for expansion now, the revised study indicates that 2006 is the earliest time that expansion can reasonably be expected; and (3) (4) The study assumptions have been changed regarding build-out. Only properties with recorded final plats are assumed to continue building during the period from 2000 to 2006 (when Teasley Lane is assumed to be expanded to six lanes). The reason for this change was to determine ifa construction slowdown would yield any concurrency benefits. The effect of the "slowdown assumption" extends Teasley Area build-out timing from Year 2010 (as originally assumed in the February 8~h report) to Year 2016. C&P Engineering is now preparing an assessment of build-out Levels of Services for study area roadways that extends from 2010 to 2016 to determine if ultimate roadway capacities are adequate to service zoning densities assumed for the Teasley Area. The 2016 assessment will be handed out to Council at the April 11th work session; and The impact of a potential new thoroughfare named the "State School Connector" was assessed to determine if such a road would provide better traffic circulation to and from 1-35E. In addition, the potential addition of one or two Community Activity Centers to reduce vehicle trips currently destined for 1-35E retail services located at the Lillian Miller and Swisher Road interchanges was assessed. Traffic Study Conclusions The March 2000 traffic count data indicates that one section of Teasley Lane, from Lillian Miller to Robinson, now operates at a Level of Service "F" (LOS "F"). This does not mean that this road segment operates at LOS F for the entire day. The road segment does operate at LOS "F" for an as yet undetermined time during either peak morning (7AM to 8AM) and/or evening (4:30 to 6:30 PM) hours. The new traffic data provides more evidence that travel demand on Teasley continues to increase. If concurrency issues are not addressed now, the incidence of automobile accidents and related injuries will increase, travel delays will become more frequent, and motorist frustration problems will worsen. As indicated previously, the traffic study assumes that between 2000 and 2006 only recorded final plats will continue with construction projects. This "slowdown assumption" still results in an LOS "F" for all of Teasley from Lillian Miller to the Denton- Corinth city line, and also results in an LOS "E" for Teasley from 1-35E to Londonderry. Policy Issues Comprehensive Plan- Mobility Plan Relationship The first and most significant policy issue to be resolved is whether the roadway system that services the Teasley Area can support traffc at an acceptable Level of Service (LOS). Staff recommends a minimum LOS "D" for build-out of the area, once all roads have been built to their planned capacity. The "State School Connector", from Ranchman to State School Road, provides significant benefits to the system, and should be formally added to the city's Mobility Plan. FM 2499 is currently shown on the Mobility Plan, and is an important noah-south route that will provide significant relief for FM 2181 (Teasley Lane), even if only two of the eventual six lanes are constructed by 2010. ii The attached traffic study indicates that all roadways segments, if built or expanded according to the timetable indicated in Table 6, will operate at an LOS "D" or better. However, build-out would not occur until 2016 because of the "slowdown assumption". The 2010- 2016 traffic study addendum (which will be completed by April 11th) will provide LOS levels for the completed roadway system at build-out. Until the addendum is available, staff is unable to arrive at any conclusions regarding the relationship between the Comprehensive Plan and the Mobility Plan. If the Mobility Plan roadway component cannot accommodate Comprehensive Plan future land uses and densities, the incompatibilities should be reconciled by amending one or both of the planning documents, or alternative trip reduction techniques could be considered. The North Central Texas Council of Governments (NCTCOG) recommends the use of"Travel Demand Management" (TDM) systems rather than resorting automatically to system capacity expansions. Concurrency / Capital Improvements Approach The issue of concurrency is significant, and will have profound impact on short-term property development within the Teasley Area. If an LOS "D" is used as a minimum standard of acceptability, then Teasley Lane between Lillian Miller and Robinson no longer operates at an acceptable level. Even more problematic is the estimated six-year period for expansion of Teasley Lane from two to six lanes. A construction slowdown or moratorium lasting a very short period of time, such as six to twelve months, might be considered feasible if needed to make necessary road improvements. Six years, however, is a significant time interval, and consideration of a slowdown or moratorium lasting six years places Council in a difficult position. Staffused a "slowdown assumption" considered to be equitable, given the presumption that once significant investments in subdivision improVements have been made, it is difficult to envision halting construction activity. Therefore, recorded plats are considered to be unaffected by any concurrency approach, and requires consideration of an Interim LOS policy that allows temporary LOS "E" or "F" within specific limits (see discussion below). The LOS values shown in Table 6 of the traffic study are based upon average daily traffic; measures of LOS for shorter periods of time are not yet available. Staff is concemed that the preliminary assessment of the Teasley Area roadway concurrency "gap" is six years, and every effort should be made to shorten this time period. The real issue is whether a tolerable LOS can lengthen current system usage, and whether improvements can be made more quickly to shorten the time taken to expand system capacity. The approach recommended by staff is to develop a concurrency strategy that is fair to developers and property owners, respects property rights issues, and is related to LOS objectives that are clearly articulated. At the same time, an aggressive strategy should be developed to expedite roadway improvements to shorten the gap between travel demand and roadway capacity. Interim LOS versus Build-Out LOS Travel demand in the Teasley Area will continue to increase even if new development is stopped entirely, due to "Base" and "Thru" traffic described in the traffic study. The timeframe involved in achieving needed roadway improvements spans a period often years, which requires consideration of property rights issues. These factors raise the policy question of whether an interim LOS policy should be considered, which expresses a tolerance limit, versus a build-out LOS policy, which expresses a minimum acceptable traffic standard. Another factor to consider is the disruption in levels of service that will occur once roadway construction occurs, which will conceivably result in an LOS worse than "D". Ul Exhibit #2 describes the recommended approach for addressing this policy issue. Included is the recommendation that a system be implemented that allows regular monitoring of traffic counts during peak and non-peak hours. The monitors can then be used to implement appropriate management strategies when predetermined thresholds have been reached. Staff acknowledges that many variables can affect the actual traffic patterns that occur, and recommends that tme field data be used as the basis for any land use regulations that may be considered to address concurrency issues. OPTIONS 1. Consider the imposition of a short-term moratorium (approximately 3 months) at an upcoming regular Council meeting until conclusions regarding concurrency and a capital improvements strategy have been reached. 2. Allow staff the time to meet with developers and property owners in the affected study area, and with Denton County and TXDOT officials to determine the extent to which a public/private parmership can be fro,ned to expedite Teasley Lane expansion from two to six lanes. RECOMENDATION Staff recommends Option #2. The use of a moratorium is a reactive option, and private developers in the area should be asked to participate proactively in solutions for the Teasley Area mad improvements. Potential private funding mechanisms such as assessment districts, public improvements districts, or tax increment financing districts may be feasible, and are less restrictive. Careful consideration of all alternatives should occur before a moratorium is imposed. The City of Denton Mobility Plan should be amended to add the "State School Connector" as shown in the traffic study. This connector provides an important link to the Teasley Area from State School Road for northbound motorists that currently use the 1-35E / Lillian Miller intersection to retum to the Teasley Area. Planning staff should also be instructed to provide an evaluation of potential Community Activity Centers that could be located centrally within the Teasley Area. The Community Activity Centers provide substantial benefits; they account for a diversion of 75 percent of the trips that would otherwise be destined for the 1-35E retail centers located at Lillian Miller and Swisher. Finally, staffrecommends consideration of the monitoring system that would be installed to take regular traffic counts to allow evaluation of actual travel demand. ESTIMATED PROJECT SCHEDULE Unless instructed otherwise, staff will continue to develop detailed information for a combined concurrency and capital improvements strategy. A work session has been tentatively scheduled to continue discussion on these topics on May 23~d. Staff intends to meet with affected developers, Denton County representatives, and Texas Department of Transportation (TXDOT) officials in the interim. PRIOR ACTION/REVIEW The first review of the Teasley Lane Corridor Study occurred on February 8th, 2000. iv FISCAL INFORMATION Financial options will be discussed when the third phase of the Teasley Study is scheduled for Council work session review. ATTACHMENTS Exhibit #1: Revised Teasley Lane Corridor Traffic Study Exhibit #2: Level of Service Evaluation Exhibit #3: February 8th, 2000 Council Work Session Summary Exhibit #4: Teasley Lane Corridor Traffic Study - Land Use Data Traffic Study and Level of Service Evaluation Prepared By: C & P Engineering, Ltd. 3501 FM 2181, Suite 230 Corinth, Texas 76205 ~Respectfully ~~ ~ssistant City Manager, Development Services V Exhibit #1 TEASLEY LANE CORRIDOR STUDY FINAL REPORT prepared for CITY OF DENTON Prepared by C&P Engineering, Ltd. 3501 F.M. 2181 · Suite 230 ° Corinth, Texas 76205 ° (940)270-0602 TEASLEY LANE CORRIDOR STUDY CITY OF DENTON PURPOSE OF STUDY The purpose &this study is to address the traffic impact of future developments along the Teasley Lane Corridor during the ten year period of 2000 - 2010. This corridor includes the influence area affecting two specific street segments: Teasley Lane from IH 35E on the north to the Corinth city limit on the east; and Lillian Miller from IH 35E on the north to Teasley Lane on the south, Figure 1 has been developed to depict the influence area that will create the furore traffic impact on the streets and roads in the Teasley Corridor. This area was identified by the City's Planning Department in a document entitled "The South Denton Project", Build out within the study area has been projected to occur by the year 2016. An addendum to this report is being prepared to determine the level of service for all affected roadways once all study area properties have been developed. The addendum will be ready by April 11, 2000. Page 1 THE SOUTH DENTON STUDY AREA The study area contains approximately 3,207 acres and includes a variety of land uses. Table 1 has been prepared to ~ the various land uses as well as the assumed density of development for each use. The table also includes the ITE (Institute of Transportation Engineers) code associated with each land use. 1TE data willbe ufili?~xt to determine the trip ends calculated to be generated by the South Denton area. It should be noted that the land areas presented in Table 1 include approximately 545 acres that are already built out and occupied. The impact of these 545 acres was accounted for as being part of the existing traffic patterns in the study area. The residential land uses in Table 1 account for 93.4% of the total acreage that makes up the South Denton area: The majority of the residents that will live in this study area will have no nearby work or shopping destinations, but will be required to travel significant distances to satisfy these needs. Most of the retail zoning WIll occur in Unicorn Lake which is located in close proximity to IH 35E. As a result, much of its trip attraction will be from the IH 35 corridor. TABLE 1 Trip Generation Data Residential 210 single family homes 8,600 units (2,768 acres) Residential 220 multi-family apartments 1,030 units (69 acres) Residential 250 retirement community 1,170 units (157 acres) Day Care 565 square feet of gross floor area 20,000 s.f. (2 acres) General Office 710 square feet of gross floor area 185,130 s.f. (17 acres) Commercial 820 square feet of gross floor area 969,210 s.f. (89 acres) (for retail and light industrial) Civic Uses N/A acres 85 acres (85 acres) Communication N/A towers 1 tower Tower (20 acres) Page STUDY ASSUMPTIONS AND DATA The completion of this study involved a cooperative effort between the Consultant and the City's staff in temps of developing appropriate assumptiOns regarding several traffic and land use related issues in the corridor. Much of this information was developed by the Planning Department and was included in "The South Denton Project" document. The key assumptions and data used in this study have been listed below. Assumptions All undeveloped agriculturally zoned or unzoned property in the study area is assumed to be converted to single-family residential development at an average gross density of 3.5 dwelling units per acre. The annual population growth rate for the study period is assumed to be about 4 percent per year, corresponding to the Comprehensive Plan population estimates. Traffic traveling through the study area is assumed to increase at a rate of 4 percent per year. Commercially zoned sites were assumed to develop with a floor to area ratio of 0.25 :1. Two connector streets were assumed to be constructed: an east/west connector to tie Teasley Lane with State School Road (year 2004); and a north/south connector to tie Wind River with the east/west connector (year 2004). See Figure 2. Two 10 acre Community Activity Centers were assumed to be included in the study area - construction to occur in 2004 with their full impact shown in the 2006 traffic projections. Two Centers were selected because it was assumed that two would be needed to provide an adequate level of retail services to this area. The assumed general location of the Centers has been shown on Figure 2. This area was selected because of its central location within the study area and because this location was assumed to be able to attract retail customers from the entire study area. For the 2000 - 2006 period building permits were assumed to be issued only for those developments that have received final plat approval. Page 4 10. !1. 12. Koy Data 1. For the 2006 - 2010 period the trip generation for three parcels was assumed not to occur: the Good Samaritan MF-1; the Acme Brick property; and PD-100. The year 2006 was chosen as the break point because it was assumed that 2006 was the earliest date that Teasley (FM 2181) Lane could be expanded. The 4% growth in through traffic was assumed to be constant throughout the study period. The extension of Hickory Creek from its intersection with Teasley Lane east to intersect with the future FM 2499 roadway was assumed to be completed by the year 2005. This project will be private developer funded. FM 2499 was assumed to be constructed by the year 2010. The absorption rate for the 2006 - 2010 period was assumed as follows: 8% in the first year; 7% in the second year; 6% in the third year; and 4% thereafter. Based on these assumed absorption rates, the total build out of the South Denton area was calculated to occur by the year 2016. The City's Comprehensive Plan estimates a city-wide population increase of approximately 33,000 from 1999 through 2008. City-wide, during 1998 and 1999, single-family building permits were issued at an average rate of 70 per month, or 840 per year. Multi-family building permits were issued at an average rate of 42 units per month, or 504 per year. This represents an annual growth rate of approximately 4 percent per year for the city as a whole. Page 5 SCHOOL AREAS Concern has been expressed regarding the impact of school related traffic on the South Denton area street system - especially as it relates to school related trips that originate in the City of Corinth. Figure 2 has been prepared to depict the relative locations of the existing and assumed schools that may influence the South Denton area. Estimates of the level of influence on Denton schools have suggested the following percentages of Corinth students at schools in the South Denton area. McMath Middle School 30% Houston Elementary School 50% MeNair Elementary School 90% Vehicular school related traffic from Corinth has a definite impact on Denton streets especially in the morning commuter peak period. Studies have shown that the peaking characteristics around schools are different in two ways from peak period conditions that would typically be encountered on the way to work each morning. School area peak period traffic volumes are two to three time higher than the typical peak period volumes on non-school area streets. The time period during which the school peak period occurs is typically 20 minutes in length while the typical non-school area peak period duration is 60 minutes~ A number of new schools have been planned for construction in the City of Corinth. This is a direct result of the significant population growth in both Corinth and Denton. These new schools will certainly relieve the Corinth school related traffic impact on Denton streets. However, the decline in the Corinth population in Denton schools will be simply replaced by an increase in students from the South Denton area. In completing this corridor study we have interpreted this shift in the school populations in the following manner. The peak period traffic patterns will show a change from a definitive orientation to and from the southeast to a more centralized local area pattern. The overall daily traffic volumes and patterns will not reflect as significant a change as will the peak periods. This is due to the influence of other major components of the typical traffic stream: the home to work traffic; the work to home traffic; and the retail/commercial traffic generated by the projected 10,800 residential units in the South Denton area. Page 6 McMATH MS HOBSON H:OU.STON:. :ES::,::-:.:::.:. RYAN I CREEK SCHOOL LOCATIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS d ROBINSON ::~ / ::~ AREA SCHOOLS HS/ES o~/ FUTURE STREETS cq h TEASLEY (FM2181) FIGURE 2 8058Fig1 Page 7 EXISTING CONDITIONS A number of truffle related data collection efforts was undertaken to establish the existing conditions for this study. These efforts resulted inthe collection of the following information. The Consultant collected peak hour turning movement counts in November and December 1998 at eight key intersection locations within and adjacent to the South Denton area. These locations have been identified in Figure 3 and the count summary sheets have been included in a separate attachment to this report, The City collected 24-hour traffic counts in March 2000 at 12 locations in the study area. Figure 4 has been prepared to depict these daily traffic volumes. This 24-hour data was recorded by 60 minute periods and the computer print out for each location has been included in a separate attachment to this report. Field data with regard to the number of traffic lanes on the major streets in the study area and the locations of traffic signal installations was collected by the Consultant. This data has been recorded on Figures 5 and 6. A license plate survey was conducted in February 1999 for the South Denton area. In this effort the license plate numbers of all traffic entering and exiting the study area were recorded during the morning peak period of 6:45 - 8:45 am and during the afternoon peak period of 4:30 - 6:30 pm. The purpose of the license plate survey was to collect data that would allow the Consultant to quantify the amount of "through" traffic in the study area. In other words, the amount of the traffic that passes through the area - it has no origin or destination within the area. This information was determined for traffic entering and exiting the South Denton study area as follows: along Lillian Miller on the north; along Teasley Lane on the north; along Ryan Road on the west; along Hickory Creek Road on the west; along Robinson Road on the east; and along Teasley lane on the south. The results of the license plate survey have been depicted on Figures C1 - C6 and Figures D1 - D6 which have been recorded in a separate attachment to this report. A table has also been included in a following section (Analysis of Traffic Stream Components) of this report that summarizes the "through" traffic results. Page 8 HOBSON RYAN PEAK HOUR COUNT LOCATIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS J ROBINSON TEASLEY (FM2181) FIGURE 3 ,,~,~F.g2 Page 9 3550 HOBSON -- 4254 7397 5190 152 572 RYAN 2039 2171 1720 CREEK ~.~ 1736 MARCH 2000 24-HOUR TRAFFIC VOLUMES TEASLEY LANE CORRIDOR !DTUDY DENTON, TEXAS 2065 1879 LEGEND 8422 ROBINSON YEAR 2000 24-HR. VOLUME TEASLEY (FM2181) FIGURE 4 8058Fig3 Page 10 4D °4 4D 4D 4U HOBSONI~2U 4D TRANSITION AT BENT OAKS RYAN 2U 2U 2U '~?'~O¢~cREEK 2U TRANSITION AT CORINTH CITY LIMIT LEGEND 2U 2 LANE UNDIVIDED 4U 4 LANE UNDIVIDED 4D 4 LANE DIVIDED 6D 6 LANE DIVIDED ROBINSON EXISTING STREET SECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 2U ~ 2U TEASLEY (FM2181) FIGURE 5 8058Fi~4 Page 11 HOBSON RYAN ~CREEK TRAFFIC SIGNAL LOCATIONS TEA!gLEY LANE CORRIDOR STUDY DENTON, TEXAS ROBINSON LEGEND EXISTING SIGNALS FUTURE SIGNALS TEASLEY (FM2181) FIGURE 6 8058Fi9 5, Poge t2 PROGRA~V~ED CAPITAL IMPROVEMENTS A number of capital improvements are planned for the general study area. These improvement projects vary as to size and scope as well as to the level of impact they will have on the traffic volumes and patterns on the existing South Denton area street system. These capital improvement projects have been listed below along with their scheduled/estimated construction dates. Wind River Extension... The extension of Wind River from its intersection with Teasley/Lillian Miller east to intersect with the southbound IH 35E frontage road was accomplished during 1999. This project has created an alternative route for area residents that seek to travel southbound on IH 35E and want to bypass the IH 35E and Loop 288/Lillian Miller interchange, IH 35E Ramp Reversals... The existing ramp configuration at IH 35E and Loop 288/Lillian Miller is estimated to be reconstructed by the year 2003. This improvement should reduce the traffic volumes on both Lillian Miller and Teasley Lane through the South Denton area, but its most significant impact will be to improve traffic operations and safety at the interchange itself. Hickory Creek Expansion... This project will result in the widening of Hickory Creek Road from a two lane to a four lane cross section. The project will extend from FM 1830 to FM 2181 and is scheduled to be completed by the year 2002. This will be a City/County funded project and will provide increased capacity for area motorists traveling along Hickory Creek between the limits of this project. FM 2499.:. This project will result in the construction of a major arterial road from the south over Lake Lewisville that will intersect IH 35E at the State School/Mayhill Road interchange. This project has been estimated to be constructed by the year 2010. This project will allow residents east of Teasley Lane an alternative to access IH 35E other than using the existing route ofTeasley Lane/Lillian Miller. The City's current Mobility Plan depicts the projected road system including these four projects that affect the South Denton area. Page 13 INITIAL SOUTH DENTON AREA GROWTH In this section of the report we have responded to concerns expressed by City staffthat the initial traffic growth in the South Denton area may have been quite significant. We determined that the initial growth that has precipitated the concerns regarding the South Denton area began in 1997. In order to quantify the initial growth, we obtained the city's 1997 count map and compared that count data with corresponding count data that was collected in 1998. Table 2 has been prepared to summarize the results of this comparison. TABI.E 2 Initial Growth Evaluation Lillian Miller: 12,672 vpd 14,668 vpd 15.6% IH 35 - Southridge [ Teasley: 6,433 vpd 9,923 vpd 54.3% Londonderry - Hobson Teasley: 7,983 vpd 9,561 vpd 19.8 % Hobson - Lillian Miller Teasley: 3,471 vpd 7,510 vpd 116.4 % Lillian Miller - Robinson As can be seen, the traffic growth over the South Denton area was significant - especially on Teasley Lane south ofLillian 1Vflter. Our assumption for this study was an average annual growth rate of four percent, but during the 1997 to 1998 period the growth rate averaged approximately 36%. It should be noted that during 1997 to 1998 there were very few new residemial units completed in the study area. Most of the new housing did not come on line until late in 1998. As a result, the average 36% growth in the South Denton area traffic during that time period may be due to the influence of the Corinth related growth as well as the growth in Denton jobs and retail sales. Page 14 TRIP GENERATION AND DISTRIBUTION Estimated vehicle trip ends to and from the study area were calculated utilizing trip generation rates and characteristics collected and compiled by the Institute of Transportation Engineers (ITE). Tables 3 and 4 have been prepared to summarize the associated trip generation data and the calculated trips that are anticipated to be generated by the South Denton study area as depicted in Figure 1. Table 3 reflects the land use and trip generation data for the development of the Teasley Lane Conidor study during the six year period of 2000 - 2006. Only those properties that have received final plat approval but have yet to be developed are included in this table. TABLE 3 Calculated Trip Ends Year 2000 - 2006 Period S.F. Residential 20,432 400 1,201 1,380 776 (2A35 units) M.F. Residential 0 0 0 0 0 (0 units) Mobile Home Park 1,106 19 73 80 49 (230 units) Retirement Community 0 0 0 0 0 (0 units) Day Care 0 0 0 0 0 (0 s.f.) General Office 2,038 254 35 47 229 (185,130 s.f.) General Re~ail 1,402 21 13 59 64 (32,670 s.f.) ADT = average daily trips; vpd = vehicles per day; vph = vehicles per hour; in = vehicles entering the site; out = vehicles exiting the site; and s.f. = square feet. Page 15 Table 4 reflects the land use and trip generation data for the development of the Teasley Lane Corridor study during the four year period of 2006 - 2010. This four year development period excludes three properties: Good Samaritan, Acme Brick, and PD-100. TABLE 4 Calculated Trip Ends Year 2006 - 2010 Period S.F. Residential 16,326 320 959 1,103 620 (1,706 units) M.F. Residential 1,930 24 125 121 60 (291 units) Mobile Home Park 0 0 0 0 0 (o units) Retirement Community 0 0 0 0 0 (0 units) Day Care 556 47 42 43 49 (7,014 s,f.) General Office 0 0 0 0 0 (0 s.f.) General Retail 13,606 199 127 569 616 (317,008 s.f.) ~ ~i~i~ii!i!!~ii~ ~ii~ii~!i~ ~i~!~i~ii~ii~i~i~ii!!~i ~i~i~i~i~iiii!!!!ii i :::: ::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::::::::::: ADT = average daily trips; vpd = vehicles per day; vph = vehicles per hour; in = vehicles entering the site; out = vehicles exiting the site; and s.f. = square feet. The trip ends in Tables 3 and 4 were distributed to and from the study site based on the site's location with respect to area development, nearby streets and roadways, and existing traffic patterns. It should be noted that the actual number of trips distributed was adjusted (by an average of 9.6%) to account for two types of trips: short internal trips between residential units and retail sites that do not reach any of the major study streets; and work related trips that include a stop at a retail site on the way to or from work. Page 16 PROJECTED TRAIqlqC VOLUMES In order to conduct our analyses of the study area's traffic impact on the streets and roads serving .the South Denton area, the Consultant developed projected traffic volumes. As previously stated, based on assumed absorption rates the total build out of the South Denton area was calculated to occur by the year 2016. This study addressed the ten year period of 2000 - 2010 and as such traffic volume projections were developed for each two year period during that ten year study period. Figures 7 through i 1 have been developed to depict the projected traffic volumes along the major streets within the South Denton study area. Three pieces of information are provided for each street: the projected traffic volume for that design year; the existing street cross section; and the street cross section recommended to support the projected volume, These projected volumes consist of three components: the 2000 traffic volume (base traffic) for that street; the through traffic volume (background traffic) as detefJ~fined from the license plate survey; and the trip ends generated by the South Denton area (site traffic in Tables 3 and 4) and distributed along the streets within the study In order to account for the average annual growth in traffic due to the growth in the county's population, the through traffic volumes were increased by an annual growth rate of 4.0%. Page 17 HOBSON.~.. 8,550 2U/2U RYAN 13,000 20,500 4D/4D 5,150 2U/2Ui 17,500 4D/4D 14,100 4D/4D 5,350 5,250 ~CREEK a~l~u/2u 10,350 2U/2U YEAR 2002 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 1,500 4U/4U 4,850 x~/2U ROBINSON I 9,400 2U/4U LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION 9,250 .LU/2U TEASLEY (FM2181) FIGURE 7 80.55Fi96 Page 18 21,650 4D/6D 14,200 4D/4D 19,050 4D/4D HOBSON 9,300 2U/2U 15,700 4D/4D 17,700 6,100 RYAN 2U/2u,~L 12,700 2U/4D YEAR 2004- PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 2,500 4U/4U 1,000 -/2U 5,750 'N~/2U J ROBINSON 9,400 2U/4U LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION 11,500 ,.Lu/4D TEASLEY (FM2181) FIGURE 8 8058Fig7 Page 19 20,350 4D/4D 12,850 4D/4D 15,550 4D/4D HOBSON ~ 9,900T 2U/2U 15,950 4D/4D 18,550 11,000 RYAN 2U/4Di 2,450 4U/4U 2~~ 000v -/2U 7,150 J ROBINSON ~CREEK 10,050 J~u/2u 14,600 2U/4D YEAR 2006 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 9,400 2U/4U LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION 13,950 .LU/4D TEASLEY (FM2181) FIGURE 9 8058Fig8 Page 20 21,950 14,450 4D/4D 17,750 4D/4D HOBSON.~.. 11,o5oT 2U/4U 18,200 4D/4D 950 15,100 RYAN 2U/4D! 3,800 4U/4U 3,550 -/2u 8,700 2U/2U J 11,950 CREEK ., 18,000 2U/4D YEAR 2008 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS ROBINSON 9,400 2U/4U [__ LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION 16,700 2U/4D TEASLEY (FM2181) FIGURE 10 8058Fig9 Page 21 23,700 4D/6D 16,250 4D/4D 19,950 4D/40 HOBSON 12,300T 2U/4U 20,600 4D/4D 25,700 5,350 4U/4U 15,450 RYAN 2U/4D]L 5,250 -/2U 10,350 2U/4U ROBINSON 14,100 ,~L2u/4D CREEK 21,800 2U/6D YEAR 2010 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 9,400 2U/4U 19,750 k.,,,..... ,.b2U/4D LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION TEASLEY (FM2181) FIGURE 11 .... 8~ ~. 0 Page 22 IMPACT OF FM 2499 ON T~ TEASLEY LANE CORRIDOR The capital improvements discussed in a previous section are needed improvements and will be constructed at varying points in the future. However, the FM 2499 project has a significant amount of uncertainty with regard to its construction date. In this study we have assumed that it would be constructed in the year 2010. Since this is a very important as well as political project, the construction date could occur well beyond or well before the build out of the study area. As a result, we have developed Figure 12 to illustrate the projected impact of FM 2499 on the study area streets assuming a year 2010 construction completion date for FM 2499. We have identified three key components of the study area traffic stream that would utilize FM 2499. The first component would be the South Denton area traffic located in the area bounded by IH 35 on the north, State School Road on the east, Teasley Lane on the west, and the City of Corinth on the south. This would be the most likely source to use FM 2499. However, since the alignment of this road is on the very east edge of the South Denton area, some of the study area traffic would still seek to utilize Teasley Lane. The second component would be the background traffic that passes through the South Denton area. Our analysis assumed that approximately 50% of the possible north/south through traffic would utilize FM 2499. The third component would include those motorists that would seek a less congested north/south route like FM 2499 rather than face the congested traffic operations along Lillian Miller and Teasley Lane. As traffic volumes steadily increase and the ability of the street system to carry and move the vehicular traffic decreases, there will be a greater tendency for motorists to seek nearby less congested routes. This will become very evident when capacity levels exceed the City's established acceptable level of service '~". Our analysis of the traffic data in Tables 3 and 4 indicated that the construction of FM 2499 would result in a reduction of the projected traffic volumes on Lillian Miller/Teasley Lane between IH 35 and the Corinth City Limit by 15 - 20%. This reduction would result in acceptable levels of service on the streets and roads within the study area. All service levels would be at a level of"D" or better. Page 23 22,500 HOBSON 12,300 2U/4U 15,450 4D/4D 19,550 4D/4D 20,550 16,950 4D/4D 5,350 4U/4U 15,450 RYAN 2U/4D,~L 5,250 -/2U 10,350 2U/4U ROBINSON ~CREEK 14,100 ~L2u/4D 18,550 2U/4D IMPACT OF FM 2499 YEAR 2010 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 17,800 9,400 2U/4U LEGEND 24-HR. VOLUME NEEDED STREET SECTION --EXISTING STREET SECTION TEASLEY (FM2181) FIGURE 12 8C)SBF'igl 1 Page 24 ANALYSIS OF TRAFFIC STREAM COMPONENTS For this report we have prepared Table 5 to summarize the three basic components of the traffic volumes and projections that have been prepared for this study. The three components have been previously identified in this report and are described as follows. "Base" - These values represent the existing local traffic that was counted in our traffic counts in 2000. They were derived by removing the "thru" traffic volumes (obtained in the license plate surveys) from the 2000 counts. '°thru' - These values are indicated in red and represent the through traffic volumes obtained in the license plate surveys. When added to the "base" values the results equal the existing 2000 volumes. "Dev." - These values represent the new development traffic expected to be generated by the assumed development in the South Denton Area. When added to the "base" and "thru" traffic values, the results equal the projected volumes. These three values as well as their percentage of the total traffic (represented in the table by the "all" value) have been included in Table 5. As can be seen in the table, the "thru" traffic volumes in the exisfmg (2000) conditions represent a significant percentage of the total traffic. As the South Denton area develops over the 10 year study period, the percentage ofthe"thru" traffic significantly decreases in some cases while the percentage of the "development" traffic significantly increases in all cases. A review of the table will reveal a discontinuity in the traffic volumes beginning in the year 2006. It was at this point that the impact of the two State School Road connector streets and the two activity centers was introduced into the analysis. In order to simulate the resulting change in the existing traffic patterns, we had to assume new "base", '~thm", and "dev." values - thus the discontinuity in the traffic volume projections. Page 25 :::::::::::::::::::::::::: ::ii::::i!::!~ oo~ ~o~ ~' ~- ~ ~o~ (q ,~ ~,~ ~o c< ~ ~ ~ ~ ~ ~ ~ ~ ~ :::::::::::::::::::::::::::::::::::: ========================= ~o ~ ~ ~ ~0~ oooo ooco FINAL OBSERVATIONS Based on the results of our analyses and the findings presented in Figures 7 - 11, we have developed observations regarding potential intersection turn lane requirements as well as street and roadway lane needs. Table 6 has been developed to present the operational service level of the key streets in the study area based on the city's capital improvement strategy. The table summarizes each street/roadway segment with its projected cross section based on the city's current capital improvements construction estimates for the 2000 - 2010 period. Table 6 also includes the "level of service" associated with each street over the 10 year study period. Levels of service begin with "A" which suggests light, flee flowing traffic with negligible interruptions and proceed to "F" which suggests heavy, nearly stopped traffic with many interruptions. Typically the desirable levels of service are "A" through "D" with "E" and "F" being undesirable. We have attached a detailed description of the six possible levels of service as well as a figure that illustrates the level of traffic congestion and vehicular density associated with each service level. As urbanization from the Dallas metroplex area creeps northward towards Denton, citizens of this area are going to gradually experience more and more '~oig city" type traffic congestion problems on the City's streets. The "B" and "C" levels of service that w.e[e typically the norm in the past are going to be replaced with "D", "E", and even "F" service levels in the future. The need to address these future traffic congestion problems is real and should not be minimized or ignored. It should also be noted that the levels of service presented in this report reflect the traffic operations that are projected to occur during the peak periods of operation on each street and road. These peak periods will typically last for one to two hours during the morning and evening commuter time periods. The service levels during the non-peak periods are expected to occur at acceptable levels. A review of Table 6 suggests that an aggressive approach to the funding of street improvements for the South Denton study area may be needed. If the City of Denton continues to grow as has been suggested in the South Denton Project report prepared by the City's Planning Department and then expanded upon in this study, then major street widening improvements will be necessary over the next ten years. Also for your information we have attached a table that summarizes street capacities and their corresponding levels of service. This was the table used to determine the service levels expressed in this study. The values in the table were detemfined through an interpolation of values included in a Texas Department of Transportation table that was presented to the North Central Texas Council of Governments. Page 29 TABLE 6 Lane Needs Based on Capital Improvement Strategy Lillian Miller: 4D 4D 4D 4D 4D 4D Teasley: 4D 4D 4D 4D 6D 6D IH 35 - Londonderry "A" "D" "E" "D .... A .... A" Teasley: 4D 4D 4D 4D 4D 4D Londonderry - Hobson "A .... A" "A" "A" "A" "A" Teasley: 4D 4D 4D 4D 4D 4D Hobson - Lillian Miller "A" "A .... A" "A" "C" "D" Teasley: 2U 2U 2U 6D 6D 6D Lillian Miller - Robinson "F" "F" '~ .... A" "A" "A" Teasley: 2U 2U 2U 6D 6D 6D Robinson - Hickory Creek "B" "D/E" "F .... A" "A .... A" Teasley: 2U 2U 2U 6D 6D 6D Hickory Creek - City Limit "A" "C/D" "F .... A" "A .... A" Hobson: 2U 2U 2U 2U 4U 4U Country Club - Teasley "B .... C" '*B" "B .... A .... A" Wind River: 4U 4U 4U 4U 4U 4U Teasley - IH 35 "A" "A .... A" "A" "A .... A" Ryan: 2U 2U 2U 4D 4D 4D Country Club - Teasley "A" "A .... A" "A" 5'A .... A" Robinson: 2U 2U 2U 2U 2U 4D Teasley - Harvard "A" "A" "A" "A" "C .... A" Hickory Creek: 2U 2U 4D 4D 4D 4D City Limit - Teasley "A" "A" "A .... A .... A .... A" FM 2499: ........ 4D IH 35 - FM 2181 "A" Hickory Creek: ...... 4U 4U 4U Teasley - FM 2499 "A" "A .... A" State School Connector: .... 2U 2U 2U 2U Ranchman - State School "A" "A" "A" "A" Page 30 The City should be aware that widening projects on Lillian Miller will require the attainment of additional fight-of-way because the existing right-of-way is only 80 feet. Future sections of Lillian Miller may require a six lane divided cross sectionl The minimum right-of-way width for such a section is 93 feet while the desired width is 102 feet. Existing sites will lose parking and/or portions of their side yards with significant screening walls possibly required. However, the City has done well on several of the streets in this area and has designed and constructed them to satisfy the anticipated growth for many years to come. These streets are listed below. Wind River between Lillian Miller and IH 35 will be able to adequately serve the City's traffic demands in its present condition for the next 15 years if not indefinitely. Teasley Lane between Londonderry and Hobson will be able to adequately serve the City's traffic demands in its present condition for the next 12 years. Teasley Lane between Hobson and Lillian Miller will be able to adequately serve the City's traffic demands in its present condition for the next 10 years. Figure 13 depicts the potential turn lane requirement needs at the key intersections within the South Denton area. These lane needs will be highly dependent on the development of adjacent and nearby land parcels. Because of this it is difficult to identify a forecast year by which the intersection lane needs should be implemented. The City should continue to review and evaluate each development site in this area for its impact on nearby intersections. Continued developer participation should be sought in the construction of needed intersection improvements. In this manner the ultimate intersection lane requirements will be accomplished in a manner consistent with the traffic impact at that point in time. Page 31 INSET "A" _J HOBSON INSET "A" SEE INSET "B" RYAN F- ROBINSON ~ CREEK POTENTIAL TURN LANE NEEDS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS L TEASLEY FM2181) FIGURE 1 5 8058F igl 2 Page 32 CLOSING C&P Engineering, Ltd. has conducted a comprehensive traffic study to assess the future infrastructure needs with regard to the major streets and roads within the South Denton area. Based on the results of our study Table 6 has been developed to identify the operational service levels based on the city's current capital improvement strategy. A review of Tables 3, 4, and 5 indicates that by the end of the 10 year study period the development traffic will constitute the major portion of the typical traffic stream within the study area. To address the infrastructure needs summarized in Table 6, especially on the state's facility Teasley Lane, will require new and aggressive funding mechanisms. It is imperative that the City establish the process to create these funding mechanisms as quickly as possible in order to implement the Table 6 lane needs in a timely manner. With the appropriate process in place the City's growth can be maintained rather than halted or stagnated and traffic flow throughout the South Denton area can be provided in a manner acceptable to Denton residents. Page LEVEL OF SERVICE GENERAL DESCRIPTIONS LOS DESCRIPTION AandB C D E F No delays at intersections with smooth progression of traffic. Uncongested operations; at signalized intersections all vehicles clear in a single signal cycle. Moderate delays at intersections with satisfactory to good progression of traffic. Light congestion; occasional back-ups on critical approaches. 40 percent probability of delays of one cycle or more at every signalized intersection. No progression of traffic along the roadway with 90 percent probability of being significantly stopped at every intersection experiencing '~D" condition. Significant congestion on critical approaches, but intersection functional. Vehicles required to wait through more than one cycle during short peaks at signalized intersections. No long standing lines formed. Heavy traffic flow condition. Delays of two or more cycles probable at signalized intersections. No progression. 100 percent probability of being significantly stopped at intersection. Limit of stable flow. Blockage of signalized intersections may occur if traffic signal does not provide for protected turning movements. Unstable traffic flow. Heavy congestion. Traffic moves in forced flow condition. Three of more cycles required to pass through signalized intersections. Total breakdown with stop-and-go operation. Page 34 AND BY LEVEL OF SERVICE ROADWAY CLASS I LOS A ! LOS B LOS C I I LOS D LOS E Urban Freeways 4-lane I 44,000 6-lane 66,000 8-lane 88,000 48,400 72,600 96,800 52,800 79,200 105,600 58,600 87,900 1i7,200 64,400 96,600 128,800 LOS F 70,200 t05,300 Urban Divided Streets 4~lane 16,100 I 17,600 19,100 21,050 I 23,000 24,950 6-lane I 23,500 I 25,700 27,900 30,450 I 33,000 35,550 8-lane I 29,400 I 32,150 34,900 38,450 42,000 45,550 Urban Undivided Streets 2-lane 7,700 I 8,400 I 11,000 11,950 4-lane 12,600 I 13,750 14,900 16,450 18,000 6-lane 19.800 ! 21,650 23,500 25,900 28,300 19,550 30,700 Rural Freeways 4-lane I 20,800 I 26.200 I 31,600 I 36,800 I 42,000 47,200 6-..n~'oo ! 31,200 I 39,300 I I 47,400 55,200 ,163.000 70,800 Rural Divided Highways 6-lane i 23,400 26,600 29,800 36,600 43,400 50,200 Rural Undivided Highways Roiling Terrain 2-lane i 2,200 i 3,000 I 3,800 I 6,900 i i0,000 i 13,100 Level Terrain 2-lane 3,20014,250 5,300 9,400113,500117,600 4-lane 9,500 11,250 13,000 15,300 17,600 19.900 6-lane 15,000 ! 17,250 19,500 23,300 !27,100 [30,900 Page 35 Exhibit #2 LEVEL OF SERVICE (LOS) EVALUATION Congestion and the resulting delay to motorists typically occurs during the AM and PM peak travel periods. These two periods are associated with the home-to-work and work-to-home trips and in the City of Denton they typically occur in the rooming during the one hour period of 7 - 8 AM and in the afternoon during the two hour period of 4:30 - 6:30 PM. The remaining 21 hours of the day are referred to as off-peak travel periods. During the periods of peak travel demand, motorists in metropolitan areas such as exist in the Dallas- Fort Worth area have learned to expect congested traffic flow and delay on major roadways and streets. During these peak periods traffic operations will typically occur at less than acceptable service levels - LOS "E" or "F". These peak periods may function at an acceptable service level for a portion of their time, but due to traffic volume fluctuations, a portion of the peak period may also occur at an unacceptable level. Conversely, during the off-peak travel periods motorists have learned to expect uneongested traffic flow and smoother and less interrupted vehicular trips. During these off-peak periods traffic operations will typically occur at acceptable service levels - LOS "A" through "D". This acceptance of specific service levels associated with off-peak and peak hour travel demands has become the norm. As a result, organizations such as TXDOT and NCTCOG develop their traffic control and traffic management strategies and guidelines around this concept. A key question raised was how to monitor the results of this study, that is, how do we know if traffic growth in the study area is occurring as we have projected. If it is growing less quickly than anticipated, the City can then choose to delay specific capital improvements or expedite development in the area. On the other hand, if the growth is occurring more rapidly than anticipated, the City can then choose to slow down development or expedite implementation of the appropriate capital improvements. We have developed a general methodology that we believe will accomplish this goal. 1. Establish six permanent count stations in the Teasley Lane study area. Compare the count data on a monthly basis with the traffic projections developed in this study. Adjust the timing of the capital improvements or modify the regulatory strategy as necessary according to the results of the comparison. We recognize that a multitude of variables exist in attempting not only to monitor the results of this study, but also to determine the timings, priorities, and mechanisms of the funding of related capital improvements. As a result, it is possible and quite probable that some streets will operate at or above acceptable service levels for extended periods of time while capital improvements arc programed and ultimately constructed. With this in mind we suggest that the City also monitor the length of the peak hour periods that occur at or above a level of service "E". If traffic counts consistently indicate a period of level of service "E" that occurs for a continuous I20 minutes or a period of level of service "F" that occurs for a continuous 60 minutes, then special steps should be taken to ameliorate the problem. These steps could take the form of traffic management techniques; mass transit; fast tracking of geometric improvements; etc. We believe that the referenced 120 and 60 minute periods are consistent with what is typically being experienced by area motorists on major streets and highways. When vehicular delays begin to exceed the expected norm, the dissatisfaction of motorists increases and their patience becomes even more tested such that the safety of the driving environment is significantly threatened. We should point out that the context within which we are describing the peak hour data, the levels of service, and the monitoring oftbe study results is one of vehicular volumes only. The congestion, the delays, and the dissatisfaction is predicated on a lack of capacity and not on incident situations. In other words, we do not believe that congestion due to stalled vehicles, accidents, objects in the roadway, or street/roadway constmction should be justification for implementing a capital improvement project. If congestion and delay due to incident situations is a common occurrence at a location that has adequate capacity, then specific action should be taken to address the problem that is causing the incident situation. It is our belief that the ideas suggested in this document be implemented or utilized on an interim basis until the capital improvement strategies developed as a result oftbe Teasley Lane Corridor study have been put into place. When this occurs, motorists in the South Denton area should experience excellent traffic operations with minimal congestion and delay. TEASLEY LANE CORRIDOR TRAFFIC STUDY FEBRUARY 8TM, 2000 COUNCIL WORK SESSION SUMMARY Exhibit #3 A summary of conclusions offered during the February 8th, 2000 Council work session are listed below, in response to the Teasley Lane Corridor Study: Future travel demand will exceed Teasley Lane's current capacity. At current construction rotes, Teasley Lane will experience serious safety and traffic congestion problems before necessary roadway improvements can be programmed and constructed. Minimum Level of Service ("LOS") A minimum Level of Service "D" should be designated for Teasley Lane, and the rote of building permit issuance should be regulated to match Teasley Lane's ability to accommodate increased traffic demand. Lillian Miller Parkway improvement options are severely limited. Lillian Miller Parkway is a four-lane divided arterial that would normally be expanded to six lanes, but because of right-of-way cost constraints, will likely not be expanded. The Teasley Corridor improvement strategy should use a variety of methods to reduce travel to shopping destinations and to the 1-35E connection through Lillian Miller Parkway. Investigate Adequate Public Facilities Requirements. The issuance of building permits may need to be regulated using "Adequate Public Facilities" requirements. Such an approach would create a "window" of time to allow public improvements to catch up with anticipated traffic demand. A Community Activity Center would divert trips from 1-35E intersections. The designation ora "Community Activity Center" in a central location within the Teasley Study Area that reduces shopping trips, particularly during P.M. peak hour traffic, should be considered. Teasley Lane expansion from 2 lanes to 6 lanes should be expedited. An aggressive capital improvements strategy should be developed to expand Teasley Lane to its ultimate design capacity as indicated in the Roadway Component of the Denton Mobility Plan. The City of Denton ($143,000) is prepared to participate with Denton County (143,000) and the City of Corinth ($ t 00,000) in the first stages of project design, Environmental Assessment and Design. Expansion fi'om a two-lane rural roadway to a six-lane divided arterial, from the Lillian Miller intersection south to the Denton / Corinth city line, should be pursued. To expedite completion of the expansion, the City of Denton may have to consider removing F.M. 2181 (Teasley Lane) fi'om the state highway system and assume long-term maintenance of the roadway. The City of Corinth, Denton County, the North Central Texas Council of Govemments (NCTCOG), and the state should be strongly encouraged to extend the six-lane improvements to the 1-35E Swisher Road exit. Denton County and the City of Corinth intend to expand F.M. 2181 from the Swisher Road exit to Parkridge. Teasley Lane feeder roads should also be programmed and funded for expansions. A longer-term strategy should be developed to improve Hobson Lane, Ryan Road, Robinson Road, Nowlin Road, and Lake Sharon Drive. Of existing feeder roads that connect to Teasley Lane, only Hickory Creek Road is currently programmed for expansion to a four-lane collector by 200~ using Denton County CIP funding. Construction of two new roads within the Teasley Study Area should be considered within the next ten years. Two new roadways should be considered during the next two CIP bond elections. The first road is F.M. 2499, which is identified on the Denton Mobility Plan as a primary arterial intended to traverse the eastern side of the Tcasley Study Area. Thc second road, which is not part of the Denton Mobility Plan, would connec~ the subdivisions east of Tcasley to State School Road. These roadways need to be considered as the Study Area approaches build-out. Several options were discussed on February 8th, with two major options preferred by Council: Option #1: Address Concurrency Issues As can be noted in Table 5, many roadway segments will experience lane needs in excess of the number of lanes currently available. When the roadway is built to ultimate design capacity, most roadway segments will operate at acceptable Levels of Service. The challenge is to build capacity improvements (new lanes or new roads) concurrent with the Imffic load the roadway is expected to carry. Adequate Public Facilities (APF) requirements are relatively new, and provide an optional regulatory tool that has been used in other part of the country to address concurrency issues. If used in the Teasley Area, APF requirements would likely slow construction activity considerably until major capacity improvements are installed. The 1999 comprehensive plan indicates that APF requirements will be explored by the City of Denton. An explanatory publication has been provided as Attachment 4. The use of a moratorium is another option to consider. A moratorium would "freeze" construction activity and reduce anticipated increases in traffic volume until necessary roadway improvements are built. The use of a long-term moratorium could also cause negative effects such as disinvestment, stagnation of partiallY completed infrastructure systems, or leapfrog interest in undeveloped areas outside the area subject to the moratorium. Option #2: Increase Roadway Capacity The City of Denton has already demonstrated a limited level of commitment to Teasley area capacity increases by virtue of adoption of the Denton Mobility Plan in 1999 (see Attachment 3). The Plan is used to officially designate the approximate location of new roadways and to identify existing roadways expected to be expanded (or widened). During subdivision and plat review, right-of-way dedications are made by developers to fix the location of future improvements, and in many instances the developer installs roadway improvements as part of a private development project. This approach depends upon the timing of private development, and as is the case of the Teasley Lane Corridor, home construction is anticipated to occur faster than Mobility Plan roadway improvements. The need for capacity improvements ultimately becomes a question of funding. Several potential funding participants include private developers, property taxpayers, sales taxpayers, city, county, state, and/or federal governments. The funding options available will be discussed in detail when the second part of Teasley Corridor Study is prepared for Council review on April 11a. TEASLEY LANE CORRll)OR TRAFFIC STUDY LAND USE DATA Prepared for Council Discussion: ~lpril 11~, 2000 Exhibit #4 Tract Name Area in acres Number of Lots Final Platted Built Chaucer Estates, Phase 3B 33 120 76 3 Estates of Forest Ridge, Phase 1 21 43 43 13 Hickory Creek Heights, Phase 3A 17 94 94 49 Hickory Creek Ranch, Phase 5 63 213 126 3 Oakmont II, Phase IIB 61 212 119 22 Oaks of Montecito, Phase 3B 80 232 152 35 Ridgemont, Phase I 20 74 74 34 River Oaks, Phase 5 205 677 675 105 Ryan Ranch, Phase 3B 115 275 77 0 Summit Oaks, Phase 2A 78 332 160 32 Sundown Ranch, Phase 2A 173 433 287 61 Thistle Hill, Phase 3A 53 129 36 0 Wind River Estates, Phase 2A 136 434 316 158 Wynstone at Oakmont, Phase 4B 99 556 252 2 tOTAL 1154 3824 2487 517 Average Density 3.3 (New means approved since 1/1/97) (Phase listed is most current phase) Tract Name Area in acres Number of Lots Final Platted Built Bent Oaks, Phase 1 16 41 41 25 Denton West MHP, Phase 1 56 307 307 249 Forest Ridge, Phase 1 162 317 317 224 Lakewood MI-IP, Phase 2B 80 410 410 238 Montecito del Sur 93 116 116 70 Montecito, Phase 1 146 90 90 88 Southmont, Phase 1 9 31 31 26 Total 562 1312 1312 920 Average Density 2.3 (Old means approved prior to 1/1/97) Tract Name Area in Acres Max. Number of Lots Final Platted Built Zoning Briscoe- Clark 23 74 0 0 SF-7 Kirby Tract 39 143 0 0 !PD Lexington Park (Freeman) 58 254 0 0 SF-10 Shadow Brook 34 92 0 0 SF-16 Teasley Harbor 35 133 0 0 SF-7 Top of the Hill 65 243 0 0 PD Unicom Lake 22 127 0 0 PD-20 for SF-10 Wheeler Ridge 152 628 0 0 PD TOTAL 428 1694 0 0 Average Density 4.0 Tract Name Area in Acres Max. Number of Lots Final Platted Built Acme Brick 83 291 0 0 Forester Tract 37 130 0 0 Helm Drive Tract 181 529 0 0 Kirby Tract 6 21 0 0 Nowlin Road Tract 9 39 0 0 NW Hickory Creek, Teasley 77 270 0 0 Oakmont Area 24 84 0 0 Ryan Tract 80 280 0 0 South of Bent Oaks 30 t30 0 0 South Shadow Brook 30 11 11 8 Stewart Tract 56 196 0 0 SW Hickory Creek, Teasley 51 179 0 0 TOTAL 664 2160 11 8 (3.5 units per acre multiplier used) l//lllll Density Tract Name Area in Acres Max. Number of Units Final Platted Built Zoning (dua) Archer Tract 10 170 0 0 PD 17 Good Samaritan - Retirement 157 1170 0 0 PD 7.5 PD-100 29 254 0 0 PD varies Unicom Lake 30 660 0 0 PD 21 TOTAL 226 2254 0 0 Average Density 10.0 Name Area in Acres Unicom Lake 33 St. Marks Church 13 Southmont Church 8 Library/Fire Station 3 Sam Houston Elementary 15 McNair Elementary 13 TOTAL 85 Name Area in Acres Zoning Final Hatted Built Unicom Lake 55 PD-20 0 0 Archer Tract 4 GR 0 0 KDNT 20 A 20ac. 20ac. PD- 100 2 PD for GR 0 0 PD- 16 9 PD for GR 0 0 Robinson/Teasley 3 GR 3ac. 3ac. Ryan/Teasley 1 GR 1 ac. 1 ac. Teasley Harbor 2 NS 0 0 Teasley Office District 17 O 17ac. 0 Wheeler Ridge 15 PD for GR 0 0 TOTAL 128 41ac. 24ac. South Denton and Teasley Lane Corridor Study GIS Map located in Exhibit File AGENDA INFORMATION SHEET AGENDA DATE: April 11, 2000 DEPARTMENT: ACM: Utility Administration Howard Martin, 349-8232 SUBJECT: Consider approval of the Preliminary Design Report by Freese & Nichols for the Modifications to Lake Ray Roberts Surface Water Treatment Plant. BACKGROUND: On August 23, 1999, staff held a discussion with the PUB regarding the advantages and disadvantages of building a 10-mgd vs. 20-mgd treatment capacity at the proposed Lake Ray Roberts Water Treatment Plant (LRRWTP). Based on this discussion, the PUB recommended moving forward with the design of a plant with a 20-mgd capacity. Staff presented the PUB recommendation to the City Council in the workshop session on August 24, 1999. The City Council also endorsed the PUB recommendation to move forward with the 20-mgd design. Staff has worked with the consulting firm of Freese and Nichols, Inc. who were the original designers of the 10-mgd plant in 1990, to develop the scope of work and cost proposal for the preliminary design of the 20-mgd LRRWTP. The decision to undertake the preliminary design was made as several process units have to be modified to meet the current regulations; and instrumentation and Supervisory Control And Data Acquisition (SCADA) system technology has changed drastically since 1992. The preliminary design will help identify the design changes that need to be made and the feasibility of the alternative designs and costs for each alternate. The preliminary design effort then will help to develop the scope and costs associated with developing plans and specifications for the final design of the LRRWTP. The contract for the preliminary design effort and final report was approved by the PUB on October 4, 1999 and by the City Council on November 2, 1999. The consultants scope of services and the cost proposal are attached as Exhibit II. During the preliminary design process, the Water Utilities Department formed a review team comprised of staff members from the administration, engineering and water production divisions. This review team met with the consultant in a series of two and three day workshops to review the consultant's progress, facilitate guidance and direction on preliminary design decisions, and to provide staff with a more detailed understanding of the project leading into the design phase. Two significant recommendations that resulted from these workshops included the addition of ozonation facilities with the initial plant construction and the relocation of the ground storage and high service pump station facilities from the Hartlee Field Road site to the LRRWTP site. Staff provided an update on the economic and regulatory justification of these two recommendations to the PUB on January 24, 2000 and to the City Council on February 8, 2000. The preliminary design effort has identified the desired design modifications for the LRRWTP facilities. It also determined the estimated construction costs for these facilities to be incorporated into the FY 2001 - 2005 Water Utilities Capital Improvements Plan. The report also provides the basis for staff to identifying the scope of services and negotiate a professional services agreement with Freese & Nichols, Inc. for completing the final design of the facilities. OPTIONS: Approve the preliminary design report as submitted. Recommend desired changes to the preliminary design report. RECOMMENDATIONS: Staff recommends approval of the preliminary design report as submitted by Freese and Nichols, Inc. PRIOR ACTION REVIEW (COUNIL, BOARDS, COMMISSION) August 23, 1999 - Discussion on the LRRWTP cost update and 10-mgd vs 20-mgd plant construction. October 4, 1999 - Approval of the preliminary design contract with Freese & Nichols, Inc. January 24, 2000 - Receive an update from staffon the major decisions and recommendations from the preliminary design report workshops. City Council: August 24, 1999 -Discussion on the LRRWTP cost update and 10-mgd vs 20-mgd plant construction. November 2, 1999 - Approval of the preliminary design report contract with Freese & Nichols, Inc. February 8, 2000 - Receive an update from staff on the major decisions and recommendations from the preliminary design report workshops. ESTIMATED SCHEDULE OF PROJECT: The plant should be operational by the late summer of 2002. The current schedule for the project is detailed in Exhibit IV. FISCAL INFORMATION: The professional services agreement with Freese & Nichols, Inc., for the preliminary design report was based upon a lump sum amount of $142,700. The estimated construction cost of the 20-mgd plant facilities including the raw water pumping station, ozonation facilities, ground storage and high service pumping station facilities is approximately 35 million dollars. A detailed breakdown of these costs is included in the preliminary design report (Exhibit III). A summary comparison of the costs for these facilities from the FY 2000-2004 Water Utility Capital Improvements Plan and the 1998 Capital Improvements Plan for Water and Wastewater Impact Fees (Duncan Associates) is shown in Exhibit V. Based upon the estimated construction costs identified for this project in the preliminary design report, this project can be funded without an anticipated rate increase provided impact fee revenues match current projections. See Exhibit I Respectfully submitted: Assistant Director of Water Utilities Exhibit I Exhibit II Exhibit III Exhibit IV Exhibit V - Location Map - Freese and Nichols Scope of Work and Cost Proposal - Preliminary Design Report for the Modifications to Lake Ray Roberts WTP. - Project Schedule - Cost comparison summary $ ~4 ~ fie, id Road Pump D4ENTON EXHIBIT 1 J.'..A,-cviev~h'o~ectsWay Robert~ W'i'P. September 28, 1999 FREESEoNICHOL$ Mr. P.S. Arora, P.E. City of Denton Water Utilities 215 E. McKinney Denton, TX 76201 Proposal for Preliminary Design Phase Lake Ray Roberts Water Treatment Plant City of Denton Off99050/DT63/1160 Dear Mr. Arora: The attached spreadsheet is the basis for our estimate of hours and costs to prepare a revised Preliminary Design Report for the Lake Ray Roberts Surface Water Treatment Plant. The design team for the preliminary phase includes Freese and Nichols, Montgomery Watson, and Gary Juren Architects. Montgomery Watson will prepare the elements of the PDR related to the electrical and instrumentation design. Gary Juren, the original architect will be involved in an advisory role on the revisions to the Administration Building. Freese and Nichols will complete all of the other tasks, inclusive of overall project administration. Our previously submitted scope and the attached fee are based on the following: Reliance on previous design and analysis, to the extent possible. Increase of the plant design flow from 10 MGD to 20 MGD. Process and design changes will be evaluated and determined in a workshop setting with the D~3,~' staff in FNI's Ft. Worth office, per our letter dated August 27, 1999. Additional su~'ey and geotechnical work will be contracted directly by the City. It is currently anticipated that the existing info~ixxation will be adequate for the revision to the PDR. City of Denton Professional Services Agreement is to be used. The estimated fee is $142,700. This is approximately one-fourth of the original preliminary design phase fee, when the two are compared on a common year basis. This represents a salvage value of our original work of about 75%. For the preliminary design phase we request the compensation basis be lump sum, since the scope is clear and it will facilitate project administration. Freese and N~chols. Inc Engineers Enwronmen[al Sc~er~t~sts Architects 4055 Internat~ona~ Plaza Suite 200 Fort Worth, Texas 76109-4895 817-735-7300 Fax 817-735-7491 EXHIBIT II Mr. P.S. Arora, P.E. August 6, 1999 Page 2 of 2 In that there have been several modifications in the ~'ederal regulations pertaining to water quality and site accessibility and safety, and there have been significant advances in the water treatment industry in the past 10 years, it is expected that substantial modifications may be required to the final design elements. These will be presented, evaluated and decided upon by the City during the planned workshops. Upon completion of the PDR, an estimate of hours and cost for the final design and construction phase will be prepared based on the elements modified or supplemented. We hope that this information assists you in your decision process and, if you need further information, please contact us. Very truly yours, Freese & Nichols, Inc. R/x~ond R. Longoria Principal [of'tggO50Jtl,T: LETPDR COST PROPOSAL REV 0l WPD '.r X Ltl CITY OF DENTON REPORT ON LAKE RAY ROBERTS SURFACE WATER TREATMENT PLANT PRELIMINARY DESIGN CITY OF DENTON MODIFICATIONS TO LAKE RAY ROBERTS SURFACE WATER TREATMENT PLANT PRELIMINARY DESIGN PROJECT DTN99479 MARCH 2000 Prepared for FREESE ° NICHOLS Freese and Nichols, Inc. 4055 International Plaza Suite 200 Fort Worth, TX 76109 $17/735-7300 03-24-00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Executive Summary EXECUTIVE SUMMARY ES.1 PROJECT BACKGROUND The 10~mgd Lake Ray Roberts Water Treatment Plant (LRRWTP) for the City of Denton Water Utilities (DWU) was originally designed by Freese & Nichols, Inc. (FNI) in 1990/91, but was not constructed due to the City's re-evaluation of water demand projections. The original design included the 10-mgd Raw Water Pump Station and Pipeline from Lake Ray Roberts and the 10-mgd Conventional Water Treatment Plant. A separate but related project was the 35-mgd Hartlee Field Road Storage and High Service Pump Station project. The combined cost for those two projects, if built now, would be $27 million (estimated Year 2001 construction costs). Growth in Denton and Denton County in the last half of the decade and the associated increase in water usage/demand prompted the City to reinitiate the treatment plant construction project. A primary goal was to utilize as much of the previous design as practical to shorten the project implementation time and reduce costs. The DWU staff took a three-step approach to detemdning the best course of action. The first step updated the projection of water needs for the City of Denton and its customers. The second looked at the continued suitability of a plant at the existing site. The third identified the required and the recommended modifications to the original WTP to account for the regulatory, site condition, and technology and operational strategy changes in the water industry since 1991. The "Long-Range Projections of Population and Water Requirements"(Apdl, 1999) updated the demand projections and suggested that a total of 20-mgd of treatment plant capacity should be added by the year 2002. The "Letter Report on Site Suitability" (January 1999), determined the existing site was still the preferred site. The third step, the required and recommended modifications to the plant design, is covered in this report. ES.2 REQUIRED AND RECOMMENDED CHANGES The 1991 plant design was evaluated with respect to changes in: 1. US Environmental Protection Agency (USEPA) and Texas Natural Resource Conservation Commission (TNRCC) regulations 2. Site conditions 3. Treatment technology and' equipment 4. DWU WTP operational and staffing strategies 5. DWU treated water distribution strategies ES- 1 03-24-00 FINAL- MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Executive Summary There are specific changes that were made in direct response to regulations that have been enacted since 1991. There were other changes that were regulation driven but allowed for alternative approaches for compliance. In those cases, technical and economic alternative evaluations were prepared and recommendations made. The three major changes in the plant design are 1) Increase in plant capacity from 10 to 20 mgd, 2) Change from Conventional Coagulation treatment and Chlorine Disinfection to Pre. Ozonation with Conventional Coagulation and Ozone Disinfection, and 3) Relocation of Treated Water Storage and High Service Pumping from the Hartlee Field Road site to the LRRWTP site. The first change resulted from the updated water demand projection work. The second was the result of a technical and economic evaluation prompted by proposed USEPAfrNRCC regulations. The third was the result of a technical and economic evaluation prompted by the change from the LRRWTP being a regional treated water provider to being principally a treated water provider for the City of Denton. In all three cases, the recommended alternative was the lowest cost option using a standard 20 year life-cycle cost basis. Other significant modifications include: 1. Addition of Raw Water Splitter Box. Increase of plant size from 10 to 20 mgd requires that an additional treatment train be added. Of the alternatives evaluated, the hydraulic splitter box was recommended due to ease of maintenance, accuracy and cost. 2. Filter Modifications. The concept and overall configuration of the filters remains unchanged. However, process enhancements were recommended to improve the filtered water quality. The modifications include a) change from surface wash to air scour during backwash; b) addition of filter-to-waste capability; and c) change from conventional dual media filters to deep bed GAC filters. 3. Chlorine and Ammonia Storage and Feed. Current regulations and overall site safety issues are the basis for changing the approach on chlorine and ammonia chemical storage on site. These chemicals will be stored in fewer but larger bulk containers and will be enclosed in areas with air scrubbing systems to handle and treat any accidental releases. A preliminary equipment arrangement and layout is presented in this report. The ultimate sizing and configuration of the bulk storage and chemical feed equipment and scrubbers will be finalized in a design workshop. 4. Slurry Trench Wall for Containment of Groundwater. Freese and Nichols determined that the elevated groundwater level at the site would adversely impact the filters, washwater reclamation basin, and the interim filtered water pump station. The area for these facilities (current and future) is to be isolated from the ES - 2 03-24-00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Executive Summary groundwater using a bentonite clay slurry trench wall. Permanent pumping facilities and monitoring wells are included. 5. Back Up Power System. The relocation of the HSPS from the Hartlee Field Road site to the LRRWTP site requires a high level of reliability of power supply to the site. The distance from the nearest independent electric power substation (City of Denton, or other electric power supplier) to the site makes back-up power via dual feed economically unattractive. Additionally, the control of reliability of electric power to the site would diminish if the City of Denton Electric Utility were to be sold as a result of the imminent electric power industry deregulation. Accordingly, back up power in the form of diesel powered generators has been added to the LRRWTP. 6. Administration/Operations Building. The basic overall dimensions and exterior appearance remain unchanged. One comer of the building that originally was covered but not enclosed has been enclosed. The interior of the building was modified extensively to comply with the current requirements of the Americans with Disabilities Act (ADA) and the Uniform Building Code (UBC) and to make the interior space more functional. An overview of the current plant site and plant hydraulics is given in Figures ES-1 and ES-2, respectively. The site layout drawing illustrates the original facilities, the modified facilities, and the new facilities. The current design includes a 20-mgd Raw Water Pump Station and Pipeline from Lake Ray Roberts, the 20-mgd Ozone Water Treatment Plant, a 6 MG Storage Tank and the High Service Pump Station facilities. The estimated opinion of probable construction cost for the current 20-mgd raw water conveyance, LRRWTP with ozone treatment/disinfection and the relocated Hartlee Field Road storage tank and High Service Pump Station is approximately $35 million dollars. A breakdown of the major construction components is given in Table ES-1. The current Implementation Schedule is given in Figure ES.3. The current schedule estimates substantial completion at 18 months, with final completion requiring and additional 2 to 4 months. Substantial completion for the LRRWTP is defined as all units being in operation, with the exception of the ozone facilities, the back-up power facilities, and the SCADA Control System. The plant will rely on chlorination/chloramination disinfection for start-up, single source power supply and manual control. ES.3 PRELIMINARY DESIGN REPORT FORMAT This report serves as an addendum to the original report "Lake Ray Roberts Water Treatment Plant - Final Preliminary Design Report, April 1990". The information or ES - 3 03-24-00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Executive Summary TABLE ES-1 Opinion of Probable Construction Cost Summary Lake Ray Roberts Water Treatment Plant City of Denton Facility Raw Water Pump Station and 20 MGD Ozone WTP High Service Pump Station and Total: Estimated recommended facilities from the original report remains valid unless modified in the current Preliminary Design Report. In the current report, Section I- Introduction gives the project background and scope of the work. The information in Sections 2 - 12 present the information on the areas of the plant that is to be modified. Section 13-Recommended Facilities gives a summary description of the current design. Section 14 - Opinion of Probable Construction Costs presents the estimated project costs. ES - 4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Table of Contents TABLE OF CONTENTS CHAPTER ............................................................................................................................ PAGE CHAPTER 1.0 INTRODUCTION ........................................................................................... 1-1 1.1 PROJECT AND REVIEW BACKGROUND .................................................~ ......... 1-1 1.2 REGULATORY REVIEW ........................................................................................ 1-2 1.3 ALTERNATIVE CHEMICAL TREATMENT EVALUATION .............................. 1-2 1.4 RAW WATER SPLITTING AND CHEMICAL MIXING ...................................... 1-3 1.5 GROUND WATER CONTROL ............................................................................... 1-3 116 FILTER DESIGN ...................................................................................................... 1-3 1.7 HIGH SERVICE PUMP STATION AND STORAGE ............................................. 1-3 1.8 SLUDGE MANAGEMENT ...................................................................................... 1-4 1.9 ADMINISTRATION BUILDING ............ i ................................................................ 1-4 1.10 HYDRAULIC ANALYSIS ....................................................................................... 1-5 1.11 BACKUP POWER SUPPLY .................................................................................... 1-5 1.12 INSTRUMENTATION AND CONTROL ................................................................ 1-5 CHAPTER 2.0 REGULATORY REVIEW ............................................................................. 2-1 2.1 PURPOSE .................................................................................................................. 2-1 2.2 EXISTING AND PROPOSED DRINKING WATER REGULATIONS ................. 2-1 Disinfectants and Disinfection By-Products Rule (D/DBP) Stage 1 ................... 2-1 Requirements ..................................................................................................... 2-2 Compliance ........................................................................................................ 2-3 Interim Enhanced Surface Water Treatment Rule (IESWTR) ............................ 2-6 Requirements ............................................................................... 2-6 Compliance ..................................................................................................... 2-7 2.3 ANTICIPATED FUTURE DRINKING WATER REGULATIONS ........................ 2-7 Long-term (Stage 2) D/DBP Rule ........................................................................ 2-7 Requirements ....................................................................................................... 2-8 Compliance ........................................................................................................ 2-8 Compliance Schedule ........................................................................................... 2-8 Long-term Enhanced Surface Water Treatment Rule (LTESWTR) .................... 2-8 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Table of Contents Requirements ........................................................................................................................ 2-8 Compliance .............................................................................................................................. 2-8 Compliance Schedule ................................................................................................................. 2-9 2.4 RISK MANAGEMENT PROGRAM (RMP) ..........................................................2-11 2.5 SEPTIC SYSTEM DESIGN CRITERIA REVISION ............................................. 2-13 CHAPTER 3.0 ALTERNATIVE CHEMICAL TREATMENT EVALUATION (OZONE) ......................................................... 3-1 3.1 PURPOSE .................................................................................................................. 3-1 3.2 REGULATORY REQUIREMENTS AND ALTERNATIVE EVALUATIONS ..... 3-1 Stage 1 D/DBP Compliance .............................................................3-2 Stage 2 D/DBP Compliance .............................................................3-3 Ozone Treatment Process ..............................................................3-3 3.3 ECONOMIC ANALYSIS BETWEEN ENHANCED COAGULATION AND OZONE ALTERNATIVES ....................................................................................... 3-4 3.4 RECOMMENDATION ............................................................................................. 3-6 CHAPTER 4.0 RAW WATER SPLITTING AND CHEMICAL MIXING ...................... 4-1 4.1 PURPOSE .................................................................................................................. 4-1 4.2 RAPID MIX SYSTEM/CHEMICAL ADDITION OPTIONS ................................. 4-1 4.3 RECOMMENDATION ............................................................................................. 4-2 CHAPTER 5.0 GROUND WATER CONTROL .................................................................. 5-1 5.1 PURPOSE .................................................................................................................. 5-1 5.2 GROUNDWATER MITIGATION ALTERNATIVES ................................. 5-1 5.3 RECOMMENDATION ............................................................................................. 5-2 CHAPTER 6.0 FILTER DESIGN .......................................................................................... 6-1 6.1 PURPOSE .................................................................................................................. 6-1 6.2 ALTERNATIVE CONFIGURATION ...................................................... 6-1 6.3 RECOMMENDATION ............................................................................................. 6-1 CHAPTER 7.0 HIGH SERVER PUMP STATION AND STORAGE ................................ ?-1 7.1 BACKGROUND ....................................................................................................... 7-1 7.2 STORAGE TANKS ................................................................................................... 7-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Table of Contents 7.3 PUMP STATION LAYOUT ..................................................................................... 7-2 7.4 ELECTRICAL AND INSTRUMENTATION .......................................................... 7-3 7.5 DISCHARGE PIPELINE ........................................................................... ~ .............. 7-3 CHAPTER 8.0 SLUDGE MANAGEMENT ......................................................................... 8-1 8.1 PURPOSE .................................................................................................................. 8-1 8.2 ALTERNATIVE EVALUATION ............................................................................. 8-1 8.3 RECOMMENDATION ......... i ................................................................................... 8-2 CHAPTER 9.0 ADMINISTRATION BUILDING ............................................................... 9-1 9.1 PURPOSE .................................................................................................................. 9-1 Project Background .............................................................................................. 9-1 Original Building Description .............................................................................. 9-1 9.2 BUILDING REVISIONS .......................................................................................... 9-2 Revised Design Criteria ....................................................................................... 9-2 Design Concepts .................................................................................................. 9-2 Planning Procedures ............................................................................................. 9-3 Cost Differences ................................................................................................... 9-3 9.3 RECOMMENDATION ............................................................................................ 9-4 CHAPTER 10.0 HYDRAULIC ANALYSIS ....................................................................... 10-1 10.1 PURPOSE ................................................................................................................ 10-1 10.2 HYDRAULIC PROFILE ......................................................................................... 10-1 CHAPTER 11.0 BACKUP POWER SUPPLY EVALUATION ........................... ~ ........... 11-1 11.1 PURPOSE ................................................................................................................ 11-1 11.2 EVALUATION ANALYSIS ................................................................................... 11-1 Load Evaluation ................................................................................................. 11-1 Cost Comparisons .............................................................................................. 11-1 11.3 RECOMMENDATION ........................................................................................... 11-2 CHAPTER 12.0 ELECTRICAL/INSTRUMENTATION AND CONTROL .................. 12-1 12.1 PURPOSE ............................................................................. ~ .................................. 12-1 12.2 ALTERNATIVE EVALUATION ........................................................................... 12-1 12.3 RECOMMENDATION ........................................................................................... 12-3 iii MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Table of Contents Description of Recommended Control System .................................................. 12-3 CHAPTER 13.0 RECOMMENDATIONS .......................................................................... 13-1 13.1 RECOMMENDATIONS ......................................................................................... 13-1 13.2 BULK CHLORINE/AMMONIA STORAGE AND FEED ............................ 13-2 CHAPTER 14.0 PROBABLE CONSTRUCTION COSTS ............................................... 14-1 iv MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Table of Contents List of Figures Figure ...................................................................................................... Page ES-1 Modified Site Layout .................................................................................. After Page ES-3 ES-2 Modified Hydraulic Profile ......................................................................... After Page ES-3 ES-3 Construction Schedule ................................................................................ After Page ES-3 3.1 Preozone Contactor Plan and Section ............................................................ After Page 3-6 3.2 Intermediate Ozone Contactor Plan and Section ........................................... After Page 3-6 3.3 Ozone Building Layout .................................................................................. After Page 3-6 4.1 Splitter Box Plan and Section ........................................................................ After Page 4-2 5.1 Slurry Trench Wall Layout ............................................................................ After Page 5-2 6.1 Filter Site Plan .................................................................. i ............................. After Page 6-2 6.2 Filter Sectional Plan ....................................................................................... After Page 6-2 6.3 Filter Sections ................................................................................................ After Page 6-2 7.1 High Service Pump Station Floor Plan .......................................................... After Page 7-2 7.2 High Service Pump Station Typical Section .................................................. After Page 7-2 7.3 High Service Pump Station Layout ................................................................ After Page 7-4 9.1 Operations Building First and Second Floor Plan ......................................... After Page 9-4 10.1 Modified Hydraulic Profile .......................................................................... After Page 10-1 I 1.1 Backup Power Generator Layout ................................................................. After Page 11-3 13.1 Modified Site Layout ................................................................................... After Page 13-1 13.2 Ammonia and Chlorine Feeding System Plan View ........................... After Page 13-3 MODIFICATIONS TO LRR WTP PRELIMINARY DESIGN Table of Contents List of Tables Table ES-1 2-1 2-2 .................................................................................................................................... Page Opinion of Probable Construction Cost Summary ..........................................ES-4 New Drinking Water Goals and Standards of the D/DPP Rule ............................ 2-5 Required Percent Removal of TOC Required by Enhanced Coagulation/Softening ............................................................... 2-5 2-3 Existing and Proposed Regulatory Requirements Summary ................................ 2-10 2-4 Additional DCHD Septic Tank Design Criteria .............................................. 2-13 3-1 Estimate of Chemical Cost Savings with Pre-Ozonation ..................................... 3-7 6-1 Filter Design Parameters .......................................................................... 6-3 13-1 Preliminary Design Criteria ..................................................................... 13-4 14-1 Opinion of Probable Construction Cost ....................................................... 14-2 vi 03/24/00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Introduction CHAPTER 1.0 INTRODUCTION 1.1 PROJECT AND REVIEW BACKGROUND The 10 MGD LRRWTP for the City of Denton was originally designed by FNI in 1991, but it was not constructed due to the City's re-evaluation of water demand projections. The water demand projections suggested that the City could supply adequate water on an interim basis from the existing Lake Lewisville WTP. The growth in Denton and Denton County in the last ten years and the associated increase in water usage has prompted the City to move ahead at this time with the construction of the LRRWTP project. Current water demands suggest that a new plant with a 20 mgd capacity needs to be operational by year 2002. Since 1991, there have been significant changes in the design and operation of water treatment plants in the United States. These changes were driven by both new drinking water regulations and technological changes. For example, chlorination was considered a standard disinfection strategy in the early 90s; but its usage is being discouraged currently due to stricter chlorination byproduct limits set by the EPA. The major technical changes include changes in chemical mixing equipment, filter design and control, sludge dewatering processes and instrumentation and control equipment. Another design element in the LRRWTP that has changed significantly over the years is the Administration building design. Since 1991, several editions of the Uniform Building Code (UBC) have been issued, some of which have changed life safety issues in the design of this building. There have also been major changes in handicapped requirements (Americans with Disabilities Act) over that same period. In addition, there are areas where the City's criteria used to plan the buildings have changed. There also have been permanent changes in the groundwater conditions at the proposed LRRWTP site. These changes in the groundwater conditions were first observed during the original design period, (1990/91). The initial, rapid filling of Lake Ray Roberts appeared to impact the groundwater levels surrounding the lake, including the groundwater at the proposed LRRWTP site. Observations of the groundwater levels during 1998 and 1999 suggested that the impact wa~ permanent. Thc observed groundwater level warranted an evaluation of groundwater 1-1 03/24/00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Introduction control strategies at the LRRWTP to insure the structures could be safely maintained over a long term period using the original design. The original concept for the LRRWTP design was to have most of the water storage at the Hartlee Field Road Pump Station (HFRPS). The major reason for this concept in 1991 was that the LRRWTP was intended to serve as a regional plant, and the wholesale customers would provide their own storage. Now, the LRRWTP is intended to serve mostly the City of Denton. Therefore, a comparative study was needed to determine any cost savings in locating the HFRPS at the LRRWTP site. This revised preliminary design report presents the changes to be included in the original design to comply with the new regulations, water demands, and additional issues such as changes in groundwater level and technologies. 1.2 REGULATORY REVIEW Since the completion of the original LRRWTP design in 1991, there have been significant regulatory changes in the design and operation of water treatment facilities. The City requested that FNI review the existing and proposed drinking water regulations, risk management program (RMP) requirements, Americans with Disabilities Act (ADA), and Uniform Building Code (UBC) requirements applicable to the LRRWTP and recommend design modifications in meeting those regulations and the projected water demands. Chapter 2 - Regulatory Review identifies .the requirements of the existing and proposed drinking water rules, RMP and septic tank design. Compliance strategies of these regulations were also developed in this chapter. 1.3 ALTERNATIVE CHEMICAL TREATMENT EVALUATION Since 1991, there also have been significant drinking water regulatory changes. Recently promulgated regulations would require the plant to operate in enhanced coagulation mode, increasing the cost of operation and possibly making turbidity removal more difficult. Chapter 3- Alternative Chemical Treatment Evaluation (Ozone), presents the results of the enhanced coagulation study and an economic comparison between enhanced coagulation and ozonation procc~e~. Ozonation for conditionin~ of water and disinfection was recommended to comply 1-2 03/24/00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Introduction with the new regulations. Ozonation involves a high capital cost but can offer reduction in operating costs and would produce a higher quality finished water. 1.4 RAW WATER SPLITTING AND CHEMICAL MIXING Flow splitting had not been designed in the initial design since there was only one 10 MGD train to be constructed. Since the modified plant's rated capacity will be 20 MGD with two I0 MGD trains, a means of splitting flow to each treatment train will need to be constructed. The rapid mix/chemical addition system design was also reviewed with respect to being constructed jointly with the recommended flow splitting structure. Three rapid mix/fiow splitting system alternatives were selected for evaluation and are described in Chapter 4-Raw Water Splitting and Chemical Mixing. Maintaining the pump diffusion system for chemical mixing, and adding a hydraulic flow splitter box are recommended. 1.5 GROUND WATER CONTROL At the time of initial design, Lake Ray Roberts was being filled and the groundwater levels surrounding the lake, including the proposed plant site, were impacted. Piezometers were installed at the plant site and have been monitored periodically since that time. Observations made in 1998 and 1999 suggest that the change to the groundwater level is permanent. Under the original plant hydraulic design the filters, clearwell, washwater reclamation basin and main drain pump station foundations would be below the observed groundwater level (by approximately five to twenty five feet). This condition presented a threat to the treated water quality inside basins and to the structures themselves. Chapter 5-Groundwater Control presents different alternatives to keep the treatment units protected from. Construction of a slurry trench wall and dewatering pumps is recommended. 1.6 FILTER DESIGN Chapter 6-Filter Design identifies the filter design changes to be made to comply with the new regulatory requirements and provide filter technologies that are compatible with the ozonation process. Three different layouts of filters were evaluated. A layout similar to the original design is recommended, with the addition of air scour for backwashing, deep bed GAC 1-3 03/24/00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Introduction with a sand cushion in lieu of the dual media as the recommended filter media and filter to waste capabilities to minimize turbidity spikes. 1.7 HIGH SERVICE PUMP STATION AND STORAGE The original concept for the development of the LRRWTP was to have most of the water storage at the HFRPS. The major reason for developing this concept in 1991 was that the LRRWTP was intended as a regional water plant, and the customers would provide their own storage to meet peak demands. Now, the LRRWTP is intended to serve only the City of Denton. A study was performed by FNI comparing the costs of locating the high service pump station and storage tanks at either HFRPS or LRRWTP sites. The results of this study are included in a memo dated January 8, 2000. In this study, FNI recommended eliminating the HFRPS and locating the 60 MGD (ultimate) high service pump station at the LRRWTP site. Chapter 7-High Service Pump Station and Storage provides the preliminary design of a 60 MGD (ultimate) high service pump station with a 6.0 MG ground storage tank at the LRRWTP site. 1.8 SLUDGE MANAGEMENT Chapter 8-Sludge Management presents an evaluation of different sludge dewatering options. Among the four alternatives considered, the sludge dewatering by a centrifuge was the least expensive initial cost option. However, there is little operational experience using cen.trifuges for dewatering ferric hydroxide sludge. Therefore, we recommend that the sludge lagoons be constructed as originally designed due to the proven operational performance and the reduced operating and maintenance requirements. 1.9 ADMINISTRATION BUILDING Since 1991, when the initial administration building was designed by Gary Juren, Inc., several editions of the Uniform Building Code (UBC) have been issued, some of which have changed life safety issues used in the design of this building. There have also been significant changes in handicapped requirements (Americans with Disabilities Act) over that same period. In addition, there are areas where the Owner's criteria used to plan the buildings has changed. The existing drawings were evaluated in regard to these changed conditions and the original 1-4 03/24/00 FINAL - MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Introduction design modified to reflect the revisions necessary to comply with the latest regulatory requirements. 1.10 HYDRAULIC ANALYSIS Due to the addition of several new treatment units the plant hydraulics were recalculated. Chapter 10-Hydraulic Analysis presents an evaluation of the gradeline through the plant, and the revised hydraulic profile. 1.11 BACKUP POWER SUPPLY When constructed, the LRRWTP and HSPS will become a significant source of treated water for the Denton water supply system. Backup power will be required to meet the TNRCC delivery requirements. The reliability of service from the Denton Electric Utility may diminish if the system is owned, or controlled and operated by others. Alternatives for a secure power source were examined to maintain reliability of production. Chapter 11-Backup Power Supply covers the backup power supply alternatives considered and recommends the addition of diesel generators for backup power. 1.12 INSTRUMENTATION AND CONTROL The original design utilized a Distributed Control System (DCS) for plant automatic control and monitoring. Since that time, there have been significant changes in control system technology and instrumentation systems that can be applied to the control and monitoring of the plant. Two alternatives were evaluated and direct communication link (using smart transmitters) is recommended for the LRRWTP. 1-5 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review CHAPTER 2.0 REGULATORY REVIEW 2.1 PURPOSE Since the original LRRWTP design was completed in 1991, there have been significant regulatory changes in the design and operation of water treatment facilities. The City requested that FNI review the existing and proposed drinking water regulations, risk management program (RMP) requirements, Americans with Disabilities Act (ADA), the Uniform Fire Code (UFC) and Uniform Building Code (UBC) requirements applicable to the LRRWTP and recommend design modifications in meeting those regulations. This chapter reviews the requirements of the existing and proposed drinking water regulations, RMP requirements and design criteria changes for septic system design. The requirements of the ADA, UFC and UBC are discussed in Chapter 9.0, Administration Building. 2.2 EXISTING AND PROPOSED DRINKING WATER REGULATIONS. The regulatory changes of the 1990's were the principal drivers of the design review and produced the majority of the changes. Many of the regulations that were promulgated during the 1990 design still apply, such as the Total Trihalomethanes Rule, Surface Water Treatment Rule, Total Coliform Rule, and the Lead and Copper Rule. Historically, the City has been in compliance with all these at the Lake Lewisville Water Treatment Plant (Spencer Road WTP), and the original design for the LRRWTP should not have any problems in complying with the 1990 regulations either. The recently proposed regulations that were not considered in the 1990 design and have caused this review are the Stage 1 Disinfectants and Disinfection By-Products Rule (D/DBP), and the Interim Enhanced Surface Water Treatment Rule (IESWTR), both of which are discussed in this chapter. A summary of all the relevant roles is shown in Table 2-1. Disinfectants and Disinfection By-Products Rule (D/DBP) Stage 1 The D/DBP rule was proposed on July 29, 1994 and it was promulgated on December 16, 1998. The compliance date for larger water systems like the City of Denton (population greater than 10,000) is set for January 1, 2002. The final D/DBP Rule addressed several complex and interrelated issues. The intent of the rule is to balance the risk of acute health problems associated with microbial disease outbreaks against the risks of chronic health problems 2-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review associated with disinfectants and their by-products. Disinfection by-products are formed when disinfectants used for pathogen inactivation react with naturally-occurring organic matter found in water. The D/DBP Rule was proposed for promulgation in two stages. The intent of the first stage was to provide a near-term, minimum level of regulation in regard to DBPs based on existing health effects data. Although the second stage was proposed in 1994, it will be renegotiated and revised following the collection of additional occurrence and treatment data under the Information Collection Rule (ICR). Health effect studies and other research are also expected to be completed for developing the Stage 2 requirements. Requirements Proposed new drinking water standards under the D/DBP Rule are shown in Table 2-1. The term "Maximum Contaminant Level Goal," or MCLG, refers to a desired maximum concentration that is calculated by a prescrib~ed EPA method based on health effects. These goals are non-binding and indicate the concentrations below which there are no known health effects. These values are generally below the corresponding MCLs for these compounds. The term "Maximum Residual Disinfectant Level" or MRDL, has been newly created with the release of the proposed D/DBP Rule. The MRDL requirements are similar to the MCL requirements and the City must achieve an annual running average, computed quarterly, less than the MRDL valuel Stage 1 of the D/DBP rule also included a t~:eatment technique, known as enhanced coagulation/softening, for removing certain percentages of total organic carbon (TOC), an established indicator of DBP precursors. The objective of this requirement is to limit the formation of both known and unknown DBPs. The level of TOC removal required will be based on the source water alkalinity and initial TOC concentration as shown in Table 2-2. If a TOC removal limit (Step I) cannot be met, the system will be allowed to conduct bench-scale tests to determine an alternative site-specific limit (Step 11). Systems can avoid enhanced coagulation/softening requirements if they meet one of the following exemption criteria: 1) The system's source water TOC is less than 2.0 mg/L 2) The system's treated water TOC is less than 2.0 mg/L 2-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review 3) 4 5 6 7 8). The system's source water TOC less than 4.0 mg/L, its alkalinity greater than 60 mg/L (as CaCO3), and the system is achieving TTHMs less than 0.040 mg/L, and HAA5 less than 0.030 mg/L (or the system has made a clear and irrevocable financial commitment to technologies that will meet the TTHM and HAA level). The system's TTHMs is less than 0.040 mg/L and HAA5 is less than 0.030 mg/L, and when only chlorine is used as primary and secondary disinfectant. The system's source water specific ultraviolet absorbance (SUVA) prior to any treatment is less than or equal to 2 L/mg-m. The system's treated water SUVA is less than or equal to 2 L/mg-m For softening plants, remove magnesium hardness to at least' 10 mg/L as CaCO3. For softening plants, lower alkalinity to less than 60 mg/L as CaCO3. Raw water TOC data on Lake Ray Roberts- indicated that the LRRWTP would not meet exception criteria No. 1 and No. 3 because raw water TOC is generally above 4.0 mg/L. The finished water TOC data (generally above 2.0 mg/L) from the existing plant indicated that the LRRWTP would probably not meet exception criteria No. 2. The TTHMs levels in the City's distribution system were slightly above 0.05 mg/L. Therefore, the City would not meet exception criteria No. 4. The raw water SUVA for the existing plant was generally above 2 L/mg-m. Since the water quality for both Lake Lewisville and Lake Ray Roberts are sin'filar, it is likely that the LRRWTP will not meet exception criteria No. 5 Jar testing indicated that the LRRWTP could meet criteria No. 6, finished water SUVA, less than or equal to 2 L/mg-m, with a 20 mg/L alum dose and 1.0 mg/L polymer dose. However, this test data would not be considered valid by the TNRCC since the testing was done on raw water that had been pre-oxidized with KMn04. The presence of an oxidant like KMn04 would cause interference in the SUVA measurement. Discussions with the TNRCC indicated that the City most likely would be required to add sufficient coagulant to meet the Step 1I TOC requirements (TOC removal at the point of diminishing return) or provide alternate chemical treatment. Compliance The City of Denton should meet the D/DBP Stage 1 TTHM and HAA limits of 0.08 and 0.06 mg/L, respectively without modifications to the original design. However, the City's LRRWTP would be required to remove at least 35 percent TOC (or Step 11 requirement) by enhanced coagulation or other treatment processes unless the finished water SUVA exception 2-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review criteria are continuously met and accepted by the TNRCC. The City collected data over a week at the existing plant while adding approximately 55 mg/L ferric sulfate. The TOC removal varied from 27 to 34%, which is below the required 35%. 2-4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review Maximum C°fitaminant Level GOalS (MCLGs in mg/L) Chloroform Bromodichloromethane Bromoform Bromate Dichloracetic acid Trichloroacetic acid Chlorite 0 0 0 0 0 0.3 0.8 Dibromochloromethane 0.06 Stage 1 Maximum Contarmnant Levels (MCLs in mg/L) Total trihalomethanes (TTHMs) 0.080 Haloacetic acids (five) HAA5) 0.060 Bromate 0.010 Chlorite 1.0 (Not all compounds with MCLGs will have an MCL established Proposed stage 2 Maximum Contaminant Levelg (MCLs in rog/L) TTHMs I 0.04 THAAs 0.03 Limits on Disinfectants (MRDLS in mg/L) ,~ ~ Chlorine I 4.0 (as C12) Chloramines ~ I 4.0 (as total chlorine) Chlorine dioxide 0.8 (as C 102) Source Water Source Water Alkalinity (mg/L as CaC03) TOC (mg/L) 0-60 >60-120 >120 >2-4 35 % 25% 15% >4-8 45% 35% 25% >8 50% 40% 30% 2-5 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review Interim Enhanced Surface Water Treatment Rule (IESWTR) Requirements Since the promulgation of the SWTR in 1989, several waterborne outbreaks of cryptosporidiosis have occurred in the United States. The SWTR does not specifically address Cryptosporidium. The degree of protection against this organism provided by the current SWTR is uncertain. In the worst case, protection may be inadequate, particularly if a system is supplied by poor-quality source water. The IESWTR was finalized simultaneously with the D/DBP Rule on December 16, 1998. The compliance date of this rule was set on January 01, 2002. This interim rule applies only to systems serving 10,000 people or more. The City of Denton falls into this group. The IESWTR includes establishing an MCLG for Cryptosporidium, setting more stringent finished water turbidity limits than currently required by the SWTR, and making no further changes to the SWTR. Also, continuous monitoring of an individual filter is required by the IESWTR. The more specific requirements of the IESWTR that might impact the City's water system are summarized below: 1) Cryptosporidium MCLG: The IESWTR set a Cryptosporidium MCLG at zero. 2) Cryptosporidium log removal: All water systems that are required to filter must achieve at least a 2-log removal of Cryptosporidium. Systems which use direct filtration or conventional filtration treatment and meet turbidity requirements described in the next paragraph (Item # 3) are assumed to achieve at least a 2-log removal of Cryptosporidium. 3) Finished water turbidity performance requirements: The combined filtered water turbidity must be less than or equal to 0.3 NTU in at least 95 percent of the measurements taken per month and no turbidity measurements shall exceed a maximum turbidity limit of 1.0 NTU. 4) Individual filter requirements: All water systems shall conduct continuous monitoring of turbidity for each individual filter and shall provide an exception report to the TNRCC on a monthly basis. The exception report shall include the following: 1) any individual filter with a turbidity level greater than 1.0 NTU based on two consecutive measurements fifteen minutes apart, and 2) any individual filter with a turbidity level greater than 0.5 NTU at the end of the first four hours of filter operation based on two consecutive measurements fifteen minutes apart. 5) Disinfection profile development: Each public water system shall develop a disinfection profile. The profile consists of a compilation of daily Giardia larnblia log inactivations, or virus log inactivations where applicable, computed over the 2-6 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review period of one year. Systems would not be required to develop disinfection profiles, if at least one of the following criteria are met. a) TTHM levels are less than 80% of the Stage 1 D/DBP MCL (0.064 mg/L) b) HAA5 levels are less than 80% of the Stage 1 D/DBP MCL (0.048 mg/L) Compliance With new filter design (either dual-media or deep bed mono-media) at the LRRWTP, the City would be able to meet a fihished water turbidity of 0.3 NTU in 95% of the samples taken in a month. To meet continuous turbidity monitoring requirements, an on-line turbidity meter will be installed for each filter in the LRRWTP. Regarding the disinfection profile development, the LRRWTP likely will not be required to develop disinfection profiles since the current TTHM and HAA5 levels are below the 80% levels of their Stage 1 D/DBP MCLs. 2.3 ANTICIPATED FUTURE DRINKING WATER REGULATIONS New drinking water regulations will continue to develop as required by the 1986 and 1996 amendments to the federal Safe Drinking Water Act. The primary focus of these regulations is to reduce the levels of microbiological pathogens and disinfection by-products in water delivered to system customers. By the very nature of the regulations, water suppliers like the City of Denton using surface water sources will be required to modify, and in some cases, upgrade treatment unit processes. This section of the memorandum will present the proposed requirements of the regulations and the City of Denton's ability to comply with these proposed requirements will be discussed. Long-term (Stage 2) D/DBP Rule Stage 2 of the D/DBP role proposes to further reduce drinking water standards, or MCLs, for D/DBPs. New D/DBP standards will be proposed under Stage 2 if it is determined that treatment techniques such as enhanced coagulation/softening, alone or in combination with reduced or alternative application of disinfectants, can be implemented without increasing the risk from microbiological constituents. As noted above, information developed during the ICR will be used to develop additional requirements, if any, for the Stage 2 rule. 2-7 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review Requirements As currently proposed, the MCLs for TTHMs and THAAs would be reduced to 0.040 mg/L and 0.030 mg/L, respectively. Compliance The current annual average TTHM level for the City's distribution system is slightly above 0.05 mg/L. Therefore, the City of Denton is not likely to meet the Stage 2 D/DBP limits for TTHMs if the current disinfection strategy used in the existing plant is installed in the LRRWTP. Compliance Schedule Stage 2 of the D/DBP role is scheduled to be proposed in November 2000 for promulgation within two years. The compliance date for the City of Denton would likely be within three years after the rule promulgation, probably in the year 2004 or 2005. Long-term (Stage 1 & 2) Enhanced Surface Water Treatment Rule (LTESWTR) A long-term Enhanced Surface Water Treatment Rule (LTESWTR) is under development. Stage 1 (LT1ESWTR) is similar to the current regulation (IESWTR) and basically extends the requirements of the IESWTR to water systems serving less than 10,000 people. It is expected to be finalized by August 2000. Stage 2 (LT2ESWTR) is expected to include additional requirements such as backwash water recycling and filter-to-waste issues that would be applicable to the larger water systems, including the City of Denton. The proposed and final rules for the LT2ESWTR are expected February 2001 and May 2002, respectively. Requirements The City of Denton may be required to treat filter backwash water prior to recycling and have filter-to-waste capability. Compliance It is recommended that the City install an air scour backwash system in the LRRWTP. Air scour backwash has been demonstrated to consistently produce a cleaner and more uniformly cleaned filter media at the completion of the backwash cycle. Additionally, by adding an air 2-8 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review scour backwash system, the City will reduce backwash water volume by 20 to 30%, thus reducing the capital and operating costs for backwash water treatment (if required). The filter design will include filter-to-waste capability. Compliance Schedule If this rule is promulgated as scheduled, the City will be required to meet the requirements by November 2003. Table 2-3 summarizes the regulations that have been discussed in this chapter. The information contained in this table for the proposed regulations is current as of October 1999. Due to the preliminary nature of these rules and changing political climates in the Federal government, these rules may be significantly different when finalized. Nevertheless, the City will likely encounter increasingly complex regulatory requirements in the future relative to microbial removals and disinfection by-products. 2-9 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review Table 2-3 - Existing and Proposed Regulatory Requirements, Summary City of Denton Trihalomethanes Nov. 29, 1979 Active; Proposed D/DBP Rule Set an MCL of 0.100 mg/L for sum would revise this regulation total of four trihalomethanes. Based on an annual average of running quarterly values. SWTR June29, 1989 Active; Proposed ESWTR Required filtered water turbidities of May increase requirements for less than 0.50 NTU 95 pement of the microbial removal, time in any month. Required 3-log and 4-log removal of Giardia and viruses through treatment and disinfection. Required minimum disinfectant residual be maintained in distribution system. TCR June 29, 1989 Active Requires sampling for total coliforms in the distribution system. No more than one sample may be total coliform positive. LCR June7,1991 Active Established monitoring requirements and "action level" concentrations of 0.015 and 1.3 mg/L for lead and copper, respectively. Concentrations are measured at consumers' taps. Stage 1 D/DBP July 29, 1994 Active Increased the number of DBPs Rule regulated and set standards for maximum levels for chlorine-based disinfections in Stage 1. IESWTR July29, 1994 Active MCLG for Cryptosporidium is set at zero. New levels of inactivation for Cryptosporidium. Reduced finished water turbidity requirements to 0.3 NTU in 95% measurements per month. Continuous monitoring of filters is required. Development of disinfection by-product profiles is required. ~,~ Prop,s ~ ~ Stage 2 Proposed Rule is scheduled Will set lower MCLs for DBPs than the D/DBP Rule for November 2000. MCLs set under Stage 1 Final Rule is scheduled for May 2002. LTF-,$WTR Proposed Rule is scheduled Will set requirements for treating and for November 1999. recycling filter backwash water and Final Rule is scheduled for have provisions for filter-to-waste. November 2000. 2-10 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review 2.4 RISK MANAGEMENT PROGRAM (RMP) The Risk Management Program (RMP) was created as part of the Clean Air Act Amendments of 1996. The program focuses on preventive measures to reduce the likelihood of accidental releases of chemicals such as chlorine. Facilities with more than a threshold quantity of any specifically listed chemical are required to develop and implement a Risk Management Program. The Clean Air Act (CAA) of 1996 states that facilities have a "general duty ...to identify hazards which may result from such releases using appropriate hazard assessment techniques, to design and maintain a safe facility taking such steps as are necessary to prevent releases, and to minimize the consequences of accidental releases which do occur." [CAA{} 1129(0(I)] The RMP rules require the following actions to be undertaken: identification of management officials responsible for the implementation of the RMP (management system); an inventory of significant previous releases involving regulated chemicals (five-year accident history); an off-site consequence analysis, which estimates the potential affected area of accidental releases (worst-case scenario and alternative release scenario); development and documentation of safety systems (prevention program); development of an emergency response program; and submission of a Risk Management Plan to Environmental Protection Agency (EPA) on or before regulated chemical is first present at or above its threshold quantity. The RMP has three prevention program levels; Program 1, Program 2, and Program 3. Water Treatment plants in the State of Texas owned and operated by state or local governments, such as municipalities, are likely subject to Prevention Program 2. If worst-case release scenario shows no public receptors within impact area, plant may be subject to Prevention Program 1. Program 3 is for heavy industry and states that have adopted OSHA Process Safety Management requirements for public employers. In the state of Texas water treatment plants are not subject to prevention Program 3. 2-11 ~ MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review The Risk Management Plan (RM Plan) is a summary of the RMP, and must be submitted to EPA on electronic diskette. All elements of the RM Plan are available to the public on the Intemet, except for the off-site consequence analysis (OCA) information, which is publicly accessible in hard copy format. The Federal government is currently conducting an assessment and will issue regulations governing future public access to OCA data. Until then, the plant will likely be required to conduct a public meeting summarizing the RMP. The City of Denton Surface Water Treatment Plant provides treated water to residential, commercial and industrial sectors of th.e City. Raw water is processed and treated with chlorine and ammonia in the treatment process. It is common practice to size the chlorine bulk storage tank to equal the standard load delivered from the supplier. This is done to minimize the risk of overfilling. Therefore, the LRRWTP will maintain a maximum inventory of 25 tons of chlorine. The 25 tons is above the 2,500 pounds RMP threshold value. As a result, the LRRWTP must develop the RMP and submit a R_M Plan to the EPA before chlorine is present at the plant in quantities exceeding 2,500 pounds. Only approximately 4 tons of anhydrous ammonia will be stored at the plant. It is common for ammonia bulk tanks to be specified/constructed to match the feed requirements as opposed to sizing to match the delivery track load, as the risks for overfilling are less than for chlorine. This is below the 10,000 pounds RMP threshold for anhydrous ammonia. As a result, the LRRWTP would not have to submit a RM Plan for anhydrous ammonia. The prevention program for Program 2 contains the following elements: Process Safety Information: Compilation of all safety related information for each process involving a regulated substance. Hazard Review: Documented comprehensive review of all processes involving regulated chemicals which follow an organized checklist developed for each regulated process. The review must be updated at least once every five Years or when there is a major change in the process. Operating Procedures: Written procedures which describe what tasks an operator must perform when working on a regulated process. 2-12 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Regulatory Review Operator Training Program: Documented records which illustrate that each employee working on a regulated process has received the proper operational and safety training. Mechanical Integrity (Maintenance): Written maintenance schedules and procedures for ail regulated processes. Compliance Audits: Documentation that the prevention program has been periodically reviewed to assure accuracy and up-to-date information on all aspects of the program. A compliance audit must be performed at least every three years. Incident Investigation: Written summary of any accident involving, regulated process, including recommendation and actions to prevent future incidents. 2.5 SEPTIC SYSTEM DESIGN CRITERIA REVISION FNI contacted the Denton County Health Department (DCHD) and obtained the updated design criteria for septic system design. Most of the design criteria effective in 1991 are still valid. Additional criteria have been added in the septic tank design, which are presented in Table 2-4. The design of the existing septic system will be modified to comply with the current design criteria. The system will be designed as an evapotransporation bed system due to the likelihood that the City will recycle the groundwater collected from the plants dewatering wells. The ET beds will have a suitable liner system to prevent possible introduction of the effluent into the groundwater. For more details on this discussion refer to Technical Memorandum No.1, "Safe Drinking Water Acts Regulatory Review" in the Appendix. 1. For septic tanks, the entry point of the outlet device shall be below the liquid level of the tank at a depth between 25 to 50% of the overall liquid depth of the tank 2. For septic tank cleanout ports, the openings smallest dimension shall be not less than 12 inches 3. All precast septic tanks shall be marked with manufacturer's name, address and tank capacity. 4. Septic tanks must be installed so as to provide at least 12 inches of drop in. elevation from the bottom of the outlet pipe to the bottom of the disposal area. 5. For evapotranspirative drainfield, backfill material shall consist of soil Class II. 6. The porous media of evapotranspirative drainfield shall extend at least one foot beyond the edge of the drainline horizontally. 7. The evapotranspirative drainfield shall be divided into two or more separate units connected by flow control valves. 2-13 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) CHAPTER 3.0 ALTERNATIVE CHEMICAL TREATMENT EVALUATION (OZONE) 3.1 PURPOSE Since 1991, when the initial design of the LRRWTP was completed, there have been significant regulatory changes and changes in the design, technology and standard practice of operation of water treatment facilities. The City requested that FNI review the changes in the regulations and technology and recommend necessary design modifications. A principal area explored was the basic chemical treatment process-coagulation using ferric sulfate. Promulgated regulations would require the plant to operate in enhanced coagulation mode, increasing the cost of operation and possibly making turbidity removal more difficult. Ozonation for conditioning of water and disinfection was also identified as a candidate process to comply with the regulations. Ozonation involves a high capital cost but can offer reduction in operating costs and would produce a higher quality finished water. The purpose of this chapter is to present the results of the enhanced coagulation jar testing and develop a compliance plan with respect to the total organic carbon (TOC) removal requirements of the Stage I Disinfectants/Disinfection By-product (D/DBP) role. Also, an economic analysis of enhanced coagulation and ozonation processes is presented in this chapter. 3.2 REGULATORY REQUIREMENTS AND ALTERNATIVE EVALUATIONS Stage 1 of the D/DBP rule was promulgated on December 16, 1998 and it will be effective on January 01, 2002, prior to the projected summer 2002 start-up date for the LRRWTP. It sets the MCL's for TTHM's and HAA5 at 0.03 and 0.06 mgfl, respectively. An additional requirement of this rule is a specific TOC removal requirement by the treatment process. This TOC removal requirement is dependant on the raw water TOC and alkalinity levels. If a TOC removal limit (Step I) cannot be met, the system will be allowed to conduct bench-scale tests to determine an alternative site-specific limit (Step ID. Stage 2 of the D/DBP Rule will most likely lower the MCL's for TTHM's and HAAS to 0.04 and 0.03 mg/L, respectively. The role is reportedly to be finalized in May 2002. Historical difficulties in arriving at consensus on a rule of this magnitude and discussions with members of 3-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) the task fome working on the Rule suggests that it likely will be the year 2004/05 before the role is promulgated, and another 36 months before it is effective. Stage 1 D/DBP Compliance Historical operating data at the DWU's Lake Lewisville WTP and jar test results on Lake Ray Roberts raw water suggest that the City will be able to comply with the Stage 1 TTHM and HAA5 MCL's by following current operating practices. Compliance with the Step I and I1 TOC reduction requirements of the Stage 1 D/DBP was the more difficult to achieve parameter and was shown to be the governing parameter, requiring operation in the Enhanced Coagulation mode or some alternate form of treatment. Recent water analyses from Lake Ray Roberts show that TOC and alkalinity levels in the raw water are 4 to 8 mg/L and 60 to 120 mg/L (as CaCO3), respectively. Based on this raw water quality, Step I would require the LRRWTP to remove at least 35% TOC. Step II, if necessary, requires removal to the percentage set at the point of diminishing return (PODR). The PODR is defined as the point on the TOC versus coagulant dose plot where the slope changes from greater than 0.03 mg/L TOC/mg/L Coagulant to less than 0.03 mg/L XOC/mg/L Coagulant and remains less than 0.03. The best available technology to achieve either the Step I or Step 11 TOC removal requirements is enhanced coagulation. Enhanced coagulation is defined as the process of obtaining additional TOC removal by adding increased amounts of coagulant. Enhanced coagulation is not required for the LRRWTP if the plant can meet one of the six exception criteria discussed in Chapter 2.0. The City of Denton demonstrated through jar testing that they could meet the criteria for exception No. 6 which requires treated water specific ultraviolet light absorbance (SUVA) to be less than or equal to 2 L/mg-m. However, this test data would not be considered valid by the TNRCC since the testing was done on raw water that had been pre- oxidized with KMn04. The presence of an oxidant like KIVIn04 would cause interference in the SUVA measurement. Preliminary discussions with the TNRCC indicate that the TNRCC would require DWU to meet the Step. 11 TOC requirements instead of allowing the utility to avoid enhanced coagulation by meeting exception criteria No. 6. Therefore, Enhanced Coagulation or some other form of treatment would be required. 3-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) Enhanced Coagulation Jar Tests were conducted using raw water from Lake Ray Roberts to determine the enhanced coagulation dosage for removing at least 35% raw water TOC (Step I) and to detemdne the ferric sulfate dose to reach the PODR (Step I~. The jar testing indicated that the Lake Ray Roberts water was recalcitrant and would not be able to meet the 35% removal requirement. The Step 11 PODR-TOC removal will govern the dosage requirement for the LRRWTP. The jar testing demonstrated that the LRRWTP could meet the Stage 1 D/DBP Rule if operated in the PODR Enhanced Coagulation mode. The PODR dosage of 42 mg/1 of ferric sulfate yielded a TOC reduction of 23.9%. These would be the values assumed for Enhanced Coagulation for any treatment alternative comparisons, or for preliminary design. Stage 2 D/DBP Compliance Historical operating data at the DWU's Lake Lewisville WTP and jar test' results on Lake Ray Roberts raw water suggest that the City will not be able to comply with the Stage 2 D/DBP Rule as currently proposed. A treatment process other than enhanced coagulation will be required to meet the proposed regulations. Ozone Treatment Process An alternative to enhanced coagulation in meeting the TOC removal requirement is ozonation with biologically active filtration, also referred to as biofiltration. Ozone has been shown to break down high molecular weight TOC into smaller molecular weight TOC which can subsequently be assimilated by microorganisms attached to the filter media (biofiltration). The oxygen rich water created by the normal breakdown of ozone into molecular oxygen and the abundant supply of easily assimilated organics in the ozonated water create an ideal environment for the microorganisms. Without ozone, biofiltration would not occur in the filters. More effective biological filtration is obtained with granular activated carbon filters using (GAC) media than in filters using either sand or anthracit~ media due to the greater surface area and the adsorptive properties of GAC. However, to accomplish the required turbidity removal, a deeper bed depth of GAC media is needed than would be required with sand or anthracite mono or dual media. Ozone also serves as the primary disinfectant. This eliminates the use of free chlorine as a primary disinfectant, under normal operating conditions, to comply with the CT requirements 3-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) of the SWTR. However, the secondary disinfectant, chloramine, still would continue to be used. By eliminating free chlorine usage, the LRRWTP will increase the likelihood of complying with the Stage 2 D/DBP limits for TTHMs and HAA5 of 40 and 30 ug/L, respectively. Ozone, a powerful oxidant, is being applied more frequently as a primary disinfectant in water treatment plants in the United States. It offers an additional benefit of reducing taste and odor in the finished water. Adding ozone in raw water will eliminate potassium permanganate and/or powdered activated carbon (PAC) usage at the LRRWTP. Experience at other plants in this region suggests pre-ozonation will reduce coagulation chemical usage by 30 to 50%. Intermediate ozonation acts as a filter aid by agglomerating particles in the settled water. Overall, ozonation (pre plus intermediate ozonation) dramatically improves finished water quality as measured by TOC and turbidity removal. A disadvantage of ozone is the formation of bromate which will be regulated at 10 ~tg/L level by the Stage 1 D/DBP role. Experience with raw water quality in the North Central Texas area indicates that bromate formation in the LRRWTP is not likely to exceed the regulatory limit. However, baseline bromide data for Lake Ray Roberts will be necessary to predict the specific bromide formation. Montgomery Watson America conducted bench-scale and pilot plant studies for the Upper Trinity Regional Water District using Lake Lewisville Water, which is similar in quality to Lake Ray Roberts. The report concluded that treatment using ozone would be able to comply with the bromate MCL without pH adjustments or other bromate control techniques. The City of Dallas, Texas, Elm Fork WTP also treats Lake Lewisville water with pre- ozonation, and has not reported elevated bromate concentrations. With ozonation and deep bed filters using GAC media, the LRRWTP should meet the Stage 1 and 2 TTHM and HAAS MCL's as well as the Stage 1 D/DBP TOC removal requirement. 3.3 ECONOMIC ANALYSIS BETWEEN ENHANCED COAGULATION AND OZONE TREATMENT ALTERNATIVES. The historical operating data at the DWU Lake Lewisville WTP, jar tests performed on the Ray Roberts water by Freese and Nichols, and pilot scale treatability testing by others on similar North Central Texas raw waters suggest that the LRRWTP will be able to comply with 3-4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) the Stage 1 D/DBP Rule by operating in the PODR Enhanced Coagulation mode of operation, but will not be able to comply with the Stage 2 D/DBP Rule without going to an alternative mode of treatment, such as ozonation. The alternative treatment facilities could be constructed as part of the initial construction of the LRRWTP or delayed to coincide with the anticipated start date of the Stage 2 Rule According to best available information, the proposed Stage 2 rule will be promulgated as proposed, in the 2004-05 time frame and will become effective sometime during the years 2007- 08. Since the timeline for adoption of the Stage 2 rule occurs near the anticipated completion timeline of the initial construction of the LRRWTP (2002-03) it was appropriate to consider two scenarios for implementing the alternate treatment/disinfection economic evaluation process. The first scenario phases the construction of the ozone facilities to coincide with the Stage 1 and Stage 2 rule implementation schedule. This scenario would initially employ Enhanced Coagulation for TOC and turbidity removal and chlorination as the primary disinfectant with ozone disinfection facilities added in year 2006. The second scenario included ozone facilities as part of the initial LRRWTP construction. The capital and annual costs of both alternatives were calculated and a life cycle cost analysis was done on a 20 year and a 50 year basis. The 20 year analysis is the industry standard for projects of this type. It generates costs that are comparable to the total project cost projections made for the other components of the LRRWTP. The 50 year analysis was prepared to deter'mine the sensitivity of the analysis with respect to the assumption made on the when the Stage 2 Rule would be promulgated. The analysis indicated that constructing the ozone facilities as part of the initial construction as opposed to deferring the construction of the ozone facilities until 2006 would result in a savings of $187,000/yr for each year of the 20 year planning period. To determine how closely this result was tied to the assumed timeline of rule promulgation in 2004-05, a cost sensitivity analysis was performed to determine at what point the savings would disappear. The required timeline for promulgation of the Stage 2 rule would have to be delayed in excess of 30 years for the economics to favor deferring the construction. The detailed alternative cost analysis is included in the Appendix. 3-5 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) 3.4 RECOMMENDATION FNI recommend that the city include ozonation facilities in the initial construction of the plant. It is recommended that some specific Lake Ray Roberts pilot scale treatability tests be performed during the Spring/Summer of 2000 to establish the optimal ozone configuration (intermediate ozonation only, or pre-ozonation with intermediate ozonation) and the design parameters. Intermediate ozonation only will produce the required treatment and will involve less construction. The addition of pre-ozonation involves additional construction cost but will reduce the overall chemical requirements. Operational data at ozone plants in North Central Texas showed that ozone addition in the raw water reduced primary coagulant chemicals by 30 to 50%. Table 3.1 estimates the potential chemical savings on the LRRWTP at $285,000 over the first 20 years of operation. The ozonation facilities as proposed include preozonation contactors, intermediate ozonation contactors, a liquid oxygen storage tank, ozone generators, ozone destruct equipment, a building to house ozone generation equipment, and instrumentation and control. The intermediate ozone contactors (ozone contactors between the sedimentation basins and filters) will be used to meet primary disinfection requirements and to control taste and odor. The preozonation contactors will be used to add ozone in the raw water in achieving microflocculation benefits of ozonation. The size of a preozonation contactor is generally one half the size of an intermediate ozone contactor. The ozone dose in the preozonation contactors is low as compared to the ozone dose in the intermediate contactors. The preozonation dose is normally twenty percent (20%) of the total ozone dose (ozone demand). The proposed ozone facilities are shown in Figures 3.1, 3.2 and 3.3. For plant layout and construction budgeting purposes, we have assumed the inclusion of pre and intermediate ozone facilities. The ultimate configuration will be detemfined from both the results of the pilot testing and input during a design workshop during the design phase. 3-6 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) TABLE 3-1 Estimate of Chemical Cost Savings with Pre-Ozonation If we assume thirty percent (30%) reduction of ferric sulfate and caustic due to ozone addition for the LRRWTP, the City will save a total chemical cost of approximately $285,000 over a 20-year period. The calculations are as follows: Design average ferric sulfate dose = 12 mg/L Design average caustic dose = 4.8 mg/L Average flow = 16 MGD Ferric sulfate unit cost = $92.0/Ton Caustic unit cost = $175/Ton Total ferric sulfate usage for 20 years =12 mg/L*8.34 Ib/MG* 16 MGD*365 days/yr*20 yr/(2000 lb/Ton) = 5845 Tons Total ferric sulfate savings (30%) due to preozonation = 5845 Tons * (30/100) * $92/Ton = $162,000 Total caustic usage for 20 years = 4.8 mg/L*8.34 Ib/MG*16 MGD*365 days/yr*20 yr/(2000 lb/Ton) = 2338 Tons Total caustic savings (30%) due to preozonation -- 2338 Tons * (30/100) * $175/Ton = $123,000 Total Savings in Chemical Costs = $285,000 3-7 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Alternative Chemical Treatment Evaluation (Ozone) CHAPTER 4.0 RAW WATER SPLITTING AND CHEMICAL MIXING 4.1 PURPOSE Flow splitting was not included in the initial design since there was only one 10 MGD train to be constructed. Since the modified plant's rated capacity will be 20 MGD with two 10 MGD trains, a means of splitting flow to each treatment train would need to be constructed. The rapid mix system/chemical addition design was also reviewed. Three rapid mix/flow splitting system alternatives with the most apparent application for the LRRWTP were selected for evaluation. 4.2 RAPID MIX SYSTEM/FLOW SPLITTING OPTIONS Complete and instantaneous dispersion of chemical coagulants is required to achieve optimum coagulation and minimize chemical costs. Conventional mixing design provides for 30 to 60 seconds detention time with a velocity gradient of 500 to 1500 sec 4. More recent applications suggest near instantaneous mixing of 0.5 seconds with a velocity gradient of at least 1000 sec '~ The flow splitting alternatives need to have the flexibility to allow the flow to split into two trains during the initial construction, and up to five trains by the time it reaches the 50 MGD capacity. When using mechanical mixing, redundancy is required by the state design criteria. The analyzed alternatives were: Alternative A.- Pumped diffusion and rate-of-flow control valves. This alternative requires additional space between the chemical tank storage area and the flocculation basins to allow for adequate upstream conditions prior to the flow meters in each meter vault. This will require adjustments to the site plan, paving, and drainage. The pumped diffusion requires one 15-HP pump operated continuously. The opinion of probable construction cost for this alternative is $486,000 at 20 MGD and $838,000 at 50 MGD. 4-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Ground Water Control Alternative B.- Pumped diffusion and splitter box. For the initial 20 MGD plant design, only a portion of the structure would need to be constructed. This alternative utilizes the pumped diffusion vault for rapid mixing and chemical addition. This alternative requires continuous operation of one 15 HP pump. The opinion of probable construction cost for this alternative is $329,000 at 20 MGD and $503,000 at 50 MGD. Alternative C.- Rapid mix structure with mechanical mixing and splitter box. As discussed for Alternative B, only a portion of the splitter box would need to be constructed for the initial 20 MGD plant. This alternative requires continuous operation of one 25 HP mixer for the 20 MGD plant. When the plant is expanded, two 25 HP mixers will be operated continuously. The probable construction cost for this alternative is $368,000 at 20 MGD and $545,000 at 50 MGD. 4.3 RECOMMENDATION The pumped diffusion system, the mixing alternative considered in the original design, is the recommended chemical mixing alternative. The primary coagulant is added to the discharge side of a pump and then injected countereurrent to the raw water flow through a high velocity nozzle. This provides an intense mixing zone in which rapid dispersion of the coagulant occurs. Different treatment plants using the system were contacted to detemtine operational history of the system. Some of the advantages mentioned were cleanness, silence, chemical savings and low maintenance. The disadvantages mentioned were low flexibility, lack of experience using ferric sulfate and nozzle clogging. Therefore, spare feed taps upstream of the nozzle and provisions for removal of the nozzle without taking the raw water pipeline out of service will be provided. Because of its economic advantage, the splitter box flow splitting alternative is recommended. The structure will be designed to uniformly distribute velocity gradients across the basin. The initial construction will include the required structure for two trains. The splitter box will be expanded when more treatment trains are added in the future. The proposed splitter box is shown in Figure 4-1. For more details on this discussion refer to Technical Memorandum No.3 "Rapid Mix and Flow Slitting Evaluation" in the Appendix. 4-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Ground Water Control CHAPTER 5.0 GROUND WATER CONTROL 5.1 PURPOSE Lake Ray Roberts filled rapidly as the original plant design was being completed in 1990. This filling of the lake impacted the groundwater conditions at the LRRWTP site. The City installed piezometers in the early 90's and has been monitoring groundwater levels at the LRRWTP site. Initial piezometer readings in 1990/91 indicated groundwater levels ranging from El. +582 feet to El. +592 feet. The ground surface elevation a the site is approximately El. +598 feet. The geotechnical report prepared in 1990 to account .for higher than anticipated groundwater levels recommended using an assumed groundwater level of El. +595 feet for structural design relative to uplift pressures and lateral wall pressures. More recent (1998/99) piezometer readings indicate groundwater levels of El. +582.42 feet to El. +592.82 feet suggesting the impact of the lake on the groundwater at the plant is permanent. The original and current plant designs included foundations with depths that range from approximately 5 to 25 feet below the groundwater level, as shown previously in Figure ES-2, Modified Hydraulic Profile. This situation presented a threat to the treated water quality through infiltration of the groundwater and to the structures themselves, indicating that structural facilities to mitigate the impact of the groundwater were needed. 5.2 GROUNDWATER MITIGATION ALTERNATIVES In the current preliminary design study different alternatives were studied to mitigate the impact of high groundwater levels. These alternatives were: · Place an intermediate pump station using vertical propeller pumps between the filters and clearwell to allow the clearwell structure to be raised above the groundwater. · Place an intermediate pump station using screw pumps between the filters and the clearwell, for the same purpose. · Both previous options, placed between sedimentation basins and the filters, raising both the filters and clearwell. · Installing dewatering wells next to the impacted units. · Soil bentonite barrier installed with a slurry trench cutoff · Grout curtain installed with high pressure grout methods. · Installing a vinyl sheeting barrier · Installing a permanent dewatering interceptor trench. 5-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Ground Water Control 5.3 RECOMMENDATION The soil bentonite barrier with intermittent dewatering alternative was the lowest cost and most reliable approach to minimize the exposure of the treatment units to the groundwater, as shown in the December 15, 1999 memorandum - "Dewatering Alternatives for the Proposal Clearwell Area" included in the Appendix. A permeability of 1.0xl0-7 can be achieved with this system. The wall will be 1680 feet long, surrounding the filters, washwater reclamation basin, main drain pump station, and transfer pump station. The trench wall is shown in Figure 5.1. The trench will be deep enough to intersect the top of the weathered shale located 37 feet below ground. Dewatering wells will be placed inside the barrier walls. Initial dewatering will drop the water level down to safe levels for the construction and operation of the units. After this, only minimal, intermittent dewatering will be necessary. 5-2 (;ND. WATER · EL..+590 EXISTING SOIL APPROX. :'IN. (;RADE EL.+598 FT(+) TRANSFER PUMP I I I WEATHERED SHALE SECTION 1 "=20' FLOW METER FUT. WASHWATER RECL. FREESE o WASHWATER BASIN SLURRY TRENCH WALL MAIN DRAIN SUMP 0 50' 100' 1 "=100' F,~N aol~ I~r~9947§ CITY OF DENTON, TEXAS RLE FI0--5-- 1 .OWG D~'~ RUARY 2000 SCALE AS SHOWN SLURRY TRENCH WALL LAYOUT DRAFTED SB 200' 5-1 FIGURE MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Filter Design CHAPTER 6.0 FILTER DESIGN 6.1 PURPOSE Significant advances have occurred in filter technology since 1991. The original design is to be modified to take advantage of these advances. Also, some additional changes are needed to optimize the benefits of the added upstream ozone process and to comply with new regulations. These changes relate to the type of filter media used. Filter to waste provisions also are to be included. 6.2 ALTERNATIVE CONFIGURATIONS Three different layouts were presented together with their corresponding advantages and disadvantages. The alternative descriptions are included in the Appendix. These options included: Original Layout Cluster Arrangement Layout · Conventional Arrangement Layout The recommendation of FNI and the decision of the City was to remain with the original design. 6.3 RECOMMENDATION The recommended alternative is to maintain the basic configuration of the gravity sand filters as originally designed. These are Self Backwashing Filters with influent controlled by a downward opening weir and the effluent controlled by a Set level in the transfer pump station wetwell. The level in the wetwell will be set by plant staff and maintained by the variable speed pumps in the transfer pump station. A back-up system for controlling the set level via a motor operated weir gate will also be considered during the design phase. Minor modifications to the initial design are recommended, such as a change of the media to GAC mono-media over a 6-inch thick sand cushion to take advantage of the ozone process and to comply with future regulations. The GAC media following ozonation has a demonstrated ability for effective removal of TOC. The deep depth of the GAC and the added sand cushion will provide the required turbidity removal. The underdrain ~y~tem will have air scour backwashing capabilities for more effective cleaning of the media. The design also 6-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Filter Design includes filter to waste provisions, in-line turbidity meters and particle counters to minimize and monitor turbidity spikes in the filter effluent. There initially would be 8 filters with a total capacity of 25 MGD. Design elements are explained in Table 6-1 and shown in Figures 6-1, 6-2, and 6-3. For more details on this discussion, refer to Technical Memorandum, "Gravity Sand Filter Alternatives" in the Appendix. 6~2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Filter Design Table 6-1 Filter Design Parameters Media Backwash Parameter Mode of Operation Capacity Filter to Waste Advantages Disadvantages Design 44" GAC over 6" sand cushion 1/d~0 greater than 1250 Air over Water Backwash Programmable for Collapse Pulsing Bed Backwash 3-5 scfm/sf air blower design 15 gpm/sf water backwash design Constant Rate influent controlled Total Capacity One Filter off-line Two Filters off-line 25 MGD 21.9 MGD 18.75 MGD Individual lines off the filter effluent that will require widening access corridor Duplex submersible pump station return with routing to sedimentation basin effluent channel or downstream of pump diffusion Gravity flow to Washwater Reclamation Basin Maximizes use of original design High level of reserve capacity with filters off-line Moderate cost Minimal O&M through self backwashing feature - Separate influent and effluent pipe access areas - Deep construction - Major redesign to accommodate different mode of filter operations 6-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN High Service Pump Station and Storage CHAPTER 7.0 HIGH SERVICE PUMP STATION AND STORAGE 7.1 BACKGROUND The original concept for the development of the LRRWTP was to have most of the water storage at the Hartlee Field Road Pump Station (HFRPS). The major reason for developing this concept in 1990 was that the LRRWTP was intended as a regional water treatment plant, and that the wholesale customers would provide their own storage to meet peak demands. Now, the LRRWTP is intended to serve only the City of Denton. A study was performed by FNI comparing the costs of locating the high service pump station and storage tanks at the HFRPS and LRRWTP sites. The results of this study are found in a memo dated January 8, 2000. In this study, FNI recommended eliminating the HFRPS and locating the 60 MGD high service pump station at the LRRWTP site. The revised concept was approved by the City of Denton. 7.2 STORAGE TANKS The revised concept will have a transfer pump station after the filters that will allow clearwell storage to be above ground. One 6 MG tank will be constructed initially with room for five additional 6 MG tanks. FNI will evaluate prestressed concrete tanks and welded steel tanks, taking into account the life-cycle costs, foundation considerations, construction cost, and the experience of city personnel.' Our previous cost estimates have assumed pre-stressed concrete tanks will be used. Freese & Nichols will investigate using an aluminum dome as a roof for the storage tanks. The aluminum dome has several advantages including lower cost, higher corrosion resistance, and lower weight that will lessen the soil bearing load. We recommend the following appurtenances be installed for the new 6 MG tank: · Inlet and outlet piping and isolation valves · Overflow piping with erosion protection and air-break · Tank drain line and air break off the tank discharge · Painted exterior ladder with safety cage · Stainless steel interior ladder with safety cage · Roof ladders for access to vents and manholes · 1-30" diameter roof access manhole · 3-30" screened roof vents · 2-30" shell manholes with davits 7-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN High Service Pump Station and Storage · Lightning protection · Exterior lighting · 4-20 mA level transmitter with indicator inside the pump station · Low level and high level cut-off switches 7.3 PUMP STATION LAYOUT The pump station will be designed for an initial firm capacity of 30 MGD and a future firm capacity of 60 MGD. The pump station will be constructed with approximately six pump slots. The preliminary selection includes four pumps initially, three 14 MGD pumps and one 6 MGD pump. Two 14 MGD pumps could be installed at a later date to bring the firm capacity to 62 MGD. The number of pumps and the sizes will be re-evaluated during the final design phase. The smaller pump will have a low voltage variable frequency drive to allow for greater pumping flexibility. The type of starters will be verified after coordination with the electric utility. For the purpose of this report, we have assumed that each pump will have a soft starter to minimize electrical in-rush. FNI will evaluate canned vertical pumps and horizontal split-case pumps. Horizontal pumps not~xially provide higher efficiency and lower maintenance costs; however, vertical pumps allow a wider range of suction and discharge head conditions. The type of pumps will be selected after the head conditions are verified. Figures 7-1 and 7-2 show the preliminary layout and section for the high service pump station. The typical section illustrates that the six suction lines will diverge from the header. Gate valves will be used for isolation of the suction lines. A flexible, harnessed dresser coupling will be provided to allow for easy pump removal. A pump control valve will be used to reduce surges during pump start-up and during pump shutdown. The pump control valves will be ball valves or cone valves. The pump control valve will have a central nitrogen-charged hydraulic accumulator to close the pump control valves during an electrical power failure. Each pump will have an isolation valve°for maintenance of the pump and control valve. The discharge piping from each pump will turn down under the floor and converge into a 54" header. The high service pump station building will have a steel frame with precast concrete panels. A bridge crane will be included to aid in the installation and servicing of the pumps, motors, and valves. The building will have a truck access door for equipment removal. The building will have a small control room that will be climate controlled and house the VFD and 7-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN High Service Pump Station and Storage SCADA equipment. Toilet facilities will not be included in the building layout. The pump room will be ventilated to reduce heat build-up from the pump motors. 7.4 ELECTRICAL AND INSTRUMENTATION Preliminary studies indicate the larger pumps will be medium voltage and the smaller pumps will be low voltage. The electrical power design will be determined at a later date. Coordination with the power company will determine the type of starters required. Power factor correction capacitors will be used if required by the power company. Instrumentation will include the following: · Pump Status · Pump Control Valve Status · VFD speed and set-point · Pumping Pressure · Flow Rate · Accumulator pressure · Motor bearings and RTD temperature · Pump room and control room temperature · Tank Levels General alarm status will be provided for the following: · High / Low Tank Level · Motor protection features · Pump failure · VFD and Starter alarms · Pump Control Valve failure · Switchgear alarm · Hydraulic accumulator low and high pressure · Loss of communication · Intruder Alarm 7.5 DISCHARGE PIPELINE The City of Denton is designing the seven mile pipeline from the high service pump station to the distribution system. Although the original design of the Hartlee Field Road Pump Station included 4200 feet of discharge line, we recommend this line segment be included with the seven mile pipeline to reduce construction cost. We recommend the pipeline be 54-inch diameter to allow for acceptable head losses at the maximum pumping rate of 62 MGD. FNI will coordinate with the City of Denton to verify system head conditions. 7-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN High Service Pump Station and Storage A single flow meter and vault will be constructed on the discharge side of the pump station. However, individual flow meters on each pump will be evaluated during the final design. FNI recommends ultrasonic flow meter(s) be used because of low cost and the wide operating range. A future pig launching station on the discharge pipeline will be provided for in the design layout. Figure 7.3 shows the proposed layout of the treatment plant, tank field, and pump station. For further detail in this discussion, refer to Memorandum, "Cost Comparison of Hartlee Field Road vs. Lake Ray Roberts Water Treatment Plant." 7-4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Sludge Management CHAPTER 8.0 SLUDGE MANAGEMENT 8.1 PURPOSE There are two primary sludge generation soumes at the LRRWTP: 1) sludge from the sedimentation basins, and 2) backwash waste sludge from the washwater recovery basin. The backwash waste sludge volume from the washwater recovery basin is small compared to the sludge from the sedimentation basins. Therefore, this section primarily focuses on sludge from the sedimentation basins. As initially designed, the LRRWTP would draw sludge from the sedimentation basins and discharge it to four sludge lagoons. Also, the sludge that accumulated in the washwater recovery basin periodically would be routed to the lagoons, via the basin drain system and pumps. Sludge production calculations for the base case Conventional Coagulation, using an empirical equation published by the AWWA Research Foundation suggest that the average sludge production would be 3028 pounds per day. The proposed regulations Stage 1 D/DBP on removal of the organic precursors contributing to chlorine disinfection by-products would require DWU to change to an alternative chemical treatment system (Ozonation) or dose the coagulant at a rate to achieve Enhanced Coagulation. Under the first scenario (ozonation) the sludge production would be 2,788 pounds per day, less than the conventional coagulation average production rate, due to the lower chemical dosage. Under the second scenario (Enhanced Coagulation), the sludge production would be 4,275 pounds per day, more than the conventional coagulation average production rate, due to the greater chemical dosage. If the second scenario with the higher rate of sludge production is selected, a re-evaluation of alternatives sludge disposal methods would be needed. 8.2 ALTERNATIVE EVALUATION The daily sludge production data is necessary to evaluate the different sludge disposal alternatives. Since the LRRWTP is a new plant and no sludge production data is available, the daily sludge production rate was estimated based on the anticipated average chemical usage and turbidity data. The average sludge production assuming Conventional Coagulation at a design flow of 20 MGD is approximately 3,028 pounds per day on a dry weight basis. The volume of 8-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Sludge Management wet sludge is calculated to be approximately 9,076 gallons per day by assuming 4.0 % solids in the wet sludge. At a design flow of 50 MGD, the average sludge production is approximately 7,570 pounds per day on a dry weight basis and 22,690 gal/day assuming 4.0% solids in the wet sludge. The following sludge disposal alternatives, including the currently designed lagoon system were considered: Alternative No. 1: Construction of Lagoons: Under this alternative, the City would remain with the initial design, and construct a four-compartment lagoon as designed. Alternative No. 2: Installation of Sewer Line: This alternative would require construction of a sewer line from the LRRWTP to the nearest sewer interceptor from the plant site. The sewer line has to be designed to meet the plant's ultimate capacity of 100 MGD. Alternative No. 3: Installation of a Belt Filter Press Facility: In this altemative, the City would install a 1-meter belt filter press to mechanically dewater the sludge. One cell of the existing lagoon would be used to store the sludge before the sludge is pumped to the belt press. Alternative No. 4: Installation of Centrifuge Facility: In this alternative, the City would install a centrifuge to mechanically dewater the sludge. One cell of the existing lagoon would be used to store the sludge before the sludge is pumped to the centrifuge. To evaluate and compare the various sludge disposal alternatives, the capital and operating costs associated with each alternative were estimated. The capital cost was amortized over 20 years at an interest rate of 7%. Both chemical (polymer) and power costs were assumed to be constant over the next 20 years. The polymer usage data for the belt press facility was obtained from the sludge settleability tests conducted by vendors on sludge collected from the Lake Lewisville plant. The polymer usage data for the centrifuge option was provided by the vendors. The sludge production was estimated to increase linearly, starting with the volumes produced at 20 MGD and ending up at year 20 with the sludge production corresponding to the 50 MGD plant. 8.3 RECOMMENDATION The evaluation was done assuming a base case sludge production scenario. Since ozonation facilities are to be constructed at the facility, the sludge volumes are expected to decrease significantly. This does not lower the construction cost of the lagoons since they are 8-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Sludge Management designed for a 50 mgd capacity plant. However, it does lower the frequency of maintenance and the surface loading on the lagoons, increasing their efficiency and economy. Sludge lagoons have the advantage of requiring very little operation and maintenance. The absence of sophisticated technologies makes it easier to operate, especially when compared with the mechanical options. The recommendation is to remain with the initial design. Under this alternative, a four- compartment lagoon will be constructed. The lagoons will receive sludge discharged from the sedimentation and washwater reclamation basins. After a lagoon compartment is filled with sludge, it will be taken out of service. Water in the sludge will evaporate and solids will slowly settle. Periodically, the water level will be lowered in the lagoon by removing stop logs or opening shear gates. The decant water will drain by gravity to the washwater reclamation basin, from where it will be returned to the head of the plant. Over time the sludge will dry and become more concentrated. Upon reaching a solids concentration of approximately 30%, the lagoon will be cleaned out with skip loaders. The solids would then be disposed of at the City's landfill or land applied if a site becomes available. For more details on this discussion, refer to Technical Memorandum No. 5, "Sludge Dewatering Alternative Evaluation" in the Appendix. 8-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building CHAPTER 9.0 ADMINISTRATION BUILDING 9.1 PURPOSE Project Background The original architectural design and related construction documents for the administration building for the LRRWTP was prepared by Gary Juren in 1991; however, the water treatment plant was not constructed at that time. Since 1991, several editions of the Uniform Building Code (UFC) have been issued, some of which have changed life safety issues used in the design of this building. There have also been significant changes in ADA requirements over that same period. In addition, there are areas where the owner's criteria used to plan the buildings has changed. The existing drawings have been evaluated by Freese and Nichols with regard to these changed conditions and the original design has been modified to reflect the revisions necessary to comply with the latest requirements. Original Building Description The original design consists of a linear floor plan having an administration area, a maintenance shop along with associated parts storage and ancillary spaces, a chemical process space, and an ammonia/chlorine storage and processing area, ail enclosed within a single building shell. The administration area was designed as a two-story building, while the remainder of the building is a one-story structure. The first floor consisted of an entrance lobby, an office, conference room, a break room and restrooms, while the second floor had a control reom, a laboratory and additional restrooms. A hydraulic elevator connected the two-story portion of the building. The design included one interior staircase and a second set of stairs at an exterior balcony which runs the length of the administrative area along the rear of the building. The basic construction is a structural steel frame with steel joist and a metai deck, covered by an insulation board and a metal standing seam roof system. The wall construction consisted of face brick veneer. The original mechanical system consisted of multiple small fan coil units and remote condensing units located outside the building. This resulted in numerous small air conditioning units rather than one central air handling unit. 9-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building Advantages of this system include: · Systems can easily be maintained by local mechanics. (These units are very similar to residential units and can be serviced by any number of local companies.) · Loss of one unit does not affect the air conditioning for the remainder of the building. · Multiple units provide more individual control of room temperature. Disadvantages of the original mechanical system include: As each of the smaller units are designed slightly over the required loading conditions, the more smaller units used, the greater the over-design of capacity provided. The units are not as efficient as the larger systems, resulting in greater energy cost and higher energy consumption. 9.2 BUILDING REVISIONS Revised Design Criteria Since the time the original building was planned and construction documents completed, the building criteria have been re-evaluated by the owner. These modifications to the design criteria required a re-evaluation of the entire program and modifications to the existing plans. Basic considerations used in re-evaluating the floor plan are as follows: Maintain the exterior profile of the building, along with maintaining the exterior appearance as close to the original as possible. Remove the hazardous materials (Ammonia and Chlorine) from the building and construct a separate building dedicated exclusively for this purpose at a remote location. · Use the additional space gained by removing the ammonia/chlorine functions to expand the various areas. This provides more flexibility and allows for future growth. Provide additional offices within the administration area. Expand the break room and laboratory to allow for future growth. · Re-design the spaces to avoid having a "wet" area above the electrical room. · Utilize some of the lobby area for more functional usage. Design Concepts A particular concern was the location of hazardous materials within the same building occupied by employees, as covered by the Uniform Fire Code (UFC). Regulations concerning buildings housing hazardous materials have become more stringent in the last several years, particularly in regard to toxic and highly toxic products, such as ammonia and chlorine. Buildings housing ammonia and chlorine are considered as "hazardous occupancies", which 9-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building requires that the design of these spaces comply with more stringent regulations than are required for other type of occupancies. Removing these toxic producing gases from the building simplifies the building design, including types of separation and fire protection standards that would otherwise be required. In addition to revisions in fire safety and building codes, there have been changes in ADA requirements for buildings since this building was designed, which required re-evaluation of the building in general, and restrooms in particular. The re-design of the building has taken into consideration the newer ADA requirements. At the same time, the restrooms locations were studied, and after careful consideration those restrooms located on the first floor were re- positioned to be between the administrative functions and the shop area, so as to be available to both. A hallway was added to connect both areas to the restrooms and break area, and which provided an opportunity to install doors as sound barriers between these functions. Planning Procedures The FNI architectural team met with the owner's representatives in a series of workshops to review the original building plans and discuss new design criteria. From these meetings, a series of preliminary floor plans were prepared and discussed with the owner's representatives. After several preliminary designs were prepared and discussed, a final scheme was prepared, which is included as Figure 9-1. This schematic floor plan will be used to prepare the construction documents for bidding and construction purposes. Additional meetings with the owner's representatives during the final design phase will determine finishes and details nec¢"~ary to complete the design. Cost Differences Construction costs have increased in the past ten years and these increased costs are reflected in the latest estimate of probable construction cost. Addition of a new Ammonia/Chlorine Building will also result in additional cost. Otherwise, relative costs for internal changes in the d.esign should be approximately the same for the anticipated modifications within the perimeter wall lines, except that where additional area has been added, there will be a corresponding increase in cost. Additional cost will be also be incurred where the 9-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building existing floor plan has been modified to re-claim some of the un-used, open lobby area at both floors. These costs are indicated in the latest estimate of construction cost. 9.3 RECOMMENDATION As stated above, the final preliminary floor plan was developed as a result of reviewing a number of schemes with the owner, until a consensus was achieved. The final preliminary floor plan is based on the design concepts listed above. Principally, the major considerations are the removal of the ammonia/chlorine functions from this building and constructing a separate hazardous materials building at a remote location, and re-using the existing design as nearly as possible. The floor space originally used for ammonia and chlorine has been re-distributed between the remaining functions, permitting expansion of each of these areas to fit the confines of the perimeter shell. This provides for additional room for expansion as the plant operations grow. Since the total building area is essentially the same as the original plant design, the cost differences have been determined by: · Adjusting the overall construction cost to account for inflation · Increasing the cost as necessary to expand the building area · Adjusting the cost to account for the re-distribution of spaces within the building footprint. · Adjusting the cost to create more functional spaces within the building footprint. · Increasing the cost associated with the new detached hazardous material building (Chlorine and Ammonia) The schematic floor plan represented in Figure 9-1 indicates a slightly larger chemical area, providing additional space for future expansion, while providing adequate space for the immediate usage. An overhead service door has been added in the end on the structure, permitting an easy method for serving the chemical spaces. The shop area has been expanded to provide additional space for the future. A second overhead service door has been added for the same reason. Since the shop area is located between other spaces, thereby restricting future expansion, it is essential that adequate space be provided to allow for growth, rather than finding that the service function has outgrown the available area in the future. The electrical switchgear room has been re-located to the shop area, solving the criteria to not have this area located under a wet area. 9-4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building The administrative area has been expanded into the shop area by approximately 512 sq fi. As finish-out costs for this type of space is more expensive than that required for shop areas, it is reasonable to assume that the expansion of the administrative areas will result in an increase of approximately $22,500. In addition, open space in the lobby has been modified to make it more usable by converting some of the area into offices and workrooms. The additional enclosed gpace amounts to approximately 235 sq fi that was originally open lobby space. Using this space requires additional floor framing, construction of partitions, and additional finishes. This could result in additional costs in the $20,000 range. The administrative space has been increased by closing in a comer that originally was under roof cover, but not enclosed by walls. In the final design this space has been enclosed and will be finished as additional office space, with approximately 1000 sq fi of additional structure. This will add approximately $100,000.00 to the building cost. Features of the final floor plan are as follows: A. Four offices instead of the single office at the first floor. Two additional office spaces are available at the second floor, which can be used for storage and later converted into offices, as the need arises. B. A larger break room with an expanded kitchen area. This provides additional space for future increase in the number of employees. C. A larger conference room with a storage room for tables and chairs when not in use. D. A plan room for storage of catalogs, records and plans plus a space for drafting tables for spreading out the plans for examination. E. A telecommunications closet for data terminals and telephone terminal cabinets. F. A receptionist counter and workroom with space for a copier, fax, etc. G. A separate file room for records. H. A larger laboratory with two separate areas for different types of procedures. I. A small office for the laboratory technician (records).. J. A separate space off the operator's area for testing of water quality samples. K. Additional storage space. L. A room connected to the outside to serve as a "mud" room and storage of rain gear. M. A larger shop area with two service doors and additional space for future growth. N. A large chemical processing area to provide for future growth. O. An overhead service door located at the end wall of the chemical area to provide an easy method for providing chemicals. P. Installation of two polymer tanks within the building with feed slurry piping from exterior source for service. 9-5 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Administration Building Qo The lobby area has been reduced in size by using part of this space for a receptionist, workroom and files as noted above. The "open" space to the second floor has been maintained to preserve open concept, only reduced in scale. The final floor plans will be developed in compliance with the 1997 edition of the Uniform Building Code, adopted by the City of Denton, the requirements of the Americans with Disabilities Act of 1991, the Texas Accessibility Standards, and the appropriate chapters of the Uniform Fire Code. In addition the ammonia/chlorine building will take into consideration the additional provisions of the National Fire Protection HAZARDOUS MATERIALS. For more details on this discussion, refer Administration (NFPA) Article 80, to Technical Memorandum #6, "Administration/Operations Building Floor Plan and Code Revisions"...in the Appendix. 9-6 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Hydraulic Analysis CHAPTER 10.0 HYDRAULIC ANALYSIS 10.1 PURPOSE Hydraulics is one of the primary considerations connecting the process design and the physical topography of the site because the gradeline through the plant sets the elevation of the processes. These elevations then are evaluated in relation to ground and water elevations at the site to achieve an optimum design. At the same time, the lake elevations have to be considered ~ince gravity flow into the plant is desired. During the original and current design, the primary hydraulic constraint on the project involved the expected lake elevations and the conditions at the site for gravity flow through the plant. A raw water pump station was required to allow gravity flow through the plant during low lake levels. The introduction of the ozone contactors and the ground storage tank changed the conditions at the site requiring a revised hydraulic analysis. 10.2 HYDRAULIC PROFILE The revised preliminary hydraulic gradeline, which takes into account the ozone facility and ground storage tank is presented in Figure 10.1. It shows a head loss of 22.7 feet. This is 2.7 feet more than the initial design. The proposed hydraulic gradeline has a plant influent elevation of 612.7 feet and ends at an elevation of 590.0 feet at the transfer pump station. The calculated gradeline provides for a reasonable elevation of the unit processes and the operation building. It was a major concern in the initial design to assure that all units were placed above high groundwater levels. The addition of the slurry trench wall allows the filters, transfer pump station and washwater reclamation basins to be physically located below the water line. A more detailed hydraulic profile will be developed during the final design. 10-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Backup Power Supply Evaluation CHAPTER 11.0 BACKUP POWER SUPPLY EVALUATION 11.1 PURPOSE From the TNRCC Chapter 290, Subchapter D Rules and Regulations for Public Water Systems, Paragraph 290.45(b) "all surface water supplies must provide .... an elevated storage capacity of 100 gallons per connection," or "sufficient emergency power must be provided to deliver a minimum of 0.35 gallons per minute per connection in the event of the loss of normal power." With the increase in flow capacity from the initial LRRWTP design, the proposed expansion capabilities and the relocation of the HSPS to this site, the treatment plant will become a significant source of treated water for the DWU. Due to this increase in significance, alternatives for a secure power source were examined to maintain uninterrupted operation. 11.2 EVALUATION ANALYSIS Load Evaluation Electrical loads derived for peak usage of equipment represent a statistical possibility by assuming all ancillary operations are occurring at the same time, i.e.; raw water pumps, air scouring, etc. while the heater system is at full force. The transfer pumps and raw water pumps were calculated at the plant capacities of 20 MGD and 50 MGD. The high service pumps could pump more than plant capacity because of peak requirements and the availability of ground storage. The high service pumps rates of 24 MGD for the 20 MGD plant and 62.5 MGD for the 50 MGD plant were used for generator sizing. Cost Comparisons An alternative considering a power company second feed was determined to not be feasible. This comparison was only between using a diesel engine or a natural gas generator as backup power. The diesel fuel consumption rate is approximately 78 gallons per megawatt hour or 7.8C/kWh at a cost of $1.00 per gallon. The gas consumption rate is approximately 9.8 MMBTU I1-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Backup Power Supply Evaluation per megawatt hour. For natural gas this is 2.8C/kWh at a cost of $3.0 per MMBTU. For propane this is 4.6C/kWh at a cost of $4.40 per MMBTU. With these fuel cost, and with a full load of 3 megawatts the generators would have to be used for over 6,000 hour before the diesel system would become more costly than natural gas: Difference in Capital cost: $920,000 = $1,810,000 - $890,000 Difference infuelcost: $900,000 = 6000 hrs x (2.8¢-7.8¢)/kWh x 3 megawatts 11.3 RECOMMENDATION The relocation of the HSPS from the Hartlee Field Road site to the LRRWTP site requires a high level of reliability of power supply to the site. The distance from the nearest independent electric power substation (City of Denton, or other electric power supplier) to the site makes back-up power via dual feed economically unattractive. Additionally, the control of reliability of electric power to the site would diminish if the City of Denton Electric Utility were to be sold as a result of the imminent electric power industry deregulation. Accordingly, back up power in the form of diesel powered generators has been added to the LRRWTP. A single utility company service at the LRRWTP with a diesel power generator system located at the LRRWTP is recommended to provide normal and backup power at both the WTP and the Raw Water Pump Station. Diesel is recommended over natural gas because of the initial capital cost and annual maintenance cost. Natural gas fuel cost saving will never be realized with. the generators used as backup power only. The actual runtime for the generator in a backup mode would average less than 100 hours per year; i.e. $7,800 for diesel fuel. Natural gas does burn cleaner than diesel by producing less than one third the ozone emissions. However, there is no financial incentive for using natural gas over diesel at this time because generators used for backup power are not regulated for emissions. The proposed emissions controls for diesel engines (TNRCC, Chapter 14 - Control of Air Pollution from Motor Vehicles, Rule Log Number 99055A- 114-AI & Rule Log Number 99-055-SIP-AD in the four county DFW nonattainment area address two rules changes; fuel and flue-gas cleanup. The proposed rule change for fuel is interpreted currently as applying to only motor vehicles. However, it will likely become a standard applying to all low 11-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Backup Power Supply Evaluation volume users such as emergency diesel generators. The LED (Low Emission Diesel) fuel will likely cost only 4¢ per gallon more, an increase of $312.00 per year for 100 hours of operation. A proposed emissions control on non-road diesel engines for the flue-gas cleanup is likely to be implemented before 2007. Though backup generators may be exempt from this regulation, an EPA study on stationary engines has shown that retrofit SCR technologies can meet their emission standards levels. Manufacturers have yet to establish costs for this retrofit equipment. A single 3 phase overhead high voltage line between the facilities is recommended to provide both utility and backup generator power. A single generator system reduces maintenance and allows generator power not needed for raw water pumping to be used at the LRRWTP. With this design a single service from the utility company would also provide the best overall electric rate for power. With the high service pumping located at the LRRWTP the initial system should be 3.0MW comprised of two 1.5MW generators. If a single generator failure occurs the TNRCC requirements for the minimum distribution delivery could still be met with only one generator. The generator system could be expanded with the same size generators with the WTP expansions, adding the generator cost as needed. Using the same size generators, the maintenance costs will be minimized. Though not within the scope of this backup power system study, it is recommended that transformer redundancy be considered for the WTP and the raw water pumping station design. Transformer redundancy will minimize the possibility of a single point of failure at a minimal cost. A site layout of the back-up power supply generator building can be found in Figure 11.1 For more details on this discussion refer to Technical Memorandum No. 7, "Back-up Power Requirements" in the Appendix. 11-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Electrical/Instrumentation and Control CHAPTER 12.0 ELECTRICAL/INSTRUMENTATION AND CONTROL 12.1 PURPOSE The original design for the LRRWTP was completed in 1991, but the plant was not constructed. The original design utilized a Distributed Control System (DCS) for plant automatic control and monitoring. Since 1991 there have been significant changes in control system technology and instrumentation systems that can be applied to the control and monitoring of water treatment plants. To be more cost effective, the City of Denton desires to automate the LRRWTP to mazimize the productivity of staff time. This requires that the control system be capable of operating the plant in a full automatic mode. Additionally, the control system must be capable of alerting operating personnel of alarm conditions (off-site and/or away from the control room) as well as performing a plant shutdown in abnormal conditions. 12.2 ALTERNATIVE EVALUATION Two alternative control system design approaches were evaluated. The first approach is similar to the original DCS design except Programmable Logic Controllers (PLC) are utilized in place of the DCS control units, and a commercial software package (i.e., Intellution, Wonderware) is utilized for operator interface. The second approach eliminates most of the PLCs and provides a direct communication link between the operator interface software and the field instrumentation, valve actuators, and motor control devices. In this design approach, the operator interface software would perform the control and logic functions. These two alternatives were evaluated based on the following criteria: · Functional performance · Reliability · Maintainability · Cost Functional performance is defined as the ability to perform the required process control, process monitoring, and equipment monitoring functions that will be required at the LRRWTP. In terms of process control and process monitoring, each alternative is considered equal. Both alternatives are well able to perform the required process control, interlock and sequencing 12-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Electrical/Instrumentation and Control functions. For equipment monitoring, the second approach that communicates directly to instruments, valve actuators, and motor control devices provides better equipment monitoring capabilities. This is because additional data is gathered from the control devices such as motor current, torque, etc. By trending this data over time the equipment performance can be closely monitored and predictive maintenance can be implemented. Although both alternatives were considered highly reliable, overall, the second alternative (direct communication link) is slightly, more reliable. Both alternatives require the primary instruments and final control elements to be fully functional for the system to be fully operational. Also, both alternatives require the operator interface software to provide all aspects of the control and monitoring system. Because the first alternative has an additional PLC cOntrol layer there is an increase in the probability of failure. Another aspect of failure is how the process responds to a failure of the primary control unit. In the second alternative, the individual final control elements operate autonomously and therefore they would remain at their last position, speed, etc. in the event of a failure of the control computer or communications link. Between the two alternative systems, the second alternative is easier to maintain. This is primarily due to the fact that there are fewer components and wiring as the PLC and manual backup panels (including associated wiring) are eliminated. Smart instruments that are connected through a digital communications cable can be calibrated on-line. Items such as valve actuators that communicate directly are easier to maintain as high maintenance items like limit switches and feedback potentiometers are eliminated. Further, the use of smart instruments and control elements can often provide helpful trouble shooting information in the case of a failure. As the smart instrument concepts continue to mature, a conversion of communication systems develops making replaceable devices more homogenous. This increases options for future replacement devices. In comparing the cost of these two control system design alternatives several aspects were investigated. There are significant savings with the second alternative. There are savings associated with the deletion of the PLCs and manual back-up panels, and those associated with simpler check out and start-up requirements. The estimated total saving from the elimination of PLCs and panels is approximately $190,000. 12-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Electrical/Instrumentation and Control 12.3 RECOMMENDATION Based on the above evaluations, the recommended design approach provides a direct communication link between the operator interface software and the field instrumentation, valve actuators, and motor control devices, and the operator interface software performs the control and logic functions. At several locations, a small PLC may be needed to provide a cost-effective interface to some instrumentation. Also, at the raw water pump station a small PLC will be provided due to the distance of the communications link. A separate PLC is also recommended at the ozone generation building. The direct communication link approach is an emerging trend in control system applications and has been successfully employed by Montgomery Watson on several projects for the City of Houston. The recommended manufacturers from the original design specifications were contacted to ensure that this technology was available from the City of Denton's preferred vendors. It was found that direct digital communication links were available from listed manufacturers of motor controllers, variable speed drives, valve actuators, chlorinators, ammoniators, and most instruments and analyzers, thereby ensuring a competitive and viable bidding situation. Description of Recommended Control System A brief description of the recommended control system design is presented below. At the raw water pump station a small PLC will be provided for raw water flow and pump control. The PLC will communicate digitally to the raw water pump variable frequency drives (VFD) and raw water control valve actuators. The raw water pressure, flow, turbidity, pH, and temperature transmitters will be wired to PLC analog input cards. Spread spectrum radio is recommended for communications between the raw water PLC and the central control computer. For the chemical feed systems, rapid mixers, flocculation drives, sludge collection drives, and telescoping valves a single twisted pair cable will be wired to each chlorinator, ammoniator, chemical feed pump VFD, rapid mix pump starter, flocculator VFD, sludge collector motor starter, and telescoping valve actuator and wired back to the operator interface. Interlocks such as chlorine high/low vacuum switches would be wired directly to the individual microprocessor controlled chlorinators. 12-3 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Electrical/Instrumentation and Control For the filter control system, a single twisted pair cable will be wired to each filter control valve actuator (influent, effluent, air wash, wash water drain and filter to waste valves). A second twisted pair may be used to communicate to the filter effluent turbidity meters as the protocol used by Hach (Lon Works) is probably different than that utilized by the valve actuators and not ail software packages can communicate multiple protocols through the same port. Filter level monitoring would be through a multi-sensor ultrasonic level system. For the high service pumps, waste water pumps, supplemental backwash pump, and air blowers, a single twisted pair cable will be wired to each motor starter or VFD. The central computer system will be a redundant PC configuration connected through a TCP/IP Ethernet LAN. Report and alarm printer would be shared through the network. Communications to the raw water pump station and the possible off-site high service pump station would be over spread spectrum radio. The system can also be expanded to include a remote site SCADA system and bridged to a computer control system at the existing Lake Lewisville water plant. The control software will be Fix DMACS by Intellution or a similar commercially available product. Final software selection will be made at a later date. The software will be configured to provide complete plant graphic displays including: · A plant overview display · Unit process displays for each unit process · Detailed displays for each unit within a unit process · Control pop-up windows for each valve, drive and control loop · Trend displays for all critical variables As part of the alarming system, the software will be able to page or dial out alarm conditions during unmanned operations. Offsite personnel will be able to dial-in to the system using a laptop computer running the operator interface software. With appropriate security codes, the operator will be able to perform all control and monitoring functions through the laptop computer. The system will also be programmed to perform an orderly plant shutdown when the plant is unmanned and conditions warrant. The software will be configured to automatically produce the necessary plant operations, maintenance and regulatory reports. This will include the required TNRCC reports, production reports, and chemical and electrical usage (production cost) reports. 12-4 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Electrical/Instrumentation and Control For more detail on this discussion, refer to Technical Memorandum No. 8, "Control System Design Alternative Evaluation" in the Appendix. 12-5 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations CHAPTER 13.0 RECOMMENDATIONS 13.1 RECOMMENDATIONS The LRRWTP for the City of Denton was originally designed to have a 10 MGD capacity, but was not constructed due to the City's re-evaluation of water demand projections. The growth in Denton County over the last ten years and the associated increase in water demand requires that the City constmct'a treatment plant with a capacity of 20 MGD by the year 2002. The capacity increase of the plant, technological advances and regulatory modifications led to a review of the units to be included at the plant. The following recommendations are based on the original design, and include the modifications discussed in this report. The units to be used are shown in Figure 13-1 and summarized in Table 13-1. The following are the recommended processes: · Raw Water Pumping Station. Remained in accordance with the original design. · Influent Flow meter. Also included in the original design, but re-sized to account for a larger range of flow. · A Pm-ozone Contactor. Added to the initial design. The flow would flow through the contactor, at a maximum applied ozone dose of 1 mg/L, to enhance microflocculation and improve turbidity removal. · Pumped Diffusion Mixing. In accordance with the original design. · Splitter box. This unit needed to be added, since the original design only consisted of one train. This unit uses a hydraulic split to divide the 20 MGD capacity into two 10 MGD capacity treatment trains. · Flocculation Basins. The design configuration remains the same. Another basin is added to account for the flow increase. · Sedimentation Basins. The design remains the same. Another basin is added to account for the flow increase. · Intermediate Ozone Contactor. Added to the initial design. The intermediate ozone contactor serves as a primary disinfectant unit at a maximum applied dose of 3.5 mg/L. · Filters. Although the basic layout, remains the same, several significant changes are made to the original design. GAC is to be used as media, and air scour is used instead of surface wash during the backwash. Filter to waste provisions are added. · Waste Washwater Reclamation. The design remains in accordance with the original design, although the waste production is expected to decrease due to the use of ozone. · Sludge Drying Lagoons. The design remains identical to the initial layout, although the sludge production is expected to decrease due to the use of ozone. · Transfer Pump Station. Added to the original design. A pump station will lift the flow to the ground storage tank. · Clearwell. The design changed from an underground 1 million-gallon concrete tank, to a ground level 6 million gallon pre-stressed concrete or steel tank. 13-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations · High Service Pump Station. The HSPS was located, in the initial design, at the Hartlee Field Road site, but has been relocated the LRRWTP site. The conceptual design remains the same, but the capacity and discharge head have increased to reflect the changed site conditions. · Slurry Trench Wall. Added to the original design. A trench wall surrounding the filters, the washwater reclamation basin and the main drain pump station, among other units, keeps the groundwater away from these units. · Administration/Operations Building. The overall footprint of the building remains the same, but the internal space is modified to be more functional. · Back-up Power Supply. Added to the original design. The location of the HSPS to the LRRWTP site requires the reliability of power provided by back-up diesel powered generators at the site. · Bulk Chlorine/Ammonia Storage and Feed. Added to the original design. A separate building for the storage and feeding of chlorine and ammonia has been added to improve site safety with respect to hazardous materials. 13.2 BULK CHLORINE/AMMONIA STORAGE AND FEED An uncovered, pad mounted bulk ammonia storage tank was designed in the original LRRWTP design. Due to new UFC and RMP requirements, we recommend that the ammonia tank be constructed in an enclosed building. We also recommend that an ammonia scrubber be designed to scrub the enclosed space containing the storage tank. The original LRRWTP design utilized ton containers to store and feed chlorine. These cylinders were set in a semi-enclosed area. This storage system design needs to be revised to meet the requirements of the UFC and RMP. We recommend that bulk storage tanks be used to store chlorine at the LRRWTP in an enclosed building. For the 20 MGD plant, a 25-ton bulk storage tank is recommended. A chlorine scrubber will also be designed to treat any potential leaks in the bulk chlorine storage room. The bulk storage of chlorine will provide the following additional advantages over the ton cylinders. · Chlorine unit cost for bulk delivery is 15 to 20% less than the chlorine unit cost for ton cylinders · Bulk storage system is safer because of less frequent handling Of cylinders. · The proposed bulk storage design will meet the requirements of the UFC and RMP. · The bulk ammonia tank concept has similar advantages to the chlorine bulk tank. 13-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations The proposed layout of the chlorine and ammonia storage and feeding facilities is shown in Figure 13-2. The layout and design elements will be finalized in a workshop during final design. 13-3 TABLE 13.1 PRELIMINARY DESIGN CRITERIA LAKE RAY ROBERTS WATER TREATMENT PLANT Item Plant Capacity Raw Water Pumping Station Number of Pumps Capacity (each) Influent Flow Meter Type Number Size Capacity Ozone Generators Number Capacity (each Total Capacity Lox Storage Tank Capacity Pre-Ozone Contact Basins Type Number Length (each) Width (each) Water Depth Volume (each) Volume (total) Design flow per contactor Detention time at design flow Units Initial Interim Ultimate mgd 20 50 100 no. 2 3 5 mgd 20 25 25 Universal Venturi Tube no. 1 1 2 in 30 42 42 mgd 8-50 15-70 30-140 no. 2 2/1 2/2 lb/day 1,000 1,000/2,000 1,000/2,000 lb/day 2,000 3,000 6,000 gallons 15,000 15,000 30,000 Under/Over Baffle 2 5 10 R. 39 39 39 R. I0 10 .10 R. 22 22 22 gal 64,200 64,200 64,200 gal 128,400 321,000 642,000 MGD 10 10 10 (min) 8 8 8 Comments The interim capacity is based on the dependable yield of 19.76 mgd available to the City of Denton from Lake Kay Koberts multiplied by 2.22 which is the maximum day drought demand factor. Ultimate capacity is for a regional plant Minimum number with at least one standby pump at each capacity. Initial pumps are to be modified to 25 mgd capacity for Interim. A backup ozone generator is supplied for reliability 13-4 TABLE 13.1 PRELIMINARY DESIGN CRITERIA LAKE RAY ROBERTS WATER TREATMENT PLANT I[em Flash Mix Type Number G~value Mixing time Pump Capacity Motor Horsepower Splitter box Type Capacity Flocculation Basins Type Number of Basins Size (each basin) Water Depth Stages Volume (each basin) Volume (total) Detention Time Flocculators: Type Number (each basin) Number (total) Mixing Energy (G, sec 1 st Stage 2"a Stage 3ra Stage Sedimentation basins Type Number Size (each basin) Water Depth Volume (each basin) Volume (total) Detention Time Units Initial Interim Ultimate Pumped Diffusion no. 1 1 2 sec'~ 750 750 750 sec 1.25 0.5 0.5 gpm 400 400 400 hp 5 5 5 Hydraulic Split mgd 20 50 100 no. 2 5 10 ftxft 37x64 37x64 37x64 ft. 12 12 12 no. 4 4 4 ft3 27,650 27,650 27,650 ft3 55,300 138,250 276,500 min 30 30 30 no. 6 6 6 no. 24 60 120 see't 60 to 20 60 to 20 60 to 20 sec'~ 60 to 20 60 to 20 60 to 20 ' see'~ 40 to 5 40 to 5 40 to 5 Rectangular, plug flow No. 2 5 10 ftxff 44x285 44x285 44x285 ff 13.5 13.5 13.5 ff~ 169,290 169,290 169,290 338,580 846,450 1,692,900 Min 180 180 180 Comments Horizontal flow, baffled and compartmentalized for plug flow characteristics Stages separated by diffuser walls Vertical shaft (variable speed in all stages) Two in each stage 13- 5 TABLE 13.1 PRELIMINARY DESIGN CRITERIA LAKE RAY ROBERTS WATER TREATMENT PLANT Item Surface Loading Rate Weir Overflow Rate: End Weir (Length) Overflow Rate Sludge Collectors: Type Units Initial Interim Ultimate gpd/£( 797 797 797 ff 360 360 360 gpd/ff 27,700 27,700 27,700 Number (each basin) no. 2 2 2 Number (total) no. 4 10 20 Speed fpm 2 2 2 Intermediate Ozone Contact Basin Type Number No Length (each) Ft Width (each) Ft Water Depth Ft Number of Cells (per contactor) Volume (each) Gal Total Volume Gal Design Flow Per MGD Contactor Detention Time at Design Flow (min) Filters Type Number No. 8 Size ftxft 16x29 Area (each) ~ 464 Area (total) ft2 3712 Filtration Rate With all filters gpm/ft2 3.75 With one filter out gprrdff2 4.30 Backwash Rate Maximum gpm/ft2 18 Average gpm/ft2 15 Comments State requirement is a maximum of 800 gpd/ft2 3 total each basin (59ftx2ff each) State requirement is 20,000 gpd/ft maximum Chain and Flight (with small chain and flight cross collector) 2 5 10 86 86 86 10 10 10 22 22 22 8 8 8 141,200 141,500 141,500 283,000 707,500 1,415,000 10 10 10 18 18 18 16 32 16x29 16x29 464 464 7424 14,848 4.70 4.70 5.00 5.00 18 18 15 15 Gravity, equal loading self-backwashing 13- 6 TABLE 13.1 PRELIMINARY DESIGN CRITERIA LAKE RAY ROBERTS WATER TREATMENT PLANT Item Units Initial Interim Ultimate Comments Filter Media GAC Depth (in) Sand Depth (in) Surface Wash Type # of blowers Pressure (psi) Rate scfm 44 44 44 6 6 6 2 2 4 7.5 7.5 7.5 2,300 2,300 4,600 Waste Washwater Reclamation Volume per backwash gallons 35,728 Maximum filter wash no. 3 cycles per day Waste production rate mgd .43 (maximum) Washwater Holding Tank: Number no. 1 Size (each) ftxft 50x60 Effective water depth ft 6.5 Effective volume gallons 145,860 Sludge Drying Lagoons Estimated Production (dry solids) Average lb/day 35,728 35,728 3 3 Critical lb/day 1.68 3.2 1 2 50x60 50x60 6.5 6.5 145,860 291,720 2,788 6,970 13,940 12,217 30,544 61,089 Volume of Sludge Produced at 4% solids (641bs/ff3) Average ft3/day 1,095 Critical 4,838 Lagoon Sizing Number no. 4 · 2,737 5,475 12,095 24,191 4 8 Effective Depth ft 6 6 Area (each) ft2 12,000 12,000 Volume (each) ft3 72,000 72,000 Volume (total) f¢ 288,000 288,000 Days of Storage Average days 263 105 6 12,000 72,000 576,000 105 Worst case, 3 backwashes per filter per day Sized for two backwash volumes each 10 NTU and 7 mg/1 ferric sulfate 50 NTU and 17 mg/1 ferric sulfate Critical period assumed at one month per year Designed to handle critical month at ultimate capacity 13- 7 TABLE 13.1 PRELIMINARY DESIGN CRITERIA LAKE RAY ROBERTS WATER TREATMENT PLANT Item Units Initial Interim Ultimate Comments Critical Clearwell Type days 59 24 24 Number no. 1 3 6 Capacity (total) gal 6x106 6x106 6x106 Water Depth (minimum) ft 32 32 32 Diam ft 180 180 18 High Service Pump Station Number of Pumps no. 3/1 5/1 10/2 Capacity(each) mgd 14/6 14/6 14/6 Firm capacity Mgd 34 62 128 Circular steel or pre- stressed concrete tank Minimum number with one standby pump at each capacity [dtn99479]word2000\TAFINAL REPORT~Table_ 13.1 .doe -- 13- ~ MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations CHAPTER 14.0 PROBABLE CONSTRUCTION COSTS The estimated opinion of probable construction cost for the new Lake Ray Roberts Water Treatment Plant is shown in Table 14-1. The total estimated capital cost for the Raw Water Conveyance facilities is approximately $2.3 million. The capital cost of the 20-mgd WTP including the Administration/Operations Building and the back up power generators is estimated at $ 26.2 million. The relocated clearwell storage and High Service Pumping facilities are estimated at approximately $6.3 million. The total for the facilities is estimated at approximately $35 million. The estimates include all costs associated with the construction contract including contractor's overhead and profit as well as 10% for contingencies. Construction cost estimates were based on equipment and unit costs at Year 2001 dollars. It is important to recognize that all costs show on Tables 14-1 are preliminary estimates based on actual costs for similar facilities and assume typical construction conditions. They cannot account for all of the factors unique to the new Denton site and the construction project bidding environment at the time of bid opening. Currently in North Texas there is a low level of competition, and a higher than normal labor cost resulting in higher overall project costs. Consequently, the cost estimates should be considered to be a "budget estimate." The estimated range of costs of the 20 MGD plant, including the high service pump station, should be between $34 and $36 million. These estimates will be revised during the final design. 14-1 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations Table 14-1 - Opinion of Probable Construction Cost Summary of Cost - 20 MGD Ozone Plant and 60 MGD Pump Station RAW WATER PUMP STATION AND PIPELINE -2001 UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL Raw Water Pump Station/Pipeline/Electrical 1 LS $965,262 $965,262 Raw Water Electrical Building (^) 1 LS $56,300 $56,300 Raw Water Pipeline 1 LS $1,108,723 $1,108,723 Electrical Instrumentation (B) 1 LSA $183,881 $183,881 TOTAL COST - 2001 $2,314,166 20 MGD OZONE PLANT - 2001 UNIT ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL Raw Water Meter Vault 1 LS $111,537 $111,537 Pumped Diffusion Vault (c) 1 LS $119,746 $119,746 Splitter Box {c~ 1 LS $209,254 $209,254 Flocculation and sedimentation Basin 2 LS $1,479,557 $2,959,113 Ozone Facility (D) 1 LS $5,100,000 $5,100,000 Filters 2 LS $1,883,600 $3,767,200 Air Scour System 1 LS $477,289 $477,289 Transfer Pump Station (E) 1 LS $808,000 $808,000 Chemical Storage Tank Area 1 LS $702,838 $702,838 Chemical Feed Facilities 1 LS $1,260,131 $1,260,131 Chemical Pipe Chase 1 LS $617,120 $617,120 Lined Chemical Drain Pit 1 LS $53,944 $53,944 Chlorine and Ammonia Storage Building 1 LS $631,955 $631,955 Sludge Dewatering System (v~ 1 LS $800,000 $800,000 Washwater Reclamation Basin 1 LS $422,042 $422,042 Washwater Recycle Meter Vault 1 LS $48,081 $48,081 Main Drain Sump 1 LS $149,845 $149,845 Operations Building (~) 1 LS $1,662,000 $1,662,000 Slurry Trench ® 1 LS $338,000 $338,000 Yard Piping 1 LS $550,597 $550,597 Sitework/Paving 1 LS $612,410 $612,410 Landscaping and Irrigation 1 LS $65,150 $65,150 w (H) Backup Po er 1 LS $890,000 $890,000 Electrical Instrumentation 1 LS $3,863,925 $3,863,925 TOTAL COST - 2001 $26,220,177 14-2 MODIFICATIONS TO LRRWTP PRELIMINARY DESIGN Recommendations HIGH SERVICE PUMP STATION - 2001 ITEM DESCRIPTION QUANTITY UNIT UNIT TOTAL PRICE 60 MGD Pump Station 1 LS $3,805,310 $3,805,310 6 MG Storage 1 LS $1,415,930 $1,415,930 Plant Effluent Meter Vault 1 LS $114,143 $114,143 Electrical/Instrumentation ~B) 1 LS $960,369 $960,369 TOTAL COST - 2001 $6,295,752 *Unless indicated otherwise, unit prices are taken from the initial cost estimate multiplied by the ENR index factor of 1.303 to change costs to 2001 dollars. A) Unit price is reduced since potassium permanganate feeding facility is taken out from initial design. B) E/I&C is based on 18% of plant costs. Increased to account for new equipment. Includes RWPS but not pipeline. Does not include extra for Backup Power. C) Unit Price from TM-3, Alternative B. Pumped diffusion mixing with splitter box, 23-Nov-99. D) Unit Price from TM-2, Table E-4, 23-Nov-99. E) Unit Price from Memorandum "Cost Comparison of HFR vs LRRWTP, 8-Jan-00. F) Unit price for Lagoon Facility from TM-5, 10-Dec-99. G) Unit Price is increased by comments in revised TM-6, and contingencies are increased from 10% to 15%. H) Unit Price from TM-7, 19-Jan-00. 14-3 The following figures are located in the Exhibits File: ES-l, ES-2, 3-1, 3-2, 3-3, 4-1, 6-1, 6-2, 6-3, 7-3, 7-2, 7-3, 9-1, 10-1, 11-1, 13-1, 13-2 AGENDA INFORMATION SHEET Agenda No.~ Agenda Ite. n) AGENDA DATE: April 11, 2000 DEPARTMENT: Electric Utility ACM: Howard Martin, 349-8232 SUBJECT: Receive a report and give direction regarding: A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DENTON, TEXAS DETERMINING COMPETITIVE MATTERS RESPECTING CERTAIN PUBLIC POWER UTILITIES WHICH ARE SUBJECT TO PROTECTION UNDER THE TEXAS OPEN MEETINGS ACT AND THE TEXAS PUBLIC INFORMATION ACT; ADOPTING DECLARATIONS AND FINDINGS IN THE PREAMBLE; AND PROVIDING FOR AN EFFECTIVE DATE. BACKGROUND: Senate Bill 7, that was enacted into law by the 76th Texas Legislature, created a public power exception to both the Texas Open Meetings Act and the Texas Public Information Act for municipal electric utilities. This exception is designed to provide a "level playing field" for all participants in the existing competitive Texas electric wholesale and newly defined competitive electric retail market. Private entities participating in the electric market have always been able to protect virtually all of their activities such as strategies, planning discussions, detailed financial information, purchasing activities, and technical data from public dissemination. Prior to the passage of Senate Bill 7, municipal electric utilities were required to make virtually all their decisions and data available to the public, including other electric providers. Except in unusual situations, such as DME's dual and triple certified areas, this was not a problem as long as electric utilities were limited to serving customers in exclusive service territories. With the advent of competition in the wholesale marketplace after the 1995 Legislation session, this began to become a problem. For example, knowledge of scheduled outages ora utility's generating units provided power marketers with the ability to raise prices for replacement power because they knew how badly that power was needed by the utility with the outage. Private utilities and power marketers have been successful in preventing the public dissemination of the prices at which they bought and sold wholesale power both before and after the transactions took place. However, municipal utilities could not prevent their competitors in the wholesale market from determining that same information, either by attending open meetings where transactions were approved or through open records requests. Without the changes made to the Texas Open Meetings Act and the Texas Public Information Act made by the 76th Texas Legislature, when full retail competition takes place the situation would have become even more difficult for municipal utilities. For municipal utilities that are competing in any form, either through "opting in" to retail competition or in multiply certified areas, competitors would be able to determine every action planned by the municipal utility in the competition for energy customers and new distribution customers (in multiply certified areas) while maintaining the confidentiality of their information. For municipals who "opt out" of competition, operational and cost information could be used in development of take-over efforts, efforts to persuade businesses to locate outside of a municipal utility service area, and in preparation to attack the municipal utility as soon as it "opts in" to retail competition. An "opt- out" utility that conducts it business totally in the open until the day it "opts-in" can be assured that competitors will use that information to prepare an assault on its customers as soon as it is possible to do so. The intended effect of the changes made to the Texas Open Meetings Act and the Texas Public Information Act made by the 76th Texas Legislature was to allow public utilities to make only the same amount of information available in public that private utilities provide in public. It is unfortunate that, in order to protect the significant investment our citizens have in their electric utility and the revenue provided to the City from those investments in the new deregulated environment, a portion of the total openness of the electric utility management has been lost. However, we are fortunate that we retain the oversight of the electric utility operations by elected officials who are available to accept citizen input at all times. Denton Municipal Utility intends to remain responsive to its citizen customer/owners. The purpose of this resolution is: · To provide the citizens of Denton a clear understanding of how the City intends to implement this new law, and; · To provide Council guidance to the Public Utilities Board, the City Attorney, and the electric utility staff on application of this exception. This resolution is similar to the attached resolutions that have been adopted by San Antonio, the Lower Colorado River Authority, and the City ofBoeme. TPPA also indicates that resolutions using "basically the same approach" have also been adopted by New Braunfels, Kerrville, Lubbock, Bryan, and Brownsville. The competitive issues listed in the Resolution are divided into six areas. The Financial Information section contains items that would: · Establish DME risk management strategies for fuel and purchase power supply costs. · Allow competitors to influence fuel markets to the detriment of DME · Determine the financial strength of DME · Allow competitors to forecast DME rates · Allow competitors to develop low cost take over proposals · Allow competitors to assess competitive strengths or weaknesses of DME and its ability to withstand preditory price reductions by others. The Purchasing and Contract Information section contains items that would: Allow competitors to influence the wholesale power market to the detriment of DME · Establish levels that DME would be willing to pay for wholesale power Establish levels that DME would be willing to pay for fuel or the transportation of fuel. · Allow competitors and vendors insight into DME purchasing habits and identity of suppliers on which DME relies heavily The Business Operations Information section contains items that would: · Inform competitors of DME's strategic and business plans · Inform competitors of the strengths and weaknesses of DME's operation. · Assist competitors in formulating offers to hire key DME employees. · Inform competitors of DME strategy regarding either the sale or acquisition of assets. The Generation/Transmission/Distribution System Operations Information section contains items that would: · Allow wholesale power marketers to take advantage of generating unit outages to raise prices for replacement supplies of energy and capacity · Determine DME's production costs for its power supply · Determine DME's growth rate and need for additional capacity · Allow competitors to develop valuations of DME's assets in preparation of take over attempts. · Determine DME's need for critical pieces of equipment whose availability could be influenced by the purchasing schedules of competitors. The Sales, Market Research and Marketing section contains items that would: · Allow competitors to adjust their sales and marketing strategies to undercut DME's efforts to add customers to its system and retain existing customers. The Competitive Customer Information section contains items that would: · Allow competitors to target DME's most valuable retail customers · Protect the privacy of its customers' energy consumption records. OPTIONS: 1. Adopt Resolution as presented 2. Determine all "competitive matters" on a case by case basis in closed PUB and Council sessions. RECOMMENDATIONS: Adopt this resolution as presented. PRIOR ACTION/REVIEW (Council, Boards, Commission): There has been no official action or review of the Resolution by the Public Utilities Board. However each member has been given an opportunity to review the proposed Resolution and provide comments and suggestions. FISCAL INFORMATION: None Respectfully submitted: Sharon Mays Director of Electric Utilities RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DENTON, TEXAS DETERMINING COMPETITIVE MATTERS RESPECTING CERTAIN PUBLIC POWER UTILITIES WHICH ARE SUBJECT TO PROTECTION UNDER THE TEXAS OPEN MEETINGS ACT AND THE TEXAS PUBLIC INFORMATION ACT; ADOPT1NG DECLARATIONS AND FINDINGS IN THE PREAMBLE; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, Senate Bill 7 ("SB 7") was enacted into law by the 76th Texas Legislature, and signed by the Governor on June 18, 1999, with an effective date of September 1, 1999. Said SB 7, among other things, amended Subchapter D, Chapter 551 of the Texas Government Code (the "Open Meetings Act") by adding a new Section 551.086 thereto, commonly referred to as the "Public Power Exception"; and WHEREAS, SB 7, amended Subchapter C, Chapter 552 of the Texas Government Code (the "Public Information Act") by adding a new Section 552.131 thereto, commonly referred to as the "Public Power Exception;" and WHEREAS, Senate Bill 7 defines a public power utility "competitive matter" as a utility- related matter that the public power utility governing body in good faith determines by a majority vote is related to the public power utility's competitive activity, including commercial infomiation, and would, if disclosed, give advantage to competitors or prospective competitors; and WHEREAS, the provisions of Senate Bill 7 exclude the following categories of information from the definition of a "competitive matter": · Information relating to the provision of distribution access service, including the terms and conditions of the service and the rates charged for the service but not including information concerning utility-related services or products that are competitive; · Information relating to the provision of transmission service that is required to be filed with the Public Utility Commission of Texas, subject to any confidentiality provided for under the roles of the commission; · Information for the distribution system pertaining to reliability and continuity of service, to the extent not security-sensitive, that relates to emergency management, identification of critical loads such as hospitals and police, records of interruption, and distribution feeder standards; · Any substantive rule of general applicability regarding service offerings, service regulation, customer protections, or customer service adopted by the public power utility as authorized by law; · aggregate information reflecting receipts or expenditures of funds of the public power utility, of the type that would be included in audited financial statements; · Information relating to equal employment opportunities for minority groups, as filed with local, state, or federal agencies; 5 · information relating to the public power utility's performance in contracting with minority business entities; · Information relating to nuclear decommissioning trust agreements, of the type required to be included in audited financial statements; · Information relating to the amount and timing of any transfer to an owning city's general fimd; · Information relating to environmental compliance as required to be filed with any local, state, or national environmental authority, subject to any confidentiality provided under the rules of those authorities; · Names of public officers of the public power utility and the voting records of those officers for all matters other than those within the scope of a competitive resolution provided for by this section; · A description of the public power utility's central and field organization, including the established places at which the public may obtain information, submit information and requests, or obtain decisions and the identification of employees from whom the public may obtain information, submit information or requests, or obtain decisions; or · Information identifying the general course and method by which the public power utility's functions are channeled and determined, including the nature and requirements of all formal and informal policies and procedures; and WHEREAS, the City of Denton, a Home-Rule city, and a municipal corporation, in the State of Texas, owns and operates a municipal electric utility; and WHEREAS, the Denton City Council, as the governing body of the municipally-owned electric utility, desires to adopt this RESOLUTION defining "competitive matter" for the purpose of protecting the competitive position of its electric utility, Denton Municipal Electric ("DME") as provided for in Senate Bill 7; NOW, THEREFORE, THE COUNCIL OF THE CITY OF DENTON HEREBY FINDS AND RESOLVES: SECTION 1: That the following activities constitute "competitive matters" that are related to present and future competitive activity of the electric utility, and that would, if disclosed, provide advantage to existing or prospective competitors: A. Financial Information, including but not limited to: · Financial planning, sensitivity and scenario analysis; · Rate and pricing strategies, studies and targets; · Revenue and expense projections and targets; · Historical and projected fuel pricing, purchases and usage; · Fuel and purchased power hedging/risk management strategies; · Cost of services studies; · System valuation studies and related information · Cash flow projections · Internal audit reports · Debt allocation and debt refunding strategies B. Purchasing and Contract Information, including but not limited to: · Power purchase pricing, proposals and contracts; Power sales pricing, proposals and contracts; · Fuel purchase pricing, proposals and contracts; · Fuel transportation pricing, proposals and contracts; · Purchasing information, including bids, proposals and contracts; · Negotiations, modeling, data, correspondence, drafts and memoranda related to negotiations and considerations of the above contracts and pricing; · Information or data related to firms supplying goods or services related to Denton Municipal Electric; · Alliance, joint venture and aggregation information. C. Business Operations Information, including but not limited to: · Corporate strategic and business plans; · Consulting reports; · Work management studies; · Benchmarking studies; · Personnel compensation; · Divestiture or acquisition plans and strategies. D. Generation/Transmission/Distribution System Operations Information, including but not limited to: · System improvement evaluations and recommendations, including economic evaluations; · Generating unit operating and performance data including heat rates; · Engineering and design of generation units and transmission/distribution system; · Control system design and capabilities; · Maintenance schedules; · Unit dispatch and system outage information; · Load forecasts; · Generation/transmission/distribution system improvement plans and work papers; · Generation unit and system audits; · Transmission and distribution system loading characteristics and capabilities; · Target electric generation and production levels. E. Sales, Market Research and Marketing · Market research studies; · Marketing strategies, plans and budgets; · Sales and promotion strategies; · Incentive programs. F. Competitive Customer Information, including but not limited to: Customer lists or identification data; ·Customer energy pricing, sales and revenue information; Customer non-energy pricing, sales and revenue information; · Customer load profiles. SECTION 2: That all of the declarations and findings contained in the preamble to this }esolution are made a part hereof and shall be fully effective as a part of the subject matter of this resolution. SECTION 3: That consistent with the identification of such competitive matters, the City Council declares confidential all documents and other information concerning such matters, and will determine on a case-by-case basis as to the specific activities within the scope of such identified matters whether deliberations and action by the City Council will be undertaken in an executive session or not. SECTION 4: That the City Council reserves the right to supplement or amend the list of competitive matters set forth in this resolution by the addition or deletion, or case-by-case determinations as may be desirable in order to continue to operate and manage the City of Denton's electric system in a manner consistent with the interests of the City and its electric ratepayers, in accordance with the provisions of applicable law, expressly including, without limitation, the protections authorized by Senate Bill 7. SECTION 5: That if any section, subsection, paragraph, sentence, clause, phrase or word in this ordinance, or application thereof to any person or circumstances is held invalid by any court of competent jurisdiction, such holding shall not affect the validity of the remaining portions of this ordinance, and the City Council of the City of Denton, Texas hereby declares it would have enacted such remaining portions despite any such invalidity. SECTION 6: That this resolution shall become effective immediately upon its passage and approval. PASSED AND APPROVED this the day of ., 1999. JACK MILLER, MAYOR ATTEST: JENNIFER WALTERS, CITY SECRETARY By: APPROVED AS TO LEGAL FORM: HERBERT L. PROUTY, CITY ATTORNEY S:\Our DocumentshO, esolutions'O9\l)ra~ 2 DME SB7 Competitive Matters Res.doc ! ! I I ! ! ! I I I I t ! ) ) t PUBLIC POWER EXCEPTION OPEN MEETINGS Sec. 551.086. CERTAIN PUBLIC POWER UTILITIES: COMPETITIVE MATTERS. (a) Notwithstanding anything in this chapter to the contrary, the rules provided by this section apply to competitive matters of a public power utility. (b) In this section: (1) "Public power utility" means an entity providing electric or gas utility services that is subject to the provisions of this chapter. (2) "Public power utility governing body" means the board of trustees or other applicable governing body, including a city council, of a public power utility. (3) "Competitive matter" means a utility-related matter that the public power utility governing body in good faith determines by a vote under this section is related to the public power utility's competitive activity, including commercial information, and would, if disclosed, give advantage to competitors or prospective competitors but may not be deemed to include the following categories of information: (A) infoi-iitation relating to the provision of distribution access service, including the terms and conditions of the service and the rates charged for the service but not including infoimation concerning utility-related services or products that are competitive; (B) information relating to the provision of transmission service that is required to be filed with the Public Utility Commission of Texas, subject to any confidentiality provided for under the rules of the commission; (C) information for the distribution system pertaining to reliability and continuity of service, to the extent not security-sensitive, that relates to emergency management, identification of critical loads such as hospitals and police, records of interruption, and distribution feeder standards; (D) any substantive rule of general applicability regarding service offerings, service regulation, customer protections, or customer service adopted by the public power utility as authorized by law; (E) aggregate information reflecting receipts or expenditures of funds of the public power utility, of the type that would be included in audited financial statements; (F) information relating to equal employment opportunities for minority groups, as filed with local, state, or federal agencies; (G) information relating to thc public power utility's performance in contracting with minority business entities; 10 (H) information relating to nuclear decommissioning trust agreements, of the type required to be included in audited financial statements; (I) information relating to the amount and timing of any transfer to an owning city's general fund; (J) information relating to environmental compliance as required to be filed with any local, state, or national environmental authority, subject to any confidentiality provided under the rules of those authorities; (K) names of public officers of the public power utility and the voting records of those officers for all matters other than those within the scope of a competitive resolution provided for by this section; (L) a description of the public power utility's central and field organization, including the established places at which the public may obtain information, submit information and requests, or obtain decisions and the identification of employees from whom the public may obtain information, submit information or requests, or obtain decisions; or (M) information identifying the general course and method by which the public power util/ty's functions are channeled and determined, including the nature and requirements of all formal and informal policies and procedures. (c) This chapter does not require a public power utility govermng body to conduct an open meeting to deliberate, vote, or take final action on any competitive matter, as that term is defined in Subsection (b)(3). Before a public power utility governing body may deliberate, vote, or take final action on any competitive matter in a closed meeting, the public power utility governing body must first make a good faith detemfination, by majority vote of its members, that the matter is a competitive matter that satisfies the requirements of Subsection Co)O). The vote shall be taken during the closed meeting and be included in the certified agenda or tape recording of the closed meeting. If a public power utility governing body fails to determine by that vote that the matter satisfies the requirements of Subsection (b)(3), the public power utility governing body may not deliberate or take any farther action on the matter in the closed meeting. This section does not limit the right of a public power utility governing body to hold a closed session under any other exception provided for in this chapter. (d) For purposes of Section 551.041, the notice of the subject matter of an item that may be considered as a competitive matter under this section is required to contain no more than a general representation of the subject matter to be considered, such that the competitive activity of the public power utility with respect to the issue in question is not compromised or disclosed. (e) With respect to municipally owned utilities subject to this section, this section shall apply whether or not the municipally owned utility has adopted customer choice or serves in a multiply certificated service area under the Utilities Code. (f) Nothing in this section is intended to preclude the application of the enforcement and remedies provisions of Subchapter G. 11 TEXAS PUBLIC POWER ASSOCIATION FAX TRANSMITTAL LETTER Phone # (512) 472-5965 FAX # (512) 472-5967 tO: RE: Number of pages (including cover): If you do not receive all pages, or if any difficulty in transmission occurs, please contact at (512) 472-,5965. 12 701 Braze, Suite 375 Au.~tln, Te.xa.~ 78301 Phone. (~12) RI~SOLU/ION DI2;' TF-.P. MiNrlNG COMPETITIVE MATTERS WHICH ARE SUBJECT TO ?ROTECTION UNDER. THE TEXAS OPEN MEISTINGS ACT AaND TEXAS PUBLIC INFORMATION ACT WI-IEREAS, Senate Bill 7 passed by the Texas Legislature during its 1999 session recognizes that municipally owned utilities require an additional degree of flexibility Ln connection with their operations under thc Texas Open Meetings Act and the Texas Public Information Act, in connection with the existing competitive wholesale electric market and impending competitive retail market as the transition to an era of retail competition occurs; and WI-I~KEAS, the City Public Service Board recognizes that its electric and gas utility operations will be affected by the impending changes to the retail electric m~rket and will be affected by competitive pressures from new electric suppliers, whether or not City Public Service and the San Antonio City Council elect to implement customer choice on or alter January 1, 2002; and WB-'F-REAS, Senate 'l~iI1 7 amends thc Texas Open Meetings Act and Texas Public Information Act to authorize the governing body cfa public power utility such as City Public Service to determine in good faith those areas of its operations which it deems to be "competitive matters" related to its competitive activities, including commercial information that would, if disclosed, provide an advantage to its existing competitors or prospective competitors; and WI-~,~AS, after appropriate deliberations, the City Public Service Board ha~ identified, as of the present time, those general areas wltich it deems to be "competitive matters" as contemplated by Senate Bill 7, as well as thc potential harm to the city's competitive position a~d the nature of the potential advamage to e~.st[ng or ?ro~pective competitors in the event deliberations and actions of the City Public Service Board with respect to ~uch matters are required to be open to the public, and in the event information relating to such matters is required to be released upon request made pursuant to the Texas Public Information Act NOW= TI-IF. REFORE gE iT RESOLVED: The City Public Serv/ee Board in the exarci~qe of good faith and cognizant o£its fiduciary duty in mana~ng and operating the City of San A.ntonio'~ electric and gas sy~tem~, hereby det~rmine~ that the activities listed on Exhibit A attached to this resolution con~irute "competiriv~ matters" because they arc related to present or future competitive activity of City Public Service, and that, for the rea~on~ including but not lira/ted to those set out as to each matter, would if disclosed provide advantage to existing or prospective competitors of City Public Service. None of the matters included in Exhibit A ~e intended to encompass any of thc thirteen subjects e~cluded from the deaqnitlon of "competitive matters" pursuant to Sections 552.131 (a)(3) and 55 !.086(b)(3) of the Texas Oovernment Code. S005121?.WI'D: 2. Consistent with the identification of~uch competitive matters, the City Public Service Boo. rd declares confidential ali documents and other information 13 B concerning such matters, and delegates to City Public Service start'thc responsibiliit5, ct' d~tea'mining those documents and other information which are reasonably rel.~ed 'co such matters and of seek-lng to preserve their confidentiality through the procedures provided tot by the Public Int'orm~fion Act. 3. The Cfty Pt~blic Service Board will determine on a case-by-case basis as to specit~c activities withha the scope of such identified matters or other such matters hereafter deemed to be competitive matters, whether deliberations and action by the City PubIic Service Board will be undertaken in an executive session. 4. The Cky Public Service Board reserves the right to supplement or amend thc list of competitive matters set out in this resolution from time to time by addition or deletion or case-by-case determinations as ma)' be appropriate -',nd desirable in order to continue to operate and manage the San Antonio electric and gas systems hi a mariner consistent with the interests of the City and its energy ratepayers, and ,~4th the protections authorized by Senate Bill 7. 14 Competitive Information I. Energy Supply A. Fuel 1. Contracts and/or Proposals for Fuel Supply, Transportation & Storage Description - Contracts and/or proposals for fuel supply, transportation & storage including all fuels and fuel cost components. Rationale - Establishes level CPS may be willing to pay for fuel or energy; could provide wholesale or potential retail competitors with information allowing negotiating advantages. 2. Fuel Price Hedging and Risk Management Program Data Description - Certain data included in the hedging pro~arn that reflects CPS fuel/pricing positions. Rationale - CPS' fuel pricing, quantities and position data included in hedging contracts and mater/als would provide information to competitors which could allow CPS production costs to be calculated and used to competitors' advantage. Fuel Pricing (Historical & Forecast) Description - Historical fuel price information as well as forecast of fuel prices. Rationale - Historical fuel price information establishes CPS' fuel acquisition practices and strategies. Force,ts &fuel pr/ce establishes what CPS may be willing to pay tbr fuel or energy and could benefit competitors seeking to undercut CPS prices. Fuel Usage (Historical & Forecast) Description - CPS' usage of fuel, both historical and forecast. Rationale - Indicates the planned need for fuel at CPS, and may lead suppliers to engineer ways to price services at levels above market prices, thus placing CPS at a competitive disadvantage compared to other market participant& Competitive Fuel Price Information Description - Competitive market inreI[igence regarding fuel prices that is gathered and analyzed and ukirnately used to forecast fuel prices. Rationale - Establishes level CPS ma)' be willing to pay for fuel or energ-y. Information is expensive to maintain and making it available ro competitors gives them that advantage at no cost or nominal cost. Stored/Reser-,'e Fuel Supply Description. The amount of stored or reserve fuel supply. Rationale - Fuel Requirements fluctuate due to deliveries and consumption of other fuels. Information may suggest how much CPS need, the fuel and place competitors in a position to block or bid up fuel supplies. Budgets for Fuel Purchases Description - Budgets of qu~tities and dollar~ that CPS anticipates purchasing. Rationale - indica:es the pr-tuned need for fuel at CPS, and may lead suppliers to engineer ways to price services at levels above market prices, thus providing competitors with fuel and en~gy sales market advantages. Actual Fuel Purchases Description s Documentation regarding actual fuel purchases made by CPS that may include pricing information, including cash vouchers, invoices, etc. Rationale - Establishes amount CPS actually paid for fuet, thus providing comp~tors with a key cost clement for CPS's energy productien costs. S0052943W51: B. Generation 1. Generating Unit Design, Operating and Performance Data Description - Unit production cost and performance information ~ heat rates, variable and ftxed O&M costs, forced outage rates, high and low capaci~ limits, ramp rates, minimum up and down t"imes, st~rt-Ltp costs, etc. Rationale - A unit's design, operating and performance data gives competitors valuable information in determining CPS' production costs. AcmaI and design performance information should be confidential. 2. Maintenance Schedules Description - Planned maintenance schedules for all units. Rationale - Establishes CPS need for fuel and energy during maintenance periods, thus making CPS vulnerable to competitor planning and supplier pricing of energy resources. Capital Improvement Plans & Strategies Description - Any data pertaining to the CPS Generation Plan, such as units and fuel ~ypes being considered, new plant design information, estimated cost to build, proposed timing of new plant addition, potential acquisitions, potential divestitures, etc. Rationale - Provides competitors with information on future additions to the capacity, and ener~ markets, allowing them to plan their own strategies in ways that may disadvantage CPS. Competitive Bench.marking Information Description - Competitive Bench marking information against other plants and utilities. Rationale - Eszablishes operational advantages (or disadvantages) over other utilities and evaluation of competitive m~ke~lace used by CPS to establish market prices. Disclosure could benefit competitors :o CPS's detriment via marketing campaigns, direct communications of large CtlStom ~r5, OtC. Oenerating Unit Dispatch & Outage Information Description - Generating Unit dispatch and outage information, what units we plan to run and what units actually n.m. Rationale - Determines surpius and sho~'Jge~ of energy. May be used by suppliers to extract higher fees fi.om CPS than established by the market, thus disadvantaging CPS vis-a-vis competitors in the energy market. Critical Non-Fuel Procurement Activities Description - Contracts for goods and services which are critical for power generation, especially large procurement contracts and stxategic vcmdor alliances. Rationale - In.formation regarding critical procurement activities can provide competitors with det,liled cost information for key aspects of power generation, and it could also compromise negotiations with other suppliers. e o C. Wholesale Power 1. Contract Materials and;or Proposals for Purchase and/or Sale of Wholesale Power Description -Development Documents leading toward Purchase & Sale agreements and proposals for energy, capacity, tolling, ancillary serv'ices, t~ancial and/or physical hedging transactions, and any other a~eements for ~holesale energy services. Final executed agreements are not included, except where both parties a~ee that pricing provisions or other key terms should be maintained as confidential in order to preserve competitive advantages to eithm- or both parties. Rationale - Development documents leading toward contracts and a~eements with other parties if ~isclosecl prior consummation of a transaction have the potential to jeopardize the transaction in the hands of competitors. Likewise, pricing provisions or other key terms may be justifiably maintained as confidential under circumstances where both parties believe disclosure will provide adv,'mtages to a competitor. In addition, pricing constitutes a major component of CPS's production costs, which are competitively sensitive. 2. Pricing Strategies Description - Pricing strategies used to secure highest market rates for CPS supplied sc-trices and lowest prices for CPS required services. $0052943.W5l: 16 RationaLe - Competitors could use information to thwart CPS efforts. Sales & Revenues (Historical & Forecast) Description - CPS' historical and future expectations of sales ~nd revenues. Rationale - Competitors could use information to target CPS wholesale customers and attempt to win their business. Aggregate information of a type included in CPS audited financial statements is excluded. Competitive Wholesale Power Price Information Description - Accumulated t~ansaction data and market intelligence. Rationale - Forms basis for CPS marker price expectations and represents commercially valuable information that competitors should not be able to acquire fi.om CPS at no cost or nominal cost. Alliances and Joint Ventures for Wholesale Power Generation and/or Sales Description - Strategic information relating to business alliances and information relating to negotiations with a potential business parmcr for purchase of business assets, performance of key services, cooperative energy dispatch arrangements, etc. Rationale - Potential parmers often w/Il not make information available to CPS if it is not protected. Disclosure v,'ould provide competitors with information not available through other sources which could benefit their own marker strategies to CPS's detriment. D. Acquisition, Disposition or Exchange of Generation-Related or Fuel- Related Assets 1. Generation facilities and critical equipment Description - Purchase, sale, lease or exchange of generation facilities and critical equipment that is needed to generate power. Rationale - Establishes CPS's cost of generation regarding those a~sets, ~,hich if released could provide competitors with key information allowing a market advantage. 2. Property Description - Information relating to p~rchase, sale, lease or exchange of property that is for the purpose of securing a fuel supply, new or existing power generation facilities, transmission or distribution facilities, or other system in~asrrucmre. Final executed agreements and evaluation materials following execution or transaction completion are excluded, subje~ to other competitive matter protections under this policy. ILationale - Contains information on alternatives available to CPS and terms that may be agreeable to CPS. May include information about CPS interest in surrounding or simi.lar properties. Such transactions may divulge information of a strategic value to CPS which could benefit a competitor in its own strategic planning if disclosed.. Aggregate information ora type included in CPS audited f'mancial statements is excluded from items 1 and 2. II. Retail Activities A. Customer Information Description. All information regarding retail customers, including information that is currently part of the Customer Master File which constitutes the CPS Customer Information System, as well as separate databases such as the Key Accoun~ database which includes contact management information that is specific to each of our largest energy custom:rs. Rationale - Information regarding retail customers can be used by competitors to target CPS retail customers based on their usage, operating characteristics, location, rate classification, or any other feature, whether indi~,idually or for aggregation purposes, or to exert pressure relating to the decision of adoption of customer choice 17 S0052943w51- B. Sales & Marketing 1. Energy Retail Sales & Revenue Information (Historical & Forecast) Description - Retail sales and revenue information for retail gas and electhcity sales to individual customers. Ag~egate information ora .type included in CPS audited financial statements is excluded. Rationale - Retail sales and revenue information for energy sales to individual customers or narrowly-del'rued groups of customers could provide cotupetitors with valuable information for targeting CPS' most valuable retail customers. 2. Non-Energy Retail Sales & Revenue Information (Historical & Forecast) Description - Sales and revenue information for non-energy retail products and services that CPS currently offers such as Budget Payment Plan (BPI>), Pre-Authorized Electronic Payments (PEP), and All Night Securi~ Lights (ANSLs), and non-energy ret, ail products that CPS may offer in the furore such as whole house electrical surge protection, flood lighting, green retail pricing, carbon monoxide detectors, Internet access, home security monitoring, billing information services, data transport sen4ces, etc. Aggregate i~formation ora .type included in CPS audited financial statements is excluded. Rationale. Retail sales ,and revenue information for non-energy products and sep,-ices could provide competitors insights to which products and/or set,,'ices are valued by CPS' retail ener~ customers, and which ones could be used to entice CPS' retail energy customers to ~witch energy suppliers. 3. Sales and Promotion Strategies, Plans & Budgets (Historical & Forecast) Description - Information regarding sales and promotion activities for retail sales. Such activities include advertising carnpai~s, promotional pricin~ campal,~s, and cooperative promotions with other organiz.-tions. Rationale - Competitors can use this information to subvert CPS retail sales efforts and to §au~e thc effectiveness of CPS sales a~d promotion strategies. 4. Contracts and/or Proposals for Sales and Promotion Pro,rams Description - Contracts and proposals for Saks and Promotion progrmms Rationale - Terms and conditions specified in contracts ~nd ~opos~ls typically include detailed information re§a.rdin~ the s~rategies, plans and budgets for sales and promotion programs, and this Luformation can be used by competitors to a~sess the effectiveness of CPS sales and promotion efforts in retaining and/or acquiring new retail customers. Contracts and/or Proposals for Retail Sales Description - Contracts for retail energy ~ales from CPS to individual customers or ~'oups of customers. R~tiona!c - Establishes the terms ~d conditions that CPS is wil;ing to offer for retail energy sales. Competitors can use this information to undercut CPS offers to new retail customers. Commission-Based Sales Incentive Plan~ Description - Sales incentive programs that are directly related to ~ales or revenue tbr retail energy and non-energy products a.qd services. Rationale -Such programs might be developed for retail products and services. Information regarding employee performance relative to such pro,ams would indirectly provide information regarding sales and/or revenue generation from retail products and services. C. Market Research 1. Market Research Studies Description - Market research studies related to retail activities. Rationale - Market research studies related to retail s,~les activities provide information that is needed to successfully market to retail customers; dlsclosure of this infonmation to competitors would provide them with a marketing advantage at CPS's expense, Ooth by entrancing their own knowledge of CPS target market conditions and suggesting to them the direction of CPS's market interests. Examples of this type of i/fformation include market research related to: customer satisfaction and loyalty; customer awareness and perception of corporate and competitor br~d $¢0529~3,w51: 1 8 o image; customer values and switching behavior; customer awareness, understanding and perception of issues related to retail aspects of the electric industry; customer perceptions of retail products and services including various attributes of products and set, ices and price; and, customer perceptions of retail sales and promotion activities and strategies. Proposals for Market Research Studies Description - Proposals for market research studies related to retail activities. Rationale - Proposals for market research studies typically include detailed information regarding the methodology, and scope 0fproposed market research activities, and this information can be used by competitors to gain insights to CPS retail strategies and plaxmed activities. Marketing Research Strategies, Plans & Budgets (Historical & Forecast) Description - Information regarding marketing research s~'ategies, plans and budgets related to retail sales. Rationale - This information would pro,~ide competitors with insights to CPS' strategies and plans for retaiI products and services. Secondary Market Research Data Description - Secondary market research data is avaLlable for purchase or for licensing fi.om a number of organizations such ~ Dun & Bradstreet, Aexiom, £xperian, and many others who specialize in gathering, processing and selliag such information. Secondac~ market research data Includes demographic, psychographic, and femographic (business) information which is gathered from a variety of existing data sources such as credit card companies, financial institutions, product warranty registrations, public records, magazine subscriptions, etc Rationale - Secondary market research data can be used for direct marketing to retail customers; for analyzing and assessing the potent/al size for retail markets; and for developing retail marketing plans ,'md strategies. Competitors should not be allowed to benefit by obtaining at nominal copying cost expensive research material available for commercial purchase; nor should they be pun mitred rka'ough use of such material to identify market segments utrgeted or under consideration by CPS. D. Product/Service Development & Pricing 1. Business Plans for Retail Products and Services Description - Business plans include detailed information: analyzes, sales a~d promotion plans and strategies, and producVservice partner a~eements for new or modified offerings of retail products and services. Rationale - Disclosure of this mater/a}~ v, hich establishes CPS's pi,ms for offering retail products and ser~,'ices including expec'ted sales and revenues, pr;a'nary and secondary market research related to the product or service offering, and product or service cost information, could provide significant strategic advantage to competitors. 2. Competitive Market Intelligence for Retail Products and Services Description - Includes primary and secondary, market research related to retail products or services to assess their performance in the market place. Rationale - Gathering competitive maxket in:elligence for retail products and services is costly and time consuming, but after this information is gathered it provides a competitive advantage for developing competitive strategies and comper2ng in markets for products and services. Disclosure would benefit competitors by providing them the intrinsic value of the harelligence as well as insights in:o CPS planning. M~rket Research Related to Development of Retail Products and Services Description - Market research related to customer preferences for potential retail products or services, or preferences for certain am-ibutes or key features of potential products or services. Rationale - Market research for product development provides an enhanced understanding customer preference~ tow'ards potential products mqd services or key features or attributes ofnew products or services. Disclosure of information developed by CPS regardhag customer preferences for ret,ail producta and services would pro,4de ex/sting and potential adversaries a competiti,~¢ advantage ha the market place. 4, Retail Pricing Plans & Studies soo529a3 19 Description - Plans, studies and detailed analyzes regarding retail pricing for energy and non- energy products and services Rationale. Establishes CPS' cost structure and margin on retail products and services which can be used by competitors to undercut CPS offers to retail customers. Energ7 Load Research Description - Energy load research for individual customers or groups of customers which provides information regarding their energy load profile. Rationale - Energy load research provides information regarding customer's ener~' load profile which is critical information for retail pricing. Energy load research is costly, and this information provides a competitive advantage to companies that have access to it, E. Supply Contracts/Arrangements for Retail Products and Services 1. Wholesale Energy Supplies Description - Supply contracts or intra-company transfer arrangements for supply of wholesale energy that CPS will sell at retai[. Rationale - Wholesale ener~ supply contracts or inn-a-company transfer arrangements for wholesale energy include detailed information regarding price and other terms and conditions which would provide competitors critical information that could be used to undercut CPS offers in the retail market. 2, Non-Energ'y Products and Services Description - Contracts for supply of non.energy products and services that CPS will sell at retail. In some cases contracts for non-chert' products and services ate referred to as "product pa,"mer contracts" because CPS simply provides the retail marketing channel for s,"de of the third-party's product or service along with CPS' energy products. Rationale - Supply contracts for non-energy products and sew'ices contain detailed in~'ormation regarding price as ,,*'ell as terms Md conditions which would provide competitors with critical information that could be used to undercut CPS offers in the retail market. III. Corporate Planning & Strategy Information 1, Corporate Business Plan Description - Bus/ness plans include detailed information, analyzes: plans and strategies, and producv'service parmer a=mcemcmts for new or modified offerings of retail products and services. Any substantive rule of general applicabiliw regardJ, ng service offerings, service regulation, customer protections, or customer service adopted by CPS is excluded. Rationale - Shows CPS competitive strategies and long range plans. Would allow competitor advance notice of CPS actions, 2. Acquisition Assessments Description - Assessments, plans and strategies mlatcd to acquisition of other utilities. Rationale - Shows CPS m'ategy and could allow other entit%s to preempt potential acquisitions by counter offering or overbidding CPS offers_ 3. Debt Allocation and Debt Refunding Strategies Descr/ption - CPS strategies and studies on debt allocations or refundings as well as potential debt offerings. Rationale - Knowledge of these V/pcs of ~ansac6ons/plans could give competitors insight into CPS pricing and marketing strategies. 4, Executive Pay and Perquisites Description - Information regarding executive pay and perquisites beyond ,,hat i$ required to be disclosed by SEC re_.m.~lations for investor ovencd utilities. Rationale - Could allow competitors to assess potential offers to attrac~ key CPS personnel. 5. Internal Audit Reports 20 S00529t3 W::; 1: o Description - Those poixions of internal audit report~ containing information relar/ng to competitive matters. Rationale - The scope of'CPS internal auditing program covers all CPS functions and activities. Those portions of all such reports that cover matters identified as competitive in nature would, if disclosed, provide competitors with information about CPS strategies and plans. 6. Consulting Reports Descr/ptiou - Internal consulting reports include all repons developed to review the performance of CPS functions and activities that are otherwise defined as competitive in nature. Rationale - Ail in~ernal consulting reports that cover matters identified as competitive in nature would likewise contain information on CPS strategies and plans, which could disadvantage CPS if known to competitors. Internal Audit and Consulting Work Papers Description -Those portions of internal audit consulting project work papers that include correspondence, field notes, documents and analyzes developed to audit or review the CPS functions and activities that are othera~ise defined as competitive in nattaz. Rationale -Ail information included in ~nternal audit and consulting reports and information used to develop such repons that cover matters identified as competitive in nature could, if released, provide competitors with direct information regarding CPS competitive strategies. Corporate Inventions/Innovations Description - Inventions include, but are not limited to, hardware, softwaze, tools and pi'ocessing methods. Rationale. Shows CPS competitive strategics and propr/etary technologies. Would allow competitors to utilLze results of CPS research and design efforts without investment_ Financial, Accounting & Statistical Data Submitted Voluntarily and Confidentially to Industry Groups, to the extent containing information regarding Competitive Matters Description - Data submitted to APPA, IPPA. AGA or another industry group wkich pertains to competitive Rationale - Competitive information included in data submitted under confidentiality arrangements with third panics, if released, could benefit competitors in ~he same ~'ay as direct information relating to such matters. 10. Supplier Information Description -. Data related to fwms supplying CPS goods and services. Rationale - Competitor insight into CPS purchasing habiu and identity of suppliers on which CPS heavily relies to supply necessary goods ~d services could provide significant advantage. Engagement,'use ....ora particular supplier could indicate types of strategic moves CPS is pl~mning or lmnatmg. 11. Corporate Cash Flow Projections Description - Projections of CPS revenues, expenditures and funds available for in','estment and services, excluding ag~egate information ora type that would be included in audited t'mancial statements. Rationale - Disclosure of such inforrnaion would show CPS's competitive stren~h or weakness £mancially in near-term competitive scena~qos, '.including ability to meet competitive price reductions by others, abili~ to acquire assets or operations, and others. 12. Business Unit Financial Statements Description - Projections of CPS revenues, expenditures ~d net income for the Business Units. Excludes aggregate information of' a D:pe that would be included in audited financi~ statements. Rationale - Disclosure could benefit competitors by showing competitive s'a'ength or v, eakness of the business unit and reflecting its ability, or inability to conduct acquisitions, mount new competitive programs, or expand into additional markets. S0052943W$1: 21 701 BRAZO$, SUITE 375 AUSTIN, TX 78701 Phone: 512-472-5965 Fax: 512-472-5967 Fax To: SHARON MAYS DENTON From: MARKZION EXECUTIVE DIRECTOR, TPPA Fa~ 940-349-7334 Date: September 14, 1999 Phone: Pages: 4 Re: Operl Records Resolutions · Sharon: Attached is the LCRA resolution (this copy is for their affiliate, GenTex, and an essentially identical version has been passed by th~ LCRA Board for the LCRA in general). CPS in San Antonio has also passed their re~olution. We will fax a copy of it to you under separate cover later today. Austin has not passed a resolution, but their Council may consider such action in the near future, Hope this is helpful, please call if you need anything else. Thanks, Mark 22 8112/99 Page I of 3 GENTEX BOARD POLICY PROTECTION OF COMPETITIVE ELECTRIC INFORMATION August 12, 1999 PURPOSE Th.is Policy establishes the policy, findings, and procedures oft. he Board regarding the protection of information related to public power utility "competitive matters," as pro¼ded in § 552.131, Texas Govenmaent Code (Texas Public Ir~ormation Act). POLICY OenTex is a generating electric utili~- authorized by la,,,,- to compete in the wholesale electric market. GenTex has an obligation to protect information related to competitive matters in order to successfully fulfill its mission to provide low' cost utiliD' services to @enTex customers. This policy is intended to protect such information consistent with Senate Bill 7 and the protections provided by section 552.131, Government Code. FINDINGS The Board finds that information collected, a~sembled, or maintained by OenTex m any media .l. ha.t_is x.e.~ed m th~.£oLlo.wiag 2LsI: of marrersis, clearly.and_masonaNy related .to .GeaTex,~/awful competmve energy service and energy market activiues, and such information would, if disclosed, give advantage to competitors or prospective competitors of.the O~Yex. in the electric market: (A) Financial information, including (1) Business -and facilities plans and budgets (2) Capital improvement and project plans and studies (3) Target electric generation and production levels ffeg)' Revenue and expense projections and targets (5) Operation and capital statements - actual to budget perforrnance information (6) Business forecasts (7) Strategic plans, studies and supporting documents 23 8/12/99 Paga 2 of 3 (1'2) (14) Cost of service studies Rates and pricing strategies and target~ Fuel hedging and risk management sln-ateg/es Internal business performance information Energy and billing information Intc~'rnal cost assignments and allocation methodology Financial planning, sensitivity -and scenario analyses (B) Purchasing and Contract Information, including (15) Power supply (energy and capacity) pricing, proposals, and contracts (16) Fuel contracts, including all terms and conditions (17) Tranqportation deliver;,' contracts, including rail and pipeline (18) Purchasing information, including bidders lisu, specifications, bids, proposals, contracts and bid results (19) Negotiations, modeling, data, correspondence, drafts, and memoranda related to negotiations and consideration of the above contracts and pricing (C) Business operations, including (20) Work management studies, system configuration and system data (21) Bench_marking data, surveys, and reports (22) Market plans and studies (23) Personnel stuffing and compensation (24) Competitive IntelIigence systems and information (25) Product design information (D) Generation system operations, including (28) .. O~-r~ri~.cout:ol.~y~em de, aign aad cat~abiii~s Generation unit and elec~c generation system maintenance and outage schedules . Generation unit, generation:$ymem, and facility .construction. and project ~ent plans (29) Generation unit and generation system operating and perfo,mance data (30) Generation unit and generation system audits (3 I) Engineering and design of generation units and generation (32) System improvement evaluations ar.d recommendations, including economic evaluations (33) Load and generation forecasts (34) Maintenance policies and processes (35) Operation management planrfing information 24 8/12/99 Page 3 of 3 Information or records, in any media, of GenTex that are reasonably related to competitive matters described above are excepted from the disclosure requirement~ of Chapter 552 of the Texas Government Code. From time to t/me, the GenTex Board of Directors may determine that additional information is reasonably related to OenTex's lawful competitive activities, but need not amend this policy to do so. The policy, findings, and procedure of this Policy shall apply to such additional information. This Policy is not intended to apply to any in.formation excluded from the definition of "competitive matter" enumerated in section 552.131 (a)(3)(A - M, Government Code. PROCEDURE The information described above shall be managed by GenTex officers, employees, and agents as confidential, with all necessary, and reasonable man,~gement and security measures. 25 701 BRAZO$, SUITE 375 AUSTIN, TX 78701 Phone: 512.472-5965 Fax: 512-472-5967 Fax To: Sharon Mays, Denton From; MARK ZION EXECUTIVE DIRECTOR, TPPA Date= Phone: Pages: Re: Open Records cc: · Sharon: Attached is the resolution from the City of Boeme. I have not received copies from the others (including Lubbock and Kerrville PUB). it appears that everyone is using basically the same approach (based on the examples provided at our TPPA Annual Meeting) with some modifications in the preamble. I will ask LP&L and KPUB to forward their resolutions to us and will send them on to you, Please call if I can be of help, Ma~k 26 RESOLUTION NO. 99-R35 A RESOLUTION DEFINING "COMPETITIVE .MATTER" FOR TI~ PUI~OSE OF PROTECTING THE COMPETITIVE POSITION OF THE CITY OF BOERNE ELECTRIC AND GAS UTILITIES AS PRO.VIDED FOR IN SENATE BILL 7 WHEREAS, Senate Bill 7 enacted into law by the 76'h Session of the Texas Legislature and ~igned by the Governor on June 18, 1999, with an affective date of September 1, 1999, amends Subchapter C, Chapter 552, Government Code, by adding Section 552.131 to provide a new exception to disclosure for public power utilities competitive matters; and WHEREAS, Senate Bill 7 defines "competitive matter" as a utility-related matter that the public power utilities' governing body in good faith determines by a majority vote is related to the public pov,?r Utilities' competitive activity, including commercial infow-,ation, and would, if disclosed. give advantage to competitors or prospective competitors; and · . WHEREA'8, the City.0fBoerne;' Texas, ow,ns and operates municipal ele~ · )_ '-..- WHEREAS, the City Council of th owned electric and g~s utilities, desires to pr~rpose o£protecting thc competitive posi Bill 7; NOW THEt~EFORE, BE IT RE: BOERNE, TEXakS: PART f: Competitive Matter (he 552.131 of the Govemm'ent Code, whk utilities competitive matters, th~ follo~ Council of the City of B0erne, in the exert ofwMch would give advantage to comp, A. Financial information, in( 1-. Business and fad !.. Capital improven 3. Revenue and exp 4. Operations and ce 5. Business forecazl 6: Strategic plans, s 7. cOst of service st 8. Rates and pricin~ 9. Internal business 10. Energy and billi~ 1 t. Internal cost assil 12. Financial plannit 7exas, a home-rule municipal cti.rporation, in the State of tric and gas utilities; and ~ City. of Boeme, as the governing body of the municipally dopt.this Resolution defining "competitive matter" for tb.e :ion of its electric and g-as utilities as provided for in Senate · rmn so called): For th purposes of pp ~ auon o ~c n h provides for exception to disclosure for public 1: ower ng categories of information are determined by ~e City ise 9fgood faith, to be Competitive Matters, the discl ,sure ~titors or potential competitors: ' :luding but not limited to: ities plans and budgets ent and project plans and studies rose projections and targets ' ~ ' sPitat statements; actual to budget performanqe inforr~ation udies and supporting documents · ~dies strategies and targets, aefformance information : in.formation nment and allocation methodology [, sensitivity'and scenario analysis 27 13. Fuel pricing and us; 14, Fuel hedging/risk n 15. Operation and capil Purchasing and Con~ract Ir 5. 6. 7. 8. Power supply prici: Purchasing infomm contracts and bid r~ Negotiations, mod, to negotiations an¢ Power sales pricin Fuel contracts and Fuel pricing and u Power purchase c( Fuel transportatim Business operations, inch 1. Work managemer 2. Benchmar 'king da' 3. Market plans and 4. Personnel, staffml 5. Competitive intel 6. Product design in: 7. Cost of service s~ 8. Internal business 9. Energy and bitlLn 10. Internal cost assi~ 11. Financial plarmin 12. Competitive intel 13. 14'. '" 15. ~anagement strategies al statements-actual to budget performance informa formation, including but not limited to: ~g, proposals and contracts :ion, including bidders list, specifications, bid~s, propoIlals, ,suits ; i ,1 ling, data. correspondence, drafts ahd memoranda related considerations of the above contracts and pricine , proposals and contracts }roposals ~ge at, acts and proposals pricing and contracts :ling but not limited to: t studies, system config~ation mud system data a, surveys and reports ;tudies ~ and compensation igence systems and information 'ormation rd/es >erform~nce information =, information nments and allocation methodology ~, sensitivity and scenario analysis .igence systems and information Product design in [ormation Forecast of sales Md revenues Sales and promction strategics, plans, contracts, proposal* and bt 'ecast) osals for retail energy sales ans contracts, proposals and budgets rcga. rd~ng mari (historical and fo 16. Contracts or pro[ l 7. Sales incentive p 18. Strategies, plans research 19. Strategies, plans, and marketing ~ development of ': 20. Research rcgardi 21. Corporate busim 22. Assessments, pl~ 23. Strategies, plans 24. Internal audi~ re contracts, proposals m~d badgets regarding analysis md promotion of retail products and services. .ag energy loads dgets feting sales ~r the ss plans ns or strategies related to acquisition of other utilities or studies regarding debt allocation or reftmding 28 25. Reports, sununarie: employment prcre~ 26. Consulting reports 27. Financial, account groups or other thi: 28. Information or date municipally owme¢ 29. Alliance, and joint' D. Competitive Customer Irt 1. Customer lists or data PART 2: Intbrmation or record, related to a Competitive Matter as deft requirements of Chapter 552 of the PART 3: The City Council ofth~ the list of Competitive Matters set out in case-by-case determinations as may be a manage the City of Boeme electric and g City and its electric and gas utilities custo PART 4: Notwithstanding any, Competitive Matter an), matter exclude< Section 552.131 (a)(3) (A-M) of the PASSED and APPROVED this' ; or otller documentation describing executive pay aisites ag or statistical data submitted con!~dent~ally to ind~ d parties regarding competitive matters related to firms supplying goods or services related utility tenture and ag~egation intbrmation for power gener~ )rmation : ratification da-m, consumption data, or rate.,q2illing/ac~ md ATTEST: -~ity,~3ecretary stry the 2tort 29 APPROVED: Mayor of the City of Boeme, in any media, that axe reasoriab!y .ed in PART 1 above are excepted from the disch ~sure mment Code. City of Boeme reserves the right to supplement or a ~end his Resolution from time to time by~ addition or deleti on or ,propriate and desirable in order to continue to opcrat: and ts utilities in a mariner consistent with the interests fthe a~ers, and '~,-ith the protections authorized by Senate Bill 7. mumeration otherwise, this Resolution shall not de~lm as from the definition of "competitive matter" descril~ed in ;mment Code. he 26" day of October, 1999. 24 TexReg 11294 December 17, 1~ Texa~ ReglU~r Agenda Item. Date AGEN))A INFORMATION SHEET AGENDA DATE: April 11, 2000 DEPARTMENT: Utility Administration ACM: Howard Martin, 349-8232 SUBJECT: Receive a report, hold a discussion and give staff direction concerning dually certified service areas between the City of Denton and Argyle Water Supply Corporation. BACKGROUND: The City of Denton's existing water and wastewater service area or Certificate of Convenience and Necessity (CNN) was first established by the TNRCC in 1979. This service area is referred to as CCN Number 10195. Subsequent adjustments were made to Denton's CCN in the area south of the Lake Roberts Dam to add to Denton's CCN and later to decertify portions of this area to Bolivar Water Supply Corporation. The current CCN held by Denton includes dually certified areas with several small water systems that were developer created water systems (Vacation Village, Spring Hill, Powell Farm, Terra Southwest ect.). Denton's CCN also has dually certified area with three expanding rural water supply corporation (Bolivar WSC, Bartonville WSC and Argyle WSC). Argyle and Bartonville WSCs are current wholesale water customers of the Upper Trinity Regional Water District (UTRWD) and likely to expand rapidly due to their access to treated surface water supplies and their strategic location within Denton county. Argyle WSC and the City of Denton have enjoyed a positive and cooperative working relationship for many years. As the Argyle WSC has slowly expanded over the years they have established a significant customer base within the dually certified service areas shared with the City of Denton. The existing CCNs for Denton and Argyle WSC along with the city limits for Argyle and Denton are shown on Exhibit I. Most of this dually certified service area was outside the Argyle city limits but was within Denton's Extra Territorial Jurisdiction (ETJ). Water service was provided by Argyle WSC by consent from the City of Denton with septic tanks used for wastewater treatment. This arrangement was driven by the relative availability of water service by Argyle WSC and the long distances and associated costs to extend water and wastewater service from the City of Denton. This service area has no existing wastewater services and includes several major Argyle WSC facilities including groundwater wells, ground storage and booster pump stations and the UTRWD surface water delivery point. More recently, the City of Denton annexed a proposed development along Hwy 377 called the Hills of Argyle and provided water service to this development through a "pass through agreement" with Argyle WSC and the UTRWD. The City of Denton's recent annexations of the Huffines and Robson Developments have also resulted in the extension of water and wastewater service to a portion of this dually certified service area along Hwy 377 that lies within Denton's city limits. Since both utilities are expanding and desire to establish defined service areas cooperatively rather than competitively, the staff has meet to discuss service area boundaries based upon a single certification approach. Preliminary discussions have lead to some conceptual adjustments to the CCN boundaries as shown in Exhibit II. If these adjustments were finalized as proposed, the resulting CCN boundaries between the City of Denton and Argyle WSC would be as shown in Exhibit III. Some key policy issues related to these proposed CCN boundaries that would need to be addressed are summarized below: 1. A portion ofDenton's ETJ that lies North of the strip annex boundary between Denton and Argyle will ultimately be annexed by Denton but would be served by Argyle WSC and septic tanks. 2. A portion of the dually certified service area that would be decertified by Argyle WSC contains existing Argyle WSC pipelines and customers. Options to consider would include: · Leave these customers permanently connected to the Argyle WSC system. · Negotiate terms and conditions with Argyle WSC to transfer these customers and related infrastructure to Denton now or in the future. 3. An isolated service area presently served by Argyle WSC outside their CCN and within Denton's CCN is proposed to be decertified to Argyle WSC. This area lies north of the strip annex boundary of Denton east of the Argyle city limits. 4. An area within Argyle's city limits south of Crawford Road that has no certification status would be certified by Argyle WSC. Staff will provide the Board with a summary and explanation of these service areas and be prepared to answer questions concerning these issues. RECOMMENDATIONS: Staff is bringing this issue to the Cit Council for information and discussion purposes only and is requesting policy direction at this time. Respectfully submitted: Howard Martin ~ Assistant-City ManagerV Utilities Exhibits: Maps of the Proposed CCN Changes Between AWSC and Denton I. Current CCN Boundaries II. Proposed Duel Certified Area CCN Changes III. Resulting CCN Boundaries ,v~ ~-~ Argyte W.S.C. C.C.N. s Areas of Adjustment ~,,~ ~,~ ~i~ EXHIBIT II J:lArc, vi~lF~u~'~$W D~l~on CCN~.a~r $ Scale: '1"=-1 Mile j:~ArcvfewV=~o~.~tSW Der4on CCNs.epr City of Denton C.C.N. Argyle W.S.C. C.C.N. Proposed Conditions EXHIBIT III TEASLEY LANE CORRIDOR TRAFFIC STUDY ADDENDUM STAFF SUPPLEMENT COMPREHENSIVE PLAN - MOBILITY PLAN RELATIONSHIP: UPDATE April 11th, 2000 TEASLEY- Lillian Miller to Robinson Year 2016:31,100 ADT [6-lane, divided] LOS D = 30,450 ADT LOS E = 33,000 ADT HOBSON - Country Club to Teasle¥ Year 2016:16,700 ADT [4-lane, undivided] LOS D = 16,405 ADT LOS E = 18,000 ADT HICKORY CREEK - City Limits to Teasle¥ Year 2016:21,650 ADT [4-lane, divided] LOS D = 21,050 ADT LOS E = 23,000 ADT HANDOUT TO COUNCIL 4/11/00 TEASLEY LANE CORRIDOR STUDY FINAL REPORT ADDENDUM Prepared for CITY OF DENTON Prepared by C&P Engineering, Ltd. TABLE 6A Lane Needs Based on Capital Improvement Strategy Lillian Miller: 4D 4D 4D 4D 4D 4D '4D 5D 5D IH 35 - Teasley "A" "B .... C .... A" "B/C" "B .... C/D .... B' "C" Teaslcy: 4D 4D 4D 4D 6D 6D 6D 6D 6D WI 35 - Londonderry "A .... D .... E .... D .... A .... A .... B" "C .... D" Teasley: 4D 4D 4D 4D 4D 4D 4D 4D 6D Londonderry - Hobson "A .... A .... A .... A .... A .... A .... B .... C/D .... A" Teasley: 4D 4D 4D 4D 4D 4D 6D 6D 6D Hobson - Lillian Miller "A .... A .... A .... A .... C .... D .... A .... B .... C/D' Teaslcy: 2U 2U 2U 6D 6D 6D 6D 6D 6D Lilliaa Miller - Robinson "F .... F' "F" "A .... A .... A .... B" "C .... D/E" Teasley: 2U 2U 2U 6D 6D 6D 6D 6D 6D Robinson - I-livkoty Creek "B .... D/E .... F .... A .... A .... A .... A .... B/C .... C/D" Teasley: 2U 2U 2U 6D 6D 6D 6D 6D 6D Hickory Creek - City Limit "A .... C/D .... F .... A' "A .... A .... A .... B .... D" Hobson: 2U 2U 2U 2U 4U 4U 4U 4U 4U Country Club - Teasley "B .... C" "B .... B .... A .... A" "B/C .... C/D .... D/E" Wind River: 4U 4U 4U 4U 4U 4U 4U 4U 4U Teasley - IH 35 "A" "A' "A" "A .... A" "A" "A" "A .... A" Ryan: 2U 2U 2U 4D 4D 4D 4D 4D 6D Country Club - Teasley "A .... A .... A .... A .... A .... A" "C .... D .... A" Robinson: 2LI 2U 2U 2U 2U 4D 4D 4D 4D Teasley - Harvard "A" "A .... A .... A .... C .... A .... A .... A .... B/C" Hickory Creek: 2U 2U 4D 4D 4D 4D 4D 4D 4D City Limit - Teesley "A .... A" "A" "A" "A .... A" "B .... C/D .... D/E" FM 2499: ........ 4D 4D 4D 4D IH 35 - FM 2181 "A" "A .... A .... A" Hickory Creek: ...... 4U 4U 4U 4U 4U 4U Teasley - FM 2499 "A" "A .... A" "A .... A .... A" State School Connector: .... 2U 2U 2U 2U 2U 2U 4U Ranchman - State School "A .... A .... A .... A .... A .... C/D .... A" 24,450 4D/6D 17,550 4D/4D 19,200 4D/4D HOBSON 2U/4U 22,250 4D/6D 24,050 7,150 4U/4U RYAN "'~O~....~CREEK 18,200 16,600 2U/4D 22,300 2U/6D 2U/4D,~L YEAR 2012 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 7,250 -/2u 13,500 2U/4D 2,000 9,400 2U/4U I' 20,950 0 0 '-r 000 -/4D ROBINSON LEGEND 24-HR. VOLUME NEEDED STREET SECTION --EXISTING STREET SECTION TEASLEY (FM2181) FIGURE A-1 ~:, 0 5 ~!" 26,450 ~o( 04~ J 19,300 40/40. HOBSON ~ 15,200'~m' 2U/4U 24,950 40/6D 27,550 RYAN 20,950 2U/4D~ 19',1 O0 2U/40 26,100 2U/60 YEAR 2014 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 21,450 40/50 8,950 4U/4U 9,250 -/2U 15,650 2U/40 4,500 24,150 2U/60 9,400 2U/4U 5OO -/40 ROBINSON LEGEND 24-HR. VOLUME · NEEDED STREET SECTION --EXISTING STREET SECTION TEASLEY (FM2181) FIGURE A-2 28,450 21,350 4D/6D 25,800 4D/5D HOBSON ~ 16,700~r 2u/4u 27,700 4D/6D 51,100 10,700 4U/4U 25,700 RYAN 2U/6Di 29,900 21,650 ' 2U/6D 2U/4D YEAR 2016 PROJECTIONS TEASLEY LANE CORRIDOR STUDY DENTON, TEXAS 11,250 -/4u 7,000 27,550 17,800 2U/4D 9,400 2U/4U I' J 000 -/4D ROBINSON LEGEND 24-HR. VOLUME NEEDED STREET SECTION EXISTING STREET SECTION TEASLEY (FM2181) FIGURE A-5 TEASLEY LANE CORRIDOR CAPITAL IMPROVEMENTS SCHEDULE The following schedule ~rovided a year by year listing of roadway improvements to be implemented based upon the April 11 , 2000 Teasley Lane Corridor Traffic Study assumptions. A strategy for funding, design, and construction has not yet been developed. The May 23fa, 2000 Council work session has been tentatively scheduled for further discussion regarding the implementation strategy. YEAR 2000 YEAR 2002 YEAR 2004 HICKORY CREEK ROAD - City Limit to Teasley STATE SCHOOL CONNECTOR - Ranchman to State School [2U to 4D] [ -- to 2U] YEAR 2006 TEASLEY LANE - Lillian Miller to Robinson TEASELY LANE - Robinson to Hickory Creek TEASLEY LANE - Hickory Creek to City Limit [2U to 6D] [2U to 6D] [2U to 6D] RYAN ROAD - Country Club to Teasley [2U to 4D] YEAR 2008 TEASLEY LANE - 1-35E to Londonderry HOBSON LANE - Country Club to Teasley [4D to 6D] [2U to 4U] YEAR 2010 ROBINSON ROAD - Teasley to Harvard FM 2499 - I35-E to FM 2181 (Teasley) [2U to 4D] [ -- to 4D] YEAR 2012 TEASLEY LANE - Hobson to Lillian Miller [4D TO 6D] YEAR 2014 LILLIAN MILLER PKWY - 1-35E to Teasley [4D to 5D: additional northbound lane] YEAR 2016 TEASLEY LANE - Londonderry to Hobson RYAN ROAD - Country Club to Teasley STATE SCHOOL CONNECTOR- Ranchman to State School [4D to 6D] [4D to 6D] [2U to 4U]