HomeMy WebLinkAboutR2011-043c:ldocuments and settings\jerichazllocal settingsltemporary intemet files\content.outlook195yned3n\dme ne denton trans line project-2011 mc.doc
RESOLUTIONNO. RZO11-043
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DENTON, TEXAS
REGARDING ESTABLISHMENT OF THE ROUTE OF THE DENTON MUNCIPAL
ELECTRIC NORTHEAST DENTON TRANSMISSION L1NE RE-BUILD PROJECT; AND
PROVIDING AN EFFECTIVE DATE.
WHEREAS, Denton Municipal Electric ("DME"), the City's electric department, has
announced that the necessity exists for the re-build of the Northeast Denton Transmission Line
(the "Project") in order to properly serve future load and the needs of its customers; and
WHEREAS, in connection with this Project, over time DME staff has carefully examined
a number of different routes in the northeast part of the City in order to determine an appropriate
route, considering the cost, engineering factors, and also considering other relevant factors such
as avoiding the taking of homes and the displacement of Denton residents for this Project to the
extent reasonably possible; and
WHEREAS, although not required by applicable law to do so, DME conducted three
public meetings in the months of July through October, 2011 with advance notices made to its
residents, in order to gauge the sentiment of the residents of the City, as well as to receive input
from the residents; which meetings spurred dialog which assisted DME in arriving at its
preferred recommendation; DME Staff also placed information, including possible alternate
locations for the route, for public viewing on the City's website; and
WI-iEREAS, the City Council has had an opportunity to hear the input of its residents at
two public hearings, conducted on October 18, 2011 and November 15, 2011; and has
considered the information and the preferred route recommendation provided to it by DME Staff;
and after considering all of the facts and circumstances is of the opinion, and the Council
accordingly finds, that the route designated below is a feasible and cost-effective route for the
Project; NOW, THEREFORE,
THE COUNCIL OF THE CITY OF DENTON HEREBY RESOLVES:
SECTION 1. The City Council hereby approves that portion of the route for the Denton
Municipal Electric Northeast Denton Transmission Line Re-Build Project, heretofore referred to
as the "purple" route, along with the location of the proposed new "Kings Row" Substation, as
depicted on the Map attached hereto as Exhibit "A," which Map is incorporated by reference
herein for all purposes. The City Council further directs staff to route that portion of such Line,
and locate the Substation, in substantial accordance with Exhibit "A".
SECTION 2. The recitals set forth in the preamble to this resolution are hereby
incorporated in and are made a part of this resolution for a11 purposes.
SECTION 3. This Resolution shall take effect immediately from and after its adoption.
PASSED AND APPROVED this the �� day of 2011.
s:llegallour documents�resolutions\l l\dme ne denton trans line project-2011 mc.doc
CITY OF DENTON, TEXAS
ATTEST:
JENNIFER WALTERS, CITY SECRETARY
PROV AS TO LEGAL FORM:
ANITA BURGESS, CITY ATTORNEY
��
I ,
By: � L�.. �
Page 2
DENTON NORTH
SUBSTATION
PROPOSED
NEW KINGS ROW
SUBSTATION
KINGS ROW
SUBSTATION
N
we
WOODROW
s
SUBSTATION
SPENCER SWITCH
Spencer to Denton North
69kV Transmission Line